CN102709855A - 用于配电线路中边相导线的张紧方法 - Google Patents

用于配电线路中边相导线的张紧方法 Download PDF

Info

Publication number
CN102709855A
CN102709855A CN2012101339042A CN201210133904A CN102709855A CN 102709855 A CN102709855 A CN 102709855A CN 2012101339042 A CN2012101339042 A CN 2012101339042A CN 201210133904 A CN201210133904 A CN 201210133904A CN 102709855 A CN102709855 A CN 102709855A
Authority
CN
China
Prior art keywords
connecting rod
phase conductor
limit phase
bearing pin
aluminium alloy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101339042A
Other languages
English (en)
Inventor
陈俊科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUANSHI POWER SUPPLY BUREAU
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Original Assignee
YUANSHI POWER SUPPLY BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUANSHI POWER SUPPLY BUREAU filed Critical YUANSHI POWER SUPPLY BUREAU
Priority to CN2012101339042A priority Critical patent/CN102709855A/zh
Publication of CN102709855A publication Critical patent/CN102709855A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本发明涉及一种用于配电线路中边相导线的张紧方法,包括以下步骤:在耐张杆横担两端设置导向滑轮;将边相导线的自由端绕过导向滑轮后再穿过一个铝合金紧线器;在铝合金紧线器上设置一个U型环扣;将带有牵引绳的牵引滑轮绕在平衡绳的中部;最后将平衡绳的两个自由端分别固定在两个铝合金紧线器的U型环扣中,通过牵引牵引绳将两根边相导线拉紧。本发明的应用能够保证配电线路中两边相导线在紧线过程中的受力平衡,不会使耐张杆横担发生扭转,并且还能够提高紧线的工作效率。

Description

用于配电线路中边相导线的张紧方法
技术领域
本发明涉及一种操作方法,具体地说是一种紧线方法。
背景技术
在电力系统中从降压变电站把电力输送到配电变压器或者将配电变压器的电力输送到用电单位的线路成为配电线路。配电线路的新建、大修或改造过程中大都采用混凝土电杆来对导线进行支撑,导线通过耐张杆横担架设在混凝土电杆上,这样可以保证导线安装的牢固性。配电线路中通常输送的单相电压,也就说相邻混凝土电杆之间通常只平行架设两根边相导线。边相导线放置在耐张杆横担上后,需要将相邻混凝土电杆之间的边相导线拉紧才能固定。目前常用的方法是采用紧线器对每一根边相导线分别进行拉紧操作,但在紧线过程中,由于两根边相导线分别由两组力量进行拉紧,因此紧线时施加在两根边相导线上的力量便不会均匀,当两组力量相差较大时,极易造成耐张杆横担扭转,当耐张杆横担扭转至与边相导线平行时,则会使两根边相导线交叉,出现这种情况后再去调正耐张杆横担,则会非常麻烦,耗费较大的人力物力。
发明内容
本发明要解决的技术问题是提供一种紧线方法,能够保证配电线路中两边相导线在紧线过程中的受力平衡,不会使耐张杆横担发生扭转,并且还能够提高紧线的工作效率。
为解决上述技术问题,本发明所采取的技术方案如下。
用于配电线路中边相导线的张紧方法,包括以下操作步骤:
A.首先在耐张杆横担两端安装边相导线的位置分别设置一个导向滑轮;
B.将边相导线的自由端绕过导向滑轮后再穿过一个铝合金紧线器,用铝合金紧线器将边相导线卡紧;
C.在铝合金紧线器上设置一个U型环扣;
D.将带有牵引绳的牵引滑轮绕在平衡绳的中部;
E.将平衡绳的两个自由端分别固定在两个铝合金紧线器的U型环扣中,通过牵引牵引绳将两根边相导线拉紧。
上述平衡绳为钢丝绳,钢丝绳的直径为10~14mm,长度为10~15m。
本发明所述铝合金紧线器的具体结构为:所述铝合金紧线器包括底板、连杆Ⅰ、连杆Ⅱ、连杆Ⅲ以及拉手,底板上设置有凸块、滑道Ⅰ和滑道Ⅱ;所述连杆Ⅰ和拉手通过销轴Ⅰ活动铰接在底板的滑道Ⅰ中,连杆Ⅰ和连杆Ⅱ的一端通过销轴Ⅱ铰接,连杆Ⅱ的中部和连杆Ⅲ通过销轴Ⅲ铰接,连杆Ⅱ的另一端与底板的凸块通过销轴Ⅳ铰接,连杆Ⅲ通过销轴Ⅴ铰接在底板的滑道Ⅱ中,滑道Ⅱ相对滑道Ⅰ倾斜设置;所述凸块与连杆Ⅲ之间设置有用于穿过边相导线的导线卡槽。
所述拉手的改进在于:拉手为U形结构,所述拉手的两开口端分别位于底板的两侧并通过销轴Ⅰ铰接。
本发明的改进还在于:所述销轴Ⅱ上设置有使连杆Ⅰ、连杆Ⅱ及连杆Ⅲ收缩的复位弹簧。
由于采用了上述技术方案,本发明所取得的技术进步在于。
本发明所述的紧线方法简单、实用、易懂、易学,在实际工作中可操作性强。在配电线路建设过程中采用本发明所述的方法进行导线的拉紧,可通过设置在横担上的与导线相配装的滑轮在紧线过程中将两边相的导线弧垂自动调平,免去在紧线过程中对单相导线进行相互调弧垂的工序,缩短了施工时间,在保证施工质量的基础上,大大提高了工作效率。配电线路中平衡绳紧线法的使用,有效避免了配电线路在新建、大修或改造工程施工过程中出现过的耐张杆横担扭转现象, 为标准化的线路施工建设奠定了坚实的基础。
 平衡绳采用直径为10~14mm,长度为10~15m的钢丝绳,可以充分保证相邻混凝土电杆之间边相导线拉紧时所需的拉力要求。如果直径较小,在张紧过程中则容易出现平衡绳断裂;如果直径较大则不能与牵引滑轮相配装,并且容易滑出牵引滑轮的轮槽,造成张紧时平衡绳脱落现象的发生。
本发明中所限定的铝合金紧线器结构简单、操作方便,各部件以底板为基准,运用杠杆原理设计,使用寿命长。拉手设置为弧形结构,方便工作人员在操作时握持;复位弹簧的设置,能够使边相导线在穿过导线卡槽后使连杆Ⅰ、连杆Ⅱ及连杆Ⅲ自动复位,减轻了工作人员的工作量,提高了工作效率。
附图说明
图1:本发明紧线状态时的示意图。
图2:为本发明所述的铝合金紧线器的结构示意图。
其中:1.铝合金紧线器,2.牵引滑轮,3.导向滑轮,4.平衡绳,5.边相导线,6.耐张杆横担,7.混凝土电杆,8.U型环扣,9.牵引绳, 11.底板,110.凸块,111.滑道Ⅰ,112.滑道Ⅱ,12.拉手,13.连杆Ⅰ,14.连杆Ⅱ,15.连杆Ⅲ,161.销轴Ⅰ,162.销轴Ⅱ,163.销轴Ⅲ,164.销轴Ⅳ,165.销轴Ⅴ,L.导线卡槽。
具体实施方式
下面将结合附图和具体实施例对本发明作进一步详细说明。
一种用于配电线路中边相导线的张紧方法,在操作过程中主要用到铝合金紧线器两个,牵引滑轮一个,导向滑轮两个,平衡绳一条,牵引机一台。
本实施例中牵引绳采用直径为14mm、长度为10m的钢丝绳,钢丝绳的两自由端插成绳套形式。
本发明的具体操作步骤如下所述:
A.首先在耐张杆横担6的两端、安装边相导线的位置上分别固定一个导向滑轮3;导向滑轮朝上设置,导向滑轮的轮槽深度大于边相导线的直径,以边相导线保证在张紧过程中不会脱离导向滑轮而飞离。
B.分别将两条边相导线5的自由端绕过耐张杆横担上相应位置的导向滑轮3,然后再将该自由端穿过一个铝合金紧线器1,用铝合金紧线器将边相导线卡紧。
上述的铝合金紧线器包括底板11、连杆Ⅰ、连杆Ⅱ、连杆Ⅲ以及拉手;底板上设置有凸块、滑道Ⅰ和滑道Ⅱ;拉手为U形结构,拉手的两开口端分别位于底板的两侧;凸块与连杆Ⅲ之间设置有用于穿过边相导线的导线卡槽L。
其中连杆Ⅰ和拉手通过销轴Ⅰ活动铰接在底板的滑道Ⅰ中,连杆Ⅰ和底板均位于拉手的两开口端之间。滑道Ⅰ中靠近导线卡槽的一端还设置有用于使销轴Ⅰ复位的复位弹簧。连杆Ⅱ的一端和连杆Ⅰ通过销轴Ⅱ铰接,连杆Ⅱ的中部和连杆Ⅲ通过销轴Ⅲ铰接,连杆Ⅱ的另一端与底板的凸块通过销轴Ⅳ铰接。连杆Ⅲ通过销轴Ⅴ铰接在底板的滑道Ⅱ中。本实施例中滑道Ⅰ、销轴Ⅰ以及销轴Ⅴ三者的连线为一条直线,滑道Ⅱ相对该直线倾斜设置。
在穿边相导线的过程中,首先通过操作拉手,使拉手和连杆Ⅰ在滑道Ⅰ中向导线卡槽L侧运动,此时连杆Ⅱ在连杆Ⅰ作用下导线卡槽L侧运动,并同时带动连杆Ⅲ在滑道Ⅱ中向导线卡槽L的进线端移动,从而将连杆Ⅲ与凸块分离,并形成导线卡槽L;然后将边相导线穿过导线卡槽,再松开拉手,此时连杆Ⅰ、连杆Ⅱ及连杆Ⅲ在复位弹簧的作用下复位,将边相导线卡紧。
C.在铝合金紧线器的拉手上设置一个U型环扣8,U型环扣环接在拉手上。
D.将钢丝绳穿在一个带有牵引绳9的牵引滑轮2中。
E.最后再将钢丝绳两个自由端的绳套分别套接在两个铝合金紧线器的U型环扣的扣环中,通过牵引机牵引牵引绳的另一端,将两根边相导线拉紧。
由于牵引滑轮设置在钢丝绳的中部,牵引线固定在牵引滑轮中,牵引机在紧线过程中对两边相导线同时施加拉力,使两边相导线受力平衡,然后根据边相导线的弧垂要求进行牵引。采用本发明所述的方法对边相导线进行张紧后,两边相导线的弧垂是一样的,并且耐张杆横担不会转动,保证了施工的规范性,提高了工作效率。

Claims (5)

1.用于配电线路中边相导线的张紧方法,其特征在于包括以下操作步骤:
A.首先在耐张杆横担两端安装边相导线的位置分别设置一个导向滑轮;
B.将边相导线的自由端绕过导向滑轮后再穿过一个铝合金紧线器,用铝合金紧线器将边相导线卡紧;
C.在铝合金紧线器上设置一个U型环扣;
D.将一平衡绳穿在一带有牵引绳的牵引滑轮中;
E.将平衡绳的两个自由端分别固定在两个铝合金紧线器的U型环扣中,通过牵引牵引绳将两根边相导线拉紧。
2.根据权利要求1所述的用于配电线路中边相导线的张紧方法,其特征在于:所述平衡绳为钢丝绳,钢丝绳的直径为10~14mm,长度为10~15m。
3.根据权利要求1所述的用于配电线路中边相导线的张紧方法,其特征在于:所述铝合金紧线器包括底板(11)、连杆Ⅰ(13)、连杆Ⅱ(14)、连杆Ⅲ(15)以及拉手(12),底板上设置有凸块(110)、滑道Ⅰ(111)和滑道Ⅱ(112);所述连杆Ⅰ(13)和拉手(12)通过销轴Ⅰ(161)活动铰接在底板的滑道Ⅰ(111)中,连杆Ⅰ(13)和连杆Ⅱ(14)的一端通过销轴Ⅱ(162)铰接,连杆Ⅱ(14)的中部和连杆Ⅲ(15)通过销轴Ⅲ(163)铰接,连杆Ⅱ(14)的另一端与底板的凸块(110)通过销轴Ⅳ(164)铰接,连杆Ⅲ(15)通过销轴Ⅴ(165)铰接在底板的滑道(112)中,滑道Ⅱ(112)相对滑道Ⅰ(111)倾斜设置;所述凸块(110)与连杆Ⅲ(15)之间设置有用于穿过边相导线的导线卡槽(L)。
4.根据权利要求3所述的用于配电线路中边相导线的张紧方法,其特征在于:所述拉手(12)为U形结构,所述拉手的两开口端分别位于底板的两侧并通过销轴Ⅰ(161)铰接。
5.根据权利要求3所述的用于配电线路中边相导线的张紧方法,其特征在于:所述销轴Ⅱ(162)上设置有使连杆Ⅰ(13)、连杆Ⅱ(14)及连杆Ⅲ(15)收缩的复位弹簧。
CN2012101339042A 2012-05-03 2012-05-03 用于配电线路中边相导线的张紧方法 Pending CN102709855A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101339042A CN102709855A (zh) 2012-05-03 2012-05-03 用于配电线路中边相导线的张紧方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101339042A CN102709855A (zh) 2012-05-03 2012-05-03 用于配电线路中边相导线的张紧方法

Publications (1)

Publication Number Publication Date
CN102709855A true CN102709855A (zh) 2012-10-03

Family

ID=46902474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101339042A Pending CN102709855A (zh) 2012-05-03 2012-05-03 用于配电线路中边相导线的张紧方法

Country Status (1)

Country Link
CN (1) CN102709855A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105098652A (zh) * 2015-07-23 2015-11-25 国网山东省电力公司菏泽供电公司 一种10千伏配电线路施工工艺
CN105098661A (zh) * 2015-07-23 2015-11-25 国网山东省电力公司菏泽供电公司 一种0.4千伏低压线路施工工艺
CN105241769A (zh) * 2015-11-17 2016-01-13 国网福建省电力有限公司 一种水泥电杆动态加载装置及加载方法
CN107681552A (zh) * 2017-11-22 2018-02-09 云南电网有限责任公司带电作业分公司 一种绝缘操作杆带电作业用10kV导线张力加强器

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53120043A (en) * 1977-03-29 1978-10-20 Innocente Riganti Off Mec Selffholding clamp for cable
CN88211406U (zh) * 1988-02-02 1988-12-28 上海川沙洋泾朱湾村经济合作社 裸金属多股绞合线紧线器
CN2840433Y (zh) * 2005-11-04 2006-11-22 肖东 安装电缆拉紧夹具
CN201048251Y (zh) * 2007-06-07 2008-04-16 扬州工三电力机具有限公司 挂胶导线卡线器
CN201222628Y (zh) * 2008-06-27 2009-04-15 李文福 配电线路跨越公路用架杆工具
CN201608461U (zh) * 2009-11-10 2010-10-13 大庆电业局 耐张钢管杆紧放线滑车
CN201781228U (zh) * 2010-07-16 2011-03-30 攀枝花电业局 改进铝合金卡线器
CN202142811U (zh) * 2011-08-01 2012-02-08 佳木斯电业局 双轮朝天滑车
CN102412532A (zh) * 2011-12-02 2012-04-11 山东电力集团公司威海供电公司 架空线滑轮装置

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53120043A (en) * 1977-03-29 1978-10-20 Innocente Riganti Off Mec Selffholding clamp for cable
CN88211406U (zh) * 1988-02-02 1988-12-28 上海川沙洋泾朱湾村经济合作社 裸金属多股绞合线紧线器
CN2840433Y (zh) * 2005-11-04 2006-11-22 肖东 安装电缆拉紧夹具
CN201048251Y (zh) * 2007-06-07 2008-04-16 扬州工三电力机具有限公司 挂胶导线卡线器
CN201222628Y (zh) * 2008-06-27 2009-04-15 李文福 配电线路跨越公路用架杆工具
CN201608461U (zh) * 2009-11-10 2010-10-13 大庆电业局 耐张钢管杆紧放线滑车
CN201781228U (zh) * 2010-07-16 2011-03-30 攀枝花电业局 改进铝合金卡线器
CN202142811U (zh) * 2011-08-01 2012-02-08 佳木斯电业局 双轮朝天滑车
CN102412532A (zh) * 2011-12-02 2012-04-11 山东电力集团公司威海供电公司 架空线滑轮装置

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周研: "更换低压导线[50mm]以上作业标准手册", 《农村电气化》, no. 08, 31 August 2010 (2010-08-31), pages 64 - 65 *
山西省电力工业局: "《供电线路(电缆)施工、运行、检修》", 31 January 1999, 中国电力出版社, article "导线、避雷线紧线施工", pages: 193-199 *
戴仁发: "《输配电线路施工》", 31 August 2006, 中国电力出版社, article "紧线施工;紧线、平衡挂线和附件安装", pages: 205-209 - 271-274 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105098652A (zh) * 2015-07-23 2015-11-25 国网山东省电力公司菏泽供电公司 一种10千伏配电线路施工工艺
CN105098661A (zh) * 2015-07-23 2015-11-25 国网山东省电力公司菏泽供电公司 一种0.4千伏低压线路施工工艺
CN105241769A (zh) * 2015-11-17 2016-01-13 国网福建省电力有限公司 一种水泥电杆动态加载装置及加载方法
CN105241769B (zh) * 2015-11-17 2018-02-09 国网福建省电力有限公司 一种水泥电杆动态加载装置及加载方法
CN107681552A (zh) * 2017-11-22 2018-02-09 云南电网有限责任公司带电作业分公司 一种绝缘操作杆带电作业用10kV导线张力加强器
CN107681552B (zh) * 2017-11-22 2024-02-20 云南电网有限责任公司带电作业分公司 一种绝缘操作杆带电作业用10kV导线张力加强器

Similar Documents

Publication Publication Date Title
CN100464474C (zh) 高压输电线路用耐张绝缘子串的带电更换方法及装置
CN102290742B (zh) 张力架线施工工艺
CN205429581U (zh) 一种用于电子领域的锁杆结构
WO2016000434A1 (zh) 一种导线快速连接装置及带电导线连接结构
CN105914657B (zh) 便携式双盘循环紧线器及其应用的紧线方法
CN104143782B (zh) 一种±800kV线路耐张绝缘子串的带电更换工具及方法
CN102354926A (zh) 大截面导线张力架线施工方法
CN103618258B (zh) 一种输电线路架设紧线器
CN104538887B (zh) 一种避雷线提升转换器
CN102709855A (zh) 用于配电线路中边相导线的张紧方法
CN104003291B (zh) 一种发电厂锅炉装备安装用单轨行走吊具
CN110172919A (zh) 一种矮塔斜拉桥穿索方法及系统
CN203850726U (zh) 一种10kV配电线路杆上吊线器
CN106786157A (zh) 通航水面上方的输电线路大跨越拆旧方法
CN102025119B (zh) 放线系统及方法
CN202550413U (zh) 一种平行集束电缆紧线器
CN202197048U (zh) 一种塔用双角钢挂点起重连接工具
CN202602171U (zh) 带电更换220kV线路多回路双分裂导线绝缘子工具
CN203722140U (zh) 一种电力架线人力紧线装置
CN109346996A (zh) 一种电力施工紧线装置及紧线方法
CN210326721U (zh) 一种架空线路架设工具
CN201191731Y (zh) 电动绞磨
CN103618250A (zh) 超、特高压线路带电更换双v、双l绝缘子串的作业方法
CN208508389U (zh) 一种三相四线制线缆紧线器
CN202405723U (zh) 一种悬垂绝缘子串与耐张线夹的组合结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: YUANSHI POWER SUPPLY BUREAU

Effective date: 20121017

Owner name: HEBEI ELECTRIC POWER CORPORATION YUANSHI POWER SUP

Effective date: 20121017

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 051130 SHIJIAZHUANG, HEBEI PROVINCE TO: 100031 DONGCHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20121017

Address after: 100031 West Chang'an Avenue, Beijing, No. 86

Applicant after: State Grid Corporation of China

Applicant after: Hebei Electric Power Corporation

Applicant after: Yuanshi Power Supply Bureau

Address before: Yuanshi County 051130 Hebei city of Shijiazhuang province Grenville Street Power Supply Bureau

Applicant before: Yuanshi Power Supply Bureau

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 100031 West Chang'an Avenue, Beijing, No. 86

Applicant after: State Grid Corporation of China

Applicant after: State Grid Hebei Electric Power Company

Applicant after: State Grid Hebei Electric Power Company Yuanshi Power Supply Branch

Address before: 100031 West Chang'an Avenue, Beijing, No. 86

Applicant before: State Grid Corporation of China

Applicant before: Hebei Electric Power Corporation

Applicant before: Yuanshi Power Supply Bureau

CB03 Change of inventor or designer information

Inventor after: Chen Junke

Inventor after: Feng Huan

Inventor after: Zhang Huijun

Inventor after: Dong Tianyu

Inventor before: Chen Junke

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CHEN JUNKE TO: CHEN JUNKE FENG HUAN ZHANG HUIJUN DONG TIANYU

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121003