CN104779608B - Safe stable on-line additional emergency control method of power system based on off-line strategy - Google Patents

Safe stable on-line additional emergency control method of power system based on off-line strategy Download PDF

Info

Publication number
CN104779608B
CN104779608B CN201410692578.8A CN201410692578A CN104779608B CN 104779608 B CN104779608 B CN 104779608B CN 201410692578 A CN201410692578 A CN 201410692578A CN 104779608 B CN104779608 B CN 104779608B
Authority
CN
China
Prior art keywords
control
oma
measure
forecast failure
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410692578.8A
Other languages
Chinese (zh)
Other versions
CN104779608A (en
Inventor
徐泰山
任先成
鲍颜红
刘天斌
罗建裕
于钊
徐伟
徐友平
李海峰
张剑云
张隽
周博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STATE GRID CENTER CHINA GRID Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
State Grid Jibei Electric Power Co Ltd
Nari Technology Co Ltd
Nanjing NARI Group Corp
Original Assignee
STATE GRID CENTER CHINA GRID Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
State Grid Jibei Electric Power Co Ltd
Nari Technology Co Ltd
Nanjing NARI Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STATE GRID CENTER CHINA GRID Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, State Grid Jibei Electric Power Co Ltd, Nari Technology Co Ltd, Nanjing NARI Group Corp filed Critical STATE GRID CENTER CHINA GRID Co Ltd
Priority to CN201410692578.8A priority Critical patent/CN104779608B/en
Publication of CN104779608A publication Critical patent/CN104779608A/en
Application granted granted Critical
Publication of CN104779608B publication Critical patent/CN104779608B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/001Methods to deal with contingencies, e.g. abnormalities, faults or failures

Abstract

The invention discloses a safe stable on-line additional emergency control method of a power system, and belongs to the technical field of safe stable emergency control of the power system. The method disclosed by the invention comprises the following steps: generating safe stable electric network operating fault surface data which is assessed on line by using safety control real-time information as a standard, performing an on-value control measure of an off-line strategy, in the measure space of additional control, generating safe stable on-line assessment calculation examples through the enumerated combination of the control measure, based on a cluster calculating platform, preferentially processing the calculation examples with a small control cost, updating the additional control measure combination which has a small control cost and can ensure the safety and the stability of the electric network to a safety control device, and after an expected failure occurs, implementing the on-value control measure and the on-line additional control measure of the off-line strategy at the same time for the electric network. The method disclosed by the invention can effectively reduce the probability that the safety and the stability of the electric network cannot be ensured after emergency control.

Description

The online additional emergency control method of power system safety and stability based on off-line strategy
Technical field
The invention belongs to power system safety and stability emergent control technical field, more precisely, the present invention relates to a kind of Suitable for the method for the online additional emergency control on the basis of power system safety and stability emergent control off-line strategy.
Background technology
Safety and stability emergency control system (referred to as Safety system) is the second defence line of electricity net safety stable, reliability Require very high.In order to adapt to the operation of power networks operating mode of complexity, by carrying out substantial amounts of security and stability analysis calculating to electrical network, and tie Engineering experience is closed, Off-line control Policy Table is formulated by conservatism.Under normal circumstances, controlled based on Off-line control Policy Table The Safety system of system, it can be ensured that the electricity net safety stable after forecast failure generation, but, still suffer from and electrical network actual motion work Condition mismatch, the probability that electricity net safety stable requirement can not be met.With the increase of electrical network scale, operation of power networks characteristic will more Complexity, Off-line control strategy can also be increased with the probability of electrical network actual operating mode mismatch, the wind of power network safety operation Danger also will increase.
In order to overcome the inherent defect of Off-line control strategy, " on-line pre-decision system, real-time matching " emergent control technology is in state Some engineer applieds are obtained in interior external power grid, due to the calculating time of bulk power grid safety and stability emergent control " on-line pre-decision system " Generally need a few minutes, and the operating condition of bulk power grid is possible to occur than larger change within this few minutes, by The online emergency control policy that line computation is obtained there is also with electrical network actual operating mode mismatch, electricity net safety stable can not be met The probability of requirement, simply compared with Off-line control strategy, its probability is reduced.Affect " on-line pre-decision system, real-time matching " One of key factor of emergent control Technique Popularizing application is to be difficult to the adaptability to strategy of on-line to carry out quantitative evaluation, generally Still the applicable elements of online strategy are preset by rule of thumb, and its reliability is difficult to ensure that.
In sum, the emergent control based on off-line strategy ensure that the peace of electrical network under the most of operating conditions of electrical network It is complete stable, but the precision of control strategy is not high, generally too guards, and controlled quentity controlled variable is excessive;Emergent control based on on-line pre-decision system Tactful high precision, but its reliability still relies on experience.
The content of the invention
The present invention seeks to:For deficiency of the prior art, there is provided a kind of power system security based on off-line strategy Stablize online additional emergency control method.The method comprehensive utilization is based on the emergent control of off-line strategy and based on on-line pre-decision system Two kinds of technical schemes of emergent control advantage, obtain reasonable balance between the two in control accuracy and reliability, effectively Reduce cannot ensure the probability of electricity net safety stable after emergent control.
The present invention ultimate principle be:Substantial amounts of cases of engineering shows that off-line strategy is transported in the great majority of electrical network The safety and stability of electrical network is ensure that under row operating mode.If can be on the basis of off-line strategy, then the control of additional on-line pre-decision system Strategy, and the whether applicable elements of the control measure of additional on-line pre-decision system after the forecast failure for proposing occurs, do not rely on Jing Test setting.Compared with the Safety system of only off-line strategy, this technical scheme is higher to the adaptability of operation of power networks operating mode, control Precision processed is higher;And compared with the Safety system of only strategy of on-line, the engineering practicability of this technical scheme is higher, reliability It is higher.
Specifically, the present invention employs the following technical solutions realization, including following two parts content:
Part I is the generation and refreshing of online additional control combined measure, is comprised the following steps:
1-1) at power grid regulation center, collect in real time send in all security control devices in Safety system plant running state, Communication port state, pressing plate state, definite value, Off-line control Policy Table and electrical network real-time running state information, make constantly by collecting The corresponding operation of power networks moment is calculated for online additional control combined measure OMA meter, t is designated as0
The Off-line control Policy Table includes that combinations of states, element/passway for transmitting electricity tide is thrown/stopped to pressing plate combinations of states, element Stream combination, definite value combination, forecast failure, classification SP of safety and stability problem and control measure combination 7 are arranged totally;
Classification SP of the safety and stability problem refer to static security stable, transient safe and stable and dynamic security it is stable and Its combination;
The control measure refer to control object and its controlled quentity controlled variable;
The security control device after line additional control combined measure OMA refers to that forecast failure occurs is in Off-line control Policy Table In the control measure combination that is superimposed again on the basis of the Off-line control combined measure that searches;
1-2) at power grid regulation center, first, according to the plant running state sent in all security control devices in Safety system With communication port state, determine each security control device current with reference to Safety system framework model and communication port structural model The function that moment can implement, then, the work(that can be implemented at current time according to each security control device in Safety system respectively Can, electrical network real-time running state, pressing plate state and the definite value sent on meter and security control device, recognize each security control device can in value Control measure space CM, then for each forecast failure that security control device is defendd, transported in real time according to the electrical network given in security control device Row state, pressing plate state and definite value, search respectively the SP and phase corresponding to each forecast failure from Off-line control Policy Table Answer in value Off-line control combined measure OM;
