CN102708225A - 一种交直流大电网电磁暂态仿真的分片调试方法 - Google Patents

一种交直流大电网电磁暂态仿真的分片调试方法 Download PDF

Info

Publication number
CN102708225A
CN102708225A CN2012101098120A CN201210109812A CN102708225A CN 102708225 A CN102708225 A CN 102708225A CN 2012101098120 A CN2012101098120 A CN 2012101098120A CN 201210109812 A CN201210109812 A CN 201210109812A CN 102708225 A CN102708225 A CN 102708225A
Authority
CN
China
Prior art keywords
subregion
direct current
current
electrical network
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101098120A
Other languages
English (en)
Other versions
CN102708225B (zh
Inventor
洪潮
赵勇
樊丽娟
夏成军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China South Power Grid International Co ltd
Original Assignee
China South Power Grid International Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China South Power Grid International Co ltd filed Critical China South Power Grid International Co ltd
Priority to CN201210109812.0A priority Critical patent/CN102708225B/zh
Publication of CN102708225A publication Critical patent/CN102708225A/zh
Application granted granted Critical
Publication of CN102708225B publication Critical patent/CN102708225B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开提出了一种交直流大电网电磁暂态仿真的分片调试方法,应用于PSCAD/EMTDC的交直流大电网电磁暂态仿真模型的分片调试方法,目的是减少大规模交直流系统电磁暂态模型的调试时间,利用较少的时间使模型的初始稳定状态达到目标稳定状态,并保证模型中发电机释放以后系统能继续保持稳定运行而不产生数值振荡,为后续电磁暂态过程故障仿真提供保证。同时,采用分片调试的方法可以达到协同工作的目的,提高工作效率。

Description

一种交直流大电网电磁暂态仿真的分片调试方法
技术领域
本发明涉及一种交直流大电网电磁暂态仿真的分片调试方法,属于电力系统电磁暂态仿真技术领域。
背景技术
机电暂态仿真从原理上采取了简化(忽略了发电机定子绕组和电网中的电磁暂态过程,只考虑交流系统中基波分量电压、电流和功率以及发电机转子绕组中非周期性分量的变化;在不对称故障或非全相运行期间,略去发电机定子回路基波负序分量电压、电流对电磁转矩的影响),并且直流模型采用的是准稳态模型,因此,在研究交直流相互影响、多直流落点系统的动态特性时就体现出一定的局限性。
电磁暂态仿真能精确模拟电力系统中各种元件的暂态特性,特别是可以精确模拟含有HVDC和FACTS等电力电子装置的开关特性,能精确分析交直流电网中的各种机电和电磁暂态现象。因此大规模交直流电网电磁暂态仿真建模技术,成为学术研究和工程应用研究的热点。
在建立南方电网电磁暂态仿真模型过程中发现,由于电磁暂态仿真原理上是建立在离散化微分方程、小步长、递推计算的基础之上,大规模交直流电网电磁暂态仿真存在一个非常突出的技术问题,即电磁暂态仿真初始稳定状态的建立和调试问题。
电磁暂态仿真首先要对所有元件初始化,使得全网元件初值平衡并进入稳定的初始状态,然后再施加故障,模拟其后的暂态过程。如果在建模过程中有参数录入错误、网络接线错误、初值不平衡等问题,电磁暂态仿真不收敛,预期的初始稳定状态无法建立。由于网络规模大、仿真运行速度非常慢,查找和排除这些问题耗时费力、效率低下,有时甚至无法找到错误。因此本发明提出一种交直流大电网电磁暂态仿真的分片调试方法。
目前,国内外常用的电磁暂态仿真程序有EMTP(Electro-Magnetic Transient Program)、加拿大Manitoba直流研究中心的PSCAD/EMTDC、中国电科院的EMTPE和德国西门子公司的NETOMAC等,其中加拿大Manitoba直流研究中心PSCAD/EMTDC由于友好的工作界面和准确的仿真结果以及强大的模型自定义功能得到电力行业的认可和广泛应用。
发明内容
本发明提出了一种应用于PSCAD/EMTDC的交直流大电网电磁暂态仿真模型的分片调试方法,目的是减少大规模交直流系统电磁暂态模型的调试时间,利用较少的时间使模型的初始稳定状态达到目标稳定状态,并保证模型中发电机释放以后系统能继续保持稳定运行而不产生数值振荡,为后续电磁暂态过程故障仿真提供保证。同时,采用分片调试的方法可以达到协同工作的目的,提高工作效率。
本发明的实现与PSCAD/EMTDC的初始化过程密切相关,PSCAD/EMTDC经过以下步骤后达到初始稳态:
(1)根据设定的发电机节点的电压幅值和相角,各发电机先以理想电压源的模式启动从而达到稳定状态;
(2)模型达到稳定状态后释放发电机的励磁和调速器,完成从理想电压源到发电机的转变。
本发明的技术方案为:
一种交直流大电网电磁暂态仿真的分片调试方法,包括以下步骤:
1)分别将目标电网中的交流部分、直流部分进行分区,得到多个交流分区与多个直流分区;
2)采用机电暂态仿真计算得到目标电网的初始稳定状态,将该初始稳定状态作为目标稳定状态,同时计算出目标电网中每台发电机的端电压和相角;
3)各个交流分区、直流分区均作为独立电网,对各个独立电网建模;
4)对各分区间的边界电网进行处理;
5)对各个交流分区调试,使每个交流分区稳定状态与目标稳定状态相一致;对各个直流分区调试,在各个直流分区的送端和受端加理想电压源模拟送端和受端的交流系统,并分别设置理想电压源的电压幅值和相角;
6)全网合并,将各个交流分区、直流分区合并到一个大电网,各分区的边界电网处用导线进行连接。由于各分区稳定状态已与目标稳定状态一致,合并后的大电网与目标稳定状态基本接近,只需进行微调即可达到目标稳定状态。
步骤3)采用机电暂态仿真软件的BPA才潮流计算数据,步骤4)是在PSCAD/EMTDC中分别建立相应的模型。
所述步骤1)对交流部分的分区按最小割集划分,同时保证各分区的规模在50~100个节点之内。最小割集是指将一个网络分割成两个互不连通的子网络的一组支路的最小集合,可见采用最小割集的方法可以使各交流分区间的联络支路数最少。
所述步骤1)对直流部分的分区是以每一回路的直流作为一个直流分区。
所述步骤4)各分区之间的边界电网处理分为两种情况:
41)功率送入的边界电网处,采用理想电压源代替,设定该节点处的电压幅值和相交来实现相应功率的送入;
42)功率送出的边界电网处,采用恒功率负荷代替,设定负荷的有功功率和无功功率来实现相应功率的输出;
43)交流分区与直流分区的整流站连接处,采用负荷代替;
44)交流分区与直流分区的逆变站连接处,用电压源代替。
对于情况41)由于PSCAD/EMTDC中发电机出口处的升压变一般采用Y/D11接线方式,而BPA稳态潮流计算结果中不考虑变压器高压侧和低压侧的相角差30°,PSCAD/EMTDC中设定电压源参数前要对电压相角进行转换。
交直流大电网电磁暂态仿真规模庞大,发电机等动态元件数量很多,为了保证电磁暂态仿真能够顺利启动并建立预期的初始化稳定状态,需要投入大量时间进行繁琐的调整。本发明提出的交直流大电网电磁暂态仿真分片调试的方法,目的是通过分片的思想将大电网的问题转化成小电网进行解决,不但节省调试时间,而且可以达到协同工作的目的,使调试时间大为缩短,为交直流大电网电磁暂态仿真精确初始化提供了快速有效的方法。
附图说明
图1为本发明交流分区边界处理示意图;
图2为本发明直流分区边界处理示意图;
图3为本发明具体实施步骤中边界处导线连接示意图。
具体实施方式
以2012年度南方电网包含所有500kV节点和五回详细直流模型的网络为例,该网络包含600个节点,采用本发明提出的交直流大电网电磁暂态仿真分片调试方法,包括以下步骤:
(1)将目标电网中交流部分进行分区。按照每个分区50~100个节点的规模,同时利用最小割集的思路划分交流区域,使得区域间联络支路数最少,同时各分区内的节点数相当,分区后整个交流系统包含11个分区。
(2)将目标电网中高压直流输电系统进行分区。每一回直流作为一个分区,在整流侧和逆变侧交流母线处与交流网分割。
(3)由BPA的稳态潮流数据,通过计算,得到大电网的初始稳定状态,将该初始稳定状态作为目标稳定状态,同时得出每台发电机的机端电压和相角。
(4)每一个分区作为一个工程,在PSCAD/EMTDC中建立相应的模型。对于交流分区,发电机采用详细的Park模型,输电线路采用考虑分布参数的Bergeron模型,负荷采用ZIP综合模型;对于直流分区,建立详细的换流器和控制保护系统模型,能完全反映实际系统的运行特性。
(5)边界处理。分区与分区之间的边界处理采用如下方法,示意图如图1,2所示:
(5-1)对于功率送入的边界处,采用理想电压源代替,通过设定该节点处的电压幅值和相角来实现相应的功率注入。由于PSCAD/EMTDC中发电机出口处的升压变一般采用Y/D11接线方式,而BPA稳态潮流计算结果中不考虑变压器高压侧和低压侧的相角差30°,PSCAD/EMTDC中设定电压源参数前要对电压相角进行转换。
(5-2)对于功率送出的边界处,采用恒功率负荷代替,通过设定负荷的有功和无功功率实现相应的功率输出。
(5-3)交流与直流整流站连接处,用负荷代替;交流与直流逆变站连接处,用电压源代替。
(6)直流分区调试。在送端和受端加理想电压源以模拟送端和受端的交流系统,分别设置电压源电压幅值和相角,启动直流系统,观察稳态时直流功率、整流侧和逆变侧电压与BPA是否一致,若不一致则查找原因,直到与BPA相吻合为止。
(7)交流分区调试。监视交流分区中各发电机机端电压,有功和无功出力,监视每个500kV节点电压,使监视量与BPA相一致,由于BPA和EMTDC模型方面及计算步长的不同,两者不可能完全一致,实际调试中,保证各量的偏差在±2%内即可。如果差别较大,则检查发电机电压幅值和相角、线路参数和负荷参数是否正确。
(8)全网合并。将分布在不同工程中的各分区集中到一个工程中,边界处用导线进行连接,如图3,由于各分区稳定状态已与目标稳定状态一致,合并后的大电网与目标稳定状态基本接近,只需进行微调即可达到目标稳定状态。

