CN102733800B - 一种岩性密度仪器刻度系统及方法 - Google Patents

一种岩性密度仪器刻度系统及方法 Download PDF

Info

Publication number
CN102733800B
CN102733800B CN201210191919.4A CN201210191919A CN102733800B CN 102733800 B CN102733800 B CN 102733800B CN 201210191919 A CN201210191919 A CN 201210191919A CN 102733800 B CN102733800 B CN 102733800B
Authority
CN
China
Prior art keywords
lithology
logging instrument
density logging
block
rectilinear orbit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210191919.4A
Other languages
English (en)
Other versions
CN102733800A (zh
Inventor
黄雅
杜华伟
李明
王亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Oilfield Services Ltd
China National Offshore Oil Corp CNOOC
Original Assignee
China Oilfield Services Ltd
China National Offshore Oil Corp CNOOC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Oilfield Services Ltd, China National Offshore Oil Corp CNOOC filed Critical China Oilfield Services Ltd
Priority to CN201210191919.4A priority Critical patent/CN102733800B/zh
Publication of CN102733800A publication Critical patent/CN102733800A/zh
Application granted granted Critical
Publication of CN102733800B publication Critical patent/CN102733800B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measurement Of Radiation (AREA)

Abstract

本发明公开了一种岩性密度仪器刻度系统及方法,克服目前岩性密度仪器刻度时工作人员容易遭受较大辐射的缺陷,该系统包括直线轨道、岩性密度仪器、镁块和铝块,岩性密度仪器设置在直线轨道上,镁块和铝块设置在直线轨道同一个方向的延长线上。本发明显著缩短了岩性密度仪器的刻度时间,减少了刻度工作量,并降低了工作人员暴露在放射性空间中的时间,从而显著提高了工作人员的安全条件。

