CN102674132A - 艉轴拂配吊装工装 - Google Patents

艉轴拂配吊装工装 Download PDF

Info

Publication number
CN102674132A
CN102674132A CN2012101515097A CN201210151509A CN102674132A CN 102674132 A CN102674132 A CN 102674132A CN 2012101515097 A CN2012101515097 A CN 2012101515097A CN 201210151509 A CN201210151509 A CN 201210151509A CN 102674132 A CN102674132 A CN 102674132A
Authority
CN
China
Prior art keywords
stern shaft
base plate
hoisting tool
top board
shaft scraping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101515097A
Other languages
English (en)
Inventor
刘建荣
潘建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengxi Shipyard Co Ltd
Original Assignee
Chengxi Shipyard Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengxi Shipyard Co Ltd filed Critical Chengxi Shipyard Co Ltd
Priority to CN2012101515097A priority Critical patent/CN102674132A/zh
Publication of CN102674132A publication Critical patent/CN102674132A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Cleaning In General (AREA)

Abstract

本发明涉及一种艉轴拂配吊装工装,属于修造船设备技术领域。它包括顶板(1)和底板(3),所述顶板(1)和底板(3)之间通过多个螺栓(2)相连接,所述底板(3)中间开设有圆形通孔,所述顶板(1)顶部平行设置有两个吊耳(4),所述两个吊耳(4)之间连接设置有柱销(6)。本发明一种艉轴拂配吊装工装,它大大提高了艉轴拂配的效率。降低了工人的劳动强度。

Description

艉轴拂配吊装工装
技术领域
本发明涉及一种艉轴拂配吊装工装,属于修造船设备技术领域。
背景技术
46000T船是公司承接的又一新船型,在轴、舵系的拉线照光、桨、舵叶的拂配、安装等方方面面,都需要大量系列的工装实施来保障。
发明内容
本发明的目的在于克服上述不足,提供一种艉轴拂配吊装工装,它大大提高了艉轴拂配的效率,降低了工人的劳动强度。
本发明的目的是这样实现的:一种艉轴拂配吊装工装,其特点是:它包括顶板和底板,所述顶板和底板之间通过多个螺栓相连接,所述底板中间开设有圆形通孔,所述顶板顶部平行设置有两个吊耳,所述两个吊耳之间连接设置有柱销。 
与现有技术相比,本发明的有益效果是:
本发明一种艉轴拂配吊装工装,它大大提高了艉轴拂配的效率。降低了工人的劳动强度。
附图说明
图1为本发明一种艉轴拂配吊装工装的结构示意图。
图2为图1的俯视图。
图3为图1中底板的结构示意图。
其中:
顶板1
螺栓2
底板3
吊耳4
艉轴5
柱销6。
具体实施方式
参见图1~图3,本发明涉及一种艉轴拂配吊装工装,它包括顶板1和底板3,所述顶板1和底板3之间通过多个螺栓2相连接,所述底板3中间开设有圆形通孔,所述顶板1顶部平行设置有两个吊耳4,所述两个吊耳4之间连接设置有柱销6。

Claims (1)

1.一种艉轴拂配吊装工装,其特征在于:它包括顶板(1)和底板(3),所述顶板(1)和底板(3)之间通过多个螺栓(2)相连接,所述底板(3)中间开设有圆形通孔,所述顶板(1)顶部平行设置有两个吊耳(4),所述两个吊耳(4)之间连接设置有柱销(6)。
CN2012101515097A 2012-05-16 2012-05-16 艉轴拂配吊装工装 Pending CN102674132A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101515097A CN102674132A (zh) 2012-05-16 2012-05-16 艉轴拂配吊装工装

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101515097A CN102674132A (zh) 2012-05-16 2012-05-16 艉轴拂配吊装工装

Publications (1)

Publication Number Publication Date
CN102674132A true CN102674132A (zh) 2012-09-19

Family

ID=46806786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101515097A Pending CN102674132A (zh) 2012-05-16 2012-05-16 艉轴拂配吊装工装

Country Status (1)

Country Link
CN (1) CN102674132A (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1330003A1 (ru) * 1985-09-02 1987-08-15 Предприятие П/Я Р-6109 Устройство дл испытани верхнего строени плавучего крана
JP2002234484A (ja) * 2001-02-07 2002-08-20 Mitsubishi Heavy Ind Ltd 作業船における荷重試験方法
CN201634315U (zh) * 2010-01-27 2010-11-17 浙江金港船业股份有限公司 一种艉轴竖直拂配起吊工具
CN202181164U (zh) * 2011-07-06 2012-04-04 宣化钢铁集团有限责任公司 一种内燃机车整体吊装连接装置
CN202643074U (zh) * 2012-05-16 2013-01-02 中船澄西船舶修造有限公司 艉轴拂配吊装工装

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1330003A1 (ru) * 1985-09-02 1987-08-15 Предприятие П/Я Р-6109 Устройство дл испытани верхнего строени плавучего крана
JP2002234484A (ja) * 2001-02-07 2002-08-20 Mitsubishi Heavy Ind Ltd 作業船における荷重試験方法
CN201634315U (zh) * 2010-01-27 2010-11-17 浙江金港船业股份有限公司 一种艉轴竖直拂配起吊工具
CN202181164U (zh) * 2011-07-06 2012-04-04 宣化钢铁集团有限责任公司 一种内燃机车整体吊装连接装置
CN202643074U (zh) * 2012-05-16 2013-01-02 中船澄西船舶修造有限公司 艉轴拂配吊装工装

Similar Documents

Publication Publication Date Title
CN103266779B (zh) 一种越过水平障碍物的提升滑移施工设备及其方法
CN202124416U (zh) 吊梁工装
CN202643074U (zh) 艉轴拂配吊装工装
CN202829301U (zh) 钢轨吊装工具
CN203112378U (zh) 塔式起重机标准节的引进装置
CN102674132A (zh) 艉轴拂配吊装工装
CN204590114U (zh) 一种液压旋转抓石器
CN202529699U (zh) 用于轴承拆装的三爪折叠吊具
CN104098018A (zh) 一种可重复使用的多级平衡梁组合系统
CN102491163B (zh) 风力发电机机舱罩的装配工艺
CN202245671U (zh) 蒸发器组件吊装横梁
CN202369320U (zh) 一种电机搬运架
CN203781642U (zh) 一种矩形钢板吊具
CN203345936U (zh) 多用途封闭式液压抓手
CN204057672U (zh) 一种组合式物料吊具
CN203095395U (zh) 钢板吊装索具
CN201619941U (zh) 横梁式吊具
CN201545594U (zh) 吊具
CN105329773A (zh) 起重机用多瓣抓斗
CN202657862U (zh) 一种墙板吊出装置
CN204454260U (zh) 一种固定式吊钩组
CN204057802U (zh) 一种起重吊钩组滑轮组装置
CN204262112U (zh) 一种半圆开口型钢的冷弯装置
CN203850768U (zh) 一种不易变形的桥架盖板
CN203522098U (zh) 一种垂直引上引下电缆竖井

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120919