Claims (4)

1.一种交直流大电网电磁暂态仿真的分片调试方法,其特征在于该方法包括以下步骤:
1)分别将目标电网中的交流部分、直流部分进行分区,得到多个交流分区与多个直流分区;
2)采用机电暂态仿真计算得到目标电网的初始稳定状态,将该初始稳定状态作为目标稳定状态,同时计算出目标电网中每台发电机的端电压和相角;
3)各个交流分区、直流分区均作为独立电网,对各个独立电网建模;
4)对各分区间的边界电网进行处理;
5)对各个交流分区调试,使每个交流分区稳定状态与目标稳定状态相一致;对各个直流分区调试,在各个直流分区的送端和受端加理想电压源模拟送端和受端的交流系统,并分别设置理想电压源的电压幅值和相角;
6)全网合并,将各个交流分区、直流分区合并到一个大电网,各分区的边界电网处用导线进行连接。
2.根据权利要求1所述的交直流大电网电磁暂态仿真的分片调试方法,其特征在于所述步骤1)对交流部分的分区按最小割集划分,各分区的规模在50~100个节点之内。
3.根据权利要求1所述的交直流大电网电磁暂态仿真的分片调试方法,其特征在于所述步骤1)对直流部分的分区是以每一回路的直流作为一个直流分区。
4.根据权利要求1所说的交直流大电网电磁暂态仿真的分片调试方法,其特征在于所述步骤4)各分区之间的边界电网处理分为四种情况:
41)功率送入的边界电网处,采用理想电压源代替,设定该节点处的理想电压的幅值和相交来实现相应功率的送入;
42)功率送出的边界电网处,采用恒功率负荷代替,设定恒功率负荷的有功功率和无功功率来实现相应功率的输出;
43)交流分区与直流分区的整流站连接处,采用负荷代替;
44)交流分区与直流分区的逆变站连接处,用电压源代替。
CN201210109812.0A 2012-04-13 2012-04-13 一种交直流大电网电磁暂态仿真的分片调试方法 Active CN102708225B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210109812.0A CN102708225B (zh) 2012-04-13 2012-04-13 一种交直流大电网电磁暂态仿真的分片调试方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210109812.0A CN102708225B (zh) 2012-04-13 2012-04-13 一种交直流大电网电磁暂态仿真的分片调试方法

