CN102677957A - 防治沙尘钢混墙 - Google Patents

防治沙尘钢混墙 Download PDF

Info

Publication number
CN102677957A
CN102677957A CN2011100743814A CN201110074381A CN102677957A CN 102677957 A CN102677957 A CN 102677957A CN 2011100743814 A CN2011100743814 A CN 2011100743814A CN 201110074381 A CN201110074381 A CN 201110074381A CN 102677957 A CN102677957 A CN 102677957A
Authority
CN
China
Prior art keywords
dust
sand
meters
steel mixed
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100743814A
Other languages
English (en)
Other versions
CN102677957B (zh
Inventor
刘章发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110074381.4A priority Critical patent/CN102677957B/zh
Publication of CN102677957A publication Critical patent/CN102677957A/zh
Application granted granted Critical
Publication of CN102677957B publication Critical patent/CN102677957B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Road Paving Structures (AREA)

Abstract

防治沙尘钢混墙是针对西北利亚寒风和蒙古国的沙尘对中国的侵扰,以及沙尘中粗大沙粒都集中在50米以下空间运行和冷空气下沉的特点而设计。在中蒙国境线内从东向西建一道高60米防治沙尘钢混墙。距离第一道钢混墙20公里处再建第二道高60米钢混墙。距离北京市西北面20公里的北面再建第三道高60米钢混墙。同时实施复审中的专利《防治沙尘混凝土扣板》和植树。达到防治沙尘立即见效,快速,彻底长期有效防治沙尘和公园式防治效果。有效减缓西北利亚寒风的侵害力度和强度,改变中国不能从根本上抑制沙尘的结论。防治沙尘钢混墙以钢混核心结构为主体,以空心砌块等为辅料,设计成上小下大的宝塔形状,合理美观。

