CN102707231B - Generator set primary frequency regulation analysis system based on matlab/simulink - Google Patents

Generator set primary frequency regulation analysis system based on matlab/simulink Download PDF

Info

Publication number
CN102707231B
CN102707231B CN201210151580.5A CN201210151580A CN102707231B CN 102707231 B CN102707231 B CN 102707231B CN 201210151580 A CN201210151580 A CN 201210151580A CN 102707231 B CN102707231 B CN 102707231B
Authority
CN
China
Prior art keywords
module
output
primary frequency
frequency modulation
input
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210151580.5A
Other languages
Chinese (zh)
Other versions
CN102707231A (en
Inventor
徐广文
葛新峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Power Technology Co Ltd
Original Assignee
Hohai University HHU
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU, Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Hohai University HHU
Priority to CN201210151580.5A priority Critical patent/CN102707231B/en
Publication of CN102707231A publication Critical patent/CN102707231A/en
Application granted granted Critical
Publication of CN102707231B publication Critical patent/CN102707231B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Telephonic Communication Services (AREA)

Abstract

The invention discloses a generator set primary frequency regulation analysis system based on simulation software matlab/simulink. The system is composed of a primary frequency regulation action judgment module, a primary frequency regulation action number statistics module, a primary frequency regulation duration statistics module, a primary frequency regulation module for judging whether a power frequency exceeds an evaluation threshold in the duration, a primary frequency regulation action integration electric quantity calculating module, a primary frequency regulation action integration electric quantity output module and a primary frequency regulation action message recording module, wherein the primary frequency regulation action integration electric quantity output module meets dispatch evaluation conditions. According to the generator set primary frequency regulation analysis system based on the matlab/simulink, the system is constructed by means of a modularization method, and the system is clear in structure, mature in technology, complete in function and capable of providing accurate primary frequency regulation action information ( including integration electric quantity), analyzing factors which influences indexes required by primary frequency regulation evaluation, seeking reasons for the primary frequency regulation evaluation and improving efficiencies of the primary frequency regulation evaluation and stating.