Publications (2)

Publication Number Publication Date
CN102708225A true CN102708225A (zh) 2012-10-03
CN102708225B CN102708225B (zh) 2014-08-06

Family

ID=46900988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210109812.0A Active CN102708225B (zh) 2012-04-13 2012-04-13 一种交直流大电网电磁暂态仿真的分片调试方法

Country Status (1)

Country Link
CN (1) CN102708225B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102930110A (zh) * 2012-11-12 2013-02-13 浙江省电力公司电力科学研究院 生成pscad/emtdc电力系统仿真模型的方法
CN103605829A (zh) * 2013-10-22 2014-02-26 华中科技大学 对交直流混联电网进行电磁暂态仿真的等值建模方法
CN105322540A (zh) * 2015-11-12 2016-02-10 中国电力科学研究院 一种交直流大电网电磁暂态模型的稳态运行方式建立方法
CN106340907A (zh) * 2016-09-30 2017-01-18 国家电网公司 一种电力系统安全稳定控制策略确定方法及装置
CN107592044A (zh) * 2017-09-20 2018-01-16 四川理工学院 一种pscad自定义发电机控制器的初始化方法
CN109460575A (zh) * 2018-10-09 2019-03-12 武汉大学 一种基于贝杰龙等值线路的混合仿真接口系统及插值算法
CN109766585A (zh) * 2018-12-14 2019-05-17 中国电力科学研究院有限公司 大规模电网电磁暂态自动建模的子系统划分方法及系统
CN109830970A (zh) * 2019-01-08 2019-05-31 中国电力科学研究院有限公司 双馈风电机组换流器控制模型电磁暂态仿真初始化方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1601848A (zh) * 2003-09-28 2005-03-30 中国电力科学研究院 电力系统数字仿真方法
US20060282239A1 (en) * 2005-06-08 2006-12-14 Chang Gung University Method of setting-up steady state model of VSC-based multi-terminal HVDC transmission system
CN101719182A (zh) * 2009-12-11 2010-06-02 中国电力科学研究院 一种交直流电力系统分割并行电磁暂态数字仿真方法
CN102361329A (zh) * 2011-10-18 2012-02-22 山东电力研究院 一种用于混合交直流系统动态特性研究的建模方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1601848A (zh) * 2003-09-28 2005-03-30 中国电力科学研究院 电力系统数字仿真方法
US20060282239A1 (en) * 2005-06-08 2006-12-14 Chang Gung University Method of setting-up steady state model of VSC-based multi-terminal HVDC transmission system
CN101719182A (zh) * 2009-12-11 2010-06-02 中国电力科学研究院 一种交直流电力系统分割并行电磁暂态数字仿真方法
CN102361329A (zh) * 2011-10-18 2012-02-22 山东电力研究院 一种用于混合交直流系统动态特性研究的建模方法

