CN203701143U - Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum - Google Patents
Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum Download PDFInfo
- Publication number
- CN203701143U CN203701143U CN201320809186.6U CN201320809186U CN203701143U CN 203701143 U CN203701143 U CN 203701143U CN 201320809186 U CN201320809186 U CN 201320809186U CN 203701143 U CN203701143 U CN 203701143U
- Authority
- CN
- China
- Prior art keywords
- template
- medium plate
- construction
- pba
- stratum
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 23
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title abstract description 4
- 238000012407 engineering method Methods 0.000 claims description 12
- 238000000034 method Methods 0.000 abstract description 7
- 239000000463 material Substances 0.000 abstract description 2
- 238000009415 formwork Methods 0.000 description 4
- 239000004927 clay Substances 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320809186.6U CN203701143U (en) | 2013-12-09 | 2013-12-09 | Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320809186.6U CN203701143U (en) | 2013-12-09 | 2013-12-09 | Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203701143U true CN203701143U (en) | 2014-07-09 |
Family
ID=51051599
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320809186.6U Expired - Fee Related CN203701143U (en) | 2013-12-09 | 2013-12-09 | Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203701143U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106437770A (en) * | 2016-11-09 | 2017-02-22 | 湖南五新模板有限公司 | Hydraulic formwork trolley for rail top air duct post-pouring construction |
| CN108316344A (en) * | 2018-02-02 | 2018-07-24 | 北京市政建设集团有限责任公司 | A kind of construction method of subway station hall layer |
-
2013
- 2013-12-09 CN CN201320809186.6U patent/CN203701143U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106437770A (en) * | 2016-11-09 | 2017-02-22 | 湖南五新模板有限公司 | Hydraulic formwork trolley for rail top air duct post-pouring construction |
| CN106437770B (en) * | 2016-11-09 | 2018-11-09 | 湖南五新模板有限公司 | A kind of hydraulic template trolley for pouring construction after rail against the wind road |
| CN108316344A (en) * | 2018-02-02 | 2018-07-24 | 北京市政建设集团有限责任公司 | A kind of construction method of subway station hall layer |
| CN108316344B (en) * | 2018-02-02 | 2020-01-07 | 北京市政建设集团有限责任公司 | Construction method of subway station hall layer |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101864963B (en) | Large-section loess tunnel construction method | |
| CN103835729B (en) | Deep distance roadway surrounding rock pre grouting from the surface reinforcement process | |
| CN106761778B (en) | A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground | |
| CN105256812B (en) | Foundation ditch prefabricated assembled concrete supporting construction and its construction method | |
| CN102587922A (en) | Oblique-crossing inclined shaft upper arc guide top brushing construction method for soft crushed rock layer | |
| CN104533446A (en) | Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel | |
| CN102650212B (en) | Construction method for protecting partition wall in double-arch tunnel through temporary support of middle pilot tunnel | |
| CN106121689A (en) | A kind of excavation method of non-coal mine underground large stable chamber | |
| CN108266191A (en) | An optimized construction method for multi-arch tunnels | |
| CN102660955B (en) | Quick construction method for foundation pit slope support | |
| CN105822316A (en) | Integrated pit tunnel heading machine | |
| CN204877493U (en) | Soft rock tunnel supporting construction | |
| CN205422729U (en) | Integral type hole tunnel boring machine | |
| CN203847129U (en) | Supporting device used for tunnel construction in weak, fractured and uneven stratum | |
| CN204436407U (en) | The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs | |
| CN106677806A (en) | Pipe type shed frame supporting structure used for down-hole roadway and tunnel | |
| CN102493819B (en) | Method for controlling stability of surrounding rocks of laneway in coal seam | |
| CN103397881B (en) | A kind of engineering method expanding mineral building stopping area | |
| CN206129303U (en) | Great mining height rib wall caving reinforcing apparatus | |
| CN107542065A (en) | Suddenly let out the small punching block of groove turns over a liter construction method to a kind of height | |
| CN204040042U (en) | A kind of super large ultra-deep support with manually dug piles structure | |
| CN102619248B (en) | Rock trenching machine and trenching method | |
| CN204080820U (en) | A kind of concrete structure foundation ditch support replacement device | |
| CN204080821U (en) | A kind of steel work foundation ditch support replacement device | |
| CN104453966A (en) | large mining height end-mining fully-mechanized excavating machine manufacturing removing frame channel collapse column passing leg-less supporting erecting construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C41 | Transfer of patent application or patent right or utility model | ||
| C56 | Change in the name or address of the patentee | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli Patentee after: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP Co.,Ltd. Address before: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli Patentee before: China thirteen Railway Construction Bureau Group Co.,Ltd. Address after: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli Patentee after: China thirteen Railway Construction Bureau Group Co.,Ltd. Address before: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli Patentee before: CHINA RAILWAY 13TH BUREAU GROUP Co.,Ltd. |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20161024 Address after: Residential building No. nine in Yantian District of Shenzhen city in Guangdong province 518000 3 floor Patentee after: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP 2ND ENGINEERING Co.,Ltd. Address before: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli Patentee before: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP Co.,Ltd. |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140709 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |