CN102730574A - Roof hoisting apparatus based on whole life cycle of building and introduced from exterior wall of construction part - Google Patents
Roof hoisting apparatus based on whole life cycle of building and introduced from exterior wall of construction part Download PDFInfo
- Publication number
- CN102730574A CN102730574A CN2012102210503A CN201210221050A CN102730574A CN 102730574 A CN102730574 A CN 102730574A CN 2012102210503 A CN2012102210503 A CN 2012102210503A CN 201210221050 A CN201210221050 A CN 201210221050A CN 102730574 A CN102730574 A CN 102730574A
- Authority
- CN
- China
- Prior art keywords
- building
- roof
- cycle
- exterior wall
- lifting appliance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention provides a roof hoisting apparatus based on the whole life cycle of a building and introduced from the exterior wall of a construction part. The apparatus is formed by the following construction: foundation supports are arranged at two sides along a longitudinal direction of a roof and are provided with guide rails; moving devices fixedly connected with a work chamber are arranged on the guide rails; two ends of the work chamber extend out from the roof, and each extended-out part of the work chamber is provided with a lifting unit on which a container is hitched; a power set is arranged below an operation chamber; an operation board of the operation chamber is connected with the moving devices through electrical leads and connected with the lifting unit through the power set. According to the invention, a large-scale hoisting machine is prevented from entering into a residential community, which enables influence on the living environment of the community to be reduced; the roof hoisting apparatus slides along rails, and the container can reach the balcony of a house of any user, thereby mitigating influence of room reconstruction on other residents; usage of the roof hoisting apparatus is not restricted by an elevator, a stair and a hoisting appliance, hoisted components and parts do not easily get damaged, so logistics of appliances, parts and wastes is benefited. The roof hoisting apparatus provided in the invention is applicable to a building in a whole life cycle and is beneficial for reconstruction and upgrading of dwelling houses and for promotion of reconstruction industrialization.
Description
Technical field
The present invention relates to a kind of lifting appliance that is arranged on the fixed buildings, particularly relate to a kind of roof lifting appliance and operational method thereof that imports based on building cycle life-cycle building portion article exterior wall.
Background technology
In recent years, the commercial house resident family heightens to the demand of improving house owing to the growth of economic strength, the factors such as variation, work or family's change of family structure.Under existed building structure unmodified prerequisite, to no matter new house still is old room little cover thing of adjacent flat bed or north and south are got through into big cover, the little cover of two-layer up and down correspondence adds the Housing Reconstruction phenomenon that stair make compound big cover into to be taken place constantly.Simultaneously, house ornamentation inner bag system also makes and need acquire or upgrade because of the new home or old housing reform.
Indoor transformation; Need carry waste or frock and the new and old household of indoor and outdoor portion article, common way is: one, adopt wheel crane, but wheel crane must land steady placement with leg during because of lifting; So had relatively high expectations in the work-yard, this does not generally possess around the finished product building.Two, adopt tower crane, but the tower crane driving surface is big and also need accessory equipment simultaneously, thereby can't around the finished product building, uses.The 3rd, use a dead lift, a dead lift efficient is low, to big with other resident family's influence in the unit building.In the carrying, construction apparatus and building portion article are damaged by the restriction of elevator & stairs and hoisting appliance easily.Therefore, under the indoor transformation spring tide of current the commercial house, it is necessary to develop a kind of easy roof lifting appliance that can in cycle the commercial house life-cycle, all be suitable for.
Summary of the invention
An object of the present invention is deficiency to the prior art situation; Provide a kind of all suitable in cycle the commercial house life-cycle; Requirement is not done in the work-yard; Do not receive structural limitations, not fragile such as elevator when construction apparatus and the carrying of building portion article, little to other resident families' influences, high efficiency, the roof lifting appliance based on the importing of building cycle life-cycle building portion article exterior wall easy and simple to handle.
The objective of the invention is to realize.The present invention is based on the roof lifting appliance that building cycle life-cycle building portion article exterior wall imports; It is characterized in that: the said roof lifting appliance that imports based on building cycle life-cycle building portion article exterior wall; Roof length by the finished product building respectively is provided with a pedestal 4 to both sides; Said every pedestal 4 is provided with a guide rail 3, is symmetrical set a cover mobile device 7 on said two guide rails 3 respectively, supports an affixed Working cabin 1 above the said two cover mobile devices 7; Said Working cabin 1 two ends lean out before and after the roof two sides respectively and respectively are provided with a hanging device 6 leaning out the position; Respectively articulate a freight container 8 on said two hanging devices 6, be provided with operator's compartment 2 in the said Working cabin 1, be provided with engine installation 5 below the said operator's compartment 2; The operation board of said operator's compartment 2 is connected with said mobile device 7 through electrical lead, and the operation board of said operator's compartment 2 is connected common formation through electrical lead, engine installation 5 and steel rope with said hanging device 6.