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
《南方电网技术》 20091231 王强,夏成军等 "广州地铁33kV中压电网合环操作分析" 第111-115页 1-4 第3卷, 第5期 *
《电力系统自动化》 20091125 边宏宇等 "RTDS上机电暂态仿真自定义模块的研究与开发" 第61-65页 1-4 第33卷, 第22期 *
《电网技术》 20080630 汪娟娟等 "交直流电力系统暂态电压稳定性综述" 第30-34页 1-4 第32卷, 第12期 *
汪娟娟等: ""交直流电力系统暂态电压稳定性综述"", 《电网技术》 *
王强,夏成军等: ""广州地铁33kV中压电网合环操作分析"", 《南方电网技术》 *
边宏宇等: ""RTDS上机电暂态仿真自定义模块的研究与开发"", 《电力系统自动化》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102930110B (zh) * 2012-11-12 2016-01-13 国家电网公司 生成pscad/emtdc电力系统仿真模型的方法
CN102930110A (zh) * 2012-11-12 2013-02-13 浙江省电力公司电力科学研究院 生成pscad/emtdc电力系统仿真模型的方法
CN103605829A (zh) * 2013-10-22 2014-02-26 华中科技大学 对交直流混联电网进行电磁暂态仿真的等值建模方法
CN103605829B (zh) * 2013-10-22 2016-08-17 华中科技大学 对交直流混联电网进行电磁暂态仿真的等值建模方法
CN105322540B (zh) * 2015-11-12 2019-02-22 中国电力科学研究院 一种交直流大电网电磁暂态模型的稳态运行方式建立方法
CN105322540A (zh) * 2015-11-12 2016-02-10 中国电力科学研究院 一种交直流大电网电磁暂态模型的稳态运行方式建立方法
CN106340907B (zh) * 2016-09-30 2019-03-19 国家电网公司 一种电力系统安全稳定控制策略确定方法及装置
CN106340907A (zh) * 2016-09-30 2017-01-18 国家电网公司 一种电力系统安全稳定控制策略确定方法及装置
CN107592044A (zh) * 2017-09-20 2018-01-16 四川理工学院 一种pscad自定义发电机控制器的初始化方法
CN107592044B (zh) * 2017-09-20 2019-12-13 四川理工学院 一种pscad自定义发电机控制器的初始化方法
CN109460575A (zh) * 2018-10-09 2019-03-12 武汉大学 一种基于贝杰龙等值线路的混合仿真接口系统及插值算法
CN109460575B (zh) * 2018-10-09 2023-10-31 武汉大学 一种基于贝杰龙等值线路的混合仿真接口系统及插值算法
CN109766585A (zh) * 2018-12-14 2019-05-17 中国电力科学研究院有限公司 大规模电网电磁暂态自动建模的子系统划分方法及系统
CN109830970A (zh) * 2019-01-08 2019-05-31 中国电力科学研究院有限公司 双馈风电机组换流器控制模型电磁暂态仿真初始化方法

Also Published As

Publication number Publication date
CN102708225B (zh) 2014-08-06

Similar Documents

Publication Publication Date Title
CN102708225B (zh) 一种交直流大电网电磁暂态仿真的分片调试方法
Guillaud et al. Applications of real-time simulation technologies in power and energy systems
Dufour et al. On the use of real-time simulation technology in smart grid research and development
Yang et al. Development of converter based reconfigurable power grid emulator
Dufour et al. Review of state-of-the-art solver solutions for HIL simulation of power systems, power electronic and motor drives
Zhang et al. Fault modeling and analysis of grid-connected inverters with decoupled sequence control
CN103106328A (zh) 基于整体矢量拟合法的频率相关网络等值的生成方法
CN103760893A (zh) 交流控制保护装置频率适应性的闭环试验系统及试验方法
Aggarwal et al. MATLAB/Simulink based simulation of a hybrid power flow controller
Tremblay et al. Real-time simulation of a fully detailed type-IV wind turbine
Jalili-Marandi et al. Real-time electromagnetic and transient stability simulations for active distribution networks
CN102496924A (zh) 修正预测熄弧角建模方法及系统
Bélanger et al. A modern and open real-time digital simulator of contemporary power systems
Haddadi et al. An active distribution network model for smart grid control and protection studies—Model validation progress
Bhatti et al. Integrated T&D Modeling vs. Co-Simulation–Comparing Two Approaches to Study Smart Grid
CN103605871A (zh) 一种基于直流外特性拟合的大电网仿真分析方法
CN102708258A (zh) 一种PSS/E至SimPowerSys的电力网络系统数据转换方法
Tao et al. Power connection technology for full-digital real-time simulation and analog simulator
Martin et al. Hardware-in-the-loop for power and telecomunications co-simulation with applications
Yamane et al. Multi-FPGA solution for large power systems and microgrids real time simulation
Dufour et al. Testing 750 node distribution grids and devices
Bi et al. Aggregated dynamic model of grid-connected PV generation farms
Macana et al. Modeling and Simulation of Inverter based Distributed Generators for Renewable Energy Integration
Liu et al. Automatic generation and initialization of EMT simulation models for large-scale AC-DC hybrid power system
CN108062449B (zh) 基于psd-bpa辅助开关的电力系统外部等值方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant