CN102691328A CN2012101809989A CN201210180998A CN102691328A CN 102691328 A CN102691328 A CN 102691328A CN 2012101809989 A CN2012101809989 A CN 2012101809989A CN 201210180998 A CN201210180998 A CN 201210180998A CN 102691328 A CN102691328 A CN 102691328A
Authority
CN
China
Prior art keywords
supporting
pore
luoyang spade
forming
hole forming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101809989A
Other languages
Chinese (zh)
Inventor
温惠清
滕斌
沈康
陶湧
陈勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JiangSu Gold Civil Construction Group Co Ltd
Original Assignee
JiangSu Gold Civil Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JiangSu Gold Civil Construction Group Co Ltd filed Critical JiangSu Gold Civil Construction Group Co Ltd
Priority to CN2012101809989A priority Critical patent/CN102691328A/en
Publication of CN102691328A publication Critical patent/CN102691328A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a hole forming device for a soil nailing wall. The device comprises a Luoyang shovel, a support base and a support frame, wherein the support base can support the Luoyang shovel to work through the support frame. A hole forming method comprises the following steps of: 1) firstly mechanically excavating a 0.8-1m foundation pit; 2) placing the support base at the bottom of the foundation pit, and keeping a support table top horizontal; 3) connecting the support frame with the support base, regulating the height of a support pipe, and enabling a guide groove of the support frame to be 0.1-0.15m higher than that of a hole forming point; 4) placing a shovel rod of the Luoyang shovel into the guide groove, starting to perform hole-forming operation, pulling out the Luoyang shovel at the speed of 1.5-2m/min when the Luoyang shovel is tunneled into a soil layer by 1.9-2m, dismantling the support base and the support frame after the Luoyang shovel is pulled out, and moving to the next operation point; and 5) repeating the steps 1)-4) till the completion of the formation of all the holes on the basis of the foundation pit which is excavated in the step 1). According to the device disclosed by the invention, the hole forming construction is facilitated in the local position where a machine can not enter, thus the efficiency of the hole forming construction is improved, and the quality of the formed holes is further ensured.