Description

Based on the generating set primary frequency regulation analytic system of matlab/simulink
Technical field
The present invention relates to a kind of system that generating set primary frequency regulation situation is analyzed, especially relate to a kind of generating set primary frequency regulation analytic system based on simulation software MATLAB/SIMULINK.
Background technology
Power plant's assistant service refers to the safe and stable operation for safeguarding electric system, ensure the quality of power supply, except normal electrical energy production, conveying, use, the service provided by electricity power enterprise, comprising: primary frequency modulation, Automatic Generation Control (AGC), peak regulation, Reactive-power control, for subsequent use, black starting-up etc.
Wherein, primary frequency modulation refers to when power system frequency departs from target frequency, genset is by the automatic reaction of governing system, adjustment is meritorious exerts oneself to reduce the service that frequency departure provides, belong to the basic assistant service that genset must provide, the corresponding requirements not meeting power monitoring department can by power scheduling department appraisal.
For improving power system safety and stability operation level, assistant service in February, 2010 assessment mode is in full swing in south electric network region within the jurisdiction.Since enforcement, primary frequency modulation examination proportion in assistant service examination is higher, and such as Nian Zhitiao power plant of Guangdong Province 2011 primary frequency modulation cost of verification and evaluation is 2921.4246 ten thousand yuan, accounts for 62.7% of whole assistant service cost of verification and evaluation.
The standard of power scheduling department appraisal primary frequency modulation is that the number percent of the device electricity/theoretical action device electricity of primary frequency modulation actual act is less than 50%.The actual integration start time is that frequency is crossed Dead Time and added time delay 6 seconds, and the integration end time is the time that frequency gets back to dead band, and no longer than 1 minute, expression formula was as follows:
In formula: ---primary frequency modulation actual integration electricity;
---per second in the duration has work value;
---integration start time have work value;
---integration start time;
---the primary frequency modulation duration after integration starts, more than 1 minute in 1 minute.
When power plant has objection to primary frequency modulation examination, the frequency during primary frequency modulation action can be aided with, guide vane opening (pitch stroke), active power waveform state to traffic department, to exempt examination.From primary frequency modulation primary frequency modulation effect of being examined the statement of particularly hydroelectric power plant of power plant, a lot of situation to be all genset displays, but the actual act device electricity that power scheduling department draws is very little.This shows the computing method existing problems of the primary frequency modulation actual act device electricity of power scheduling department.But the statement reason of power plant is rough, fail to calculate according to the primary frequency modulation data of recording the device electricity of actual act, often statement has little effect, and cannot retrieve deserved interests.
Summary of the invention
Technical matters to be solved by this invention, just be to provide a kind of generating set primary frequency regulation analytic system based on simulation software matlab/simulink, can the device electricity of accurate calculating generator group primary frequency modulation actual act, provide the primary frequency modulation action message meeting scheduling appreciation condition, analyze primary frequency modulation by the reason of power scheduling department appraisal.
Solve the problems of the technologies described above, the present invention adopts following technical scheme to realize:
Based on the generating set primary frequency regulation analytic system of matlab/simulink, it is characterized in that: comprise primary frequency modulation whether action judge module, primary frequency modulation action frequency statistical module, primary frequency modulation duration statistics module, the duration of primary frequency modulation, whether mains frequency exceedes evaluation threshold judge module, primary frequency modulation action device electricity calculates module, meet primary frequency modulation action device electricity output module and the primary frequency modulation action message logging modle of scheduling appreciation condition, whether action judge module inputs mains frequency to described primary frequency modulation, export and be connected to all the other described modules, the duration that the primary frequency modulation action device electricity output module of described satisfied scheduling appreciation condition also inputting described primary frequency modulation, whether mains frequency exceedes and evaluates threshold judge module, primary frequency modulation action device electricity calculates the output of module, export and be connected to described primary frequency modulation action message logging modle, described primary frequency modulation action message logging modle also inputs described primary frequency modulation action frequency statistical module, primary frequency modulation duration statistics module, the duration of primary frequency modulation, whether mains frequency exceedes the output evaluating threshold judge module, and export primary frequency modulation action message.
The described primary frequency modulation whether composition of action judge module and annexation is: dead band module inputs the output of the first constant module (exporting 50Hz) and the difference of the output of the first load module (In1), and output is connected to the input of the first absolute value block; The input of the first comparison module connects the output of the first absolute value block, exports and is connected to the first output module (Out1).
In1 inputs mains frequency.Mains frequency is deducted with 50Hz, the difference obtained and Man made Dead Band compare, with zero balancing after comparative result takes absolute value, draw the judged result of primary frequency modulation whether action: if 50Hz deducts the scope of difference beyond Man made Dead Band of mains frequency, i.e. primary frequency modulation action, Out1 equals 1, otherwise Out1 equals 0.
Composition and the annexation of described primary frequency modulation action frequency statistical module are: the trigger pip of input and first and second rising edge trigger module that the output of the second load module (In2) is connected to the first rising edge trigger module inputs, the output of first and second rising edge trigger module is added, and result delivers to input and second output module (Out2) of the second rising edge trigger module.
The output Out1 of the whether action judge module of the primary frequency modulation described in In2 input.In the primary frequency modulation action moment, namely Out1 became for 1 moment from 0, the input of first and second rising edge trigger module just can be assigned to output, and the two is added the number of times just drawing primary frequency modulation action: primary frequency modulation first time action, and Out1 equals 1, second time action, Out1 equals 2, third time action, and Out1 equals 3, the rest may be inferred, and Out2 is 4,5,6,7 according to this afterwards ...
