CN102758460A - 高速铁路综合接地工程电缆沟开挖机 - Google Patents
高速铁路综合接地工程电缆沟开挖机 Download PDFInfo
- Publication number
- CN102758460A CN102758460A CN2012102592989A CN201210259298A CN102758460A CN 102758460 A CN102758460 A CN 102758460A CN 2012102592989 A CN2012102592989 A CN 2012102592989A CN 201210259298 A CN201210259298 A CN 201210259298A CN 102758460 A CN102758460 A CN 102758460A
- Authority
- CN
- China
- Prior art keywords
- support
- cable trench
- wheel disc
- excavating machine
- tractor head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
本发明具体为一种高速铁路综合接地工程电缆沟开挖机,解决了现有综合接地工程路基采用人工开挖或借助风镐开挖电缆沟存在费时费力且影响施工效率的问题。包括拖拉机头和与其尾部连接的支架,拖拉机头与支架前部之间设置有与两者铰接的拉伸杆,支架右方设置有轮盘,轮盘外圆柱面上均布固定有合金钢钻头,轮盘上部设置有与支架固定的防护罩,支架左侧设置有配重块,支架尾部下方设置有定向轮,拖拉机头的动力输出轴与轮盘的中心轴传动连接。本发明结构设计合理可靠,独自一人即可完成电缆沟的开挖工作,节省了大量人力物力,而且节约了成本,具有结构简单、搬运轻便且方便快捷的优点。
Description
技术领域
本发明涉及高速铁路用开沟设备,具体为一种高速铁路综合接地工程电缆沟开挖机。
背景技术
由于高速铁路建设的需要,综合接地工程电缆沟的开挖工作面位于路堑或露肩基础的两侧,宽度约70cm左右,与中间带有一定坡度的路面相比低50cm,一般施工机械不便于进行开挖,所以在这种工作面受极大条件限制的路基上开挖电缆沟难度很大,尤其是在压实后的填料上开挖更是难上加难。
发明内容
本发明为了解决现有综合接地工程路基采用人工开挖或借助风镐开挖电缆沟存在费时费力且影响施工效率的问题,提供了一种高速铁路综合接地工程电缆沟开挖机。
本发明是采用如下技术方案实现的:高速铁路综合接地工程电缆沟开挖机,包括拖拉机头和与其尾部连接的支架,拖拉机头与支架前部之间设置有与两者铰接的拉伸杆,支架右方设置有轮盘,轮盘外圆柱面上均布固定有合金钢钻头,轮盘上部设置有与支架固定的防护罩,支架左侧设置有配重块,支架尾部下方设置有定向轮,拖拉机头的动力输出轴与轮盘的中心轴传动连接。
作业时,借助拖拉机内变速器来调节动力输出轴的转速,进而带动中心轴及轮盘运行来实现电缆沟的开挖,同时根据电缆沟开挖要求调整定向轮的高度来固定电缆沟的开挖深度,克服了现有综合接地工程路基采用人工开挖或借助风镐开挖电缆沟存在费时费力且影响施工效率的问题。
本发明结构设计合理可靠,独自一人即可完成电缆沟的开挖工作,节省了大量人力物力,而且节约了成本,具有结构简单、搬运轻便且方便快捷的优点。
附图说明
图1为本发明的结构示意图。
图中:1-拖拉机头,2-支架,3-拉伸杆,4-轮盘,5-合金钢钻头,6-防护罩,7-定向轮,8-动力输出轴,9-中心轴,10-配重块。
具体实施方式
高速铁路综合接地工程电缆沟开挖机,包括拖拉机头1和与其尾部连接的支架2,拖拉机头1与支架2前部之间设置有与两者铰接的拉伸杆3,支架2右方设置有轮盘4,轮盘4外圆柱面上均布固定有合金钢钻头5,轮盘4上部设置有与支架2固定的防护罩6,支架2左侧设置有配重块10,支架2尾部下方设置有定向轮7,拖拉机头1的动力输出轴8与轮盘4的中心轴9传动连接。
具体实施过程中,动力输出轴8和中心轴9采用蜗轮蜗杆传动结构或伞齿轮配合的传动结构。
首先准备机械设备就位,开挖深度根据设计规范9301或8401要求,通过调整拉伸杆3的位置控制支架2及定向轮10的高度,然后根据杆秤的工作原理调整配重块10的重量,配重块10一般选择混凝土砌块或石块,目的是使电缆挖沟机在开挖过程中保持平衡;在开挖过程中,司机应随时前后兼顾,既要看行驶的前方是否有障碍物或接触网基础,又要随时观察轮盘的在开挖过程中开挖速度是否合适,对于开挖速度可以根据地质条件通过调整动力输出轴的转速来实现。
对于开挖的电缆沟有些地方有级配碎石或其他杂物掉进去,在放电缆前要先进行清理沟槽,然后再开始布放贯通地线,这样不至于在人工夯实的过程中会损坏护套,更加方便快捷地实现了对高速铁路综合接地工程电缆沟的开挖。
Claims (1)
1.一种高速铁路综合接地工程电缆沟开挖机,其特征在于:包括拖拉机头(1)和与其尾部连接的支架(2),拖拉机头(1)与支架(2)前部之间设置有与两者铰接的拉伸杆(3),支架(2)右方设置有轮盘(4),轮盘(4)外圆柱面上均布固定有合金钢钻头(5),轮盘(4)上部设置有与支架(2)固定的防护罩(6),支架(2)左侧设置有配重块(10),支架(2)尾部下方设置有定向轮(7),拖拉机头(1)的动力输出轴(8)与轮盘(4)的中心轴(9)传动连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102592989A CN102758460A (zh) | 2012-07-25 | 2012-07-25 | 高速铁路综合接地工程电缆沟开挖机 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102592989A CN102758460A (zh) | 2012-07-25 | 2012-07-25 | 高速铁路综合接地工程电缆沟开挖机 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102758460A true CN102758460A (zh) | 2012-10-31 |
