CN102678043B - Method for constructing flow plastic interlayer by adjusting hole drill - Google Patents

Method for constructing flow plastic interlayer by adjusting hole drill Download PDF

Info

Publication number
CN102678043B
CN102678043B CN201210182467.3A CN201210182467A CN102678043B CN 102678043 B CN102678043 B CN 102678043B CN 201210182467 A CN201210182467 A CN 201210182467A CN 102678043 B CN102678043 B CN 102678043B
Authority
CN
China
Prior art keywords
guard aperture
aperture pipe
hole
interlayer
plastic interlayer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210182467.3A
Other languages
Chinese (zh)
Other versions
CN102678043A (en
Inventor
张永忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Jiulong Construction Group Co., Ltd.
SHENZHEN BAOHAO MUNICIPAL ENGINEERING CO., LTD.
SHENZHEN HONGXUAN CONSTRUCTION ENGINEERING CO., LTD.
XIAMEN ANNENG CONSTRUCTION CO., LTD.
Original Assignee
FUJIAN JIULONG CONSTRUCTION GROUP Co Ltd
SHENZHEN BAOHAO MUNICIPAL ENGINEERING Co Ltd
XIAMEN ANNENG CONSTRUCTION CO Ltd
SHENZHEN HONGXUAN CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN JIULONG CONSTRUCTION GROUP Co Ltd, SHENZHEN BAOHAO MUNICIPAL ENGINEERING Co Ltd, XIAMEN ANNENG CONSTRUCTION CO Ltd, SHENZHEN HONGXUAN CONSTRUCTION ENGINEERING Co Ltd filed Critical FUJIAN JIULONG CONSTRUCTION GROUP Co Ltd
Priority to CN201210182467.3A priority Critical patent/CN102678043B/en
Publication of CN102678043A publication Critical patent/CN102678043A/en
Application granted granted Critical
Publication of CN102678043B publication Critical patent/CN102678043B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a method for constructing a flow plastic interlayer by adjusting a hole drill. A section of flow plastic interlayer is sandwiched between upper and lower sections of normal strata; and after a drilling machine drills through the flow plastic interlayer, a construction method can be adopted to prevent hole collapse of the flow plastic interlayer and comprises the following steps of: 1, taking the drilling machine out; 2, wrapping a hole protection pipe by using a layer of inverse filtering net, and putting into the flow plastic interlayer section; 3, retracting tool arms of the drilling machine by using hydraulic oil cylinders, putting a drill bit into the hole protection pipe again to make the tool arms stretch out, stretching the hole protection pipe along positive teeth and reverse teeth, namely increasing the diameter of the hole protection pipe, and extruding slot walls; and 4, ensuring that the drilling machine crosses the hole protection pipe by stretching the tool arms, and continuously drilling. By the method, the hole collapse of the flow plastic interlayer can be prevented during drilling or hole cleaning.

Description

The method of adjusting hole drill construction stream to mould interlayer
One, technical field
The present invention relates to a kind of construction method, particularly a kind of method of adjusting hole drill construction stream to mould interlayer.
Two, background technology:
At present, for existing stream to mould the geology of interlayer, during boring, just strengthen the proportion of mud and denseness and reduce the probability of collapse hole, but, before concrete perfusion, need change slurry to hole body and reduce proportion and the denseness of mud, now may cause again that hole body stream moulds the collapse hole of interlayer.
Three, summary of the invention:
The present invention has overcome above shortcoming, and a kind of method of adjusting hole drill construction stream to mould interlayer is provided.
The present invention is achieved through the following technical solutions:
Between the normal stratum of two sections, accompany one section of stream and mould interlayer, at rig, bore overcurrent and mould after interlayer, for interlayer collapse hole is moulded in anti-fluid stopping, available following construction method:
The first, rig is proposed; The second, guard aperture pipe is wrapped up in to one deck anti-filter net outward, be placed in stream and mould sandwich segment, guard aperture pipe is the cylinder that Elastic Steel is manufactured, comprise second guard aperture pipe and first guard aperture pipe, the two ends of second guard aperture pipe are respectively equipped with several pawls, the two ends of first guard aperture pipe are also respectively equipped with several commutating tooths, the mutual interlock of commutating tooth and pawl; Three, by hydraulic jack, the tool arm of rig is bounced back, again drill bit is placed in guard aperture pipe, tool arm is stretched out, guard aperture pipe is stretched along the place of commutating tooth and pawl, be about to the enlarged-diameter of guard aperture pipe, push cell wall; Four, rig continues boring by the flexible guard aperture pipe of crossing of tool arm.
The present invention has following feature:
When the present invention can prevent from holing again or clear Kong Shiliu mould interlayer collapse hole again.
Four, accompanying drawing explanation:
Below in conjunction with accompanying drawing, the present invention is further illustrated:
Fig. 1 is structural representation of the present invention.
Fig. 2 is A-A view.
In figure: 1, normal stratum, 2, stream moulds interlayer, 3, hole wall, 4, second guard aperture pipe, 5, drilling rod, 6, hydraulic jack, 7, tool arm, 8, first guard aperture pipe, 9, commutating tooth, 10, pawl.
Five, the specific embodiment:
Accompanying drawing is a kind of specific embodiment of the present invention, accompanies one section of stream and mould interlayer 2 between the normal stratum 1 of these embodiment two sections, at rig, bore overcurrent and mould after interlayer, and for interlayer collapse hole is moulded in anti-fluid stopping, available following construction method:
(1) rig is proposed;
(2) guard aperture pipe is wrapped up in to one deck anti-filter net outward, be placed in stream and mould sandwich segment, guard aperture pipe is the cylinder that Elastic Steel is manufactured, comprise second guard aperture pipe 4 and first guard aperture pipe 8, the two ends of second guard aperture pipe are respectively equipped with several pawls 10, the two ends of first guard aperture pipe are also respectively equipped with several commutating tooths 9, the mutual interlock of commutating tooth and pawl;
(3) by hydraulic jack 6, the tool arm of rig 7 is bounced back, again drill bit is placed in guard aperture pipe, tool arm 7 is stretched out, guard aperture pipe is stretched along the place of commutating tooth and pawl, be about to the enlarged-diameter of guard aperture pipe, push cell wall;
(4) rig continues boring by the flexible guard aperture pipe of crossing of tool arm.

Claims (1)

1. a method of adjusting hole drill construction stream to mould interlayer, between the normal stratum of two sections (1), accompany one section of stream and mould interlayer (2), at rig, bore overcurrent and mould after interlayer, for anti-fluid stopping, mould interlayer collapse hole, it is characterized in that: available following construction method: the first, propose rig; The second, guard aperture pipe is wrapped up in to one deck anti-filter net outward, be placed in stream and mould sandwich segment, guard aperture pipe is the cylinder that Elastic Steel is manufactured, comprise second guard aperture pipe (4) and first guard aperture pipe (8), the two ends of second guard aperture pipe are respectively equipped with several pawls (10), the two ends of first guard aperture pipe are respectively equipped with several commutating tooths (9), the mutual interlock of commutating tooth and pawl; Three, by hydraulic jack (6), the tool arm of rig (7) is bounced back, again drill bit is placed in guard aperture pipe, tool arm (7) is stretched out, guard aperture pipe is stretched along the place of commutating tooth and pawl, be about to the enlarged-diameter of guard aperture pipe, push cell wall; Four, rig continues boring by the flexible guard aperture pipe of crossing of tool arm.
CN201210182467.3A 2012-06-05 2012-06-05 Method for constructing flow plastic interlayer by adjusting hole drill Expired - Fee Related CN102678043B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210182467.3A CN102678043B (en) 2012-06-05 2012-06-05 Method for constructing flow plastic interlayer by adjusting hole drill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210182467.3A CN102678043B (en) 2012-06-05 2012-06-05 Method for constructing flow plastic interlayer by adjusting hole drill

Publications (2)

Publication Number Publication Date
CN102678043A CN102678043A (en) 2012-09-19
CN102678043B true CN102678043B (en) 2014-04-30

Family

ID=46810552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210182467.3A Expired - Fee Related CN102678043B (en) 2012-06-05 2012-06-05 Method for constructing flow plastic interlayer by adjusting hole drill

Country Status (1)

Country Link
CN (1) CN102678043B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926381A (en) * 2012-12-11 2013-02-13 张璐 Y-shaped filling pile-forming machine
CN104533327B (en) * 2014-12-19 2017-05-10 中国石油大学(华东) Walking type coiled tubing well drilling tractor

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2480414Y (en) * 2001-04-26 2002-03-06 河北省水利工程局 Wall protection pipe
US20030116579A1 (en) * 2001-12-20 2003-06-26 Chambers James D. Plastic chime ring and apparatus
CN101545357A (en) * 2009-05-06 2009-09-30 中铁二局股份有限公司 Method for drilling hole with plastic clay for protecting wall of hole
CN102226389A (en) * 2011-03-28 2011-10-26 河南理工大学 Coal mine drilling anti-collapse hole pipe network and anti-collapse hole method

Also Published As

Publication number Publication date
CN102678043A (en) 2012-09-19

Similar Documents

Publication Publication Date Title
CN100513745C (en) Construction method for mechanical hole reaming of anchor rod
CN104018792B (en) Reducing screw displacement pile drilling tool and construction method thereof
CN103195365B (en) A kind of rotary drilling rig ground consisting of hard rock classification drilling construction technique
CN101851922B (en) Method for eliminating underground anchor rope/rod by using all casing drill
CN102678043B (en) Method for constructing flow plastic interlayer by adjusting hole drill
CN103835287B (en) A kind of construction method of compacted diameter-variable pile
CN207960507U (en) A kind of PDC milling bits
CN106149683A (en) A kind of cast-in-place pile construction method using double casing to pass through deep metalling
CN104563147A (en) Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation
CN201650119U (en) Soil squeezing amount-adjustable bidirectional spiral squeezing and expanding bit
CN102312427A (en) Half soil squeezing screw expansion pile forming method
CN103114576A (en) Post grouting construction method for cast-in-place concrete pile
CN101775797B (en) Positioning rotary-cutting extruding-enlarging branch tray machine
CN103061733A (en) Sleeve valve type fracturing production-increasing tool
CN202832187U (en) Hydraulic breaker type rotary drilling rig
CN208816183U (en) A kind of tunnel advanced precipitation device
CN201714304U (en) Two-way spiral extruding expansion drilling bit capable of being lengthened
CN104131535B (en) A kind of composite reinforced earth and rockfill dam earthquake resistant structure of high polymer and construction method thereof
CN110924868A (en) Production manufacturing process and construction process of drill rod capable of expanding diameter
CN202706971U (en) Bit fisher
CN202152661U (en) Anchoring type graded deblocking packer for oil well
CN203994262U (en) Drilling machine
CN201396095Y (en) Rubber-cylinder fishing device
RU92686U1 (en) DRILL PIPE FOR GEOLOGICAL EXPLORATION
CN201225121Y (en) Oil gas well selective completion tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 276800, unit 102, building 16, car head hill area, central northbound, Arashiyama District, Shandong, Rizhao City

Applicant after: Zhang Yongzhong

Address before: 276800 Shandong Province, Rizhao City Ji'nan road 277, building 10, unit 1, Belvedere Garden 102

Applicant before: Zhang Yongzhong

CB02 Change of applicant information
ASS Succession or assignment of patent right

Owner name: SHENZHEN BAOHAO MUNICIPAL ENGINEERING CO., LTD. XI

Effective date: 20140327

Owner name: SHENZHEN HONGXUAN CONSTRUCTION ENGINEERING CO., LT

Free format text: FORMER OWNER: ZHANG YONGZHONG

Effective date: 20140327

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 276800 RIZHAO, SHANDONG PROVINCE TO: 518049 SHENZHEN, GUANGDONG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20140327

Address after: 518049 Guangdong Province, Shenzhen city Futian District Mei Hua Lu Shen Hua Science and Technology Industrial Park, No. 2 Building 5 layer 1-7 axis 501

Applicant after: SHENZHEN HONGXUAN CONSTRUCTION ENGINEERING CO., LTD.

Applicant after: SHENZHEN BAOHAO MUNICIPAL ENGINEERING CO., LTD.

Applicant after: XIAMEN ANNENG CONSTRUCTION CO., LTD.

Applicant after: Fujian Jiulong Construction Group Co., Ltd.

Address before: 276800, unit 102, building 16, car head hill area, central northbound, Arashiyama District, Shandong, Rizhao City

Applicant before: Zhang Yongzhong

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140430

Termination date: 20160605

CF01 Termination of patent right due to non-payment of annual fee