CN102730581A - Main luffing mast rope collection operating device and crane including same - Google Patents
Main luffing mast rope collection operating device and crane including same Download PDFInfo
- Publication number
- CN102730581A CN102730581A CN2012102197547A CN201210219754A CN102730581A CN 102730581 A CN102730581 A CN 102730581A CN 2012102197547 A CN2012102197547 A CN 2012102197547A CN 201210219754 A CN201210219754 A CN 201210219754A CN 102730581 A CN102730581 A CN 102730581A
- Authority
- CN
- China
- Prior art keywords
- platform
- main amplitude
- amplitude mast
- mast
- limit switch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
Embodiments in the invention disclose a main luffing mast rope collection operating device, which belongs to the field of crane operating devices. The operating device comprises a platform, the head of which is rotatably connected with a main luffing mast, and also comprises a rope collecting means which is connected with the main luffing mast; the tail of the platform is equipped with a platform bracket that is provided with a limit switch, the limit switch faces the tail of the main luffing mast and is connected with a controller, the tail of the main luffing mast turns and presses the limit switch under the action of the rope collecting means, and the switch transmits a completion signal to an externally arranged control room through the controller after sensing of the position of the main luffing mast. According to the invention, stress applied on the platform bracket by the main luffing mast is effectively transmitted to the platform through the platform bracket located at the tail of the platform, thereby avoiding collapse of the platform bracket under pressing; since sensing of the position of the main luffing mast is realized in time through usage of the limit switch, response is carried out rapidly, an alarm is sounded, and operation is restricted so as to guarantee safety of a structure and give an operator a safety alarm.
Description
Technical field
The present technique scheme relates to a kind of crane operation device, and device is made in the main amplitude mast receipts rop exercise that relates in particular to a kind of hoisting crane.
Background technology
Accomplish in the lifting back dismounting entrucking process at crawler crane, the operator will control main amplitude mast through the elevator rope withdrawing apparatus and forward the installation site on the main platform to from control position.The carriage of existing crawler crane at the platform middle part, only can play the supporting role in the normal transport process mostly.Many times; Influenced by skill level or other reason, whether the operator puts in place at the unknown mast of driver's cab, receives rope and continue to control motor; Cause hydraulic efficiency pressure system to build the pressure; It is maximum that motor pressure reaches, and it is maximum that lineoutofservice signal pull also reaches, and causes main amplitude mast to be pressed in pressure on the platform and increase to platform structure and can't bear last damage.
Summary of the invention
Provide a kind of main amplitude mast to receive the hoisting crane that rop exercise is made device and comprised this device at present; When working to solve existing hoisting crane; Because of whether the operator puts in place at the unknown mast of driver's cab; Receive rope and continue to control motor, cause hydraulic efficiency pressure system to build the pressure, the pressure that makes main amplitude mast be pressed on the platform increases the problem that causes platform structure to damage.
The concrete technical scheme of being taked is:
A kind of main amplitude mast is received rop exercise and is made device, comprises a platform, and said flat-bed stem connects a main amplitude mast rotationally; Said platform also has a rope withdrawing apparatus, and said rope withdrawing apparatus connects said main amplitude mast, it is characterized in that; Said flat-bed afterbody is installed a rig bracket; Said rig bracket has a limit switch, and said limit switch is over against the afterbody of said main amplitude mast, and said limit switch connects a controller; The afterbody of said main amplitude mast is depressed on the said limit switch through said rope withdrawing apparatus commentaries on classics, and said limit switch induction back will be accomplished signal through said controller and is passed to external OPS.
Above-mentioned a kind of main amplitude mast is received rop exercise and is made device, and wherein, said rig bracket comprises a back vertical plate, and the upside of said back vertical plate connects a mounting plate, and said limit switch is positioned on the said mounting plate, and the left and right sides of said back vertical plate connects an oblique riser respectively; Also comprise a brace panel, said brace panel is captiveed joint two said oblique risers with said back vertical plate, and simultaneously, said brace panel is connected with said flat-bed afterbody.
