CN102733849B - Filling body grouting reinforcement method - Google Patents
Filling body grouting reinforcement method Download PDFInfo
- Publication number
- CN102733849B CN102733849B CN201110087502.9A CN201110087502A CN102733849B CN 102733849 B CN102733849 B CN 102733849B CN 201110087502 A CN201110087502 A CN 201110087502A CN 102733849 B CN102733849 B CN 102733849B
- Authority
- CN
- China
- Prior art keywords
- grouting
- high water
- pipe
- flyash
- filled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110087502.9A CN102733849B (en) | 2011-04-06 | 2011-04-06 | Filling body grouting reinforcement method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110087502.9A CN102733849B (en) | 2011-04-06 | 2011-04-06 | Filling body grouting reinforcement method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102733849A CN102733849A (en) | 2012-10-17 |
CN102733849B true CN102733849B (en) | 2015-04-15 |
Family
ID=46990068
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110087502.9A Active CN102733849B (en) | 2011-04-06 | 2011-04-06 | Filling body grouting reinforcement method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102733849B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106246194B (en) * | 2016-08-23 | 2019-10-18 | 甘肃路桥建设集团有限公司 | The reinforcing Treatment Methods of tunnel roof fall wall caving |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1434176A (en) * | 2003-02-25 | 2003-08-06 | 广州市泰利斯固结补强工程有限公司 | Water-stopping strengthening reinforcement construction method for tunnel structure |
CN201148880Y (en) * | 2007-10-25 | 2008-11-12 | 金川集团有限公司 | Dredging apparatus filling with paste delivery pipeline using fill mining method |
CN101407395A (en) * | 2008-11-06 | 2009-04-15 | 昆明理工大学 | Fly ash-based grouting filler for mine |
-
2011
- 2011-04-06 CN CN201110087502.9A patent/CN102733849B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1434176A (en) * | 2003-02-25 | 2003-08-06 | 广州市泰利斯固结补强工程有限公司 | Water-stopping strengthening reinforcement construction method for tunnel structure |
CN201148880Y (en) * | 2007-10-25 | 2008-11-12 | 金川集团有限公司 | Dredging apparatus filling with paste delivery pipeline using fill mining method |
CN101407395A (en) * | 2008-11-06 | 2009-04-15 | 昆明理工大学 | Fly ash-based grouting filler for mine |
Non-Patent Citations (3)
Title |
---|
建筑物下综合机械化充填采煤技术;郝宝生;《煤矿开采》;20100630;第15卷(第3期);39-41 * |
煤矿采空塌陷区注浆加固施工;方磊等;《施工技术》;20051230;357-359 * |
石太高速公路煤矿采空区地基注浆加固技术;张志沛;《路基工程》;19961230(第06期);47-49 * |
Also Published As
Publication number | Publication date |
---|---|
CN102733849A (en) | 2012-10-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112360462B (en) | Mining process for filling and grouting short-wall fully-mechanized mining gangue | |
CN102425427B (en) | Method for constructing tunnel by utilizing shield empty-pushing crossing mine method | |
CN105240047A (en) | Filling reinforcement method for managing underground mined area of open-pit mine | |
CN104481540A (en) | Method for controlling multiple coal mining hazards by high level borehole grouting | |
WO2019085052A1 (en) | Method for filling coal mining to recover residual coal pillar and controlling stability of waterproof key layer | |
CN102071941B (en) | Fully mechanized mining gob-side entry retaining-based concrete block staggered joint longitudinal stacking wall forming method | |
CN102146794B (en) | Grouting, consolidating and gob-side tunneling process method | |
CN103742146B (en) | Pier stud type filling method coal winning technology | |
CN105507947B (en) | A kind of networking waste filling method | |
CN103790592A (en) | End soil mass reinforcement system and method | |
CN101749020A (en) | Forward coal mining by filling method | |
CN104500070A (en) | Continuous coal mining machine paste filling mining method | |
CN105240048A (en) | Air filling method based on paste filling | |
CN102777185A (en) | Inclined well shaft construction technology | |
CN112096449B (en) | Coal mine goaf paste strip grouting combined filling mining method | |
CN102400694A (en) | Reinforcement method for combined part of shield tunnel and mining-method tunnel | |
CN103161498B (en) | Half-edge coal seam section coal pillar roadside packing method | |
CN208965598U (en) | The Anti-seeping technology structure of grout curtain and underground chamber intersection area | |
CN112253115A (en) | Near-horizontal coal seam roadway type cemented filling mining method | |
Lu et al. | Cemented backfilling mining technology for gently inclined coal seams using a continuous mining and continuous backfilling method | |
CN113460562B (en) | Method for sealing and storing coal-electricity fly ash in abandoned coal mining space | |
CN111550255A (en) | Shield tunneling machine and construction method thereof | |
CN110566271A (en) | Reinforcement construction method for water-rich goaf under municipal road | |
CN104295315A (en) | Low coal seam gob-side entry retaining method | |
CN102733849B (en) | Filling body grouting reinforcement method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170314 Address after: 054000 West Street, West Bridge, Hebei, Xingtai, No. 126 Patentee after: Hebei Cut-and-fill Mining Technology company limited Patentee after: Hebei Coal Science Research Institute Address before: 054026 Xingtai West Bridge Xingtai mine, Hebei Patentee before: Jizhong Energy Resources Co., Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 054000 No.126 Tuanjie West Street, Qiaoxi District, Xingtai City, Hebei Province Patentee after: HEBEI FILLING MINING TECHNOLOGY Co.,Ltd. Patentee after: Hebei Coal Science Research Institute Co.,Ltd. Address before: 054000 No.126 Tuanjie West Street, Qiaoxi District, Xingtai City, Hebei Province Patentee before: HEBEI FILLING MINING TECHNOLOGY Co.,Ltd. Patentee before: HEBEI COAL Research Institute |