Composition and the annexation of described primary frequency modulation duration statistics module are: the output of the 3rd load module (In3) is connected to the 3rd rising edge trigger module, rise/fall inputs along the trigger pip of trigger module, the output of the 4th load module (In4) is connected to the 3rd rising edge trigger module, rise/fall along the input of trigger module, and the 3rd output module (Out3) accesses the difference of rise/fall along the output of the output of trigger module and the 3rd rising edge trigger module.
The output Out1 of the whether action judge module of the primary frequency modulation described in In3 input, the time that In4 input is corresponding with mains frequency.In the primary frequency modulation action moment, namely Out1 became for 1 moment from 0, and the 3rd rising edge trigger module, rise/fall are assigned to output along the input of trigger module, and namely all export the time of primary frequency modulation start time, now Out3 equals 0.In the primary frequency modulation involution moment, namely Out1 became for 0 moment from 1, rise/fall is assigned to output again along the input of trigger module, namely the time of primary frequency modulation finish time is exported, now Out3 equals the time that this time deducts the primary frequency modulation start time that the 3rd rising edge trigger module exports, the time that namely primary frequency modulation is lasting.
The duration of described primary frequency modulation, whether mains frequency exceedes the composition of evaluating threshold judge module and annexation is: the second absolute value block inputs the output of the second constant module (exporting 50Hz) and the difference of the output of the 5th load module (In5), and output is connected to the input of the second comparison module; 1. the input of selector switch K1 connects three constant module (exporting 1), and 2. input connects the output of logical and judge module, and 3. input connects the output of the second comparison module, exports the input the 2. with four output module (Out4) being connected to logical and judge module; 1. the input of logical and judge module connects the output of the 6th load module (In6), and 2. output be connected to the input of selector switch K1.
In5 inputs mains frequency, the output Out1 of the whether action judge module of the primary frequency modulation described in In6 input.If the absolute difference of mains frequency and 50Hz is greater than evaluation threshold, then 3. the input of K1 equals 1, otherwise is 0.Primary frequency modulation is not operating, In6 input 0, and 3. output and the input of logical and judge module output 0, K1 connect, and equal 0.Primary frequency modulation action, In6 input 1, once 3. the input of K1 equals 1,1. output and the input of logical and judge module output 1, K1 connect, and Out4 remains 1, until primary frequency modulation involution, i.e. In6 input 0.
Composition and the annexation of described primary frequency modulation action device electricity calculating module are: 2., 3. the input of selector switch K2 directly connects the output of the 7th load module (In7), and 1. input connects the output of In7 through the first time delay module; The output of K switch 2 is selected in the input of selector switch K3 2. selecting, and 3. input connects the output of the 8th load module (In8), and 1. input connects oneself output; 2., 3. directly the output of K switch 2 is selected in selecting in the input of selector switch K4, and 1. input selects the output of K switch 2 through the second time delay module selecting; 1. the input of selector switch K5 connects the 4th constant module (exporting 0), inputs the output that K switch 4 is selected in 2. selecting, and 3. input connects 5 constant virtues digital-to-analogue block (exporting 1); 1. the input of selector switch K6 accesses the difference of the output of In8 and the output of selector switch K3, input 2., 3. selecting select the output of K switch 5; The trigger pip input of integration module meets In7, and the output of K switch 6 is selected in input selecting, exports and is connected to the 5th output module (Out5).
The output Out1 of the whether action judge module of the primary frequency modulation described in In7 input, the active power that In8 input is corresponding with mains frequency.Primary frequency modulation is not operating, and 3. output and the input of In7 input 0, K2 connect, 3. output and the input of K3 connect, and 3. output and the input of K4 connect, and 3. output and the input of K5 connect, 1. output and the input of K6 connect, and integration module input 0, Out5 equals the output of integration module.Primary frequency modulation action, In7 input from 0 become 1, K2 output and input 1. connect, 1. output and the input of K3 are switched on after the first time delay, and integration module starts to calculate action device electricity, and Out5 exports from 0,1. the simultaneously output of K4 and input connect, and the second time delay module starts.If primary frequency modulation involution before the second time delay meets, namely In7 input becomes 0 from 1,3. output and the input of K2, K3, K4 all reclose, second time delay module involution, the output of K5 and input are 3., 1. the output of K6 and input still connect, integration module input reverts to 0, and integration module exports and remains unchanged, the involution until the next primary frequency modulation action moment is triggered.Otherwise the second time delay meets, the output of K5 and input are 1., 3. the output of K6 and input connect, and integration module input sets to 0, and integration module exports and remains unchanged, and forces the calculating stopping action device electricity, the involution until the next primary frequency modulation action moment is triggered.
Composition and the annexation of the primary frequency modulation action device electricity output module of described satisfied scheduling appreciation condition are: the input of the first memory module connects the output of the tenth load module (In10), and the input of the second memory module connects the output of the 11 load module (In11); 3rd comparison module inputs the difference of the output of the first memory module and the output of In10, exports the input U1 being connected to output control module; The difference of the 4th comparison module input output of In11 and the output of the second memory module, exports the input U2 being connected to output control module; 1. the input of selector switch K7 connects the output of the 9th load module (In9), and 2. input connects the output of output control module, and 3. input connects the output of the 6th constant module (exporting 0), exports and is connected to the 6th output module (Out6).
Primary frequency modulation action device electricity described in In9 input calculates the output Out5 of module, the duration of primary frequency modulation described in In10 input, whether mains frequency exceedes the output Out4 evaluating threshold judge module, the output Out1 of the whether action judge module of the primary frequency modulation described in In11 input.According to the output of output control module, the output of K7 switches between the output and zero of In9: if mains frequency exceedes evaluation threshold duration of primary frequency modulation, output control module can be exported Y and is set to 1 during primary frequency modulation involution to next primary frequency modulation action, 1. output and the input of K7 connect, Out6 equals the output of In9, and the primary frequency modulation action device electricity namely meeting scheduling appreciation condition is output; Otherwise 3. 4. the output that output control module output Y remains 0, K7 connect with input, and Out6 equals zero, represent the appreciation condition that primary frequency modulation action device electricity does not meet scheduling.
