Hydraulic transfer device
Technical field
the present invention relates to constructional engineering machinery technical field, be specifically related to the hydraulic transfer device of cement prefabricated component in housing industrialization production.
Background technology
In the production of housing industrialization, how being transported to of highly effective and safe builds assembling building site to ready-made cement pre-fabricated panel, is a difficult problem always.At present, the cement pre-fabricated panel poured into a mould is deposited in factory building one place by most domestic producer, wait solid after, then hang on automobile with weight-lifting equipment is Pork-pieces, this transport process is wasted time and energy, and limits to by factory building, and efficiency is low and dangerous.As applicant company has a kind of cement pre-fabricated panel transportation tooling for whole, once can fill 10 pieces of cement pre-fabricated panels, weigh 50 tons, but due to mill construction restriction, the indoor gauntry crane should not installing 50T, so still outdoor finished product district cannot be transported to by what fill the transportation tooling for whole safety and steady of cement pre-fabricated panel, then hung on automobile by the 50T gauntry crane of outdoor, be transported to building site.
Summary of the invention
Technical matters to be solved by this invention is: solve above-mentioned prior art Problems existing, and a kind of hydraulic transfer device is provided, can the transportation tooling for whole that cement pre-fabricated panel is housed is convenient, efficient, safe transport to the finished product district outside factory building, finished product need not be set in factory building and put district, greatly save hall space, and solve in factory building the difficult problem being not suitable for installing large-tonnage gauntry crane, reduce investment outlay, improve work efficiency.
The technical solution used in the present invention is:
A kind of hydraulic transfer device, comprise cement pre-fabricated panel transportation tooling for whole, transhipment station frame, hydraulic transfer trolley, dolly assembly, transhipment station frame is fixedly mounted in factory building, the in-built cement pre-fabricated panel of cement pre-fabricated panel transportation tooling for whole, transhipment station frame carries cement pre-fabricated panel transportation tooling for whole, transhipment station frame is also provided with the current transhipment station mounted track of dolly assembly, hydraulic transfer trolley is also provided with the trolley track that dolly assembly is current, dolly assembly is provided with multiple dolly jack-up oil cylinder.
In technique scheme, described hydraulic transfer trolley runs on ground rail.
In technique scheme, described transhipment station frame is fixedly mounted on the place of suitable transhipment station in factory building, arranges 1-5 transhipment station framves according to need of production.
Advantageous effect:
The present invention substantially increases the safety of production efficiency and operation.Transported by hydraulic transfer trolley after directly installing to transport frock after solid cement pre-fabricated panel form removal, therefore finished product need not be set in factory building and put district, save hall space, save equipment investment, and solve in factory building the difficult problem being not suitable for installing large-tonnage gauntry crane.Structure of the present invention is simple, but design concept is ingenious, convenient in production reality, practical, efficient, safety.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is transhipment station frame and hydraulic transfer trolley structural representation.
In figure, 1-cement pre-fabricated panel, 2-cement pre-fabricated panel transportation tooling for whole, 3-transports station frame, 4-hydraulic transfer trolley, and 5-transports station mounted track, 6-trolley track, 7-dolly assembly, 8-dolly jack-up oil cylinder, 9-operator's station.
Detailed description of the invention
See Fig. 1, Fig. 2, hydraulic transfer device of the present invention, comprise cement pre-fabricated panel transportation tooling for whole 2, transhipment station frame 3, hydraulic transfer trolley 4, dolly assembly 7, transhipment station frame 3 is fixedly mounted in factory building, the in-built cement pre-fabricated panel 1 of cement pre-fabricated panel transportation tooling for whole 2, transhipment station frame 3 carries cement pre-fabricated panel transportation tooling for whole 2, transhipment station frame 3 is also provided with the current transhipment station mounted track 5 of dolly assembly, hydraulic transfer trolley 4 is also provided with the trolley track 6 that dolly assembly is current, dolly assembly 7 is provided with multiple dolly jack-up oil cylinder 8.
Above-mentioned hydraulic transfer trolley 4 runs on ground rail.
Above-mentioned transhipment station frame 3 is fixedly mounted on the place of suitable transhipment station in factory building, arranges 1-5 transhipment station framves according to need of production.
Principle of work:
The present invention includes cement pre-fabricated panel, cement pre-fabricated panel transportation tooling for whole, transhipment station frame, dolly assembly and hydraulic transfer trolley.Transhipment station frame is fixedly mounted on the place that in factory building, transhipment station is suitable, can arrange 1-5 according to need of production, vacant cement pre-fabricated panel transportation tooling for whole is hung transhipment station frame, adjusts position.After solid cement pre-fabricated panel to roll-over table form removal, directly hang in cement pre-fabricated panel transportation tooling for whole by weight-lifting equipment, put successively and fix.After cement pre-fabricated panel fills transportation tooling for whole, hydraulic transfer trolley moves to transhipment station frame on ground rail, its position is detected by electric eye, when transporting station mounted track and trolley track alignment, hydraulic transfer trolley stops, two dollies laterally run along trolley track and transhipment station mounted track simultaneously from hydraulic transfer trolley cart, control dolly by electric eye to stop in transhipment station frame appropriate location, fully loaded cement pre-fabricated panel transportation tooling for whole is held up by 4 dolly jack-up oil cylinders, then hydraulic transfer trolley is got back to along track, oil cylinder is retracted, cement pre-fabricated panel transportation tooling for whole is put on hydraulic transfer trolley, then hydraulic transfer trolley carries fully loaded cement pre-fabricated panel transportation tooling for whole, the finished product district outside factory is transported to along ground rail.Thus the object fully loaded cement pre-fabricated panel transportation tooling for whole being transported to finished product district is outside the venue realized.