CN102707164A - 一种现场孤网仿真试验方法 - Google Patents

一种现场孤网仿真试验方法 Download PDF

Info

Publication number
CN102707164A
CN102707164A CN2012100742873A CN201210074287A CN102707164A CN 102707164 A CN102707164 A CN 102707164A CN 2012100742873 A CN2012100742873 A CN 2012100742873A CN 201210074287 A CN201210074287 A CN 201210074287A CN 102707164 A CN102707164 A CN 102707164A
Authority
CN
China
Prior art keywords
unit
frequency
network
lonely
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100742873A
Other languages
English (en)
Other versions
CN102707164B (zh
Inventor
黄青松
徐广文
李玺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Power Technology Co Ltd
Original Assignee
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority to CN201210074287.3A priority Critical patent/CN102707164B/zh
Publication of CN102707164A publication Critical patent/CN102707164A/zh
Application granted granted Critical
Publication of CN102707164B publication Critical patent/CN102707164B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

本发明公开一种采用孤网仿真仪来代替实际的孤网,通过现场试验来验证水电机组在孤网条件下的频率调节能力,为水电机组黑启动能力评价提供科学依据的现场孤立电网仿真试验方法:通过现场孤立电网仿真仪,在仿真的孤立电网工况下,优化调速器调节参数;采用一组优化的调节参数,试验验证机组的黑启动能力;试验验证机组孤网运行的频率调节能力;对试验机组的黑启动和孤网运行的频率调节能力进行评价。本发明可解决多数水电厂因涉及主设备运行方式的调整、要减少甚至停止对用户供电等,真正的孤网试验条件难以满足,因而,无法定期进行此类试验的问题。

Description

一种现场孤网仿真试验方法
技术领域
本发明涉及一种应用于输电线路孤网的试验方法,尤其是涉及一种现场的孤立电网仿真试验方法。
技术背景
水电机组启动辅助设备相对少,自启动能力强,机组启动快,因此水电机组一般是电网失电后作为黑启动的首选电源。
当机组启动成功后为局部电网供电,形成一个孤立的小电网-简称孤网。若孤网运行稳定,则容易同主网并列,恢复正常供电,否则系统将会崩溃,造成大面积停电。因此,电网管理部门会根据设备、线路检修安排,有计划地进行机组黑启动以及孤网稳定运行试验。然而,真实的孤立电网现场试验,需要电网管理部门、电站、用户共同参与,耗费不少的人力物力。还经常遇到孤立电网工业用户的原因,孤立电网试验条件无法满足的情况。
因此,人们建立了电厂引水系统、水轮机、发电机、调速器、孤立电网负荷等部件的数学模型,利用计算机来仿真孤立电网的运行特性。
但是,真实电厂与数学模型毕竟不同,数据会存在误差,并且设备在其寿命期间经受着偶然事故和改进,因此在某些情况下数字计算的质量相对地表现出不高。
由于这个原因,在真实的孤立电网现场试验之前或为代替真实孤立电网现场试验,希望能采用一种基于“现场孤立电网仿真试验”的中间方法。
发明内容
本发明所要解决的技术问题,就是提供一种现场孤立电网仿真试验方法,借助在线孤立电网仿真仪进行现场孤网试验,为参与黑启动机组提供在孤网运行时的调速器参数优化整定方案,保证机组频率调节的稳定性和设备安全。
解决上述技术问题,本发明采用如下技术方案:
一种现场孤立电网的仿真试验方法,包括以下步骤:
S1现场将机组出力、机组主接力器行程、发电机机端定子电压、机组蜗壳压力、通过调速器机频信号输入的电网频率信号接入在线孤网仿真仪;
S2启动在线孤立电网仿真仪,设置好仿真仪试验参数,仿真仪频率输出信号50Hz;机组开机并网运行,带预定的负荷,待机组运行稳定后,将机组调速器的机频输入通过频率切换装置切换到在线孤网仿真仪频率输出;
S3 设定不同的调速器PID参数:永态转差系数bp、比例增益Kp、积分增益Ki、微分增益Kd、频率死区Ef;
S4 用在线孤网仿真仪仿真孤网负荷变化:阶跃量为机组实发功率±10%,录制主接力器行程、发电机机端电压、机组蜗壳压力和机组频率、机组发电有功信号波形;
S5 选择从录制的波形计算出来的机组频率调节稳定性和速动性指标:调节时间、超调量、超调次数比较好的一组参数作为孤网运行参数;
S6机组在这组参数下带电站厂用电和地区部分用户负荷,通过起停孤网的用电设备(如电站的抽水泵、大型风机),验证机组频率调节的稳定性。
所述的现场孤立电网仿真仪为:包括依次电连接的功率变换器、第一信号调理模块、A/D转换模块、数字滤波及信号处理计算模块、D/A转换模块、第二信号调理模块和输出接口,所述的数字滤波及信号处理计算模块还外接有显示模块、面板输入模块和通信模块,所述的功率变换器测量发电机的有功出力,输出接口的输出信号作为孤网频率输入机组调速器。
所述的频率切换装置是一种2通道无电联系的切换开关。
所述的在线孤网仿真仪,将机组向孤立负荷供电,负荷的变化引起频率的变化就会从被测量的发电机输出功率通过计算发送出来。然后这个被模拟的频率信号被送至调速器代替实际的电网频率。
试验采用在线孤网仿真仪模拟一个孤网(或一个地区)的负荷变化,经过计算送出反映孤网频率变化信号,然后这个被模拟的频率信号送到机组调速系统,调速器响应频率变化而进行负荷调节以保证孤网的频率稳定。
模拟孤立电网试验允许水轮发电机组与互联电力系统并联运行,并且允许负荷幅值以及负荷特性表达有较大的灵活性。测量发电机向系统的输出功率,而且将该信号积分,产生一个模拟的转速信号。由输出功率测量值与可调整的功率基准值间的差值(功率初始值和试验信号值之和)的积分便得到被模拟的频率。考虑到:
机组惯性(机组加速度常数Ta);
电网负荷的惯性时间常数(负荷加速度常数Tb);
频率变化和电压变化引起电网负荷变化的特性系数――自调节系数(en)。
这种在线仿真试验,包括了水力系统真实部件的动态影响,即引水系统,水轮机(为简便起见,它与转速的关系被水轮机自调节系数考虑进去了),非线性的调速器。
有益效果:机组孤网运行频率稳定性是大家所关注主要问题之一。由于采用上述技术方案,本发明为具备黑启动能力水电机组孤网运行调节参数优化提供了一种方法。
附图说明
图1为在线孤网仿真仪的组成结构示意图;
图2为在线孤网仿真仪在线仿真测试孤立电网的连接示意图;
图3为电网在线孤网仿真仪试验接线图;
图4为在线孤网仿真仪启动画面;
图5为在线孤网仿真仪启动画面上选择“Start”后出现的选择菜单画面;
图6为选择“Current Parameter”显示当前试验参数出现画面;
图7为选择“Simulation”准备仿真出现画面。
具体实施方式
下面通过具体实施例对本发明作进一步详细描述。
以广东省南告水电厂3号机组试验为例:
图1所示为本发明的实施例中用到的在线孤网仿真仪的组成结构,图2为在线孤网仿真仪在现场仿真测试孤立电网的连接示意图。
图2表示出基于在线孤立电网仿真测试仪的现场水轮机组测试原理简图(变量均以相对值表示),发电机组以不同的输出功率值(相应于孤立电网运行所希望的不同运行点)与互联电网并列运行。因此机组的转速被电网保持不变,或接近不变。
仿真仪的原理:如果机组向一个孤立负荷供电,表示转速(频率)变化的信号就会从被测量的发电机电气输出功率通过计算发送出来。然后这个被模拟的转速(频率)信号被送至调速器替代实际转速/频率信号。
由输出功率测量值与可调整的功率基准值间的差值(功率初始值和试验信号值之和)的积分便得到被模拟的频率。
考虑到:
机组惯性(机组加速度常数Ta);
负荷惯性(负荷加速度常数Tb,这个常数通常取值为0);
被调节系统自调节系数(en),它是负荷自调节系数与水轮机自调节系数之差。
现场仿真中,包括了水力系统真实部件的动态影响,即引水系统,水轮机(为简便起见,它与转速的关系被水轮机自调节系数考虑进去了),和非线性的调速器。
试验接线如图3所示。
本发明的现场仿真试验步骤如下:
S1现场将调速器的频率测量信号通过频率切换装置K1和K2,分别与电网系统提供和在线孤立电网仿真仪连接,将要录制的机组出力、机组主接力器行程、发电机机端电压、机组蜗壳压力、机组频率、机组转速等信号接入在线孤立电网仿真仪-TG2000水轮机调速器和机组同期测试系统;
 S2启动在线孤立电网仿真仪,设置好仿真仪试验参数,仿真仪频率输出信号50Hz,调速器频率测量切换开关K1闭合,K2断开;机组开机带预定负荷并网运行,待机组运行稳定后,K1断开,K2闭合;
S3调速器人工频率死区设为0.1 Hz,永态转差系数bp=6%,参照机组原有PID调节参数,选择若干组调速器PID参数;
S4设定仿真仪负荷扰动值为当前机组实发功率的±10%,按仿真仪在线仿真选择功能,录制波形;
S5挑选一组从录制的波形计算出来的频率调节动态特性较优的PID参数作为孤网运行参数;
S6机组在这组参数下带电站厂用电和地区部分用户负荷,通过起停真实孤网的用电设备(如电站的抽水泵、大型风机),验证机组频率调节的稳定性。
具体试验方式1
现场试验接线如图3所示。TG2000水轮机调速器和同期测试系统主要功能是采集机组频率、主接力器行程、发电机输出功率、引水系统钢管压力等信号。录制孤网负荷扰动调速系统的动态响应波形,选择一组频率动态响应较好的一组PID参数作为机组孤网运行参数。机组在这组参数下带电站厂用电和地区部分用户负荷,通过起停真实孤网的用电设备(如电站的抽水泵、大型风机),验证机组频率调节的稳定性。
试验步骤
1、如图3所示,调速器机频输入切换开关K1闭合,K2断开,调速器的机频输入由系统的PT输入提供,测量的是系统频率;
2、启动在线孤立电网仿真仪;
2.1 系统启动画面如图4;
开启电源,出现启动界面图4,按“Start”。
2.2 选择“Start”出现如图5的选择菜单;
2.3 选择“Current Parameter”输入试验参数,出现如图6画面;
画面中:
Ts:表示水轮机时间参数
En:表示机组自调节系数
△P:表示阶跃功率占当前实发功率的比例,如△P =0.1表示10%当前机组发出的功率值,可输入正或者负
Pr:表示当前发电机输出的功率值
Pfactor:表示功率因子,
测得功率值=采样值*功率因子Pfactor
Plimit:阶跃功率限制值(占实发功率的比例)
Flimit:输出频率限制值,限制输出频率变化范围Hz
StepTo:表示系统从50Hz阶跃到此频率(为减少人为误动作,设置的阶跃频率值在关机后不保存。因此,当需要频率阶跃时,现场需要设置阶跃频率值,且阶跃频率值保持到关机或修改其值)。如果不做频率阶跃试验,就直接设为50Hz
按“Help” 显示接口帮助信息
按“Exit”退出当前画面
3、开机带到预定的实发功率值;
4、确认孤网仿真仪的输出频率值为预定的实发功率,按试验接线图3所示,K1断开、K2闭合,调速器的频率输入信号由孤网仿真仪提供;
5、调速器人工频率死区设为0.1 Hz,永态转差系数bp=6%,选择几组调速器并网运行PID参数;
6、选择“Simulation”准备仿真,出现如图7画面;
在当前画面:
OutputPower:测量当前输出功率OutputPower:
                注:其输出值=(采样值-偏移值)*功率因子Pfactor
MeasureFreq:测量当前系统频率(从仿真仪AC电源获得系统频率)
OutputFreq:系统随阶跃功率变化孤网仿真仪输出的频率
a)     选择“Start”开始仿真:功率阶跃△P,输出频率将随模型变化
b)    选择“Return”表示继续仿真返回阶跃前输出功率,即阶跃回原输出功率
c)     选择“End”表示保持阶跃后的输出功率结束仿真,这时输出频率为50Hz
d)    选择“Help” 显示接口帮助信息
选择“Exit”退出当前画面
7、重复5、6步骤,上下扰动功率阶跃△P,达到挑选一组频率调节性能较优的PID参数的目的。
具体试验方式2
选定一组机组孤网运行PID调节参数后,机组启动带电站厂用电和附近地区负荷。起停孤网中用电设备,录制机组出力和孤网频率的变化波形,验证机组频率调节的稳定性。
本发明的在线孤立电网仿真仪装置已成功应用于广东省汕尾市南告水电厂3号机组黑启动带孤立电网的试验。

Claims (3)

1.一种现场孤立电网的仿真试验方法,其特征是包括以下步骤:
S1现场将机组出力、机组主接力器行程、发电机机端定子电压、机组蜗壳压力、通过调速器机频信号输入的电网频率信号接入在线孤网仿真仪;
S2启动在线孤立电网仿真仪,设置好仿真仪试验参数,仿真仪频率输出信号50Hz;机组开机并网运行,带预定的负荷,待机组运行稳定后,将机组调速器的机频输入通过频率切换装置切换到在线孤网仿真仪频率输出;
S3 设定不同的调速器PID参数:永态转差系数bp、比例增益Kp、积分增益Ki、微分增益Kd、频率死区Ef;
S4 用在线孤网仿真仪仿真孤网负荷变化:阶跃量为机组实发功率±10%,录制主接力器行程、发电机机端电压、机组蜗壳压力和机组频率、机组发电有功信号波形;
S5 选择从录制的波形计算出来的机组频率调节稳定性和速动性指标:调节时间、超调量、超调次数比较好的一组参数作为孤网运行参数;
S6机组在这组参数下带电站厂用电和地区部分用户负荷,通过起停孤网的用电设备,验证机组频率调节的稳定性。
2.根据权利要求1所述的现场孤立电网的仿真试验方法,其特征是:所述的现场孤立电网仿真仪为:包括依次电连接的功率变换器、第一信号调理模块、A/D转换模块、数字滤波及信号处理计算模块、D/A转换模块、第二信号调理模块和输出接口,所述的数字滤波及信号处理计算模块还外接有显示模块、面板输入模块和通信模块,所述的功率变换器测量发电机的有功出力,输出接口的输出信号作为孤网频率输入机组调速器。
3.根据权利要求1所述的现场孤立电网的仿真试验方法,其特征是:所述的频率切换装置是一种2通道无电联系的切换开关。
CN201210074287.3A 2012-03-20 2012-03-20 一种现场孤网仿真试验方法 Active CN102707164B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210074287.3A CN102707164B (zh) 2012-03-20 2012-03-20 一种现场孤网仿真试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210074287.3A CN102707164B (zh) 2012-03-20 2012-03-20 一种现场孤网仿真试验方法

Publications (2)

Publication Number Publication Date
CN102707164A true CN102707164A (zh) 2012-10-03
CN102707164B CN102707164B (zh) 2014-08-06

Family

ID=46900097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210074287.3A Active CN102707164B (zh) 2012-03-20 2012-03-20 一种现场孤网仿真试验方法

Country Status (1)

Country Link
CN (1) CN102707164B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102830352A (zh) * 2012-07-26 2012-12-19 广东电网公司电力科学研究院 一种现场孤网仿真试验方法及其系统
CN103500425A (zh) * 2013-10-12 2014-01-08 国家电网公司 水电机组运行状态智能评价方法
CN103944164A (zh) * 2014-04-28 2014-07-23 国家电网公司 水轮机组孤网稳定运行的控制装置
CN105634009A (zh) * 2016-01-22 2016-06-01 重庆大唐国际武隆水电开发有限公司 一种水电厂调频调节方法
CN112925193A (zh) * 2021-01-22 2021-06-08 中国电力科学研究院有限公司 一种多模式切换的水电机组调速系统控制方法及系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201285433Y (zh) * 2008-09-27 2009-08-05 上海万德风力发电股份有限公司 一种1500kw永磁直驱风力发电机组仿真测试系统
DE202009002777U1 (de) * 2009-02-27 2010-07-22 Modico Systems Gmbh & Co. Kg System zum lastunabhängigen Einschalten eines Netzfreischaltungsrelais
CN102185335A (zh) * 2011-05-05 2011-09-14 山东电力研究院 一种新型孤岛检测方法及系统
CN102255330A (zh) * 2011-04-19 2011-11-23 河南电力试验研究院 一种检测微电网系统发生孤岛的装置和方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201285433Y (zh) * 2008-09-27 2009-08-05 上海万德风力发电股份有限公司 一种1500kw永磁直驱风力发电机组仿真测试系统
DE202009002777U1 (de) * 2009-02-27 2010-07-22 Modico Systems Gmbh & Co. Kg System zum lastunabhängigen Einschalten eines Netzfreischaltungsrelais
CN102255330A (zh) * 2011-04-19 2011-11-23 河南电力试验研究院 一种检测微电网系统发生孤岛的装置和方法
CN102185335A (zh) * 2011-05-05 2011-09-14 山东电力研究院 一种新型孤岛检测方法及系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
蔡笋,冯永新,邓少翔: "孤网运行频率稳定控制策略分析研究", 《广东电力》, vol. 25, no. 2, 28 February 2012 (2012-02-28), pages 16 - 19 *
魏守平: "水轮机调节系统一次调频及孤立电网运行特性分析及仿真", 《水电自动化与大坝监测》, vol. 33, no. 6, 20 December 2009 (2009-12-20) *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102830352A (zh) * 2012-07-26 2012-12-19 广东电网公司电力科学研究院 一种现场孤网仿真试验方法及其系统
CN102830352B (zh) * 2012-07-26 2014-12-17 广东电网公司电力科学研究院 一种现场孤网仿真试验方法及其系统
CN103500425A (zh) * 2013-10-12 2014-01-08 国家电网公司 水电机组运行状态智能评价方法
CN103500425B (zh) * 2013-10-12 2016-05-18 国家电网公司 水电机组运行状态智能评价方法
CN103944164A (zh) * 2014-04-28 2014-07-23 国家电网公司 水轮机组孤网稳定运行的控制装置
CN103944164B (zh) * 2014-04-28 2016-01-20 国家电网公司 水轮机组孤网稳定运行的控制装置
CN105634009A (zh) * 2016-01-22 2016-06-01 重庆大唐国际武隆水电开发有限公司 一种水电厂调频调节方法
CN112925193A (zh) * 2021-01-22 2021-06-08 中国电力科学研究院有限公司 一种多模式切换的水电机组调速系统控制方法及系统

Also Published As

Publication number Publication date
CN102707164B (zh) 2014-08-06

Similar Documents

Publication Publication Date Title
CN102830352B (zh) 一种现场孤网仿真试验方法及其系统
CN104881317B (zh) 抽水蓄能机组不同工况下同期并网仿真平台及仿真系统
CN104102788B (zh) 一种基于联合循环燃机系统模型的调速方法
CN102707164B (zh) 一种现场孤网仿真试验方法
CN107168103B (zh) 水电机组调速控制仿真方法和系统
Pak et al. Real-time simulation of a wind energy system based on the doubly-fed induction generator
Pourbeik et al. Semiautomated model validation of power plant equipment using online measurements
Cate et al. Time frame notion and time response of the models in transient, mid-term and long-term stability programs
Pourbeik Automated parameter derivation for power plant models from system disturbance data
CN106406272A (zh) 一种风电场中静止无功发生器的控制器性能测试方法
CN205721145U (zh) 一种双馈风力发电系统的动态实时仿真测试模型装置
Vergara et al. Feasibility and performance assessment of commercial PV inverters operating with droop control for providing voltage support services
Tamura et al. Development of power system simulator for research and education
CN202735710U (zh) 一种电网现场孤网仿真仪
Amora et al. Assessment of the effects of wind farms connected in a power system
Papangelis et al. Design principles of wind turbine inertia emulators for autonomous systems
Rodríguez-Bobada et al. Simplified frequency stability tool for isolated systems: adin
Wang et al. Dynamic power system simulation for real time dispatcher training
CN209460762U (zh) 原动机模拟装置
Auddy et al. Field validation of a doubly fed induction generator (DFIG) model
Fetzer et al. A flexible matlab/simulink RMS-framework for electrical power systems designed for research and education
Panwar et al. Significance of dynamic and transient analysis in the design and operation of hybrid energy systems
Honrubia-Escribano et al. Comparison of Standard Wind Turbine Models with Vendor Models for Power System Stability Analysis
Pereira et al. New thermal turbine governor modeling for the WECC
Zarghami et al. Frequency Enhancement Through a Unified Smart Generation System

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF GUANGDONG POWER GRID Co.,Ltd.

Address before: 510080 Guangdong city of Guangzhou Province Dongfeng East Road, No. 8 Guangdong water Kong EPRI high pressure

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF GUANGDONG POWER GRID Corp.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171128

Address after: 510655, No. fifth, No. 146-150, Whampoa Avenue, Tianhe District, Guangdong, Guangzhou

Patentee after: GUANGDONG DIANKEYUAN ENERGY TECHNOLOGY Co.,Ltd.

Address before: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF GUANGDONG POWER GRID Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Room 501-503, annex building, Huaye building, No.1-3 Chuimao new street, Xihua Road, Yuexiu District, Guangzhou City, Guangdong Province 510000

Patentee after: China Southern Power Grid Power Technology Co.,Ltd.

Address before: 510655 5th floor, no.146-150, Huangpu Avenue Middle Road, Tianhe District, Guangzhou City, Guangdong Province

Patentee before: GUANGDONG DIANKEYUAN ENERGY TECHNOLOGY Co.,Ltd.