Composition and the annexation of described primary frequency modulation action message logging modle are: the trigger pip input of negative edge trigger recording module connects the output of the 12 load module (In12), input U5 connects the output of the 13 load module (In13), input U6 connects the output of the 14 load module (In14), and input U8 connects the output of the 16 load module (In16); The input U3 of signal processing module connects the output of In13, and input U4 connects the output of the 15 load module (In15), exports the input U7 that Y1 is connected to negative edge trigger recording module.
The output Out1 of the whether action judge module of the primary frequency modulation described in In12 input, the output Out2 of the primary frequency modulation action frequency statistical module described in In13 input, the output Out3 of the primary frequency modulation duration statistics module described in In14 input, the duration of primary frequency modulation described in In15 input, whether mains frequency exceedes the output Out4 evaluating threshold judge module, the output Out6 of the primary frequency modulation action device electricity output module of the satisfied scheduling appreciation condition described in In16 input.Through inner process, module can record the action message of primary frequency modulation in the moment of primary frequency modulation involution with the form of data list.
Beneficial effect: compared with prior art, the present invention has following remarkable result:
1) generating set primary frequency regulation analytic system of the present invention is according to modular method establishment, each functions of modules is independent, judge primary frequency modulation whether action, statistics primary frequency modulation action frequency, calculate the primary frequency modulation duration, whether mains frequency exceedes and evaluates threshold, integration primary frequency modulation action electricity, export primary frequency modulation action message and meet the action device electricity dispatching appreciation condition check primary frequency modulation duration.
2) generating set primary frequency regulation analytic system of the present invention perfect in shape and function, meets the primary frequency modulation check requirements of scheduling, and the primary frequency modulation action message (comprising device electricity) provided as the foundation of primary frequency modulation statement, can reduce the workload of statement.
3) generating set primary frequency regulation analytic system of the present invention is developed based on matlab/simulink, technology maturation, inner parameter can be revised, and analyzing influence once adjusts the factor of the required index of examination, find primary frequency modulation by the reason examined, improve the efficiency of primary frequency modulation examination and statement.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
Fig. 1 is system architecture diagram of the present invention;
Fig. 2 is primary frequency modulation in the present invention whether action judge module schematic diagram;
Fig. 3 is the primary frequency modulation action frequency statistical module schematic diagram in the present invention;
Fig. 4 is the primary frequency modulation duration statistics module principle figure in the present invention;
The duration that Fig. 5 being the primary frequency modulation in the present invention, whether mains frequency exceedes evaluation threshold judge module schematic diagram;
Fig. 6 is that the primary frequency modulation action device electricity in the present invention calculates module principle figure;
Fig. 7 is the primary frequency modulation action device electricity output module schematic diagram of the satisfied scheduling appreciation condition in the present invention;
Fig. 8 is the primary frequency modulation action message logging modle schematic diagram in the present invention.
In figure: U1, U2 are the inputs of output control module, Y is the output of output control module, U3, U4 are the inputs of signal control module, Y1 is the output of signal control module, U5, U6, U7, U8 are the inputs of negative edge trigger recording module, K1, K2, K3, K4, K5, K6, K7 are selector switch that function is consistent (when input value is 2. greater than 0,1. and 4. connect, otherwise connect 3. and 4.).
Embodiment
Be illustrated in figure 1 the generating set primary frequency regulation analytic system embodiment based on matlab/simulink of the present invention, by primary frequency modulation, whether action judges, primary frequency modulation action frequency is added up, primary frequency modulation duration statistics, the duration of primary frequency modulation, whether mains frequency exceedes the judgement of evaluation threshold, primary frequency modulation action device electricity calculates, the primary frequency modulation action device electricity meeting scheduling appreciation condition exports and primary frequency modulation action message record seven module compositions, whether action judge module inputs mains frequency to primary frequency modulation, output is connected to all the other modules, the duration that the primary frequency modulation action device electricity output module meeting scheduling appreciation condition also inputting primary frequency modulation, whether mains frequency exceedes and evaluates threshold judge module, primary frequency modulation action device electricity calculates the output of module, output is connected to primary frequency modulation action message logging modle, primary frequency modulation action message logging modle also inputs primary frequency modulation action frequency statistical module, primary frequency modulation duration statistics module, the duration of primary frequency modulation, whether mains frequency exceedes the output evaluating threshold judge module, and export primary frequency modulation action message.
Fig. 2 is the schematic diagram of primary frequency modulation whether action judge module, by load module, output module, constant module, dead band module, absolute value block, comparison module with subtract computing module and form.In1 inputs mains frequency, 50Hz deducts difference that mains frequency obtains and Man made Dead Band compares, if difference is beyond the scope of Man made Dead Band, then the output of dead band module equals the difference of input, its absolute value is greater than zero, Out1 and equals 1, represents primary frequency modulation action, otherwise Out1 is not more than zero and be set to 0 because of the output of dead band module, represents that primary frequency modulation is not operating.