The security control device in the controllable measure space CM of value refers to that security control device is to electricity under electrical network current operating conditions The set of control object that net can be taken and that real execution can be obtained and its controlled quentity controlled variable;
If corresponding the referring in value Off-line control combined measure OM of the forecast failure is sent out under electrical network current operating conditions After having given birth to the forecast failure, security control device is arranged for the control that can obtain real execution that the forecast failure is taken electrical network Apply combination;
1-3) at power grid regulation center, first, using delivering to this grade of regulation and control center in all security control devices in Safety system Electrical network real-time traffic information newest being used for substitute that the online dynamic security Stability Assessment system in this grade of regulation and control center provides The throwing of counter element in the operation of power networks state profile data of safety on line Stability Assessment/stop state and Power Flow Information, then to place Operation of power networks state profile data after reason carries out Load flow calculation, if Load flow calculation convergence, into step 1-4), otherwise, return Return step 1-1);
1-4) at power grid regulation center, each forecast failure that Safety system is defendd is respectively directed to, is counted and step The OMA meter that OM corresponding to the forecast failure for 1-2) searching is performed is calculated, once certain forecast failure OMA it has been determined that if Respectively by t0, OM and OMA flush to defend the forecast failure security control device online additional control Policy Table in the anticipation The corresponding OMA meter of failure calculates corresponding operation of power networks moment, OMA meter and calculates the OM and OMA at corresponding operation of power networks moment;
If the OMA of all forecast failures that Safety system is defendd has determined and flushes to corresponding security control device In online additional control Policy Table, then return to step 1-1), otherwise, the OMA meter for proceeding remaining forecast failure is calculated and phase The refreshing of relevant information in the online additional control Policy Table for answering;
If during OMA meter is calculated, current time and t0Difference calculate duration threshold value more than OMA meter, then stop remaining The OMA meter for not calculating the forecast failure of OMA is calculated, and the OMA of these forecast failures is set to into empty set, and by t0And and these Forecast failure corresponding OM and OMA flushes to respectively the online additional control Policy Table of the security control device for defending these forecast failures In corresponding with forecast failure OMA meter calculate corresponding operation of power networks moment, OMA meter and calculate the OM at corresponding operation of power networks moment And OMA, return to step 1-1);
The online additional control Policy Table includes that forecast failure, OMA meter calculate corresponding operation of power networks moment tc、tcWhen The OM and OMA at quarter 4 is arranged totally;
Part II is the control measure of the actual execution of security control device after the forecast failure that Safety system is defendd occurs It is determined that, comprise the following steps:
2-1) when the security control device in Safety system detects its forecast failure defendd to be occurred, in security control device In, forecast failure generation moment is designated as into t1
The OMA meter corresponding to the forecast failure 2-2) is searched from online additional control Policy Table and calculates corresponding electrical network Time of running tc、tcThe OM and OMA at moment, and according to gather and be pooled to electrical network real-time running state information and controllable measure letter Breath, with reference to security control device current pressing plate state, definite value, searches corresponding to the forecast failure from Off-line control Policy Table In value Off-line control combined measure OM;
If 2-3) t1-tcLess than the OMA effective time threshold values of setting, and search from online additional control Policy Table OM it is identical with the control object of both the OM searched from Off-line control Policy Table, then will search from Off-line control Policy Table Rope to OM and OMA both be superimposed occur as the forecast failure after actual executions of security control device control measure, otherwise, a general Control measure of the OM searched from Off-line control Policy Table as the actual execution of security control device after forecast failure generation;
Security control device takes electrical network the control measure of actual execution, and return to step 2-1).
Above-mentioned technical proposal is further characterized by:The step of Part I 1-4) in forecast failure OMA meter Calculation method is as follows:
For forecast failure, 1-2 the step of meter and Part I) OM corresponding to the forecast failure that searches execution, The step of carrying out Part I 1-2) SP corresponding to the forecast failure that searches online evaluation;If OM pacifies accordingly after performing Total stability ensure that, then the OMA of the forecast failure is set to into empty set in online additional control Policy Table;Otherwise, first In the OM passed through in controllable measure space CM is worth corresponding to removal forecast failure of security control device, obtain can be used in OMA meter The optional control measure space CM' for calculating, then will according to the difference of control accuracy of measurement ε of the different type control object of setting Ask, can be as the control object of continuous quantity control, by the maximum x of its controlled amounts for controlled quentity controlled variable in CM'maxIt is converted Into the equally distributed n gear of controlled quentity controlled variable, wherein n is (xmax/ ε+0.5) round after numerical value so that the 1st of the control object It is x that the controlled quentity controlled variable of individual optional control measure is the controlled quentity controlled variable of the 0, the 2nd optional control measuremax/ n, the 3rd optional control measure Controlled quentity controlled variable be 2xmax/ n, the like, the controlled quentity controlled variable of (n+1)th optional control measure is xmax, then can by all in CM' Control measure are selected to carry out enumerating combination, and 1-2 the step of meter and Part I) OM corresponding to the forecast failure that searches holds On the basis of row, one group of different safety and stability online evaluation example of optional control measure combination producing, finally, root are superimposed respectively The all safety and stability online evaluation examples for generating are entered according to the ascending order of the control cost of optional control measure combination Row sequence, then according to the sequence number of online evaluation example, based on cluster Computing Platform, by the parallel calculating scheduling method of example, To all safety and stability online evaluation examples for generating, 1-2 the step of Part I is carried out respectively) the forecast failure institute that searches The online evaluation of corresponding SP, until the assessment result of at least one example is safety and stability, then stops remaining all calculations The calculating of example, the optional control measure that will be superimposed number in front and assessment result is the example of safety and stability with sequence combine as The OMA of forecast failure, if the assessment result of all examples is not safety and stability, by the OMA of forecast failure empty set is set to.
Beneficial effects of the present invention are as follows:It is of the invention to propose on the basis of off-line strategy, then additional on-line pre-decision system The design concept of control strategy, the control reliability and control accuracy that the present invention is just determined from principle is not less than tradition certainly The control method based on off-line strategy.The whether applicable elements of the control measure of additional on-line pre-decision system proposed by the present invention, It is the on-line automatic generation of safety and stability characteristic according to electrical network, does not rely on experience setting, solves substantially and how to judge A difficult problem for line decision-premaking control strategy effectiveness, largely realizes off-line strategy adaptive with on-line pre-decision system control strategy Should cooperate with.Compared with the Safety system of only off-line strategy, this technical scheme is higher to the adaptability of operation of power networks operating mode, control Precision processed is higher;Compared with the Safety system of only strategy of on-line, the engineering practicability of this technical scheme is higher, reliability more It is high.
Description of the drawings
Fig. 1 is the flow chart of the inventive method Part I.
Fig. 2 is the flow chart of the inventive method Part II.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings.
Step 1 is described in Fig. 1, collects the real time information of security control device, i.e., at power grid regulation center, peace is collected in real time Plant running state, communication port state, pressing plate state, definite value, the Off-line control plan sent in all security control devices in control system Sketch form and electrical network real-time running state information, will collect the moment as the corresponding electrical network of online additional control combined measure calculating The time of running, it is designated as t0, into step 2).
The Off-line control Policy Table includes that combinations of states, element/passway for transmitting electricity tide is thrown/stopped to pressing plate combinations of states, element Stream combination, definite value combination, forecast failure, the classification of safety and stability problem and control measure combination 7 are arranged totally, are artificial offline settings 's;
Classification SP of the safety and stability problem refer to static security stable, transient safe and stable and dynamic security it is stable and Its combination;
The control measure refer to control object and its controlled quentity controlled variable;
The security control device after line additional control combined measure OMA refers to that forecast failure occurs is in Off-line control Policy Table In the control measure combination that is superimposed again on the basis of the Off-line control combined measure that searches.
Step 2 is described in Fig. 1, recognize Safety system be worth controllable measure space, the safety and stability problem of defence and It is being worth Off-line control combined measure, i.e., at power grid regulation center, first, according to what is sent in all security control devices in Safety system Plant running state and communication port state, each peace is determined with reference to Safety system framework model and communication port structural model The function that control device can be implemented at current time, then, respectively according to each security control device in Safety system at current time The function that can implement, electrical network real-time running state, pressing plate state and the definite value sent on meter and security control device recognizes each peace control Device being worth controllable measure space, then for each forecast failure that security control device is defendd, according to what is sent in security control device Electrical network real-time running state, pressing plate state and definite value, search respectively each forecast failure institute right from Off-line control Policy Table The SP that answers and corresponding in value Off-line control combined measure.
The security control device in the controllable measure space CM of value refers to that security control device is to electricity under electrical network current operating conditions The set of control object that net can be taken and that real execution can be obtained and its controlled quentity controlled variable;
If corresponding the referring in value Off-line control combined measure OM of the forecast failure is sent out under electrical network current operating conditions After having given birth to the forecast failure, security control device is arranged for the control that can obtain real execution that the forecast failure is taken electrical network Apply combination.
Step 3 is described in Fig. 1, carries out electricity net safety stable assessment section data integration and Load flow calculation, i.e., in electricity Net regulation and control center, first, using the electrical network real time execution letter that this grade of regulation and control center is delivered in all security control devices in Safety system Cease to substitute that the online dynamic security Stability Assessment system in this grade of regulation and control center provides is newest for safety on line Stability Assessment Operation of power networks state profile data in counter element throwing/stop state and Power Flow Information, then to the operation of power networks shape after process State profile data carries out Load flow calculation, if Load flow calculation convergence, into step 4), otherwise, return to step 1);