Description

一种岩性密度仪器刻度系统及方法
技术领域
本发明涉及岩性密度仪器刻度技术,尤其涉及一种岩性密度仪器刻度系统及方法。
背景技术
对现有的岩性密度系列测井仪进行二级(车间)刻度时,一般使用镁块和铝块两个基本部分,存在着垂直刻度和水平刻度两种方法。其中的垂直刻度方法是使用起重吊装等设备将仪器垂直吊起放置,而水平刻度方法是将仪器水平通过轨道车放置在轨道车上。这两种方法都是将镁块和铝块并列在一起放置在一条轨道上,将密度仪器设置在另外一条轨道上,两条轨道呈90度摆放。刻度时需要先将岩性密度仪器或垂直或水平放置于镁块中,调整好位置后进行镁块中的刻度。镁块中刻度完毕后将仪器移出镁块再放入铝块中,重新调整好位置进行铝块中的刻度。
由于人体受到的放射性辐射与人体暴露在放射性空间中的时间直接正相关,所以尽可能地缩短人体处于放射性空间中的时间才能有效减少放射性辐射量。而由于密度仪器较重,而将仪器从镁块中移出放入铝块的过程是需要一定的时间的。而且仪器从一个刻度块移出并放置于另一个刻度块时,还需要再次对仪器居中进行调整,这也需要一定时间;并且在这个时间段内带放射源的密度仪器是运行在刻度器(镁块和铝块)外面的,没有任何的屏蔽,从而使工作人员受到更多的辐射。
发明内容
本发明所要解决的技术问题是克服目前岩性密度仪器刻度时工作人员容易遭受较大辐射的缺陷。
为了解决上述技术问题,本发明提供了一种岩性密度仪器刻度系统,包括直线轨道、岩性密度仪器、镁块和铝块,其中:
岩性密度仪器设置在直线轨道上,镁块和铝块设置在直线轨道同一个方向的延长线上。
优选地,岩性密度仪器通过轨道车设置在直线轨道上。
优选地,镁块和铝块通过刻度架设置在直线轨道同一个方向的延长线上。
本发明还提供了一种岩性密度仪器刻度方法,包括如下步骤:
将岩性密度仪器设置在直线轨道上;
将镁块和铝块设置在直线轨道同一个方向的延长线上;
采用岩性密度仪器依次对镁块和铝块进行刻度。
优选地,岩性密度仪器通过轨道车设置在直线轨道上。
优选地,镁块和铝块通过刻度架设置在直线轨道同一个方向的延长线上。
与现有技术相比,本发明的实施例显著缩短了岩性密度仪器的刻度时间,减少了刻度工作量,并降低了工作人员暴露在放射性空间中的时间,从而显著提高了工作人员的安全条件。
本发明的其它特征和优点将在随后的说明书中阐述,并且,部分地从说明书中变得显而易见,或者通过实施本发明而了解。本发明的目的和其他优点可通过在说明书、权利要求书以及附图中所特别指出的结构来实现和获得。
附图说明
附图用来提供对本发明技术方案的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明的技术方案,并不构成对本发明技术方案的限制。
图1为本发明实施例岩性密度仪器刻度系统的构造示意图。
图2为本发明实施例岩性密度仪器刻度方法的流程示意图。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚明白,下文中将结合附图对本发明的实施例进行详细说明。需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互任意组合。
如图1所示,本发明实施例的岩性密度仪器刻度系统主要包括直线轨道1、岩性密度仪器(图中未示出)、镁块和铝块等。岩性密度仪器通过轨道车2设置在直线轨道1上,轨道车2可带着岩性密度仪器沿着直线轨道1进行直线移动。镁块和铝块通过刻度架3设置在直线轨道1同一个方向的延长线上,这样直线轨道1上的岩性密度仪器、镁块和铝块就位于同一条直线上。
镁块和铝块上,与直线轨道平行地设置有通孔,镁块上的通孔和铝块上的通孔位于一条直线上,密度仪器位于通孔中进行刻度。
利用本发明的实施例进行刻度时,不再需要将岩性密度仪器从一个刻度块移出再放入到另一个刻度块中,而是在完成一个刻度块的刻度后,通过轨道车2直接将岩性密度仪器继续往前移动一段距离,即进入另一个刻度块中进行刻度。
本发明对岩性密度仪器的刻度方法进行了改进,只使用一条直线轨道,且在刻度时只需要移动岩性密度仪器,明显降低了轨道车的制作精度,降低了其制作复杂度及成本,并且有效地减少了刻度工作量,缩短了刻度时间。
本发明的实施例中,岩性密度仪器固定在轨道车上,比较稳固,进入另一个刻度块后无需再对岩性密度仪器的位置进行调整,如此缩短了刻度的整体时间,相比现有技术至少减少了将岩性密度仪器从一个刻度块中转移到另一个刻度块的过程和对另一个刻度块的居中调整过程,大大缩短了刻度时间,减少了工作人员暴露在辐射环境中的时间。
而且,本发明的实施例中,岩性密度仪器一直处在刻度器(镁块和铝块)内部,刻度器具有较强的屏蔽保护能力。在缩短了刻度时间、减少刻度工作量的同时,也有利于保护工作人员免受辐射,从而可以显著地减少放射源对人体的辐射量。
如图2所示,本发明实施例的岩性密度仪器刻度方法主要包括如下步骤。
步骤S110,将岩性密度仪器设置在直线轨道1上,岩性密度仪器可沿着直线轨道1进行直线移动。
步骤S120,将镁块和铝块设置在直线轨道1同一个方向的延长线上,这样直线轨道1上的岩性密度仪器、镁块和铝块就位于同一条直线上。
步骤S130,采用岩性密度仪器依次对镁块和铝块进行刻度。
本发明的实施例中,岩性密度仪器通过轨道车2设置在直线轨道1上。镁块和铝块通过刻度架3设置在直线轨道1同一个方向的延长线上。
虽然本发明所揭露的实施方式如上,但所述的内容只是为了便于理解本发明而采用的实施方式,并非用以限定本发明。任何本发明所属领域内的技术人员,在不脱离本发明所揭露的精神和范围的前提下,可以在实施的形式上及细节上作任何的修改与变化,但本发明的专利保护范围,仍须以所附的权利要求书所界定的范围为准。

Claims (4)

1.一种岩性密度仪器刻度系统,包括直线轨道、岩性密度仪器、镁块和铝块,其中:
岩性密度仪器设置在直线轨道上,镁块和铝块设置在直线轨道同一个方向的延长线上;岩性密度仪器通过轨道车设置在直线轨道上。
2.根据权利要求1所述的岩性密度仪器刻度系统,其中:
镁块和铝块通过刻度架设置在直线轨道同一个方向的延长线上。
3.一种岩性密度仪器刻度方法,包括如下步骤:
将岩性密度仪器设置在直线轨道上;
将镁块和铝块设置在直线轨道同一个方向的延长线上;
采用岩性密度仪器依次对镁块和铝块进行刻度;
岩性密度仪器通过轨道车设置在直线轨道上。
4.根据权利要求3所述的岩性密度仪器刻度方法,其中:
镁块和铝块通过刻度架设置在直线轨道同一个方向的延长线上。
CN201210191919.4A 2012-06-12 2012-06-12 一种岩性密度仪器刻度系统及方法 Active CN102733800B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210191919.4A CN102733800B (zh) 2012-06-12 2012-06-12 一种岩性密度仪器刻度系统及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210191919.4A CN102733800B (zh) 2012-06-12 2012-06-12 一种岩性密度仪器刻度系统及方法

Publications (2)

Publication Number Publication Date
CN102733800A CN102733800A (zh) 2012-10-17
CN102733800B true CN102733800B (zh) 2015-08-19

Family

ID=46990019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210191919.4A Active CN102733800B (zh) 2012-06-12 2012-06-12 一种岩性密度仪器刻度系统及方法

Country Status (1)

Country Link
CN (1) CN102733800B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106990453B (zh) * 2017-04-10 2018-11-16 中国石油天然气集团公司 岩性密度测井仪更换放射源的刻度传递方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4587623A (en) * 1983-04-26 1986-05-06 Troxler Electronic Laboratories, Inc. Method for recalibrating nuclear density gauges
CN101424183A (zh) * 2007-10-30 2009-05-06 杨志高 带有自动液压推靠器的密度刻度装置
CN201437726U (zh) * 2009-07-20 2010-04-14 中国石油集团渤海钻探工程有限公司 岩性密度测井仪器推靠臂限位开关可调装置

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6918293B2 (en) * 2003-04-09 2005-07-19 Halliburton Energy Services, Inc. System and method having radiation intensity measurements with standoff correction
US8327683B2 (en) * 2009-01-20 2012-12-11 Schlumberger Technology Corporation Composite materials and calibration assemblies using the same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4587623A (en) * 1983-04-26 1986-05-06 Troxler Electronic Laboratories, Inc. Method for recalibrating nuclear density gauges
CN101424183A (zh) * 2007-10-30 2009-05-06 杨志高 带有自动液压推靠器的密度刻度装置
CN201437726U (zh) * 2009-07-20 2010-04-14 中国石油集团渤海钻探工程有限公司 岩性密度测井仪器推靠臂限位开关可调装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
LDLT5450岩性密度测井仪刻度方法;闫水浪等;《测井技术》;20070430;第31卷(第2期);169-172 *
一种实用的补偿密度三级刻度器;鞠晓东;《测井技术》;19871231;第11卷(第6期);40-43 *

Also Published As

Publication number Publication date
CN102733800A (zh) 2012-10-17

Similar Documents

Publication Publication Date Title
Atlas Collaboration et al. Measurement of W^ ± W±-boson and Z-boson production cross-sections in pp collisions at s= 2.76 s= 2.76 TeV with the ATLAS detector
WO2009099972A3 (en) Magnetic vacuum systems and devices for use with superconducting-based computing systems
TN2012000022A1 (en) Method for calculating loads deposited by ionizing radiation
CN102733800B (zh) 一种岩性密度仪器刻度系统及方法
CN107346006B (zh) 消除供电线对at供电上下行电流比测距影响的方法
EP4094275A4 (en) SKEWED PIN (SPIN) MODERATOR BLOCKS FOR NUCLEAR REACTOR
CN102612248A (zh) 一种用于x光机灯丝电流和管电流双闭环控制装置
CN104759820B (zh) 一种轮胎吊大梁轨道压板车间焊接方法
CN203956396U (zh) 一种吊耳焊接工装
CN106404029A (zh) 卫星用复合材料平面框架悬挂调试工装
CN215177565U (zh) 一种接触网预留槽道检测装置
CN105108369A (zh) 一种防法兰焊接变形的结构及焊接方法
CN104197904B (zh) 一种铁道客车车体钢结构框架快速定位划线法
CN209175618U (zh) 一种新型适用于圆锥形雷达罩柔性夹具的定位结构
CN202920218U (zh) 一种三维x线球管用射线检测及防护装置
CN203138527U (zh) 一种带有立柱链接装置的x线摄影床
CN206296672U (zh) 一种用于机床的对称式支撑架
CN205608196U (zh) 井型闪烁体γ谱检测装置
CN205720628U (zh) 一种电子式电压互感器校验装置
CN211490015U (zh) 一种电感线圈与结构电容焊接工装
CN203910483U (zh) 变压器的磁极线圈安装基板的冷却水道结构
CN207888116U (zh) 一种管路绝热结构焊接工装
CN215815217U (zh) 一种γ射线设备用箱体
CN204085517U (zh) 距离转接仪
CN207338109U (zh) 一种用于修正电感线材与端子的修正线材设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: China Oilfield Services Limited

Patentee after: China Offshore Oil Group Co., Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: China Oilfield Services Limited

Patentee before: China National Offshore Oil Corporation