Description

防治沙尘钢混墙
所属技术领域:
本发明涉及一种防治沙尘钢混墙。 
背景技术:
目前,公知的国务院权威机构于2011年元月4日答记者问说:“中国有174万平方公里沙漠,蒙古国有200多万平方公里沙漠,受西北利亚寒风影响,蒙古国沙尘经常都有可能吹到中国来。中国不可能从根本上抑制沙尘和沙尘暴”。目前防治沙尘主要采用种草植树,用植物支杆加沙土筑埂,用粘土、砾石、砖头和瓦片平辅等。复审中的专利《防治沙尘混凝土扣板》仅能防治沙漠表面不发生沙尘和不发生坍塌。并不包括防治西北利来寒风和从蒙古国吹来的沙尘对于中国的侵扰。申请人于2011年3月13日申请专利《防治沙尘挡风墙配套组合》为了增加风力发电,而设计太复杂,不易实施和操作。 
本发明内容: 
在中国和蒙古国境线内从东向西建筑第一道高60米防治沙尘钢混墙,距离第一道钢混墙20公里再建第二道高60米的钢混墙。距离北京市西北面20公里再建第三道防治沙尘钢混墙。 
本发明解决问题所采取的技术方案是: 
附图所表示的是防治沙尘钢混墙。根据从西北利亚吹来的寒风和从蒙古国吹来的沙尘,以及沙尘中的粗大沙粒都集中于50米以下空间运行和冷空气下沉的特点。设计在中蒙国境线内从东向西建筑第一道高60米防治沙尘钢混墙,距离第一道钢混墙20公里再建第二道钢混墙距离北京市西北面20公里再建第三道钢混墙。同时实施复审中的《防治沙尘混凝土扣板》和植树。 
本发明的有益效果是: 
1、实施本发明的同时实施复审中的专利《防治沙尘混凝土扣板》和植树。能够快速彻底长期有效防治沙尘和沙尘暴。按规划植树,可以获得公园式防治效果。改变中国不可能从根本上抑制沙尘的结论。 
2、本发明的实施能够有效减缓从西北利亚吹来的寒风和从蒙古国吹来的沙尘的危害程度。 
附图说明:
附图是防治沙尘钢混墙: 
1、是钢混墙体。地面墙高60米,地下基础高6米,基础宽3.4米。墙顶宽为1米,呈宝塔形状。 
2、是南北交通道路和水渠的通道。高5米,宽5米以上。 
3、是墙基础,宽3.4米,用空心砌块在6米深的基槽中从东向西浆砌成3米宽的空间,用Φ20毫米的螺纹钢扎架平放在基槽3米宽的空间,用6米长的螺纹钢竖立焊接在基础钢架上,再用优质混凝土浇筑至60公分高度,震动,在气温5℃以上保养30天。螺纹钢Φ20毫米下同。 
4、是收缩后的墙基础。宽2.8米,用空心砌块在固化的墙基上浆砌成空间为2.4米的竖立螺纹钢围在其中,再按规格用横螺纹钢焊接成架,并焊接有预留竖立螺纹钢备用。用优质混凝土浇筑至5.4米高,震动在5℃以上保养30天。 
5、是地面第一节墙体,高10米。先用钢混梁浆砌在基础的砌块上再用空心砌块浆砌成1.8米的空间,用横螺纹钢焊接成钢架并且竖钢筋必须高12米,预留2米。用优质混凝土浇筑,震动。浆砌砌块必须间距3.3米高度,用钢混梁,在气温5℃以上保养30天。抹面并起凹槽。第一节墙体实际宽为2.2米。 
6、是地面第二节墙体。高10米。先用钢混梁浆砌在第一节墙体的砌块上再用砌块浆砌成1.6米的空间,砌块在3.3米高度必用钢混梁将竖钢筋焊接成12米高,用横钢筋焊接成架,用优质混凝土浇筑,震动在气温以上保养30天。抹面并起凹槽。第二节墙体实际宽为2米。 
7、是地面第三节墙体。高10米。先用钢混梁浆砌在第二节墙体的砌块上再用砌块浆砌成1.4米的空间。砌块在3.3米高度必用钢混梁。将竖立螺纹钢焊高至12米,用横钢筋焊接成架,用优质混凝土浇筑,震动。在气温5℃以上保养30天。抹面起凹槽。第三节墙体实际宽为1.8米. 
8、是地面第四节墙体。高10米。先用钢混梁浆砌在第三节墙体的砌块上再用砌块浆砌成1.2米的空间。砌块在3.3米高度必用钢混梁。将竖立钢筋焊接成至12米,用横钢筋焊接成架,用优质混凝土浇筑,震动。在气温5℃以上保养30天。抹面起凹槽。第四节墙体实际宽为1.6米. 
9、是地面第五节墙体。高10米。先用钢混梁浆砌在第四节墙体的砌块上,再用砌块浆砌成1米的空间。砌块在3.3米高度必须用钢混梁。将竖立钢筋焊接成至12米,用横钢筋焊接成架,用优质混凝土浇筑,震动。在气温5℃以上保养30天。抹面起凹槽。第五节墙体实际宽为1.4米. 
10、是地面第六节墙体。高10米。先用钢混梁浆砌在第五节墙体的砌块上再用砌块浆砌成0.6米的空间。砌块在3.3米高度时必须用钢混梁。将竖立钢筋焊接成至10米,用横钢筋焊接成架到顶,用优质混凝土浇筑封顶,震动。在气温5℃以上保养30天。抹面起凹槽。顶宽实为1米。 
具体实施方式:
在中蒙国境线内从东向西按规划挖4米宽,6米深沟槽,以见泥土或岩石为最好。按照说明书附图说明实施。 

Claims (1)

1.防治沙尘钢混墙和其他防治沙尘技术相比较,其特征是:
1实施防治沙尘钢混墙同时实施复审中的专利《防治沙尘混凝土扣板》和植树。能够有效减缓西北利亚寒风和从蒙古国吹来沙尘对于中国的侵害。中国能够防治沙尘立即见效,快速彻底长期有效防治沙尘和沙尘暴,达到公园式防治效果,改变中国不能从根本上防治沙尘的结论。以上功能是其他防治沙尘技术所不具备的特殊功能作用。
2设计从东到西,宝塔形状和钢混核心坚固作用。属于长期永久性发挥防治沙尘又能阻挡从西北利亚吹来的寒风的双重作用。 
CN201110074381.4A 2011-03-18 2011-03-18 防治沙尘钢混墙 Expired - Fee Related CN102677957B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110074381.4A CN102677957B (zh) 2011-03-18 2011-03-18 防治沙尘钢混墙

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110074381.4A CN102677957B (zh) 2011-03-18 2011-03-18 防治沙尘钢混墙

Publications (2)

Publication Number Publication Date
CN102677957A true CN102677957A (zh) 2012-09-19
CN102677957B CN102677957B (zh) 2015-03-25

Family

ID=46810473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110074381.4A Expired - Fee Related CN102677957B (zh) 2011-03-18 2011-03-18 防治沙尘钢混墙

Country Status (1)

Country Link
CN (1) CN102677957B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3225066A1 (de) * 1982-07-05 1984-01-05 Stromeyer Ingenieurbau GmbH, 7750 Konstanz Schutzwall
CN101240525A (zh) * 2007-02-07 2008-08-13 娄成城 一种制作沙障、拦沙坝、沙墈和沙墙的串连式网笼
CN201176568Y (zh) * 2008-01-21 2009-01-07 梁欣悦 沙漠铁路线导沙墙
CN201512750U (zh) * 2009-10-24 2010-06-23 成都峻峰科技开发有限公司 抗沙尘分层自洁式公路挡风墙
CN102677598A (zh) * 2011-03-14 2012-09-19 刘章发 防治沙尘挡风墙配套组合

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3225066A1 (de) * 1982-07-05 1984-01-05 Stromeyer Ingenieurbau GmbH, 7750 Konstanz Schutzwall
CN101240525A (zh) * 2007-02-07 2008-08-13 娄成城 一种制作沙障、拦沙坝、沙墈和沙墙的串连式网笼
CN201176568Y (zh) * 2008-01-21 2009-01-07 梁欣悦 沙漠铁路线导沙墙
CN201512750U (zh) * 2009-10-24 2010-06-23 成都峻峰科技开发有限公司 抗沙尘分层自洁式公路挡风墙
CN102677598A (zh) * 2011-03-14 2012-09-19 刘章发 防治沙尘挡风墙配套组合

Also Published As

Publication number Publication date
CN102677957B (zh) 2015-03-25

Similar Documents

Publication Publication Date Title
CN206768837U (zh) 公路路堑边坡生态护坡结构
CN206736931U (zh) 公路岩质边坡藤本植物生态防护结构
CN201343733Y (zh) 稳定岩质边坡生态防护构造
CN106958264A (zh) 一种高速公路绿化带及其施工方法
CN206428709U (zh) 一种公路护坡
CN204311462U (zh) 蓄水种植池
CN206245284U (zh) 一种斜坡式生态护岸模块结构
CN204185870U (zh) 一种利用香根草的边坡绿色防护系统
CN102369834B (zh) Bsc大骨料生物基质植生混凝土及其制备、施工方法
CN103122640A (zh) 一种边坡防护结构及防护方法
CN202148531U (zh) 砂层路堑边坡生态防护构造
CN102677957B (zh) 防治沙尘钢混墙
CN107401205A (zh) 一种岩溶洼地降雨利用系统
CN204418192U (zh) 锁扣式植草网格
CN104895008B (zh) 环境友好型生态带肋壁板式挡墙护岸的施工方法
CN203716160U (zh) 一种预制混凝土空心骨架护坡结构
CN202954368U (zh) 一种边坡生态混凝土防护结构
CN207775818U (zh) 一种锚固格栅护坡
CN208328984U (zh) 生态格框挡墙
CN203113354U (zh) 一种边坡防护结构
CN207619919U (zh) 一种装配式生态堤岸结构
CN208300421U (zh) 一种水利工程环保生态墙结构
CN205012335U (zh) 斜拉锚杆加固的混合双基层排水沟槽
CN201103123Y (zh) 填砂路基边坡防护预制空心块
CN102677598A (zh) 防治沙尘挡风墙配套组合

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150325