Step 4 is described in Fig. 1, carries out the safety and stability check and the calculating of OMA of OM, i.e., at power grid regulation center, Each forecast failure that Safety system is defendd is respectively directed to, is counted and step 2) OM corresponding to the forecast failure that searches The OMA meter of execution is calculated.
Once certain forecast failure OMA it has been determined that if respectively by t0, OM and OMA flush to defence the forecast failure Security control device online additional control Policy Table in corresponding with forecast failure OMA meter when calculating corresponding operation of power networks Quarter, OMA meter calculate the OM and OMA at corresponding operation of power networks moment.
If the OMA of all forecast failures that Safety system is defendd has determined and flushes to corresponding security control device In online additional control Policy Table, then return to step 1), otherwise, the OMA meter for proceeding remaining forecast failure is calculated and corresponding Online additional control Policy Table in relevant information refreshing.
If during OMA meter is calculated, current time and t0Difference more than OMA meter calculate duration threshold value (generally can set It is set to 5 minutes), then the OMA meter for stopping the forecast failure that remainder does not calculate OMA is calculated, and the OMA of these forecast failures is put For empty set, and by t0And OM and OMA corresponding with these forecast failures flushes to respectively the peace control dress for defending these forecast failures OMA meter corresponding with forecast failure calculates corresponding operation of power networks moment, OMA meter and calculates institute in the online additional control Policy Table for putting The OM and OMA at corresponding operation of power networks moment, return to step 1).
The online additional control Policy Table includes that forecast failure, OMA meter calculate corresponding operation of power networks moment tc、tcWhen The OM and OMA at quarter 4 is arranged totally;
Wherein, it is contemplated that the circular of the OMA of failure is as follows:
For certain forecast failure, meter and Fig. 1-step 2) OM corresponding to the forecast failure that searches execution, carry out Fig. 1-step 2) SP corresponding to the forecast failure that searches online evaluation, if corresponding security and stability can after OM is performed Ensure, then the OMA of the forecast failure is set to into empty set in online additional control Policy Table, otherwise, first, in security control device By removing the OM corresponding to forecast failure in controllable measure space CM is worth, obtain can be used in the optional control of OMA meter calculation Measure space CM', then, requires, in CM' according to the different of control accuracy of measurement ε of the different type control object of setting Controlled quentity controlled variable can be as the control object of continuous quantity control, by the maximum x of its controlled amountsmaxConvert thereof into controlled quentity controlled variable uniform N gear of distribution, wherein n is (xmax/ ε+0.5) round after numerical value so that the 1st of the control object optional control is arranged It is x that the controlled quentity controlled variable applied is the controlled quentity controlled variable of the 0, the 2nd optional control measuremax/ n, the controlled quentity controlled variable of the 3rd optional control measure is 2xmax/ n, the like, the controlled quentity controlled variable of (n+1)th optional control measure is xmax, then by all optional control measure in CM' Carry out enumerating combination, and in meter and Fig. 1-step 2) on the basis of the OM corresponding to the forecast failure that searches performs, fold respectively Plus the safety and stability online evaluation example that one group of optional control measure combination producing is different, finally, according to optional control measure group The order that the control cost of conjunction is ascending is ranked up to all safety and stability online evaluation examples for generating, then according to online The sequence number of assessment example, based on cluster Computing Platform, by the parallel calculating scheduling method of example, all safety to generating are steady Determine online evaluation example, Fig. 1-step 2 carried out respectively) online evaluation of SP corresponding to the forecast failure that searches, until extremely The assessment result of a rare example is safety and stability, then stop the calculating of remaining all examples, will with sequence number front and Assessment result be safety and stability example in be superimposed optional control measure combine as forecast failure OMA, if all examples Assessment result be not safety and stability, then the OMA of forecast failure is set to into empty set.
The sum of the forecast failure that M is defendd by Safety system.
Step 1 is described in Fig. 2, judges whether forecast failure occurs, i.e., when the security control device in Safety system is detected When occurring to its forecast failure defendd, in security control device, forecast failure generation moment is designated as into t1
Step 2 is described in Fig. 2, is searched in value control measure, i.e., search this from online additional control Policy Table OMA meter corresponding to forecast failure calculates corresponding operation of power networks moment tc、tcThe OM and OMA at moment, and according to gathering and collect To electrical network real-time running state information and controllable Action Message, with reference to security control device current pressing plate state, definite value, from offline control Search in Policy Table processed corresponding to the forecast failure in value Off-line control combined measure OM.
Step 3 is described in Fig. 2, it is determined that the actual control measure for performing, even t1-tcWhen effective less than the OMA of setting Long threshold value (generally could be arranged to 10 minutes), and the OM searched from online additional control Policy Table with from Off-line control The control object of both the OM searched in Policy Table is identical, then by the OM searched from Off-line control Policy Table and OMA bis- Person is superimposed the control measure of the actual execution of security control device after occurring as the forecast failure, otherwise, only will be from Off-line control strategy Control measure of the OM searched in table as the actual execution of security control device after forecast failure generation;
Security control device takes electrical network the control measure of actual execution, and return to step 1).
Although the present invention is disclosed as above with preferred embodiment, embodiment is not for limiting the present invention's.Not Depart from the spirit and scope of the present invention, any equivalence changes done or retouching also belong to the protection domain of the present invention.Cause The content that this protection scope of the present invention should be defined with claims hereof is as standard.

Claims (2)

1. the online additional emergency control method of power system safety and stability of off-line strategy is based on, it is characterised in that including following Two parts content:
Part I is the generation and refreshing of online additional control combined measure, is comprised the following steps:
1-1) at power grid regulation center, plant running state, the communication sent in all security control devices in Safety system is collected in real time Channel statuses, pressing plate state, definite value, Off-line control Policy Table and electrical network real-time running state information, will collect the moment as Line additional control combined measure OMA meter calculates the corresponding operation of power networks moment, is designated as t0
The Off-line control Policy Table includes that combinations of states, element/passway for transmitting electricity trend group is thrown/stopped to pressing plate combinations of states, element The combination of conjunction, definite value combination, forecast failure, classification SP of safety and stability problem and control measure 7 is arranged totally;
Classification SP of the safety and stability problem refers to that stable static security, transient safe and stable and dynamic security are stablized and its group Close;
The control measure refer to control object and its controlled quentity controlled variable;
The security control device after line additional control combined measure OMA refers to that forecast failure occurs is searched in Off-line control Policy Table Rope to Off-line control combined measure on the basis of be superimposed again control measure combination;
1-2) at power grid regulation center, first, according to the plant running state sent in all security control devices in Safety system and logical Letter channel statuses, determine each security control device at current time with reference to Safety system framework model and communication port structural model The function that can implement, then, the function that can be implemented at current time according to each security control device in Safety system respectively, meter And electrical network real-time running state, pressing plate state and the definite value given in security control device, recognize arranging value is controllable for each security control device Space CM is applied, then for each forecast failure that security control device is defendd, according to the electrical network real time execution shape sent in security control device State, pressing plate state and definite value, search respectively SP corresponding to each forecast failure and corresponding from Off-line control Policy Table In value Off-line control combined measure OM;
The security control device in the controllable measure space CM of value refers to that under electrical network current operating conditions, security control device is to electrical network energy The set of control object enough take and that real execution can be obtained and its controlled quentity controlled variable;
If corresponding the referring in value Off-line control combined measure OM of the forecast failure there occurs under electrical network current operating conditions After the forecast failure, the control measure group that can obtain real execution that security control device is taken electrical network for the forecast failure Close;
1-3) at power grid regulation center, first, using the electricity that this grade of regulation and control center is delivered in all security control devices in Safety system Net real-time traffic information is newest for online come substitute that the online dynamic security Stability Assessment system in this grade of regulation and control center provides The throwing of counter element in the operation of power networks state profile data of safety and stability evaluation/stop state and Power Flow Information, then to process after Operation of power networks state profile data carry out Load flow calculation, if Load flow calculation convergence, into step 1-4), otherwise, return step Rapid 1-1);
1-4) at power grid regulation center, each forecast failure that Safety system is defendd is respectively directed to, is counted and step 1-2) The OMA meter that OM corresponding to the forecast failure for searching is performed is calculated, once certain forecast failure OMA it has been determined that if distinguish By t0, OM and OMA flush to defend the forecast failure security control device online additional control Policy Table in the forecast failure Corresponding OMA meter calculates corresponding operation of power networks moment, OMA meter and calculates the OM and OMA at corresponding operation of power networks moment;
If the OMA of all forecast failures that Safety system is defendd has determined and flushes to the online of corresponding security control device In additional control Policy Table, then return to step 1-1), otherwise, the OMA meter for proceeding remaining forecast failure is calculated and corresponding The refreshing of relevant information in online additional control Policy Table;
If during OMA meter is calculated, current time and t0Difference calculate duration threshold value more than OMA meter, then stop remaining without meter The OMA meter for calculating the forecast failure of OMA is calculated, and the OMA of these forecast failures is set to into empty set, and by t0And envision event with these Hinder corresponding OM and OMA flush to respectively defend these forecast failures security control device online additional control Policy Table in it is pre- Think that the corresponding OMA meter of failure calculates corresponding operation of power networks moment, OMA meter and calculates the OM and OMA at corresponding operation of power networks moment, Return to step 1-1);
The online additional control Policy Table includes that forecast failure, OMA meter calculate corresponding operation of power networks moment tc、tcMoment OM and OMA 4 are arranged totally;
Part II is the determination of the control measure of the actual execution of security control device after the forecast failure that Safety system is defendd occurs, Comprise the following steps:
2-1) when the security control device in Safety system detects its forecast failure defendd to be occurred, in security control device, will Forecast failure generation moment is designated as t1
The OMA meter corresponding to the forecast failure 2-2) is searched from online additional control Policy Table and calculates corresponding operation of power networks Moment tc、tcThe OM and OMA at moment, and according to gathering and being pooled to electrical network real-time running state information and controllable Action Message, tie Close current pressing plate state, the definite value of security control device, search from Off-line control Policy Table corresponding to the forecast failure in value Off-line control combined measure OM;
If 2-3) t1-tcLess than the OMA effective time threshold values of setting, and the OM searched from online additional control Policy Table It is identical with the control object of both the OM searched from Off-line control Policy Table, then will search from Off-line control Policy Table OM and OMA both be superimposed occur as the forecast failure after the actual execution of security control device control measure, otherwise, will from from Control measure of the OM searched in line traffic control Policy Table as the actual execution of security control device after forecast failure generation;
Security control device takes electrical network the control measure of actual execution, and return to step 2-1).
2. the online additional emergency control method of the power system safety and stability based on off-line strategy according to claim 1, Characterized in that, the step of Part I 1-4) in forecast failure OMA meter calculate method it is as follows:
For forecast failure, 1-2 the step of meter and Part I) OM corresponding to the forecast failure that searches execution, carry out The step of Part I 1-2) SP corresponding to the forecast failure that searches online evaluation;If OM is corresponding safe steady after performing It is qualitative to ensure that, then the OMA of the forecast failure is set to into empty set in online additional control Policy Table;Otherwise, first in peace The OM passed through in controllable measure space CM is worth corresponding to removal forecast failure of control device, obtains can be used in OMA meter calculation Optional control measure space CM', then requires, pin according to the different of control accuracy of measurement ε of the different type control object of setting Can be as the control object of continuous quantity control, by the maximum x of its controlled amounts to controlled quentity controlled variable in CM'maxConvert thereof into control Equally distributed n gear is measured, wherein n is (xmax/ ε+0.5) round after numerical value so that the 1st of the control object is optional It is x that the controlled quentity controlled variable of control measure is the controlled quentity controlled variable of the 0, the 2nd optional control measuremax/ n, the control of the 3rd optional control measure Measure as 2xmax/ n, the like, the controlled quentity controlled variable of (n+1)th optional control measure is xmax, then by all optional control in CM' Measure carries out enumerating combination, and 1-2 the step of meter and Part I) bases that perform of the OM corresponding to the forecast failure that searches On plinth, one group of different safety and stability online evaluation example of optional control measure combination producing is superimposed respectively, finally, according to optional The order that the control cost of control measure combination is ascending is ranked up to all safety and stability online evaluation examples for generating, Again according to the sequence number of online evaluation example, based on cluster Computing Platform, by the parallel calculating scheduling method of example, to what is generated All safety and stability online evaluation examples, 1-2 the step of Part I is carried out respectively) SP corresponding to the forecast failure that searches Online evaluation, until the assessment result of at least one example is safety and stability, then stop the calculating of remaining all examples, The optional control measure being superimposed in front and assessment result is the example of safety and stability with sequence number are combined as forecast failure OMA, if the assessment result of all examples is not safety and stability, the OMA of forecast failure is set to into empty set.
CN201410692578.8A 2014-11-26 2014-11-26 Safe stable on-line additional emergency control method of power system based on off-line strategy Active CN104779608B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410692578.8A CN104779608B (en) 2014-11-26 2014-11-26 Safe stable on-line additional emergency control method of power system based on off-line strategy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410692578.8A CN104779608B (en) 2014-11-26 2014-11-26 Safe stable on-line additional emergency control method of power system based on off-line strategy

Publications (2)

Publication Number Publication Date
CN104779608A CN104779608A (en) 2015-07-15
CN104779608B true CN104779608B (en) 2017-05-10

Family

ID=53620918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410692578.8A Active CN104779608B (en) 2014-11-26 2014-11-26 Safe stable on-line additional emergency control method of power system based on off-line strategy

Country Status (1)

Country Link
CN (1) CN104779608B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105119380B (en) * 2015-09-16 2017-09-29 许继集团有限公司 A kind of hierarchical coordinative wide area protection control method
CN106446332B (en) * 2016-08-18 2019-11-05 国电南瑞科技股份有限公司 A kind of method that channel topology automatically generates between safety and stability emergence control
CN109217298B (en) * 2018-09-29 2020-08-21 南瑞集团有限公司 Emergency control strategy calculation method for coping with dynamic process successive events
CN109742751B (en) * 2018-11-16 2022-08-05 国电南瑞科技股份有限公司 Method, device and system for identifying and serving control strategy of security control device of power system
CN109449940B (en) * 2018-12-28 2022-04-19 国电南瑞科技股份有限公司 Emergency control wide area coordination method for coping with dynamic process succession events
CN110556828B (en) * 2019-09-25 2022-08-30 国电南瑞科技股份有限公司 Online safety and stability emergency control method and system adaptive to equipment power flow change
CN110943448B (en) * 2019-12-03 2021-06-18 国电南瑞科技股份有限公司 Security control device refusing action fault simulation method, system and storage medium

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102638040A (en) * 2012-04-16 2012-08-15 中国南方电网有限责任公司 Online setting method of safety and stability emergency control fixed value of electric power system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102638040A (en) * 2012-04-16 2012-08-15 中国南方电网有限责任公司 Online setting method of safety and stability emergency control fixed value of electric power system

Also Published As

Publication number Publication date
CN104779608A (en) 2015-07-15

Similar Documents

Publication Publication Date Title
CN104779608B (en) Safe stable on-line additional emergency control method of power system based on off-line strategy
CN105656024B (en) Electric power system operation standby margin of safety online evaluation method
CN106447522A (en) Full voltage sequence integrated power grid reliability and risk evaluation method
CN107093895B (en) online transient state safety and stability assessment method based on automatic screening of expected fault set
CN106099906B (en) A kind of power system security stablizes online integrated campaign method
CN102324743A (en) The online transient safe and stable assessment of electric power system forecast failure screening technique
CN108173293A (en) Meter and the new energy active power output maximum value on-line calculation method of operation of power networks constraint
EP2537222A2 (en) Energy generating system and control thereof
CN102638041B (en) Method forquickly checking safety and stability of scheduling operation of power system on line
CN108847660A (en) The prevention and control Study on Decision-making Method for Optimization checked online based on Safety system off-line strategy
CN102289731A (en) Method for maintaining state of power transmission equipment based on system risk
CN107909253A (en) Intelligent distribution network scheduling controlling effect evaluation method based on interval based AHP
CN103337904A (en) Emergency control method for power grid voltage out-of-limit and equipment overload based on multi-source data
CN109767063A (en) A kind of stability control device operation information system and its online power grid risk assessment method
CN106099907B (en) The online emergent control decision-making technique of meter and transient state and static security scleronomic constraint
CN107732906B (en) Cutter cutting control method for dynamically tracking transient power angle weak stability mode
CN102170131A (en) Limit power calculating method of associated electricity transmission cross-section based on parallel calculating model
CN109752629B (en) Intelligent diagnosis method and system for power grid measurement problems
CN102901868A (en) Method for electric energy acquisition system data checking
CN110265998B (en) Method and device for checking strategy fixed value of stability control system
Xu et al. Load shedding and its strategies against frequency instability in power systems
CN101453188B (en) Indication computing system with dynamic electricity generation side controlling performance standard
CN105204489B (en) Meter and protection control the online preventive control Application of risk decision method of cost with peace certainly
CN108832630A (en) A kind of power grid CPS prevention and control method based on forecast accident scene
CN106548284A (en) A kind of adaptive mode massing power grid security Alarm Assessment method towards operation regulation and control

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant