CN102758458B - 地下连续墙修复方法 - Google Patents
地下连续墙修复方法 Download PDFInfo
- Publication number
- CN102758458B CN102758458B CN201210269023.3A CN201210269023A CN102758458B CN 102758458 B CN102758458 B CN 102758458B CN 201210269023 A CN201210269023 A CN 201210269023A CN 102758458 B CN102758458 B CN 102758458B
- Authority
- CN
- China
- Prior art keywords
- wall
- construction
- excavation
- diaphragm wall
- wall body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210269023.3A CN102758458B (zh) | 2012-07-30 | 2012-07-30 | 地下连续墙修复方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210269023.3A CN102758458B (zh) | 2012-07-30 | 2012-07-30 | 地下连续墙修复方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102758458A CN102758458A (zh) | 2012-10-31 |
CN102758458B true CN102758458B (zh) | 2014-10-01 |
Family
ID=47053091
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210269023.3A Active CN102758458B (zh) | 2012-07-30 | 2012-07-30 | 地下连续墙修复方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102758458B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103161178B (zh) * | 2013-03-26 | 2016-12-28 | 中国葛洲坝集团基础工程有限公司 | 一种防渗墙成槽循环钻进施工方法 |
CN104674862B (zh) * | 2015-01-28 | 2016-07-13 | 中铁十六局集团北京轨道交通工程建设有限公司 | 一种液压抓斗卡斗后地下连续墙修复方法 |
CN105274979A (zh) * | 2015-10-12 | 2016-01-27 | 上海市基础工程集团有限公司 | 在既有结构上开孔对下部土体进行地基处理的施工方法 |
CN109137929A (zh) * | 2018-08-29 | 2019-01-04 | 中铁上海工程局集团有限公司 | 一种混凝土环形支撑与围护桩之间连接的施工方法 |
CN110847155A (zh) * | 2019-11-22 | 2020-02-28 | 中铁开发投资集团有限公司 | 一种地下连续墙施工过程中的接缝防水预处理方法 |
CN114293559A (zh) * | 2021-12-23 | 2022-04-08 | 上海市机械施工集团有限公司 | 一种水平mjs施工方法 |
CN114837240A (zh) * | 2022-05-10 | 2022-08-02 | 中交一公局集团有限公司 | 后钻孔桩提高单室闭合地下连续墙基础承载力的结构及方法 |
CN115341554A (zh) * | 2022-08-30 | 2022-11-15 | 中建八局第三建设有限公司 | 一种富水粉砂地层下缺陷地连墙封堵及补强保护施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201424658Y (zh) * | 2008-11-17 | 2010-03-17 | 天津三建建筑工程有限公司 | 地下连续墙槽段接缝处渗漏水检测及封堵修复装置 |
CN101429764B (zh) * | 2008-11-17 | 2010-08-11 | 天津三建建筑工程有限公司 | 地下连续墙槽段接缝处渗漏水检测及封堵修复装置及其方法 |
CN102535518A (zh) * | 2012-01-13 | 2012-07-04 | 同济大学 | 一种地下连续墙大接缝的封堵方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2004288174B2 (en) * | 2003-10-28 | 2007-08-16 | Warren Environmental & Coating, Llc | Method for preparing in-ground tunnel structures |
-
2012
- 2012-07-30 CN CN201210269023.3A patent/CN102758458B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201424658Y (zh) * | 2008-11-17 | 2010-03-17 | 天津三建建筑工程有限公司 | 地下连续墙槽段接缝处渗漏水检测及封堵修复装置 |
CN101429764B (zh) * | 2008-11-17 | 2010-08-11 | 天津三建建筑工程有限公司 | 地下连续墙槽段接缝处渗漏水检测及封堵修复装置及其方法 |
CN102535518A (zh) * | 2012-01-13 | 2012-07-04 | 同济大学 | 一种地下连续墙大接缝的封堵方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102758458A (zh) | 2012-10-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102758458B (zh) | 地下连续墙修复方法 | |
CN107762535B (zh) | 复杂地质环境下隧道明洞暗做施工工艺 | |
CN108868778B (zh) | 一种大型地下结构非开挖修建方法 | |
CN111411993A (zh) | 穿越巨型溶洞大厅的大断面隧道支护体系及施工方法 | |
CN110093928A (zh) | 一种基坑支护结构及土方开挖施工方法 | |
CN204491626U (zh) | 拉森钢板桩与预应力锚杆组合的基坑围护结构 | |
CN102434717B (zh) | 工字钢顶管工作坑的施工方法 | |
CN106930321B (zh) | 一种大直径顶管结合洞桩修建地下结构的施工方法 | |
CN104264688A (zh) | 人工挖孔变截面桩支护施工工艺 | |
CN102505704A (zh) | 软弱地质竖井中大型沉井施工方法 | |
CN108842819A (zh) | 一种城市轨道交通电缆线路隧道施工方法 | |
CN104294769B (zh) | 一种补桩与增大台帽组合加固已建桥台结构的施工方法 | |
CN112575670B (zh) | 一种适用于隧道穿越巨型溶洞的t形刚构桥及其施工技术 | |
CN103696784A (zh) | 一种浅埋大跨隧道下穿建构筑物的大直径长管幕施工方法 | |
CN109630127A (zh) | 一种富水软弱地层超深盾构竖井的施工方法 | |
CN211340827U (zh) | 地铁隧道穿越既有桥桩新建桥梁的构造 | |
CN109610470A (zh) | 一种采用三轴搅拌桩机的基坑支护施工方法 | |
CN206070508U (zh) | 一种加固地基基础的装置 | |
CN108867692A (zh) | 城市大断面明挖隧道临近建筑物保护及隧道基坑挖掘方法 | |
CN211500658U (zh) | 一种适用于砂土地基的浅埋近接隧道支护结构 | |
CN107740446A (zh) | 既有建筑物基础被动补充与洞内托换系统的联合施工方法 | |
CN110306559A (zh) | 一种地铁出入口支护桩的施工方法 | |
CN110565686A (zh) | 管廊下穿河道的施工方法 | |
CN204097889U (zh) | 一种补桩与增大台帽组合加固已建桥台结构 | |
CN105735383A (zh) | 一种保留结构体系的局部地下清障施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: SHANGHAI TUNNEL ENGINEERING CO., LTD. Free format text: FORMER OWNER: SHANGHAI TUNNEL ENGINEERING CO LTD Effective date: 20150119 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 200082 TO: 200232 |
|
TR01 | Transfer of patent right |
Effective date of registration: 20150119 Address after: 200232 Shanghai Wanping Road No. 1099 Patentee after: SHANGHAI TUNNEL ENGINEERING CO., LTD. Address before: 200082 No. 118, Dalian Road, Shanghai, Yangpu District Patentee before: Shanghai Tunnel Engineering Co., Ltd. |