Fig. 3 is the schematic diagram of primary frequency modulation action frequency statistical module, by load module, output module, rising edge trigger module with add computing module and form.The output Out1 of the whether action judge module of the primary frequency modulation described in In2 input, the action situation of its change reflection primary frequency modulation, becomes 1 from 0 and shows primary frequency modulation action, and vanishing interval scale primary frequency modulation involution again.Rising edge trigger module only connects input and output (namely export and equal input) at trigger pip input rising time, and the maintenance of other moment exports constant.Therefore, initial in primary frequency modulation action, original output can be added 1 and export by primary frequency modulation action frequency statistical module, the value of Out2 like this is just corresponding with primary frequency modulation action frequency, 1 represents primary frequency modulation action once, and 2 represent primary frequency modulation action twice, and the rest may be inferred.
Fig. 4 is the schematic diagram of primary frequency modulation duration statistics module, and by load module, output module, rising edge trigger module, rise/fall is along trigger module and subtract computing module and form.The output Out1 of the whether action judge module of the primary frequency modulation described in In3 input, the time that In4 input is corresponding with mains frequency.Initial in primary frequency modulation action, rising edge trigger module and rise/fall can record the time of primary frequency modulation start time along trigger module simultaneously, and when primary frequency modulation involution, only rise/fall is along the time of trigger module record primary frequency modulation finish time, deduct the time of the primary frequency modulation start time of rising edge trigger module record, primary frequency modulation continue time.
The duration that Fig. 5 being primary frequency modulation, whether mains frequency exceedes the schematic diagram evaluating threshold judge module, by load module, output module, constant module, absolute value block, comparison module, logical and module, selector switch module composition.In5 inputs mains frequency, the output Out1 of the whether action judge module of the primary frequency modulation described in In6 input.If the absolute difference of mains frequency and 50Hz is greater than evaluation threshold, then the output of comparison module equals 1, otherwise is 0.Primary frequency modulation is not operating, and In6 exports 0, and 3. output and the input of logical and judge module output 0, K1 connect, and equal 0, and the duration of expression primary frequency modulation, mains frequency does not exceed evaluation threshold.Primary frequency modulation action, In6 exports 1, once equal 1 compared with the output of module, 1. logical and judge module is connected with regard to the output and input exporting 1, K1, and Out4 remains 1, and the duration of expression primary frequency modulation, mains frequency exceedes evaluation threshold, until primary frequency modulation involution.
Fig. 6 is the schematic diagram that primary frequency modulation action device electricity calculates module, by load module, output module, constant module, time delay module, integration module, selector switch module composition.The output Out1 of the whether action judge module of the primary frequency modulation described in In7 input, the active power that In8 input is corresponding with mains frequency.Primary frequency modulation action, the output of In7 becomes 1 from 0, and the output of integration module can by involution, simultaneously 1. and 4. the connecting of K2, and time delay one starts (time delay is variable).Treat time delay one end, 1. and 4. K3 connects, 1. and 4. K4 connects, time delay two starts (time delay is also variable), but the output of time delay two is still 3. and 4. still connecting of zero, K5, and 1. and 4. K6 also connects, the active power this moment inputted is admitted to integration module with the difference of active power thereafter, calculates the device electricity of primary frequency modulation actual act and exports.If the primary frequency modulation perseveration time is less than time delay two, the integration of active power can be terminated in the moment of primary frequency modulation involution, simultaneously 3. and 4. the reclosing of K2, K3, K4, and time delay two is also stopped.Otherwise until the moment that time delay two terminates, 1. and 4. K5 is switched on, and 3. and 4. K6 is also switched on, and the integration of active power is also stopped.Calculate required generating set primary frequency regulation actual act device electricity according to this.
Fig. 7 is the schematic diagram of the primary frequency modulation action device electricity output module meeting scheduling appreciation condition, by load module, output module, constant module, memory module, comparison module, output control module, selector switch module composition.Primary frequency modulation action device electricity described in In9 input calculates the output Out5 of module, the duration of primary frequency modulation described in In10 input, whether mains frequency exceedes the output Out4 evaluating threshold judge module, the output Out1 of the whether action judge module of the primary frequency modulation described in In11 input.The output of In10 becomes 0 from 1, then output control module input U1 equals 1, otherwise U1 equals 0; The output of In11 becomes 1 from 0, then output control module input U2 equals 1, otherwise U2 equals 0.Output control module is when U1 equals 1, and putting Y is 1, when U2 equals 1, and involution Y(Y=0).Out6 is switched between the output and zero of In9 by K7, and as Y=1,1. and 4. K7 connects, and Out6 equals the output of In9, otherwise 3. and 4. connects, and Out6 equals zero.Thus realize: just export primary frequency modulation action device electricity when satisfied scheduling appreciation condition, and during satisfied scheduling appreciation condition, Out6 equals zero, and does not namely export now non-vanishing primary frequency modulation action device electricity.
Fig. 8 is the schematic diagram of primary frequency modulation action message logging modle, by load module, signal processing module, negative edge trigger recording module composition.The output Out1 of the whether action judge module of the primary frequency modulation described in In12 input, the output Out2 of the primary frequency modulation action frequency statistical module described in In13 input, the output Out3 of the primary frequency modulation duration statistics module described in In14 input, the duration of primary frequency modulation described in In15 input, whether mains frequency exceedes the output Out4 evaluating threshold judge module, the output Out6 of the primary frequency modulation action device electricity output module of the satisfied scheduling appreciation condition described in In16 input.Signal processing module is responsible for equaling the In15 output extension of 1 to next primary frequency modulation start time, so that negative edge trigger recording module correctly records its value.When the output of In12 becomes 0 from 1, negative edge trigger recording module can record the value of input U5, U6, U7 and U8, thus provides the information of each primary frequency modulation action meeting scheduling appreciation condition.
Change the setting of the dead band module in Fig. 2, the comparison module in Fig. 5, the time delay module in Fig. 6 individually or simultaneously, analyze the generating set primary frequency regulation action message under different setting, different Man made Dead Bands can being obtained, evaluating the impact arranged threshold, time delay analyzing, thus analyze primary frequency modulation by the reason of power scheduling department appraisal.

Claims (6)

1. the generating set primary frequency regulation analytic system based on matlab/simulink, it is characterized in that: comprise primary frequency modulation whether action judge module, primary frequency modulation action frequency statistical module, primary frequency modulation duration statistics module, the duration of primary frequency modulation, whether mains frequency exceedes evaluation threshold judge module, primary frequency modulation action device electricity calculates module, meet primary frequency modulation action device electricity output module and the primary frequency modulation action message logging modle of scheduling appreciation condition, whether action judge module inputs mains frequency to described primary frequency modulation, export and be connected to all the other described modules, the duration that the primary frequency modulation action device electricity output module of described satisfied scheduling appreciation condition also inputting described primary frequency modulation, whether mains frequency exceedes and evaluates threshold judge module, primary frequency modulation action device electricity calculates the output of module, export and be connected to described primary frequency modulation action message logging modle, described primary frequency modulation action message logging modle also inputs described primary frequency modulation action frequency statistical module, primary frequency modulation duration statistics module, the duration of primary frequency modulation, whether mains frequency exceedes the output evaluating threshold judge module, and export primary frequency modulation action message,
Composition and the annexation of described primary frequency modulation action device electricity calculating module are: 2., 3. the input end of selector switch K2 directly connects the output of the 7th load module (In7), and 1. input end connects the output of the 7th load module (In7) through the first time delay module; The input end of selector switch K3 2. selecting selects the output of K switch 2, and 3. input end connects the output of the 8th load module (In8), and 1. input end connects oneself output; 2., 3. directly the output of K switch 2 is selected in selecting to the input end of selector switch K4, and 1. input end selects the output of K switch 2 through the second time delay module selecting; 1. the input end of selector switch K5 connects the 4th constant module, and input end 2. selecting selects the output of K switch 4, and 3. input end connects 5 constant virtues digital-to-analogue block; 1. the input end of selector switch K6 accesses the difference of the output of the 8th load module (In8) and the output of selector switch K3, input end 2., 3. selecting select the output of K switch 5; The trigger pip input of integration module connects the 7th load module (In7), and the output of K switch 6 is selected in input selecting, exports and is connected to the 5th output module (Out5);
Composition and the annexation of the primary frequency modulation action device electricity output module of described satisfied scheduling appreciation condition are: the input of the first memory module connects the output of the tenth load module (In10), and the input of the second memory module connects the output of the 11 load module (In11); 3rd comparison module inputs the difference of the output of the first memory module and the output of the tenth load module (In10), exports the input U1 being connected to output control module; The difference of the 4th comparison module input output of the 11 load module (In11) and the output of the second memory module, exports the input U2 being connected to output control module; 1. the input end of selector switch K7 connects the output of the 9th load module (In9), and 2. input end connects the output of output control module, and 3. input end connects the output of the 6th constant module, exports and is connected to the 6th output module (Out6); The output Out1 of described 7th load module input primary frequency modulation whether action judge module, the active power that 8th load module input is corresponding with mains frequency, 9th load module input primary frequency modulation action device electricity calculates the output the 5th output module (Out5) of module, the duration of tenth load module input primary frequency modulation, whether mains frequency exceedes the output Out4 evaluating threshold judge module, the output Out1 of the 11 load module input primary frequency modulation whether action judge module.
2. the generating set primary frequency regulation analytic system based on matlab/simulink according to claim 1, it is characterized in that: the described primary frequency modulation whether composition of action judge module and annexation is: dead band module inputs the difference of the output of the first constant module and the output of the first load module (In1), exports the input being connected to the first absolute value block; The input of the first comparison module connects the output of the first absolute value block, exports and is connected to the first output module (Out1); The first described load module input mains frequency.
3. the generating set primary frequency regulation analytic system based on matlab/simulink according to claim 1, it is characterized in that: composition and the annexation of described primary frequency modulation action frequency statistical module are: the trigger pip of input and first and second rising edge trigger module that the output of the second load module (In2) is connected to the first rising edge trigger module inputs, the output of first and second rising edge trigger module is added, and result delivers to input and second output module (Out2) of the second rising edge trigger module; The output Out1 of described second load module input primary frequency modulation whether action judge module.
4. the generating set primary frequency regulation analytic system based on matlab/simulink according to claim 1, it is characterized in that: composition and the annexation of described primary frequency modulation duration statistics module are: the output of the 3rd load module (In3) is connected to the 3rd rising edge trigger module, rise/fall inputs along the trigger pip of trigger module, the output of the 4th load module (In4) is connected to the 3rd rising edge trigger module, rise/fall is along the input of trigger module, 3rd output module (Out3) accesses the difference of rise/fall along the output of the output of trigger module and the 3rd rising edge trigger module, the output Out1 of described 3rd load module input primary frequency modulation whether action judge module, the time that the 4th load module input is corresponding with mains frequency.
5. the generating set primary frequency regulation analytic system based on matlab/simulink according to claim 1, it is characterized in that: the duration of described primary frequency modulation, whether mains frequency exceedes the composition of evaluating threshold judge module and annexation is: the second absolute value block inputs the difference of the output of the second constant module and the output of the 5th load module (In5), and output is connected to the input of the second comparison module; The input of selector switch K1 has the output of three constant module, logical and judge module and the second comparison module, exports and is connected to logical and judge module and the 4th output module (Out4); Logical and judge module also inputs the output of the 6th load module (In6), exports and is connected to selector switch K1; Described 5th load module input mains frequency, the output Out1 of the 6th load module input primary frequency modulation whether action judge module.
6. the generating set primary frequency regulation analytic system based on matlab/simulink according to claim 1, it is characterized in that: composition and the annexation of described primary frequency modulation action message logging modle are: the trigger pip input of negative edge trigger recording module connects the output of the 12 load module (In12), input end U5 connects the output of the 13 load module (In13), input end U6 connects the output of the 14 load module (In14), and input end U8 connects the output of the 16 load module (In16); The input end U3 of signal processing module connects the output of (In13), and input end U4 connects the output of the 15 load module (In15), exports the input end U7 that Y1 is connected to negative edge trigger recording module; The output Out1 of described 12 load module input primary frequency modulation whether action judge module, the output Out2 of the 13 load module input primary frequency modulation action frequency statistical module, the output Out3 of the 14 load module input primary frequency modulation duration statistics module, the duration of 15 load module input primary frequency modulation, whether mains frequency exceedes the output Out4 evaluating threshold judge module, and the 16 load module input meets the output the 6th output module (Out6) of the primary frequency modulation action device electricity output module of scheduling appreciation condition.
CN201210151580.5A 2012-05-16 2012-05-16 Generator set primary frequency regulation analysis system based on matlab/simulink Active CN102707231B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210151580.5A CN102707231B (en) 2012-05-16 2012-05-16 Generator set primary frequency regulation analysis system based on matlab/simulink

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210151580.5A CN102707231B (en) 2012-05-16 2012-05-16 Generator set primary frequency regulation analysis system based on matlab/simulink

Publications (2)

Publication Number Publication Date
CN102707231A CN102707231A (en) 2012-10-03
CN102707231B true CN102707231B (en) 2015-06-10

Family

ID=46900161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210151580.5A Active CN102707231B (en) 2012-05-16 2012-05-16 Generator set primary frequency regulation analysis system based on matlab/simulink

Country Status (1)

Country Link
CN (1) CN102707231B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103779862B (en) * 2014-02-12 2016-01-20 国家电网公司 Monoblock machine is with the primary frequency modulation regulating system under stove mode and method
CN104391450B (en) * 2014-11-27 2017-11-03 南京南瑞继保电气有限公司 A kind of method of analog signal communication delay in Digital Simulation
CN108767905B (en) * 2018-05-31 2021-11-16 西安热工研究院有限公司 Method for carrying out primary frequency modulation debugging analysis based on synchronous vector measuring device data
CN113361877B (en) * 2021-05-24 2023-07-11 中广核研究院有限公司 Statistical analysis method, device, equipment and medium for power grid frequency data

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1571267A (en) * 2004-05-08 2005-01-26 上海慧能科技有限公司 Method for measuring modulation efficiency of generating set primary frequency-modulation
CN101299052A (en) * 2007-11-08 2008-11-05 国网南京自动化研究院 Electric generator one time frequency modulation real time quantitative analysis method based on phasor measuring technique
CN101672893A (en) * 2008-09-10 2010-03-17 华东电力试验研究院有限公司 Generator set primary frequency modulation performance testing method for simulating grid frequency change
CN101995854A (en) * 2009-08-19 2011-03-30 北京中电飞华通信股份有限公司 Monitoring method and system for ensuring safe operation of electric network
CN102323550A (en) * 2011-09-09 2012-01-18 西北电网有限公司 Primary frequency modulation adjusting performance determination method of generating set

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AR029828A1 (en) * 2001-07-13 2003-07-16 Petrobras En S A METHOD FOR PRIMARY FREQUENCY REGULATION IN COMBINED CYCLE STEAM TURBINES

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1571267A (en) * 2004-05-08 2005-01-26 上海慧能科技有限公司 Method for measuring modulation efficiency of generating set primary frequency-modulation
CN101299052A (en) * 2007-11-08 2008-11-05 国网南京自动化研究院 Electric generator one time frequency modulation real time quantitative analysis method based on phasor measuring technique
CN101672893A (en) * 2008-09-10 2010-03-17 华东电力试验研究院有限公司 Generator set primary frequency modulation performance testing method for simulating grid frequency change
CN101995854A (en) * 2009-08-19 2011-03-30 北京中电飞华通信股份有限公司 Monitoring method and system for ensuring safe operation of electric network
CN102323550A (en) * 2011-09-09 2012-01-18 西北电网有限公司 Primary frequency modulation adjusting performance determination method of generating set

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
华中电网一次调频考核系统的研究与开发;杨建华;《电力系统自动化》;20080510;第32卷(第09期);全文 *
提高135MW机组一次调频动作合格率的措施;杨云珍、王元强;《发电设备》;20101231(第05期);全文 *
水电机组一次调频动态品质规范探讨;徐广文等;《广东电力》;20110331;第24卷(第03期);全文 *
西北电网一次调频评价指标研究;任冲等;《电网与清洁能源》;20110930;第27卷(第09期);全文 *

Also Published As

Publication number Publication date
CN102707231A (en) 2012-10-03

Similar Documents

Publication Publication Date Title
CN103543403B (en) Electric system unit Primary frequency control ability detection method
CN106655159A (en) New energy power station primary frequency modulation capability testing system and testing method thereof
CN101777764B (en) Area control deviation and unit generation deviation-based scheduling feedback control system
CN102707231B (en) Generator set primary frequency regulation analysis system based on matlab/simulink
CN103558771A (en) Wind power plant simulation testing platform and testing method thereof
HUE035925T2 (en) Hybrid electric generating power plant that uses a combination of real-time generation facilities and energy storage system
CN102522775A (en) AGG (automatic gain control) unit performance adjustment online evaluation method based on WAMS (wide area measurement system)
CN104779608B (en) Safe stable on-line additional emergency control method of power system based on off-line strategy
CN105305468B (en) Thermal power generation unit primary frequency modulation parameter optimization method based on particle cluster algorithm
CN210422883U (en) Multi-wind-field fan electric centralized control system based on c/s framework
CN104793067A (en) Estimation system and method for power adjustment and electric energy quality of wind power station
CN102638041A (en) Method forquickly checking safety and stability of scheduling operation of power system on line
CN103078317B (en) Control method for controlled wind power plant of wide area wind power control system
CN113394795B (en) Online active evaluation method and system for primary wind power frequency modulation capability of inland mountains
CN103592531A (en) Method and system for detecting parameters of wind power plant static var generator
CN103378784A (en) Load command dynamic compensation method and system
CN110687385A (en) Grid-connected unit remote frequency disturbance testing method based on load interval dynamic adjustment
CN106340967B (en) Power station low voltage generator intelligent operation device and intelligent operation method
CN108616145A (en) The new energy of voltage influence effect cuts machine optimization method after a kind of meter and accident
CN110311425A (en) Consider that the wind fire of peak regulation ancillary service quotation is deep and adjusts electric power optimal control method
CN106528978A (en) Dynamic simulation method and system of speed regulating systems of advanced pressurized water reactor nuclear power unit
CN108695979A (en) A kind of control of micro-capacitance sensor and detection platform
CN113328474A (en) New energy AGC substation test system, method, equipment and medium
CN102818951B (en) Method, system and device for measuring performance index of wind power unit converter on line
CN111191948A (en) Power grid operation state evaluation method and system for multi-provincial union intra-day connecting line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF GUANGDONG POWER GRID Co.,Ltd.

Patentee after: HOHAI University

Address before: 510080 Dongfeng East Road, Guangdong, Guangzhou, water, Kong Kong, No. 8

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF GUANGDONG POWER GRID Corp.

Patentee before: HOHAI University

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170726

Address after: 510630, No. fifth, No. 146-150, Whampoa Avenue, Tianhe District, Guangdong, Guangzhou

Co-patentee after: HOHAI University

Patentee after: GUANGDONG DIANKEYUAN ENERGY TECHNOLOGY Co.,Ltd.

Address before: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8

Co-patentee before: HOHAI University

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF GUANGDONG POWER GRID Co.,Ltd.

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 510000 room 501-503, annex building, Huaye building, No.1-3, Chumo new street, Xihua Road, Yuexiu District, Guangzhou City, Guangdong Province

Co-patentee after: HOHAI University

Patentee after: GUANGDONG DIANKEYUAN ENERGY TECHNOLOGY Co.,Ltd.

Address before: 510630, No. 146-150, No. fifth, Whampoa Avenue, Tianhe District, Guangdong, Guangzhou

Co-patentee before: HOHAI University

Patentee before: GUANGDONG DIANKEYUAN ENERGY TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200110

Address after: 510000 room 501-503, annex building, Huaye building, No.1-3, Chumo new street, Xihua Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee after: GUANGDONG DIANKEYUAN ENERGY TECHNOLOGY Co.,Ltd.

Address before: 510000 room 501-503, annex building, Huaye building, No.1-3, Chumo new street, Xihua Road, Yuexiu District, Guangzhou City, Guangdong Province

Co-patentee before: HOHAI University

Patentee before: GUANGDONG DIANKEYUAN ENERGY TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Room 501-503, annex building, Huaye building, No.1-3 Chuimao new street, Xihua Road, Yuexiu District, Guangzhou City, Guangdong Province 510000

Patentee after: China Southern Power Grid Power Technology Co.,Ltd.

Address before: Room 501-503, annex building, Huaye building, No.1-3 Chuimao new street, Xihua Road, Yuexiu District, Guangzhou City, Guangdong Province 510000

Patentee before: GUANGDONG DIANKEYUAN ENERGY TECHNOLOGY Co.,Ltd.