The present invention is based on the roof lifting appliance that building cycle life-cycle building portion article exterior wall imports; Wherein said pedestal 4 is on the finished product building main structure beam, and the line of centers of said guide rail 3 and said pedestal 4 and finished product are built main structure beam centerline on same vertical section and overlap up and down.
The present invention is based on the roof lifting appliance that building cycle life-cycle building portion article exterior wall imports, wherein said Working cabin 1 main structure is triangular build, is made up of truss Steel Structure and outer glass curtain wall.
The present invention is based on the roof lifting appliance that building cycle life-cycle building portion article exterior wall imports, wherein said Working cabin 1 has a round straight-line trajectory on said guide rail 3.
The present invention is based on the roof lifting appliance that building cycle life-cycle building portion article exterior wall imports, wherein said freight container 8 is in both sides, building front and back respectively.
Another object of the present invention is the operational method that provides the roof lifting appliance that imports based on building cycle life-cycle building portion article exterior wall; Operational method based on the roof lifting appliance of building the building portion article exterior wall importing of cycle life-cycle of the present invention is accomplished through following steps, comprising:
The roof lifting appliance integral structure of building on step 1, the inspection building roof based on the importing of building cycle life-cycle building portion article exterior wall should be good, and hanging apparatus 6, mobile device 7 move should be steadily reliable,
Operating personal in step 3, the operator's compartment 2 starts hanging device 6, and steel rope is slowly put down, and the terrestrial operation personnel firmly are connected freight container 8 with steel rope;
Operating personal in the step 4, operator's compartment 2 is after obtaining the lifting signal that the terrestrial operation personnel send, and operation lifting appliance 6 is slowly sling freight container 8;
After step 6, freight container 8 positions are confirmed, on the balcony the staff be responsible for being transported to required building portion article, the chamber interior article parts newly purchased indoor; With the waste in the reconstruction, superseded chamber interior article parts are transported to has the ground staff to transport in the freight container;
After step 7, alteration of the houses construction finished, operating personal operation hanging device 6 was regained steel rope, and operating moving device 7 will lift the stand that cabin 1 is returned to regulation, treated next alteration of the houses construction usefulness.
The present invention is based on roof lifting appliance and hanging method that building cycle life-cycle building portion article exterior wall imports; Can lift integrated big article parts of building portion article dead size; Make the size of portion's article parts not receive elevator & stairs and hoisting appliance restriction, not fragile; Portion's article parts are through the integral transportation of freight container, but at high speed is transported to the place, room of reconstruction; Reduce the influence of retrofit work simultaneously to other resident family's trips; Secondly can avoid large-scale hoisting machinery to get into inhabitation community, reduce influence other resident living environment; The present invention can slide along the roof track, after container crane is contained in the room anterior chamber of residential housing, can arrive domestic consumer's balcony mouth neatly, the chamber interior article parts in helping reconstructing and the logistics of waste.The present invention is suitable for the use of building total life cycle, and it is beneficial to transforms dwelling house at any time and upgrade, and is beneficial to the propelling that dwelling house is transformed industrialization.
Below in conjunction with accompanying drawing roof lifting appliance and the operational method that imports based on building cycle life-cycle building portion article exterior wall of the present invention is described further.
Description of drawings
Fig. 1 is the installation perspective view on the building roof that the present invention is based on the roof lifting appliance of building cycle life-cycle building portion article exterior wall importing.
Fig. 2 is the main TV structure scheme drawing that the present invention is based on the roof lifting appliance of building cycle life-cycle building portion article exterior wall importing.
Fig. 3 is the side-looking structural representation that the present invention is based on the roof lifting appliance of building cycle life-cycle building portion article exterior wall importing.
Fig. 4 is the plan structure scheme drawing that the present invention is based on the roof lifting appliance of building cycle life-cycle building portion article exterior wall importing.
The specific embodiment
Like Fig. 1, Fig. 2, Fig. 3, shown in Figure 4; The present invention is based on the roof lifting appliance that building cycle life-cycle building portion article exterior wall imports, the roof length of being built by finished product respectively is provided with a pedestal 4 to both sides, and every pedestal 4 is provided with a guide rail 3; Be symmetrical set a cover mobile device 7 on two guide rails 3 respectively; Support an affixed Working cabin 1 above the two cover mobile devices 7, Working cabin 1 two ends lean out before and after the roof two sides respectively and respectively are provided with on 6, two hanging devices 6 of a hanging device and respectively articulate a freight container 8 leaning out the position; Be provided with operator's compartment 2 in the Working cabin 1; Be provided with engine installation 5 below the operator's compartment 2, the operation board of operator's compartment 2 is connected with mobile device 7 through electrical lead, and the operation board of operator's compartment 2 is connected common formation through electrical lead, engine installation 5 and steel rope with hanging device 6.
Working cabin 1 main structure is triangular build, is made up of truss Steel Structure and outer glass curtain wall.
Working cabin 1 has a round straight-line trajectory on guide rail 3.Freight container 8 is in both sides, building front and back respectively.
Operational method based on the roof lifting appliance of building the building portion article exterior wall importing of cycle life-cycle of the present invention is accomplished through following steps:
The roof lifting appliance integral structure of building on step 1, the inspection building roof based on the importing of building cycle life-cycle building portion article exterior wall should be good, and hanging apparatus 6, mobile device 7 move should be steadily reliable,
Operating personal in step 3, the operator's compartment 2 starts hanging device 6, and steel rope is slowly put down, and the terrestrial operation personnel firmly are connected freight container 8 with steel rope;
Operating personal in the step 4, operator's compartment 2 is after obtaining the lifting signal that the terrestrial operation personnel send, and operation lifting appliance 6 is slowly sling freight container 8;
After step 6, freight container 8 positions are confirmed, on the balcony the staff be responsible for being transported to required building portion article, the chamber interior article parts newly purchased indoor; With the waste in the reconstruction, superseded chamber interior article parts are transported to has the ground staff to transport in the freight container;
After step 7, alteration of the houses construction finished, operating personal operation hanging device 6 was regained steel rope, and operating moving device 7 will lift the stand of the regulation of cabin 1 recurrence, treated next alteration of the houses construction usefulness.
Advantage of the present invention specifically is summarized as follows:
One, the roof hanging device is installed in the roof, does not influence the function of residential housing itself;
Two, lift before utilizing track to make the roof hanging device can move to the window at each family expediently;
Three, hanging device two ends in roof can lift, and promptly can lift from the both sides, north and south of dwelling house;
Four, the on-site installation step is few, and the amount of labour used is few, and the duration is short, is convenient to the resident and transforms the space;
Above-described embodiment describes preferred implementation of the present invention; Be not that scope of the present invention is limited; Design under the prerequisite of spirit not breaking away from the present invention; Various distortion and improvement that those of ordinary skills make technical scheme of the present invention all should fall in the definite protection domain of claims of the present invention.
Claims (6)
1. roof lifting appliance based on building cycle life-cycle building portion article exterior wall importing; It is characterized in that: the said roof lifting appliance that imports based on building cycle life-cycle building portion article exterior wall; Roof length by the finished product building respectively is provided with a pedestal 4 to both sides; Said every pedestal 4 is provided with a guide rail 3, is symmetrical set a cover mobile device 7 on said two guide rails 3 respectively, supports an affixed Working cabin 1 above the said two cover mobile devices 7; Said Working cabin 1 two ends lean out before and after the roof two sides respectively and respectively are provided with a hanging device 6 leaning out the position; Respectively articulate a freight container 8 on said two hanging devices 6, be provided with operator's compartment 2 in the said Working cabin 1, be provided with engine installation 5 below the said operator's compartment 2; The operation board of said operator's compartment 2 is connected with said mobile device 7 through electrical lead, and the operation board of said operator's compartment 2 is connected common formation through electrical lead, engine installation 5 and steel rope with said hanging device 6.
2. the roof lifting appliance that imports based on building cycle life-cycle building portion article exterior wall according to claim 1; It is characterized in that: said pedestal 4 is on the finished product building main structure beam, and the line of centers of said guide rail 3 and said pedestal 4 and finished product are built main structure beam centerline on same vertical section and overlap up and down.
3. the roof lifting appliance that imports based on building cycle life-cycle building portion article exterior wall according to claim 1 and 2, it is characterized in that: said Working cabin 1 main structure is triangular build, is made up of truss Steel Structure and outer glass curtain wall.
4. the roof lifting appliance that imports based on building cycle life-cycle building portion article exterior wall according to claim 3, it is characterized in that: said Working cabin 1 has a round straight-line trajectory on said guide rail 3.
5. the roof lifting appliance that imports based on building cycle life-cycle building portion article exterior wall according to claim 4 is characterized in that: said freight container 8 is in both sides, building front and back respectively.
6. operational method based on the roof lifting appliance of building cycle life-cycle building portion article exterior wall importing is characterized in that may further comprise the steps in the method:
The roof lifting appliance integral structure of building on step 1, the inspection building roof based on the importing of building cycle life-cycle building portion article exterior wall should be good, and hanging apparatus 6, mobile device 7 move should be steadily reliable,
Step 2, operating personal get in the operator's compartment 2, start mobile device 7, lifting cabin 1 are moved to the balcony correspondence position of desire repacking resident family along guide rail 3;
Operating personal in step 3, the operator's compartment 2 starts hanging device 6, and steel rope is slowly put down, and the terrestrial operation personnel firmly are connected freight container 8 with steel rope;
Operating personal in the step 4, operator's compartment 2 is after obtaining the lifting signal that the terrestrial operation personnel send, and operation lifting appliance 6 is slowly sling freight container 8;
Step 5, when 8 in freight container winches to assigned address, stop lifting, the line position of going forward side by side fine setting makes it to align balcony, afterwards freight container 8 is positioned;
After step 6, freight container 8 positions were confirmed, the staff on the balcony was responsible for being transported to required building portion article, the chamber interior article parts newly purchased indoor; Waste, superseded chamber interior article parts in the reconstruction are transported in the freight container and are transported by the ground staff;
After step 7, alteration of the houses construction finished, operating personal operation hanging device 6 was regained steel ropes, and operating moving device 7 will lift the stand that cabin 1 is returned to regulation, treated that next alteration of the houses is executed to continue worker's usefulness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102210503A CN102730574A (en) | 2012-06-29 | 2012-06-29 | Roof hoisting apparatus based on whole life cycle of building and introduced from exterior wall of construction part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102210503A CN102730574A (en) | 2012-06-29 | 2012-06-29 | Roof hoisting apparatus based on whole life cycle of building and introduced from exterior wall of construction part |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102730574A true CN102730574A (en) | 2012-10-17 |
Family
ID=46986988
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102210503A Pending CN102730574A (en) | 2012-06-29 | 2012-06-29 | Roof hoisting apparatus based on whole life cycle of building and introduced from exterior wall of construction part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102730574A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107253673A (en) * | 2017-06-13 | 2017-10-17 | 孙博文 | A kind of Architectural Equipment hanging apparatus |
CN108455449A (en) * | 2018-02-24 | 2018-08-28 | 深圳广田方特科建集团有限公司 | A kind of interior rail type mobile curtain wall Lift-on/Lift-off System |
CN108683083A (en) * | 2018-05-16 | 2018-10-19 | 许继集团有限公司 | Prefabricated cabin cabin is pushed up and prefabricated cabin |
CN111977543A (en) * | 2020-08-19 | 2020-11-24 | 上海建工四建集团有限公司 | Intelligent integrated hoisting equipment for building solid waste treatment equipment |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2273750A1 (en) * | 1974-06-07 | 1976-01-02 | Grandi Rene | Travelling crane with multiple winches - has equal-length opposite jibs slewing on telescopic tower |
US4421242A (en) * | 1980-03-19 | 1983-12-20 | Butler Manufacturing Company | Panel locator |
JPH10245189A (en) * | 1997-03-05 | 1998-09-14 | Shinsoun Ko | Omnidirectional moving crane used for high rise building construction |
JPH1121081A (en) * | 1997-07-07 | 1999-01-26 | Maeda Corp | Device and method for carrying material and equipment for construction |
CN1396108A (en) * | 2002-08-21 | 2003-02-12 | 张文杰 | Cantilever hoister with vertical concrete columns for building |
CN201176372Y (en) * | 2008-03-31 | 2009-01-07 | 武汉钢铁(集团)公司 | Novel demountable traveling mast crane |
CN202704867U (en) * | 2012-06-29 | 2013-01-30 | 中国建筑股份有限公司 | Roof lifting equipment for guiding construction parts from external wall based on whole life cycle of building |
-
2012
- 2012-06-29 CN CN2012102210503A patent/CN102730574A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2273750A1 (en) * | 1974-06-07 | 1976-01-02 | Grandi Rene | Travelling crane with multiple winches - has equal-length opposite jibs slewing on telescopic tower |
US4421242A (en) * | 1980-03-19 | 1983-12-20 | Butler Manufacturing Company | Panel locator |
JPH10245189A (en) * | 1997-03-05 | 1998-09-14 | Shinsoun Ko | Omnidirectional moving crane used for high rise building construction |
JPH1121081A (en) * | 1997-07-07 | 1999-01-26 | Maeda Corp | Device and method for carrying material and equipment for construction |
CN1396108A (en) * | 2002-08-21 | 2003-02-12 | 张文杰 | Cantilever hoister with vertical concrete columns for building |
CN201176372Y (en) * | 2008-03-31 | 2009-01-07 | 武汉钢铁(集团)公司 | Novel demountable traveling mast crane |
CN202704867U (en) * | 2012-06-29 | 2013-01-30 | 中国建筑股份有限公司 | Roof lifting equipment for guiding construction parts from external wall based on whole life cycle of building |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107253673A (en) * | 2017-06-13 | 2017-10-17 | 孙博文 | A kind of Architectural Equipment hanging apparatus |
CN107253673B (en) * | 2017-06-13 | 2018-08-31 | 南京楚卿电子科技有限公司 | A kind of Architectural Equipment hanging apparatus |
CN108455449A (en) * | 2018-02-24 | 2018-08-28 | 深圳广田方特科建集团有限公司 | A kind of interior rail type mobile curtain wall Lift-on/Lift-off System |
CN108683083A (en) * | 2018-05-16 | 2018-10-19 | 许继集团有限公司 | Prefabricated cabin cabin is pushed up and prefabricated cabin |
CN111977543A (en) * | 2020-08-19 | 2020-11-24 | 上海建工四建集团有限公司 | Intelligent integrated hoisting equipment for building solid waste treatment equipment |
CN111977543B (en) * | 2020-08-19 | 2021-07-20 | 上海建工四建集团有限公司 | Intelligent integrated hoisting equipment for building solid waste treatment equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206242036U (en) | A kind of Substation Insulator string cleaning robot | |
CN201228207Y (en) | Portable window hoister | |
CN106150049B (en) | Spray robot | |
CN102730574A (en) | Roof hoisting apparatus based on whole life cycle of building and introduced from exterior wall of construction part | |
CN206753188U (en) | A kind of communication tower provided with prefabricated pile basis | |
CN106996214A (en) | A kind of communication tower provided with prefabricated pile basis | |
CN202704867U (en) | Roof lifting equipment for guiding construction parts from external wall based on whole life cycle of building | |
CN205346579U (en) | Electric power aerial ladder | |
CN203359889U (en) | Wall plate lifting and installation integrated operation platform | |
CN202559682U (en) | Bunker-foldable novel wall plastering machine | |
CN204609308U (en) | A kind of passage limited position concrete rail transporter | |
CN201377169Y (en) | Hoister synchronous lifting platform | |
CN103010965A (en) | Special tool of 110kVGW4-type for hoisting switch blades and porcelain bottles | |
CN203474308U (en) | Household lifting device | |
CN204184239U (en) | Cable transfer car(buggy) | |
CN103520853A (en) | Climbing protection device of iron tower and use method thereof | |
CN203647250U (en) | Track type window cleaning machine for complex inner court curtain wall | |
CN204609240U (en) | A kind of building operations waste conveyor | |
CN103720427B (en) | A kind of complicated Neiting curtain wall rail mounted window cleaning equipment | |
CN103332457B (en) | Hydraulic transfer device | |
CN103741939B (en) | The outside climbing type CONSTRUCTION OPERATIONS platform of building and mounting method | |
CN107869259A (en) | A kind of solar energy container trailer | |
CN205172088U (en) | Double -deck garage carries sweep operating system | |
CN204434108U (en) | Telescopic two cover series connection assembly pulley lifting appliances | |
CN106051445B (en) | A kind of outside Wall Cleaning safety equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20121017 |