Above-mentioned a kind of main amplitude mast is received rop exercise and is made device, and wherein, the gradient of said oblique riser extends to said flat-bed base plate from said flat-bed top.
Above-mentioned a kind of main amplitude mast is received rop exercise and is made device, wherein, also comprises annunciator, and said controller is controlled said annunciator, puts in place to warn the said main amplitude mast of external OPS.
Above-mentioned a kind of main amplitude mast is received rop exercise and is made device, and wherein, said controller connects the hydraulic electric control system, and after said main amplitude mast put in place, the external OPS of said hydraulic electric control system restriction continued to receive rope to said rope withdrawing apparatus.
A kind of hoisting crane, wherein, this hoisting crane comprises that main amplitude mast receives rop exercise and make device, it is above-mentioned any described handling device as device that said main amplitude mast is received rop exercise.
Owing to adopted above-mentioned technology, the good effect that technique scheme compared with prior art has is:
(1) through being positioned at the rig bracket of platform afterbody; And gradient extends to the design of two oblique risers of platform floor always from platform top; Make this rig bracket holding capacity effectively; And the Stress Transfer that main amplitude mast is put on rig bracket is to platform, thereby avoids rig bracket itself not good for conquassation because of load.Mounting plate is mainly used in and holds up main amplitude mast itself, and its center and main amplitude mast stem match, and guarantee that effectively main amplitude mast is in horizontal installation site reposefully.
(2) through the use of limit switch, the sensivity that utilizes electric elements be easy to controlledly, in time respond to the position of main amplitude mast, react rapidly, send warning, and restriction operation, when guaranteeing structural safety, give the operator security warning.
(3) structure of rig bracket and position utilization Mechanics Calculation and computation optimization make structure no longer big and heavy, terminal with compact integral structure, and light and handy, bearing capacity is strong.
Description of drawings
Fig. 1 is that schematic representation of apparatus is made in a kind of main amplitude mast receipts rop exercise of the embodiment of the invention;
Fig. 2 is that a kind of main amplitude mast of the embodiment of the invention is received the scheme drawing that rig bracket in the device is made in rop exercise;
Fig. 3 is an A place enlarged drawing among Fig. 1.
The specific embodiment
Below in conjunction with schematic diagram and concrete operations embodiment the present invention is described further.
Fig. 1 is that a kind of main amplitude mast of the present invention is received the scheme drawing in the specific embodiment that rop exercise makes device; Fig. 3 is an A place enlarged drawing among Fig. 1; As shown in figures 1 and 3, a kind of main amplitude mast of the embodiment of the invention is received rop exercise and is made device, includes a platform 1; The afterbody of the hinged main amplitude mast 2 of the stem of platform 1; One rope withdrawing apparatus 3 is installed in the centre of platform 1, and this rope withdrawing apparatus 3 is connected with the afterbody of main amplitude mast 2 through rope, makes that receiving rope through the elevator of rope withdrawing apparatus 3 makes the afterbody of main amplitude mast 2 to rotate around the stem of platform 1.Afterbody at platform 1 is equipped with a rig bracket 4, and this rig bracket 4 has a limit switch 5 as fender guard, and this limit switch 5 is over against the afterbody of main amplitude mast 2.Simultaneously; Limit switch 5 also comprises and is connected with a controller (not shown); If main amplitude mast 2 has forwarded installed platform carriage 4 to through rope withdrawing apparatus 3; And the afterbody of main amplitude mast 2 is pressed on the limit switch 5, and limit switch 5 backs are passed to external OPS through controller with the signal feedback of accomplishing.If operator's this moment still continues to receive rope through rope withdrawing apparatus 3, then limit switch 5 will be done to continue operation in order to the restriction operation person.
Among first embodiment of this embodiment, Fig. 2 is that a kind of main amplitude mast of the present invention is received the scheme drawing that rig bracket in the device is made in rop exercise, please continue like Fig. 1, Fig. 2 and shown in Figure 3.Concrete, weld a rig bracket 4 respectively at the right and left of platform 1 afterbody, this rig bracket 4 is a box-structure.Rig bracket 4 includes a back vertical plate 41; Upside at back vertical plate 41 is connected with a mounting plate 42; It is own that mounting plate 42 is mainly used in picking-up main amplitude mast 2; The afterbody of the center of mounting plate 42 and main amplitude mast 2 matches, and guarantees that main amplitude mast 2 can be in horizontal installation site evenly.Simultaneously, be used to install limit switch 5 on the mounting plate 42.Connect an oblique riser 43 respectively in the left and right sides of back vertical plate 41, the gradient of this oblique riser 43 extends to platform 1 always from the top of platform 1 base plate carries weight power effectively with this.Rig bracket 4 also includes a brace panel 44, makes two oblique risers 43 to be coupled together and to play the effect of reinforcement through brace panel 44 and back vertical plate 41, and simultaneously, brace panel 44 is connected with the afterbody of platform 1, with this rig bracket 4 is soldered on the platform 1.The height of rig bracket 4 structures and width are confirmed through optimal design method, to guarantee simplifying of structure itself.The version of rig bracket 4 is carried the pressure from main amplitude mast 2 effectively, and main amplitude mast 2 is put on Stress Transfer to the platform 1 on the rig bracket 4, thereby avoids rig bracket 4 itself not add by conquassation because of bearing capacity.
Among second embodiment of this embodiment, also include an annunciator (not shown), and this annunciator is controlled by controller.When the afterbody of main amplitude mast 2 is fallen 4 last times of rig bracket, limit switch 5 is sensed main amplitude mast 2 and has been reclaimed and put in place, then sends warning through controller control annunciator, caution operator shut-down operation.
Among the 3rd embodiment of this embodiment, above-mentioned controller can also connect a hydraulic electric control system (not shown).When the afterbody of main amplitude mast 2 is fallen 4 last times of rig bracket, limit switch 5 is sensed main amplitude mast 2 and has been reclaimed and put in place, and simultaneously, the operator who limits in the external operator's compartment through controller modulated pressure electric-control system continues to receive rope to rope withdrawing apparatus 3.
The present invention is owing at platform 1 afterbody erecting stage carriage 4, through increasing the mode of platform 1 arm of force, improve the load-carrying capacity of rig bracket 4 effectively.When the afterbody of main amplitude mast 2 finally drops on the rig bracket 4; Main amplitude mast 2 is in installing condition and rope withdrawing apparatus 3 continuation effects receipts rope; Cause the hoist motor maxim that builds the pressure, it is maximum that the lift rope pulling force reaches, and the extension position of the arm of force is confirmed according to the force analysis of this moment.
Among the further embodiment of this embodiment, limit switch 5 can adopt modes such as angle limit switch, contact limit switch to replace.
Among the further embodiment of this embodiment; The mode that the restriction operation person continues to reclaim the hydraulic electric control system of main amplitude mast 2 operations also can adopt other approach, as: limit switch 5 signals connect controller, and controller is connected to the hydraulic efficiency pressure system of rope withdrawing apparatus 3 hoist motors action again through modes such as electromagnetic valves; After main amplitude mast 2 puts in place; Closed electromagnetic valve, the flow of hydraulic efficiency pressure system is closed, and elevator stops rope stretching.
Among the further embodiment of this embodiment, the structure of above-mentioned rig bracket 4 also can adopt other difformities.
More than present embodiment is described in detail, but present embodiment is not restricted to the specific embodiment of above description, it is just as example.To those skilled in the art, any equivalent modifications and alternative also all among the category of present embodiment.Therefore, impartial conversion and the modification under spirit that does not break away from present embodiment and scope, done all should be encompassed in the scope of present embodiment.
Claims (6)
1. a main amplitude mast is received rop exercise and is made device; Comprise a platform (1), the stem of said platform (1) connects a main amplitude mast (2) rotationally, and said platform (1) also has a rope withdrawing apparatus (3); Said rope withdrawing apparatus (3) connects said main amplitude mast (2); It is characterized in that the afterbody of said platform (1) is installed a rig bracket (4), said rig bracket (4) has a limit switch (5); Said limit switch (5) is over against the afterbody of said main amplitude mast (2); Said limit switch (5) connects a controller, and the afterbody of said main amplitude mast (2) is depressed on the said limit switch (5) through said rope withdrawing apparatus (3) commentaries on classics, and said limit switch (5) induction back will be accomplished signal through said controller and is passed to external OPS.
2. receive rop exercise according to the said main amplitude mast of claim 1 and make device; It is characterized in that; Said rig bracket (4) comprises a back vertical plate (41); The upside of said back vertical plate (41) connects a mounting plate (42), and said limit switch (5) is positioned on the said mounting plate (42), and the left and right sides of said back vertical plate (41) connects an oblique riser (43) respectively; Also comprise a brace panel (44), said brace panel (44) is captiveed joint two said oblique risers (43) with said back vertical plate (41), and simultaneously, said brace panel (44) is connected with the afterbody of said platform (1).
3. receive rop exercise according to the said main amplitude mast of claim 2 and make device, it is characterized in that the gradient of said oblique riser (43) extends to the base plate of said platform (1) from the top of said platform (1).
4. receive rop exercise according to the said main amplitude mast of claim 1 and make device, it is characterized in that also comprise annunciator, said controller is controlled said annunciator, put in place to warn the said main amplitude mast of external OPS.
5. receive rop exercise according to the said main amplitude mast of claim 1 and make device; It is characterized in that; Said controller connects the hydraulic electric control system, and after said main amplitude mast (2) put in place, the external OPS of said hydraulic electric control system restriction continued to receive rope to said rope withdrawing apparatus (3).
6. a hoisting crane is characterized in that, this hoisting crane comprises that main amplitude mast receives rop exercise and make device, and it is any described handling device in the claim 1 to 5 as device that said main amplitude mast is received rop exercise.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210219754.7A CN102730581B (en) | 2012-06-29 | 2012-06-29 | Main luffing mast rope collection operating device and crane including same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210219754.7A CN102730581B (en) | 2012-06-29 | 2012-06-29 | Main luffing mast rope collection operating device and crane including same |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102730581A true CN102730581A (en) | 2012-10-17 |
CN102730581B CN102730581B (en) | 2014-09-17 |
Family
ID=46986995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210219754.7A Active CN102730581B (en) | 2012-06-29 | 2012-06-29 | Main luffing mast rope collection operating device and crane including same |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102730581B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB595209A (en) * | 1945-04-05 | 1947-11-28 | Anglo Iranian Oil Co Ltd | Improvements in and relating to safety devices for preventing over-luffing in jib cranes and like apparatus |
JPH08231188A (en) * | 1995-02-23 | 1996-09-10 | Hitachi Constr Mach Co Ltd | Safety device for crane |
JPH08245182A (en) * | 1995-03-14 | 1996-09-24 | Hitachi Constr Mach Co Ltd | Boom derricking stopper |
JPH09165193A (en) * | 1995-12-18 | 1997-06-24 | Birudo:Kk | Safety device of crane truck |
CN201209095Y (en) * | 2008-04-29 | 2009-03-18 | 山推工程机械股份有限公司 | Hoist boom safety position limiter for pipe crane |
CN101885450A (en) * | 2010-07-26 | 2010-11-17 | 上海三一科技有限公司 | Crawler crane main amplitude mast and cocked cylinder secondary pressure adjustment system and method thereof |
CN201670662U (en) * | 2010-05-10 | 2010-12-15 | 江苏沃得起重机有限公司 | Running limit device for single-beam crane |
CN101993007A (en) * | 2009-08-15 | 2011-03-30 | 广西华力集团有限公司 | Pipe crane hoisting arm limiting device with buffer mechanism |
CN201801333U (en) * | 2010-09-17 | 2011-04-20 | 方圆集团海阳起重机械有限公司 | Anti-climbing safety alarm device of tower crane |
-
2012
- 2012-06-29 CN CN201210219754.7A patent/CN102730581B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB595209A (en) * | 1945-04-05 | 1947-11-28 | Anglo Iranian Oil Co Ltd | Improvements in and relating to safety devices for preventing over-luffing in jib cranes and like apparatus |
JPH08231188A (en) * | 1995-02-23 | 1996-09-10 | Hitachi Constr Mach Co Ltd | Safety device for crane |
JPH08245182A (en) * | 1995-03-14 | 1996-09-24 | Hitachi Constr Mach Co Ltd | Boom derricking stopper |
JPH09165193A (en) * | 1995-12-18 | 1997-06-24 | Birudo:Kk | Safety device of crane truck |
CN201209095Y (en) * | 2008-04-29 | 2009-03-18 | 山推工程机械股份有限公司 | Hoist boom safety position limiter for pipe crane |
CN101993007A (en) * | 2009-08-15 | 2011-03-30 | 广西华力集团有限公司 | Pipe crane hoisting arm limiting device with buffer mechanism |
CN201670662U (en) * | 2010-05-10 | 2010-12-15 | 江苏沃得起重机有限公司 | Running limit device for single-beam crane |
CN101885450A (en) * | 2010-07-26 | 2010-11-17 | 上海三一科技有限公司 | Crawler crane main amplitude mast and cocked cylinder secondary pressure adjustment system and method thereof |
CN201801333U (en) * | 2010-09-17 | 2011-04-20 | 方圆集团海阳起重机械有限公司 | Anti-climbing safety alarm device of tower crane |
Also Published As
Publication number | Publication date |
---|---|
CN102730581B (en) | 2014-09-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205772984U (en) | A kind of hanging apparatus of monolithic steel truss | |
CN200992464Y (en) | Lifting mechanical apparatus with position safety monitoring system | |
EP2678262A1 (en) | Mobile crane | |
CN101934989A (en) | Dynamic balance building tower crane | |
US10124993B2 (en) | Method for operating a crane and crane | |
CN205603095U (en) | Engineering work crane | |
CN105620676A (en) | Unmanned surface vehicle collecting and releasing device | |
CN204847922U (en) | Hoist lifting rope swing stop gear | |
CN202390116U (en) | High-intensity small-tonnage hoist | |
CN102730581A (en) | Main luffing mast rope collection operating device and crane including same | |
CN103663183A (en) | Fast self-mounting tower crane | |
CN208182496U (en) | A kind of two-orbit super large heavy-duty hoisting equipment with deformation function | |
CN107381380B (en) | A kind of petroleum well field pressing crack construction unloads sand integrated apparatus and its working method automatically | |
CN106395640A (en) | Installation-detachment support for transformer | |
CN203011710U (en) | Integrated system for single/double-beam hoist | |
CN108275584A (en) | One kind having multi-functional straight rail super large heavy-duty hoisting equipment | |
CN108946560A (en) | A kind of intelligence carries the device of lift maintaining | |
CN204778412U (en) | European style trolley | |
RU2333883C1 (en) | Tower crane and method of its mounting and dismantling | |
CN202279647U (en) | Cargo boom of lorry-mounted crane | |
CN213923792U (en) | Novel limiting device of crane | |
CN201647838U (en) | Remote control device for tower crane jacking mechanism | |
CN104973512A (en) | Swing limiting mechanism for lifting rope of crane | |
CN215479303U (en) | High spider crane of security | |
CN202429946U (en) | Portable testing instrument lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160118 Address after: Eight in the 313028 Zhejiang city of Huzhou province Cao Zhen Village daily standard factory Auxiliary Building No. 2 Patentee after: Zhejiang Sany Equipment Co., Ltd. Address before: 201202, room 6999, 205 Chuansha Road, Shanghai, Pudong New Area Patentee before: Shanghai Sany Technology Co., Ltd. |