Description

Soil nailing wall hole-forming device and hole forming method thereof
Technical field
The present invention relates to a kind of soil nailing wall hole-forming device, belong to construction engineering technical field.The invention still further relates to above-mentioned soil nailing wall hole-forming device hole forming method.
Background technology
The soil nailing wall is an a kind of original position soil body reinforcement technology, and it is that excavation slope is reinforced through the soil nailing of being processed by reinforcing bar, and the side slope surface is laid one steel mesh reinforcement and sprayed the slope reinforcement type construction method for supporting that one deck concrete surface layer and cubic metre of earth side slope combine again.It is configured to be arranged on the complex that reinforcement rod member (being soil nailing or anchor pole) and its surrounding soil secure bond in the sloping body form, and the supporting and protection structure of the similar gravity retaining wall that surface layer constituted.
It has the following advantages:
1, can rationally utilize the self-bearing capacity of the soil body, with the soil body as the supporting and protection structure inalienable part.
2, structure is light-duty, and is flexible big, and good shock resistance and ductility are arranged.
3, construction equipment is simple, and the making of soil nailing and pore-forming do not need complicated technology and large-scale facility, and the All Jobs of soil nailing construction disturbs little to surrounding environment.
4, construction does not need independent occupied ground, and narrow and small for the construction plant, foundation depth is little, and large-scale slope protection construction equipment can not be marched into the arena, and this technology demonstrates unique advantages.
5, in Excavation Process, help deformation data, in time adjust soil nailing length and spacing according to field monitoring.
6, antiseptic property is good, and cost is lower.
The advantage of soil nailing wall technology is widely used it, but in some spaces little local location because the restriction in space, machinery can't get into, and causes the anchor pole pore-forming to be difficult for.
Summary of the invention
The purpose of this invention is to provide a kind of soil nailing wall hole-forming device, the little local location in the space, this device not only makes things convenient for pore-forming, and can guarantee the quality of pore-forming.The present invention also provides the method for above-mentioned soil nailing wall hole-forming device pore-forming.
In order to reach above-mentioned technical purpose, technical scheme of the present invention is: a kind of soil nailing wall hole-forming device, and it comprises:
Luoyang spade, said luoyang spade comprise semi-cylindrical shaped shovel head and the shovel bar that is connected the shovel head;
Base for supporting, it comprises the supporting leg that supporting bable tops and supporting bable tops are provided with down;
Bracing frame, it comprises the gripper shoe that is connected with supporting bable tops, is connected with the semi-cylindrical shaped gathering sill through stay pipe on the said gripper shoe, becomes 10-30 ° of angle between said gathering sill and the gripper shoe, the shovel bar of said luoyang spade is placed in the gathering sill and punches.
Construction is raised the efficiency for ease, and said stay pipe is height-adjustable telescoping tube.
Become 15 ° of angles between said gathering sill and the gripper shoe, this angle adapts to the occasion of most of construction.
The method of soil nailing wall hole-forming device pore-forming of the present invention may further comprise the steps:
1) mechanical equivalent of light excavation 0.8-1m foundation ditch;
2) base for supporting is placed on the foundation ditch bottom, and supporting leg is squeezed into the foundation ditch bottom, the bottom of supporting bable tops and foundation ditch bottom surface are fitted, and keep the supporting bable tops level;
3) gripper shoe with bracing frame is connected with supporting bable tops with bolt, and the height of the position adjustments stay pipe of pore-forming makes the position height of gathering sill exceed 0.1-0.15m than pore-forming point position height as required;
4) the shovel bar with luoyang spade is placed in the gathering sill, and the operation of beginning pore-forming when luoyang spade driving soil layer 1.9-2m, is extracted luoyang spade, and the speed that luoyang spade is extracted is 1.5-2m/min, after luoyang spade is extracted, removes base for supporting and bracing frame and moves to next setting;
5) on the basis of the foundation ditch of step 1) excavation (be benchmark with former foundation ditch bottom promptly, excavation pit once more also promptly increases the degree of depth of former foundation ditch), repeating step 1)-4), until accomplishing all pore-formings.
Device of the present invention has made things convenient for drilling construction at the unapproachable local location of machinery, has improved the efficient of drilling construction, has guaranteed the quality of pore-forming.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is done further detailed explanation.
Accompanying drawing is the structural scheme of mechanism of apparatus of the present invention.
The specific embodiment
Shown in accompanying drawing, soil nailing wall hole-forming device, it comprises:
Luoyang spade 1, said luoyang spade 1 comprise that semi-cylindrical shaped shovel 111 shovels a shovel bar 112 of 111 with being connected.Luoyang spade 1 is the critical component of this device pore-forming.
Base for supporting 2, it comprises the supporting leg 212 that supporting bable tops 211 and supporting bable tops are provided with for 211 times;
Bracing frame 3, it comprises the gripper shoe 311 that is connected with supporting bable tops 211, is connected with semi-cylindrical shaped gathering sill 313 through stay pipe 312 on the said gripper shoe 311.Said stay pipe 312 is height-adjustable telescoping tube, and the convenient like this up-down adjustment that realizes when a fixed-site, only need get final product with latch is fixing, and this measure has made things convenient for construction, has improved the operating efficiency of pore-forming.
Become 10-30 ° of angle between said gathering sill 313 and the gripper shoe 311, the shovel bar 112 of said luoyang spade 1 is placed in the gathering sill 313 and punches.Angle is typically provided to 15 ° between said gathering sill 313 and the gripper shoe 311, and this angle adapts to the occasion of most of construction.
The method step of above-mentioned soil nailing wall hole-forming device pore-forming is following:
1) mechanical equivalent of light excavation 0.8-1m foundation ditch.
The present invention adopts limit pore-forming limit excavation method to carry out successively, until design elevation.Hang down sequential analysis according to the high back of elder generation during operation.
2) base for supporting 2 is placed on the foundation ditch bottom, and supporting leg 212 is squeezed into the foundation ditch bottom, the bottom of supporting bable tops 211 and foundation ditch bottom surface are fitted, and keep supporting bable tops 211 levels.When supporting bable tops 211 was weighed with the error employing angle between the two of horizontal plane, angle between the two should be less than 10 °.
3) the gripper shoe 311 usefulness bolts with bracing frame 3 are connected with supporting bable tops 211, and gripper shoe 311 can be designed to one with supporting bable tops 211, and the purpose of split design is to operate for ease.
The height of the position adjustments stay pipe 312 of pore-forming makes the position height of gathering sill 313 exceed 0.1-0.15m than pore-forming point position height as required.Supporting bable tops 211 can produce error when being placed on the foundation ditch bottom surface, and the 0.1-0.15m that exceeds is in order to eliminate this error.For example, when luoyang spade was worked, base for supporting 2 will inevitably receive the influence of power; This influence can make it break away from original position; Down deeper be absorbed in the foundation ditch bottom, thereby cause the position height of gathering sill 313 and pore-forming point position height to change, cause luoyang spade 1 pore-forming site error.
4) the shovel bar 112 with luoyang spade 1 is placed in the gathering sill 313, and the operation of beginning pore-forming is when luoyang spade 1 driving soil layer 1.9-2m; Extract luoyang spade 1; The speed that luoyang spade 1 is extracted is 1.5-2m/min, after luoyang spade 1 is extracted, removes base for supporting 2 and moves to next setting with bracing frame 3.The speed that luoyang spade 1 is extracted has guaranteed that the Kong Buhui that is become caves in, and can smoothly soil zone be gone out.
5) the inventive method is taked layering, section construction, after accomplishing above-mentioned steps, on the basis of the foundation ditch that step 1) is excavated, (is benchmark with former foundation ditch bottom promptly therefore; Excavation pit once more; Also promptly increase the degree of depth of former foundation ditch), repeating step 1)-4), until accomplishing all pore-formings.
The method is applicable to the position of mechanical hole building inconvenience, and anchor pole and grouting will be synchronized with the mechanical hole building position, so need construction in time, guarantees to accomplish smoothly with the one side work layer.
The foregoing description does not limit the present invention in any way, and every employing is equal to the technical scheme that replacement or the mode of equivalent transformation obtain and all drops in protection scope of the present invention.

Claims (4)

1. soil nailing wall hole-forming device is characterized in that comprising:
Luoyang spade (1), said luoyang spade (1) comprise semi-cylindrical shaped shovel head (111) and the shovel bar (112) that is connected shovel head (111);
Base for supporting (2), it comprises the supporting leg (212) that supporting bable tops (211) and supporting bable tops (211) are provided with down;
Bracing frame (3); It comprises the gripper shoe (311) that is connected with supporting bable tops (211); Said gripper shoe (311) goes up and is connected with semi-cylindrical shaped gathering sill (313) through stay pipe (312); Become 10-30 ° of angle between said gathering sill (313) and the gripper shoe (311), the shovel bar (112) of said luoyang spade (1) is placed in the gathering sill (313) and punches.
2. soil nailing wall hole-forming device according to claim 1 is characterized in that: said stay pipe (312) is height-adjustable telescoping tube.
3. soil nailing wall hole-forming device according to claim 1 is characterized in that: become 15 ° of angles between said gathering sill (313) and the gripper shoe (311).
4. method of utilizing each described soil nailing wall hole-forming device pore-forming of aforesaid right requirement 1-3 is characterized in that may further comprise the steps:
1) mechanical equivalent of light excavation 0.8-1m foundation ditch;
2) base for supporting (2) is placed on the foundation ditch bottom, and supporting leg (212) is squeezed into the foundation ditch bottom, the bottom of supporting bable tops (211) and foundation ditch bottom surface are fitted, and keep supporting bable tops (211) level;
3) gripper shoe (311) with bracing frame (3) is connected with supporting bable tops (211) with bolt, and the height of the position adjustments stay pipe (312) of pore-forming makes the position height of gathering sill (313) exceed 0.1-0.15m than pore-forming point position height as required;
4) the shovel bar (112) with luoyang spade is placed in the gathering sill (313); The operation of beginning pore-forming; When luoyang spade (1) driving soil layer 1.9-2m, extract luoyang spade (1), the speed that luoyang spade (1) is extracted is 1.5-2m/min; After luoyang spade (1) is extracted, remove base for supporting (2) and bracing frame (3) and move to next setting;
5) on the basis of the foundation ditch that step 1) is excavated, repeating step 1)-4), until accomplishing all pore-formings.
CN2012101809989A 2012-06-04 2012-06-04 Hole forming device for soil nailing wall and hole forming method thereof Pending CN102691328A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101809989A CN102691328A (en) 2012-06-04 2012-06-04 Hole forming device for soil nailing wall and hole forming method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101809989A CN102691328A (en) 2012-06-04 2012-06-04 Hole forming device for soil nailing wall and hole forming method thereof

Publications (1)

Publication Number Publication Date
CN102691328A true CN102691328A (en) 2012-09-26

Family

ID=46857053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101809989A Pending CN102691328A (en) 2012-06-04 2012-06-04 Hole forming device for soil nailing wall and hole forming method thereof

Country Status (1)

Country Link
CN (1) CN102691328A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411962A (en) * 2018-05-10 2018-08-17 中建局集团第二建筑有限公司 A kind of soil nail wall drilling construction device and its construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1131221A (en) * 1995-12-29 1996-09-18 曾宪明 Supporting and protecting method for base pit, side slope, flat anchor and spray net
CN201730539U (en) * 2010-07-21 2011-02-02 林存显 Anchor rod machine
KR20120090502A (en) * 2011-02-08 2012-08-17 박민철 The soil-nailing apparatus
CN202577415U (en) * 2012-06-04 2012-12-05 江苏金土木建设集团有限公司 Hole forming device for soil nailing wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1131221A (en) * 1995-12-29 1996-09-18 曾宪明 Supporting and protecting method for base pit, side slope, flat anchor and spray net
CN201730539U (en) * 2010-07-21 2011-02-02 林存显 Anchor rod machine
KR20120090502A (en) * 2011-02-08 2012-08-17 박민철 The soil-nailing apparatus
CN202577415U (en) * 2012-06-04 2012-12-05 江苏金土木建设集团有限公司 Hole forming device for soil nailing wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411962A (en) * 2018-05-10 2018-08-17 中建局集团第二建筑有限公司 A kind of soil nail wall drilling construction device and its construction method
CN108411962B (en) * 2018-05-10 2023-04-11 中建一局集团第二建筑有限公司 Hole forming construction device and method for soil nailing wall

Similar Documents

Publication Publication Date Title
CN107059906A (en) A kind of method that utilization underground shaft robot applies major diameter open caisson
CN201250407Y (en) Embedded steel wale
JP2015014157A (en) Pier construction method
JP6304551B2 (en) Unit construction method for solar panels
KR100902083B1 (en) System of casting a wall contruction and descending the same into teh groudnd, and a driving apparatus for stepwise descending the wall construction into teh groudnd
CN205329709U (en) Mountain region photovoltaic support foundation structure
CN204828955U (en) Support is maked somebody a mere figurehead to earth anchor sleeve pipe socket joint
CN202577415U (en) Hole forming device for soil nailing wall
CN102691328A (en) Hole forming device for soil nailing wall and hole forming method thereof
CN110030004B (en) Method for excavating barrier lake drainage tunnel
CN103132531A (en) Foundation pit supporting system construction method
CN103410368A (en) Vertical rod reinforcement device used for earth excavation and vertical rod reinforcement method
CN110004942A (en) A kind of large span integral supporting structure and its construction method
CN101187207A (en) Concrete pedestal pile construction equipment and its construction method
CN102979458B (en) Rock wall beam oblique surface smooth blasting punching guiding and positioning device
KR101310677B1 (en) Top down method using precast composite retaining wall and raker in slope
CN214695638U (en) Novel water-washed pore-forming shaped steel underground structure supporting device
CN213331088U (en) Multifunctional shaft expanding and digging multi-arm drilling machine
CN103981870A (en) Pylons foundation pit digging method
CN108468330B (en) Water platform roof bolter
CN201695657U (en) Excavation platform in step type top-down pit
CN203701143U (en) Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum
CN210217728U (en) Barrier lake discharge tunnel excavation braced system
CN103215965A (en) Laminate type high-rise platform pile tower crane foundation and construction method
CN203924043U (en) A kind of bamboo concrete stake

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120926