CN102729309A - Method for machining bamboo floor - Google Patents

Method for machining bamboo floor Download PDF

Info

Publication number
CN102729309A
CN102729309A CN2012101225963A CN201210122596A CN102729309A CN 102729309 A CN102729309 A CN 102729309A CN 2012101225963 A CN2012101225963 A CN 2012101225963A CN 201210122596 A CN201210122596 A CN 201210122596A CN 102729309 A CN102729309 A CN 102729309A
Authority
CN
China
Prior art keywords
layer
bamboo
floor
minutes
bamboo chip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101225963A
Other languages
Chinese (zh)
Inventor
杨利昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anji Huaxin Bamboo & Wood Products Co Ltd
Original Assignee
Anji Huaxin Bamboo & Wood Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anji Huaxin Bamboo & Wood Products Co Ltd filed Critical Anji Huaxin Bamboo & Wood Products Co Ltd
Priority to CN2012101225963A priority Critical patent/CN102729309A/en
Publication of CN102729309A publication Critical patent/CN102729309A/en
Pending legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The invention relates to the technical field of floor materials and particularly relates to a method for machining a bamboo floor. By improving a carbonization process, a gluing process, a painting process and the like and adding a new process, the total quality of the bamboo floor is improved; the carbonization is good; the bamboo floors with different colors can be produced according to production demands; and the color is uniform. The total quality of the bamboo floor can be further improved by finely polishing; the gluing process is better, so that the integral strength of the floor can be effectively improved with a hot pressing process, the glue using amount is effectively controlled, and the production cost is effectively reduced; and the painting technique is improved, and a coating quantity is reduced, so that the painting amount is greatly reduced, the coating is more stable, and the quality is higher.

Description

The processing method on a kind of bamboo floor
Technical field
the present invention relates to the flooring material technical field, are specially the processing method on a kind of bamboo floor.
Background technology
are present, and the bamboo floor is advantages such as quality is better, anti-skid wearable because it has, and enjoy consumers in general to favor, but because the bamboo wood high humidity; Wettability is poor, is difficult for japanning and gummed, easily drying shrinkage, cracking and distortion; And damage by worms easily and go mouldy, patent of invention discloses the manufacturing approach that CN200810163701.1 discloses a kind of composite bamboo floor, and patent of invention CN200610072808.6 discloses bamboo floor producing technology; Solve some above-mentioned problems to a certain extent, the floor quality is relatively poor, insufficient strength; The appearance flaw is more, and industrial chemicals etc. have wasting phenomenon, and production cost is higher.
Summary of the invention
the purpose of this invention is to provide the processing method that a kind of color and luster is even, intensity is high, are done manual work in meticulousr bamboo floor on the surface.
Above-mentioned technical purpose of the present invention is achieved through following technical scheme: the processing method on a kind of bamboo floor may further comprise the steps: (1) bamboo chip force plane; (2) bamboo chip carbonization: during the carbide furnace venting; Closed the boiler lid; Open steam valve, let the sewage in the pipe discharge row's light, shut sewage draining valve then and carry out timing; Steam must be in 10 minutes during advance carbide furnace with the pressure rises in the stove to 0.26Mpa ± 0.01, carry out exhaust keeping stablizing under the situation of air pressure; (3) drying room is dry; (4) bamboo chip adjustable cast iron planes; (5) select materials: comprise concora crush material, middle material, bed material, match colors then; (6) gluing: the bamboo chip after will selecting materials, match colors through gluing machine carries out gluing, adopts the glue that comprises resin, modifier, curing agent preparation, is spliced into the above blanket of one deck bamboo chip, and glue-spread is controlled at 125-150g/m 2 , the resting period is 20-40 minute; (7) hot-forming; (8) sanding: thin principle is carried out sanding after the regulation position is by first light, and sanding pressure moves towards freely, operates steadily with sand paper is principle; (9) four sides adjustable cast iron planes; (10) paint sprays paint: comprise the transparent priming of ground floor, the transparent priming of the second layer, the 3rd layer transparent priming, the 4th layer scratch resistance flour milling lacquer, the scratch resistance flour milling lacquer of layer 5 successively; Every layer is carried out dry solidification after varnishing with lacquer, and behind the 3rd layer of paint dry solidification, also will carry out a sanding.Adding through to the improvement of carbonization technique, coating technique, lacquer spraying technique etc. and new technology has promoted the oeverall quality on bamboo floor, but also has practiced thrift a lot of materials of using, and has reduced production cost.
as to of the present invention preferred, in step (2) the bamboo chip carbonization, carbonization time is divided into Three Estate: a, 2 hours 10 minutes ± 5 minutes; B, 2 hours 5 minutes ± 5 minutes; 2 hours ± 5 minutes.It is dark that first grade carbonization becomes, second grade carbonization Cheng Zhongse, and the Three Estate carbonization becomes light color, processes according to different production demands.
face toward fan to the bamboo chip of just having pulled out retort after the carbonization with ventilating fan, in order to avoid hot gas makes the bamboo chip variable color and influences end product quality as to of the present invention preferred.
conduct is to of the present invention preferred, and in step (4) the bamboo chip adjustable cast iron planes, bamboo chip positive and negative cutting output is stayed the cutting of bluish yellow ratio in the bamboo bar.
conduct is to of the present invention preferred; In step (6) gluing,, be spliced into the above blanket of one deck through selection to concora crush material, middle material, bed material; The concora crush material is a direct stress surface of suppressing as vertically; The concora crush material can be made lamina, and bed material can be made doubling plate with the concora crush material, and concora crush material, middle material, bed material can be made the plate more than three layers.
conduct is to of the present invention preferred, and in step (6) gluing, the proportioning of glue is: resin: 100 parts, and modifier: 5-8 part, curing agent: 3-4 part, ammonium chloride: 1 part, can effectively improve the intensity on floor.
as to of the present invention preferred, resin viscosity is 130-230mPas, and content of free aldehyde is lower than 0.07%, and burst size of methanal is lower than 0.5mg/L, not only environmental protection but also can promote the performance of glue.
conduct is to of the present invention preferred, and during step (7) was hot-forming, during the blanket of concora crush individual layer, longitudinal pressure was 17-18Mpa; Lateral pressure is 4-6Mpa, and the press time is 8 ± 0.5 minutes, and temperature is 85-90 ℃, during the two-layer blanket of concora crush; Longitudinal pressure is 14-15Mpa, and lateral pressure is 13-15Mpa, and the press time is 7 ± 0.5 minutes; Temperature is 85-90 ℃, and during blanket that concora crush is three layers, longitudinal pressure is 17-18Mpa; Lateral pressure is 15-17Mpa, and the press time is 8 ± 0.5 minutes, and temperature is 85-90 ℃.Another effective way to the floor strength enhancing.
As to of the present invention preferred, during step (10) paint sprayed paint, the ground floor quantity for spray was 10-30 gram/M 2 , second layer quantity for spray is 30-70 gram/M 2 , the 3rd layer of quantity for spray is 15-20 gram/M 2 , the 4th layer of quantity for spray is 15-20 gram/M 2 , the layer 5 quantity for spray is 8-10 gram/M 2
as to of the present invention preferred, ground floor is the dry 6m/min of infrared lamp, second and third, four layers be dry 16 m/min of uviol lamp, layer 5 is uviol lamp drying 10m/min.
above-mentioned two optimal ways can guarantee the good coating quality of getting back under the situation that quantity for spray reduces, and the finished surface quality is better.
the invention has the beneficial effects as follows: carbonization is effective, can produce the bamboo clappers of different tones according to the production demand, and color and luster is even; Improved the total quality of product again through adjustable cast iron planes; Coating technique is better, cooperates heat pressing process to make the bulk strength on floor obtain effective raising, and glue consumption has been waited until effective control, and production cost effectively reduces; The improvement of enamelling process has reduced coating, to such an extent as to the japanning amount reduce greatly, but coating is more stable, quality is more increased.
The specific embodiment
following specific embodiment only is to explanation of the present invention; It is not a limitation of the present invention; Those skilled in the art can make the modification that does not have creative contribution to present embodiment as required after reading this specification, but as long as in claim scope of the present invention, all receive the protection of Patent Law.
Embodiment 4, the processing method on a kind of bamboo floor, and the processing method on a kind of bamboo floor may further comprise the steps: (1) bamboo chip force plane, acromere in the bamboo chip is tied shoot off simultaneously a part of tabasheer and surf green;
(2) bamboo chip carbonization: during the carbide furnace venting, closed the boiler lid, opened steam valve; Let the sewage in the pipe discharge row's light; Shut sewage draining valve then and carry out timing, steam must be in 10 minutes during advance carbide furnace with the pressure rises in the stove to 0.26Mpa ± 0.01, carry out exhaust keeping stablizing under the situation of air pressure; Carbonization time is 2 hours 10 minutes ± 5 minutes, and the bamboo chip of just having pulled out retort after the carbonization is faced toward fan with ventilating fan;
(3) drying room is dry, and the drying room temperature is controlled at 52 ℃-58 ℃, and the bamboo chip index of aridity is controlled in 10%;
(4) bamboo chip adjustable cast iron planes, bamboo chip positive and negative cutting output is stayed the cutting of bluish yellow ratio in the bamboo bar;
(5) select materials: comprise concora crush material, middle material, bed material, match colors then;
(6) gluing: the bamboo chip after will selecting materials, match colors through gluing machine carries out gluing, adopts the glue that comprises resin, modifier, curing agent preparation, is spliced into double-deck blanket; The proportioning of glue is: resin: 100 parts, and modifier: 5 parts, curing agent: 3 parts; Ammonium chloride: 1 part, resin viscosity is 130mPas, and content of free aldehyde is lower than 0.07%; Burst size of methanal is lower than 0.5mg/L, and glue-spread is controlled at 125g/m 2 , the resting period is 20 minutes;
(7) hot-forming, during the double-deck blanket of concora crush, longitudinal pressure is 14Mpa, and lateral pressure is 13Mpa, and the press time is 7 ± 0.5 minutes, and temperature is 85 ℃;
(8) sanding: thin principle is carried out sanding after the regulation position is by first light, and sanding pressure moves towards freely, operates steadily with sand paper is principle;
(9) four sides adjustable cast iron planes makes that the surface is Paint Gloss smooth;
(10) paint sprays paint: comprise the transparent priming of ground floor, the transparent priming of the second layer, the 3rd layer transparent priming, the 4th layer scratch resistance flour milling lacquer, the scratch resistance flour milling lacquer of layer 5 successively; Every layer is carried out dry solidification after varnishing with lacquer; Behind the 3rd layer of paint dry solidification, also will carry out a sanding, the ground floor quantity for spray is 10 gram/M 2 , second layer quantity for spray is 30 gram/M 2 , the 3rd layer of quantity for spray is 15 gram/M 2 , the 4th layer of quantity for spray is 15 gram/M 2 , the layer 5 quantity for spray is 8 gram/M 2 , ground floor is the dry 6m/min of infrared lamp, second and third, four layers be dry 16 m/min of uviol lamp, layer 5 is uviol lamp drying 10m/min.
Embodiment 5, the processing method on a kind of bamboo floor, and the processing method on a kind of bamboo floor may further comprise the steps: (1) bamboo chip force plane, acromere in the bamboo chip is tied shoot off simultaneously a part of tabasheer and surf green;
(2) bamboo chip carbonization: during the carbide furnace venting, closed the boiler lid, opened steam valve; Let the sewage in the pipe discharge row's light; Shut sewage draining valve then and carry out timing, steam must be in 10 minutes during advance carbide furnace with the pressure rises in the stove to 0.26Mpa ± 0.01, carry out exhaust keeping stablizing under the situation of air pressure; Carbonization time is 2 hours 5 minutes ± 5 minutes, and the bamboo chip of just having pulled out retort after the carbonization is faced toward fan with ventilating fan;
(3) drying room is dry, and the drying room temperature is controlled at 52 ℃-58 ℃, and the bamboo chip index of aridity is controlled in 10%;
(4) bamboo chip adjustable cast iron planes, bamboo chip positive and negative cutting output is stayed the cutting of bluish yellow ratio in the bamboo bar;
(5) select materials: comprise concora crush material, middle material, bed material, match colors then;
(6) gluing: the bamboo chip after will selecting materials, match colors through gluing machine carries out gluing, adopts the glue that comprises resin, modifier, curing agent preparation, is spliced into double-deck blanket; The proportioning of glue is: resin: 100 parts, and modifier: 8 parts, curing agent: 4 parts; Ammonium chloride: 1 part, resin viscosity is 230mPas, and content of free aldehyde is lower than 0.07%; Burst size of methanal is lower than 0.5mg/L, and glue-spread is controlled at 125g/m 2 , the resting period is 40 minutes;
(7) hot-forming, during the double-deck blanket of concora crush, longitudinal pressure is 15Mpa, and lateral pressure is 15Mpa, and the press time is 7 ± 0.5 minutes, and temperature is 90 ℃;
(8) sanding: thin principle is carried out sanding after the regulation position is by first light, and sanding pressure moves towards freely, operates steadily with sand paper is principle;
(9) four sides adjustable cast iron planes makes that the surface is Paint Gloss smooth;
(10) paint sprays paint: comprise the transparent priming of ground floor, the transparent priming of the second layer, the 3rd layer transparent priming, the 4th layer scratch resistance flour milling lacquer, the scratch resistance flour milling lacquer of layer 5 successively; Every layer is carried out dry solidification after varnishing with lacquer; Behind the 3rd layer of paint dry solidification, also will carry out a sanding, the ground floor quantity for spray is 30 gram/M 2 , second layer quantity for spray is 70 gram/M 2 , the 3rd layer of quantity for spray is 20 gram/M 2 , the 4th layer of quantity for spray is 20 gram/M 2 , the layer 5 quantity for spray is 10 gram/M 2 , ground floor is the dry 6m/min of infrared lamp, second and third, four layers be dry 16 m/min of uviol lamp, layer 5 is uviol lamp drying 10m/min.
Embodiment 6, the processing method on a kind of bamboo floor, and the processing method on a kind of bamboo floor may further comprise the steps: (1) bamboo chip force plane, acromere in the bamboo chip is tied shoot off simultaneously a part of tabasheer and surf green;
(2) bamboo chip carbonization: during the carbide furnace venting, closed the boiler lid, opened steam valve; Let the sewage in the pipe discharge row's light; Shut sewage draining valve then and carry out timing, steam must be in 10 minutes during advance carbide furnace with the pressure rises in the stove to 0.26Mpa ± 0.01, carry out exhaust keeping stablizing under the situation of air pressure; Carbonization time is 2 hours ± 5 minutes, and the bamboo chip of just having pulled out retort after the carbonization is faced toward fan with ventilating fan;
(3) drying room is dry, and the drying room temperature is controlled at 52 ℃-58 ℃, and the bamboo chip index of aridity is controlled in 10%;
(4) bamboo chip adjustable cast iron planes, bamboo chip positive and negative cutting output is stayed the cutting of bluish yellow ratio in the bamboo bar;
(5) select materials: comprise concora crush material, middle material, bed material, match colors then;
(6) gluing: the bamboo chip after will selecting materials, match colors through gluing machine carries out gluing, adopts the glue that comprises resin, modifier, curing agent preparation, is spliced into double-deck blanket; The proportioning of glue is: resin: 100 parts, and modifier: 7 parts, curing agent: 4 parts; Ammonium chloride: 1 part, resin viscosity is 200mPas, and content of free aldehyde is lower than 0.07%; Burst size of methanal is lower than 0.5mg/L, and glue-spread is controlled at 125g/m 2 , the resting period is 30 minutes;
(7) hot-forming, during the double-deck blanket of concora crush, longitudinal pressure is 14Mpa, and lateral pressure is 14Mpa, and the press time is 7 ± 0.5 minutes, and temperature is 88 ℃;
(8) sanding: thin principle is carried out sanding after the regulation position is by first light, and sanding pressure moves towards freely, operates steadily with sand paper is principle;
(9) four sides adjustable cast iron planes makes that the surface is Paint Gloss smooth;
(10) paint sprays paint: comprise the transparent priming of ground floor, the transparent priming of the second layer, the 3rd layer transparent priming, the 4th layer scratch resistance flour milling lacquer, the scratch resistance flour milling lacquer of layer 5 successively; Every layer is carried out dry solidification after varnishing with lacquer; Behind the 3rd layer of paint dry solidification, also will carry out a sanding, the ground floor quantity for spray is 20 gram/M 2 , second layer quantity for spray is 50 gram/M 2 , the 3rd layer of quantity for spray is 17 gram/M 2 , the 4th layer of quantity for spray is 17 gram/M 2 , the layer 5 quantity for spray is 9 gram/M 2 , ground floor is the dry 6m/min of infrared lamp, second and third, four layers be dry 16 m/min of uviol lamp, layer 5 is uviol lamp drying 10m/min.
Embodiment 7, the processing method on a kind of bamboo floor, and the processing method on a kind of bamboo floor may further comprise the steps: (1) bamboo chip force plane, acromere in the bamboo chip is tied shoot off simultaneously a part of tabasheer and surf green;
(2) bamboo chip carbonization: during the carbide furnace venting, closed the boiler lid, opened steam valve; Let the sewage in the pipe discharge row's light; Shut sewage draining valve then and carry out timing, steam must be in 10 minutes during advance carbide furnace with the pressure rises in the stove to 0.26Mpa ± 0.01, carry out exhaust keeping stablizing under the situation of air pressure; Carbonization time is 2 hours 10 minutes ± 5 minutes, and the bamboo chip of just having pulled out retort after the carbonization is faced toward fan with ventilating fan;
(3) drying room is dry, and the drying room temperature is controlled at 52 ℃-58 ℃, and the bamboo chip index of aridity is controlled in 10%;
(4) bamboo chip adjustable cast iron planes, bamboo chip positive and negative cutting output is stayed the cutting of bluish yellow ratio in the bamboo bar;
(5) select materials: comprise concora crush material, middle material, bed material, match colors then;
(6) gluing: the bamboo chip after will selecting materials, match colors through gluing machine carries out gluing, adopts the glue that comprises resin, modifier, curing agent preparation, is spliced into three layers blanket; The proportioning of glue is: resin: 100 parts, and modifier: 5 parts, curing agent: 3 parts; Ammonium chloride: 1 part, resin viscosity is 130mPas, and content of free aldehyde is lower than 0.07%; Burst size of methanal is lower than 0.5mg/L, and glue-spread is controlled at 125g/m 2 , the resting period is 20 minutes;
(7) hot-forming, during blanket that concora crush is three layers, longitudinal pressure is 17Mpa, and lateral pressure is 15Mpa, and the press time is 8 ± 0.5 minutes, and temperature is 85 ℃;
(8) sanding: thin principle is carried out sanding after the regulation position is by first light, and sanding pressure moves towards freely, operates steadily with sand paper is principle;
(9) four sides adjustable cast iron planes makes that the surface is Paint Gloss smooth;
(10) paint sprays paint: comprise the transparent priming of ground floor, the transparent priming of the second layer, the 3rd layer transparent priming, the 4th layer scratch resistance flour milling lacquer, the scratch resistance flour milling lacquer of layer 5 successively; Every layer is carried out dry solidification after varnishing with lacquer; Behind the 3rd layer of paint dry solidification, also will carry out a sanding, the ground floor quantity for spray is 10 gram/M 2 , second layer quantity for spray is 30 gram/M 2 , the 3rd layer of quantity for spray is 15 gram/M 2 , the 4th layer of quantity for spray is 15 gram/M 2 , the layer 5 quantity for spray is 8 gram/M 2 , ground floor is the dry 6m/min of infrared lamp, second and third, four layers be dry 16 m/min of uviol lamp, layer 5 is uviol lamp drying 10m/min.
Embodiment 8, the processing method on a kind of bamboo floor, and the processing method on a kind of bamboo floor may further comprise the steps: (1) bamboo chip force plane, acromere in the bamboo chip is tied shoot off simultaneously a part of tabasheer and surf green;
(2) bamboo chip carbonization: during the carbide furnace venting, closed the boiler lid, opened steam valve; Let the sewage in the pipe discharge row's light; Shut sewage draining valve then and carry out timing, steam must be in 10 minutes during advance carbide furnace with the pressure rises in the stove to 0.26Mpa ± 0.01, carry out exhaust keeping stablizing under the situation of air pressure; Carbonization time is 2 hours 5 minutes ± 5 minutes, and the bamboo chip of just having pulled out retort after the carbonization is faced toward fan with ventilating fan;
(3) drying room is dry, and the drying room temperature is controlled at 52 ℃-58 ℃, and the bamboo chip index of aridity is controlled in 10%;
(4) bamboo chip adjustable cast iron planes, bamboo chip positive and negative cutting output is stayed the cutting of bluish yellow ratio in the bamboo bar;
(5) select materials: comprise concora crush material, middle material, bed material, match colors then;
(6) gluing: the bamboo chip after will selecting materials, match colors through gluing machine carries out gluing, adopts the glue that comprises resin, modifier, curing agent preparation, is spliced into three layers blanket; The proportioning of glue is: resin: 100 parts, and modifier: 8 parts, curing agent: 4 parts; Ammonium chloride: 1 part, resin viscosity is 230mPas, and content of free aldehyde is lower than 0.07%; Burst size of methanal is lower than 0.5mg/L, and glue-spread is controlled at 125g/m 2 , the resting period is 40 minutes;
(7) hot-forming, during blanket that concora crush is three layers, longitudinal pressure is 18Mpa, and lateral pressure is 17Mpa, and the press time is 8 ± 0.5 minutes, and temperature is 90 ℃;
(8) sanding: thin principle is carried out sanding after the regulation position is by first light, and sanding pressure moves towards freely, operates steadily with sand paper is principle;
(9) four sides adjustable cast iron planes makes that the surface is Paint Gloss smooth;
(10) paint sprays paint: comprise the transparent priming of ground floor, the transparent priming of the second layer, the 3rd layer transparent priming, the 4th layer scratch resistance flour milling lacquer, the scratch resistance flour milling lacquer of layer 5 successively; Every layer is carried out dry solidification after varnishing with lacquer; Behind the 3rd layer of paint dry solidification, also will carry out a sanding, the ground floor quantity for spray is 30 gram/M 2 , second layer quantity for spray is 70 gram/M 2 , the 3rd layer of quantity for spray is 20 gram/M 2 , the 4th layer of quantity for spray is 20 gram/M 2 , the layer 5 quantity for spray is 10 gram/M 2 , ground floor is the dry 6m/min of infrared lamp, second and third, four layers be dry 16 m/min of uviol lamp, layer 5 is uviol lamp drying 10m/min.
Embodiment 9, the processing method on a kind of bamboo floor, and the processing method on a kind of bamboo floor may further comprise the steps: (1) bamboo chip force plane, acromere in the bamboo chip is tied shoot off simultaneously a part of tabasheer and surf green;
(2) bamboo chip carbonization: during the carbide furnace venting, closed the boiler lid, opened steam valve; Let the sewage in the pipe discharge row's light; Shut sewage draining valve then and carry out timing, steam must be in 10 minutes during advance carbide furnace with the pressure rises in the stove to 0.26Mpa ± 0.01, carry out exhaust keeping stablizing under the situation of air pressure; Carbonization time is 2 hours ± 5 minutes, and the bamboo chip of just having pulled out retort after the carbonization is faced toward fan with ventilating fan;
(3) drying room is dry, and the drying room temperature is controlled at 52 ℃-58 ℃, and the bamboo chip index of aridity is controlled in 10%;
(4) bamboo chip adjustable cast iron planes, bamboo chip positive and negative cutting output is stayed the cutting of bluish yellow ratio in the bamboo bar;
(5) select materials: comprise concora crush material, middle material, bed material, match colors then;
(6) gluing: the bamboo chip after will selecting materials, match colors through gluing machine carries out gluing, adopts the glue that comprises resin, modifier, curing agent preparation, is spliced into three layers blanket; The proportioning of glue is: resin: 100 parts, and modifier: 7 parts, curing agent: 4 parts; Ammonium chloride: 1 part, resin viscosity is 200mPas, and content of free aldehyde is lower than 0.07%; Burst size of methanal is lower than 0.5mg/L, and glue-spread is controlled at 125g/m 2 , the resting period is 30 minutes;
(7) hot-forming, during blanket that concora crush is three layers, longitudinal pressure is 18Mpa, and lateral pressure is 16Mpa, and the press time is 8 ± 0.5 minutes, and temperature is 88 ℃;
(8) sanding: thin principle is carried out sanding after the regulation position is by first light, and sanding pressure moves towards freely, operates steadily with sand paper is principle;
(9) four sides adjustable cast iron planes makes that the surface is Paint Gloss smooth;
(10) paint sprays paint: comprise the transparent priming of ground floor, the transparent priming of the second layer, the 3rd layer transparent priming, the 4th layer scratch resistance flour milling lacquer, the scratch resistance flour milling lacquer of layer 5 successively; Every layer is carried out dry solidification after varnishing with lacquer; Behind the 3rd layer of paint dry solidification, also will carry out a sanding, the ground floor quantity for spray is 20 gram/M 2 , second layer quantity for spray is 50 gram/M 2 , the 3rd layer of quantity for spray is 17 gram/M 2 , the 4th layer of quantity for spray is 17 gram/M 2 , the layer 5 quantity for spray is 9 gram/M 2 , ground floor is the dry 6m/min of infrared lamp, second and third, four layers be dry 16 m/min of uviol lamp, layer 5 is uviol lamp drying 10m/min.
Below be the finished surface quality:
bubbling! φ ≦ 0.5mm): every is no more than 3; A pin hole! φ ≦ 0.5mm): every is no more than 3; Elephant skin: ≦ plate area 5%; Leak brush: ≦ plate area 5%; Particle: apart from plate face 0.4m, perusal is not remarkable.

Claims (10)

1. the processing method on a bamboo floor is characterized in that, may further comprise the steps:
(1) bamboo chip force plane;
(2) bamboo chip carbonization: during the carbide furnace venting; Closed the boiler lid; Open steam valve, let the sewage in the pipe discharge row's light, shut sewage draining valve then and carry out timing; Steam must be in 10 minutes during advance carbide furnace with the pressure rises in the stove to 0.26Mpa ± 0.01, carry out exhaust keeping stablizing under the situation of air pressure;
(3) drying room is dry;
(4) bamboo chip adjustable cast iron planes;
(5) select materials: comprise concora crush material, middle material, bed material, match colors then;
(6) gluing: the bamboo chip after will selecting materials, match colors through gluing machine carries out gluing, adopts the glue that comprises resin, modifier, curing agent preparation, is spliced into the above blanket of one deck bamboo chip, and glue-spread is controlled at 125-150g/m 2, the resting period is 20-40 minute;
(7) hot-forming;
(8) sanding: thin principle is carried out sanding after the regulation position is by first light, and sanding pressure moves towards freely, operates steadily with sand paper is principle;
(9) four sides adjustable cast iron planes;
(10) paint sprays paint: comprise the transparent priming of ground floor, the transparent priming of the second layer, the 3rd layer transparent priming, the 4th layer scratch resistance flour milling lacquer, the scratch resistance flour milling lacquer of layer 5 successively; Every layer is carried out dry solidification after varnishing with lacquer, and behind the 3rd layer of paint dry solidification, also will carry out a sanding.
2. the processing method on a kind of bamboo according to claim 1 floor is characterized in that, in said step (2) the bamboo chip carbonization, carbonization time is divided into Three Estate: a, 2 hours 10 minutes ± 5 minutes; B, 2 hours 5 minutes ± 5 minutes; 2 hours ± 5 minutes.
3. the processing method on a kind of bamboo according to claim 1 and 2 floor is characterized in that, the bamboo chip of just having pulled out retort after the carbonization is faced toward fan with ventilating fan.
4. the processing method on a kind of bamboo according to claim 1 and 2 floor is characterized in that, in said step (4) the bamboo chip adjustable cast iron planes, bamboo chip positive and negative cutting output is stayed the cutting of bluish yellow ratio in the bamboo bar.
5. the processing method on a kind of bamboo according to claim 1 and 2 floor is characterized in that, in said step (6) gluing, through the selection to concora crush material, middle material, bed material, is spliced into the above blanket of one deck.
6. the processing method on a kind of bamboo according to claim 1 and 2 floor is characterized in that, in said step (6) gluing, the proportioning of glue is: resin: 100 parts, and modifier: 5-8 part, curing agent: 3-4 part, ammonium chloride: 1 part.
7. the processing method on a kind of bamboo according to claim 6 floor is characterized in that resin viscosity is 130-230mPas, and content of free aldehyde is lower than 0.07%, and burst size of methanal is lower than 0.5mg/L.
8. the processing method on a kind of bamboo according to claim 1 and 2 floor is characterized in that, during said step (7) is hot-forming, during the blanket of concora crush individual layer; Longitudinal pressure is 17-18Mpa, and lateral pressure is 4-6Mpa, and the press time is 8 ± 0.5 minutes, and temperature is 85-90 ℃; During the two-layer blanket of concora crush, longitudinal pressure is 14-15Mpa, and lateral pressure is 13-15Mpa, and the press time is 7 ± 0.5 minutes; Temperature is 85-90 ℃, and during blanket that concora crush is three layers, longitudinal pressure is 17-18Mpa; Lateral pressure is 15-17Mpa, and the press time is 8 ± 0.5 minutes, and temperature is 85-90 ℃.
9. the processing method on a kind of bamboo according to claim 1 and 2 floor is characterized in that, during said step (10) paint sprayed paint, the ground floor quantity for spray was 10-30 gram/M 2, second layer quantity for spray is 30-70 gram/M 2, the 3rd layer of quantity for spray is 15-20 gram/M 2, the 4th layer of quantity for spray is 15-20 gram/M 2, the layer 5 quantity for spray is 8-10 gram/M 2
10. the processing method on a kind of bamboo according to claim 9 floor is characterized in that, ground floor is the dry 6m/min of infrared lamp, second and third, four layers be dry 16 m/min of uviol lamp, layer 5 is uviol lamp drying 10m/min.
CN2012101225963A 2012-04-25 2012-04-25 Method for machining bamboo floor Pending CN102729309A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101225963A CN102729309A (en) 2012-04-25 2012-04-25 Method for machining bamboo floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101225963A CN102729309A (en) 2012-04-25 2012-04-25 Method for machining bamboo floor

Publications (1)

Publication Number Publication Date
CN102729309A true CN102729309A (en) 2012-10-17

Family

ID=46985953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101225963A Pending CN102729309A (en) 2012-04-25 2012-04-25 Method for machining bamboo floor

Country Status (1)

Country Link
CN (1) CN102729309A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103419261A (en) * 2013-07-24 2013-12-04 安徽龙华竹业有限公司 Method for manufacturing bamboo gusset plate furniture
CN103433184A (en) * 2013-08-19 2013-12-11 苏州圣韵工艺科技有限公司 Base triple bottoming method of bamboo charcoal picture art ware
CN103758326A (en) * 2013-07-04 2014-04-30 江西南丰振宇实业集团有限公司 Processing process of sapele simulation strand woven bamboo floor
CN103752490A (en) * 2013-07-04 2014-04-30 江西南丰振宇实业集团有限公司 Processing process of iroko simulation strand woven bamboo floor
CN104070585A (en) * 2014-06-11 2014-10-01 陈晓岗 Processing method for bamboo wood
CN104339429A (en) * 2013-08-05 2015-02-11 廖树汉 Bamboo sandwich board with higher impact resistance and higher quality than plywood
CN104708697A (en) * 2015-03-23 2015-06-17 覃健林 Processing method for bamboo moisture equilibrium carbonization
CN106217509A (en) * 2016-07-29 2016-12-14 上海轩颂建筑科技有限公司 A kind of preparation method of high-performance bamboo plywood
CN106765661A (en) * 2017-02-22 2017-05-31 国际竹藤中心 A kind of round bamboo negative ion air cleaner and preparation method thereof
CN107030838A (en) * 2017-05-12 2017-08-11 尤溪县三强竹木制品有限公司 A kind of mural painting chopping board production technology
CN110605771A (en) * 2019-07-31 2019-12-24 湖北绿知堂竹业股份有限公司 Production and processing method of bamboo furniture
CN114347205A (en) * 2022-01-27 2022-04-15 广东省林业科学研究院 Carbonized bamboo floor and preparation method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101053969A (en) * 2006-04-10 2007-10-17 朱成功 Bamboo floor producing technology
CN102152365A (en) * 2011-01-30 2011-08-17 福建省建瓯市华宇竹业有限公司 Processing technique of bamboo billet boards for bamboo floors

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101053969A (en) * 2006-04-10 2007-10-17 朱成功 Bamboo floor producing technology
CN102152365A (en) * 2011-01-30 2011-08-17 福建省建瓯市华宇竹业有限公司 Processing technique of bamboo billet boards for bamboo floors

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
唐小丽: "新型装饰材料-竹地板", 《人造板通讯》 *
肖易: "竹地板生产技术", 《中国林业产业》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758326A (en) * 2013-07-04 2014-04-30 江西南丰振宇实业集团有限公司 Processing process of sapele simulation strand woven bamboo floor
CN103752490A (en) * 2013-07-04 2014-04-30 江西南丰振宇实业集团有限公司 Processing process of iroko simulation strand woven bamboo floor
CN103752490B (en) * 2013-07-04 2015-07-15 江西南丰振宇实业集团有限公司 Processing process of iroko simulation strand woven bamboo floor
CN103419261B (en) * 2013-07-24 2016-08-10 安徽龙华竹业有限公司 A kind of manufacture method of bamboo gusset plate furniture
CN103419261A (en) * 2013-07-24 2013-12-04 安徽龙华竹业有限公司 Method for manufacturing bamboo gusset plate furniture
CN104339429A (en) * 2013-08-05 2015-02-11 廖树汉 Bamboo sandwich board with higher impact resistance and higher quality than plywood
CN103433184A (en) * 2013-08-19 2013-12-11 苏州圣韵工艺科技有限公司 Base triple bottoming method of bamboo charcoal picture art ware
CN104070585A (en) * 2014-06-11 2014-10-01 陈晓岗 Processing method for bamboo wood
CN104708697A (en) * 2015-03-23 2015-06-17 覃健林 Processing method for bamboo moisture equilibrium carbonization
CN106217509A (en) * 2016-07-29 2016-12-14 上海轩颂建筑科技有限公司 A kind of preparation method of high-performance bamboo plywood
CN106765661A (en) * 2017-02-22 2017-05-31 国际竹藤中心 A kind of round bamboo negative ion air cleaner and preparation method thereof
CN107030838A (en) * 2017-05-12 2017-08-11 尤溪县三强竹木制品有限公司 A kind of mural painting chopping board production technology
CN110605771A (en) * 2019-07-31 2019-12-24 湖北绿知堂竹业股份有限公司 Production and processing method of bamboo furniture
CN114347205A (en) * 2022-01-27 2022-04-15 广东省林业科学研究院 Carbonized bamboo floor and preparation method thereof

Similar Documents

Publication Publication Date Title
CN102729309A (en) Method for machining bamboo floor
CN102490234A (en) Production process for bamboo floor boards
CN106592919A (en) Multi-layer solid wood composite floor and processing method thereof
CN103770430B (en) A kind of flexible compound decorative veneer " finishing process
CN102080440B (en) Concave-convex obvious texture solid floor and manufacturing method thereof
CN101053967B (en) Wood simulation wood grain surface harden processing method
CN103659999A (en) Manufacturing process of raw bamboo furniture
CN103317821B (en) A kind of manufacturing process of melamine decorative wood-based plate
CN106239679A (en) A kind of manufacture method of solid wood skirting modelled after an antique
CN103419521A (en) Aluminum plate heat transfer printing method
CN102500535A (en) Processing technique for bamboo flooring with wood grains
CN104691203A (en) Plate surface pattern manufacturing technology and manufactured plate and furniture
WO2010030971A3 (en) Process for the production of a dark-color multi-layer coating
CN109208377A (en) A kind of production technology of wear-resistant immersion paper
CN105345909A (en) Method for manufacturing environment-friendly antibacterial recombined aesthetic pattern decorative sheet
CN102626942A (en) Manufacture method for bamboo charcoal cork product
CN103770181B (en) A kind of imitative Cumaru heavy bamboo floor processing technology
CN111749425A (en) Antique solid wood composite floor and production process thereof
CN103395251B (en) A kind of manufacturing process of synthetic resin face artificial board
CN101264616A (en) Method for manufacturing colorful bamboo wood board
CN103753680B (en) A kind of imitative teak heavy bamboo floor processing technology
CN108582381A (en) A kind of processing method of bamboo flooring
CN110039614A (en) A kind of production method of baking vanish door-plate
CN201865299U (en) Concave-convex grain solid wood floor
CN105500482A (en) Manufacturing method of paint-free technical wood

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121017