Family
ID=47053093
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102592989A Pending CN102758460A (zh) | 2012-07-25 | 2012-07-25 | 高速铁路综合接地工程电缆沟开挖机 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102758460A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4732227A (en) * | 1986-12-23 | 1988-03-22 | Technion Research & Development Foundation Ltd. | Equipment for continuous hole drilling in soil |
CN2928959Y (zh) * | 2006-10-19 | 2007-08-01 | 王振生 | 开沟机 |
CN101828448A (zh) * | 2010-06-04 | 2010-09-15 | 百绿国际草业(北京)有限公司 | 开沟器 |
CN101982619A (zh) * | 2010-11-16 | 2011-03-02 | 肥乡县农乐机械科技有限公司 | 连续式电缆、管线挖沟机 |
CN202672207U (zh) * | 2012-07-25 | 2013-01-16 | 中铁十七局集团电气化工程有限公司 | 高速铁路综合接地工程电缆沟开挖机 |
-
2012
- 2012-07-25 CN CN2012102592989A patent/CN102758460A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4732227A (en) * | 1986-12-23 | 1988-03-22 | Technion Research & Development Foundation Ltd. | Equipment for continuous hole drilling in soil |
CN2928959Y (zh) * | 2006-10-19 | 2007-08-01 | 王振生 | 开沟机 |
CN101828448A (zh) * | 2010-06-04 | 2010-09-15 | 百绿国际草业(北京)有限公司 | 开沟器 |
CN101982619A (zh) * | 2010-11-16 | 2011-03-02 | 肥乡县农乐机械科技有限公司 | 连续式电缆、管线挖沟机 |
CN202672207U (zh) * | 2012-07-25 | 2013-01-16 | 中铁十七局集团电气化工程有限公司 | 高速铁路综合接地工程电缆沟开挖机 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103835720B (zh) | 坚硬岩石破碎系统 | |
CN107035216B (zh) | 液压高速电力杆基夯实机 | |
CN207229109U (zh) | 一种用于软硬不均地层的大直径盾构刀盘系统 | |
CN102900360B (zh) | 组合式掏挖钻机 | |
CN205305376U (zh) | 一种农用挖坑机 | |
CN106907158A (zh) | 一种用于软硬不均地层的超大直径盾构刀盘系统 | |
CN204401675U (zh) | 后置圆盘式排水沟槽开沟机 | |
CN102296522A (zh) | 盲道切割机 | |
CN105633899A (zh) | 一种直埋电缆沟的开挖装置 | |
CN113464135B (zh) | 一种煤矿掘进用的防护装置 | |
CN202672207U (zh) | 高速铁路综合接地工程电缆沟开挖机 | |
CN110258696B (zh) | 一种建筑墙沟刨挖装置 | |
CN206376298U (zh) | 一种水利渠道坡面自动切削成型机 | |
CN102758460A (zh) | 高速铁路综合接地工程电缆沟开挖机 | |
CN102003179A (zh) | 锯片式山洞掘进机 | |
CN203896691U (zh) | 一种圆盘开沟机 | |
CN112942465B (zh) | 一种电力工程用杆坑开挖装置 | |
CN204081998U (zh) | 机动式电杆坑钻机 | |
CN115126326A (zh) | 电网线杆安装专用设备 | |
CN202969440U (zh) | 一种挖掘斗 | |
CN202131624U (zh) | 螺旋式挖沟器 | |
CN110700341A (zh) | 多功能履带式冻土开沟顶管掘进机车 | |
CN102808431B (zh) | 双挖臂挖掘机 | |
CN207484548U (zh) | 一种快速挖掘小型埋地电缆沟槽的挖沟机 | |
CN204001016U (zh) | 多用破碎锤 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20121031 |