CN102661050A - Prestressed tension auxiliary construction stage device - Google Patents

Prestressed tension auxiliary construction stage device Download PDF

Info

Publication number
CN102661050A
CN102661050A CN2012101708564A CN201210170856A CN102661050A CN 102661050 A CN102661050 A CN 102661050A CN 2012101708564 A CN2012101708564 A CN 2012101708564A CN 201210170856 A CN201210170856 A CN 201210170856A CN 102661050 A CN102661050 A CN 102661050A
Authority
CN
China
Prior art keywords
mould bases
pedestal
ground tackle
stage device
auxiliary construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101708564A
Other languages
Chinese (zh)
Inventor
贾振华
蔡安康
刘涛
朱光全
王文云
瞿疆
孙永超
马岚
张开雄
杨莺
汪勤红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN2012101708564A priority Critical patent/CN102661050A/en
Publication of CN102661050A publication Critical patent/CN102661050A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a prestressed tension auxiliary construction stage device used for engineering such as railways, roads, industrial buildings, water conservation, energy and rock and soil anchorage. The prestressed tension auxiliary construction stage device comprises an outer formwork, an inner formwork, an anchor pedestal, a tensioning anchor and a pulley component, the outer formwork and the inner formwork consist of scaffold steel pipes, the inner formwork is placed in the outer formwork, the anchor pedestal is placed on the inner formwork, the tensioning anchor is placed on the anchor pedestal, the pulley component is connected onto the outer formwork, and universal rotating wheels are disposed at the bottom of the outer formwork. The anchor pedestal consists of square timber, a reinforcing mesh and reinforcing guardrails, the reinforcing mesh is placed on the square timer, and the reinforcing guardrails are placed on the reinforcing mesh. The prestressed tension auxiliary construction stage device is simple in structure and convenient to operate, and materials of the prestressed tension auxiliary construction stage device are available easily. In addition, engineering practices show that tensioning speed is fast, construction is safe, and construction expense is lowered after the novel stage device is used.

Description

A kind of prestressed stretch-draw auxiliary construction bench frame apparatus
Technical field
The invention belongs to field of engineering technology such as railway, highway, industrial construction, water conservancy, the energy and ground anchorage, be specially a kind of bench frame apparatus that adopts on-the-spot material, this bench frame apparatus is to use when assisting prestressed stretch-draw.
Background technology
Prestressing technique is through the engineering practice of decades and constantly research; Developed into the engineering of a comparative maturity; Its principle is widely used in the bridge engineering of railway and highway, the building construction of industry; And in the slope anchorage engineering of water conservancy and geotechnical engineering, have vast potential for future development and practical value.
Steel strand are applied the critical process that prestressing force is prestressing technique, so the quality control of prestressed stretch-draw, safety assurance, construction speed just seem particularly important.Generally, during prestressed stretch-draw, be to set up interim steel pipe scaffold construction at the stretch-draw position, remove the intact back of stretch-draw, and whipline carries out operation in case of necessity.Along with the large-area popularization of prestressing technique, this traditional scaffold can not satisfy the demand of construction speed and construction safety.When in high-speed railway, concentrating case beam prefabricated, set up scaffold stretch-draw and can not satisfy construction requirement, crane can not be assisted during the stretch-draw of Cast-in-Situ Continuous Beam serrated slot, and tension ground tackle promotes and in placely all needs to solve than problems such as difficulties; Simultaneously, during the heavy stretch-draw operation of, task tight in the duration, on-the-spot a large amount of constructors and plant equipment operation had simultaneously both caused the construction interference, influenced construction speed, also brought out security incident easily.
Summary of the invention
The objective of the invention is to overcome the weak point of existing tensioning construction framed bent, a kind of simple structure is provided, gathers materials on the spot, easy to operate, construction safety, prestressed stretch-draw auxiliary construction bench frame apparatus that construction cost is low.
Technical scheme of the present invention is: the present gantries device is made up of outer mould bases, interior mould bases, ground tackle pedestal, pulley assembly; Outer mould bases and interior mould bases are made up of scaffolding steel pipe; Internal mold is placed in the outer mould bases, and on the mould bases, tension ground tackle placed on the ground tackle pedestal in the ground tackle pedestal placed; Pulley assembly is connected on the outer mould bases, and outer mould bases bottom is provided with universal moving runner.
The ground tackle pedestal is made up of the lumps of wood, reinforced mesh and reinforcing bar guardrail, and reinforced mesh places on the lumps of wood, and the reinforcing bar guardrail places on the reinforced mesh.
Bench frame apparatus of the present invention can adopt on-the-spot material, simple structure, is convenient to operation, fast, the construction safety of tensioning speed, has saved material, manpower, device resource, has accelerated construction speed, effectively reduces the construction cost of production.
Description of drawings
Fig. 1 is a bench frame apparatus structural representation front view of the present invention.
Fig. 2 is a bench frame apparatus structural representation lateral view of the present invention.
Fig. 3 is a bench frame apparatus external mold shelf structure sketch map of the present invention.
Fig. 4 is a bench frame apparatus internal mold shelf structure sketch map of the present invention.
Fig. 5 is that the universal moving runner of bench frame apparatus of the present invention connects sketch map with outer mould bases.
Among the figure, the universal moving runner of 1-, the outer mould bases of 2-, mould bases in the 3-, the 4-lumps of wood, 5-ground tackle pedestal, 6-reinforcing bar guardrail, 7-tension ground tackle, 8-pulley assembly, 9,10,11, the 12-scaffolding steel pipe, 13-jacking, 14-muscle net sheet, 15-steel plate.
The specific embodiment
Like Fig. 1, shown in Figure 2, present gantries device of the present invention is made up of outer mould bases 2, interior mould bases 3, ground tackle pedestal 5, tension ground tackle 7, pulley assembly 8; Outer mould bases 2 is connected to form by scaffolding steel pipe 9,10,11,12 with interior mould bases 3, and interior mould bases is connected with liftable jacking 13, and shown in Fig. 3, chart 4, assembling adopts scaffold clasp to connect; Interior mould bases 3 places in the outer mould bases 2, and the ground tackle pedestal puts 5 on interior mould bases 3, and tension ground tackle 7 places on the ground tackle pedestal 5, and pulley assembly 8 is connected on the outer mould bases, and outer mould bases 2 bottoms are provided with universal moving runner 1, and its connected mode is as shown in Figure 5.
Ground tackle pedestal 5 is made up of the lumps of wood 4, reinforced mesh 14 and reinforcing bar guardrail 6, and reinforced mesh 14 places on the lumps of wood 4, and reinforcing bar guardrail 6 places on the reinforced mesh 14, and the lumps of wood 4 directly is contained on the jacking 13.When interior mould bases went up and down, the ground tackle pedestal and then went up and down; The fine setting of also can going up and down of the jacking of interior mould bases, the ground tackle pedestal fine setting of also and then going up and down.After the ground tackle pedestal went up and down, ground tackle was positioned on the pedestal, thereby reaches the function of up-down ground tackle; Simultaneously, the ground tackle that also can directly go up and down of the pulley on the outer mould bases.
The present invention can adopt on-the-spot scaffolding steel pipe and fastener set to dress up outer mould bases, and universal moving runner is installed at the bottom of the mould bases outside, the recycling of realization stand and mobile; Adopt on-the-spot scaffold tube, jacking and fastener assembling internal mold frame, be installed in interior mould bases in the outer mould bases, realize promoting and the interior mould bases of reduction, realize fine setting up and down through the jacking screw mandrel through the degree of tightness fastener; On the jacking of interior mould bases, lay the lumps of wood and reinforced mesh construction pedestal as tension ground tackle; On the stand top pulley is installed, is realized the fixing and mobile of tension ground tackle; If the stretch-draw place is spacious and comfortable, operator is had a surplus, and can not adorn interior mould bases, directly uses pulley to promote ground tackle.If the stretch-draw place is limited, when outer mould bases can not use, directly universal moving runner is installed and is used, but need anchor point to cooperate the up-down ground tackle with interior mould bases.
Can remove after the completion and be reduced to on-the-spot material, can also break assembling and have enough to meet the need use, practice thrift a large amount of expenses.After a steel Shu Zhangla of place accomplished, stand did not need to remove, and only needed 1 people that stand is moved to next stretch-draw position and can restart stretch-draw, had saved a large amount of scaffolds and had taken material and the manpower of tearing open; Ground tackle interior mould bases capable of using and pulley go up and down simultaneously, have reduced the cooperation of equipment such as crane; And, reduced the site operation interference because required site operation personnel is less.

Claims (3)

1. prestressed stretch-draw auxiliary construction bench frame apparatus; It is characterized in that being made up of outer mould bases, interior mould bases, ground tackle pedestal, tension ground tackle, pulley assembly, outer mould bases and interior mould bases are made up of scaffolding steel pipe, and internal mold is placed in the outer mould bases; The ground tackle pedestal places on the interior mould bases; Tension ground tackle places on the ground tackle pedestal, and pulley assembly is connected on the outer mould bases, and outer mould bases bottom is provided with universal moving runner.
2. prestressed stretch-draw auxiliary construction bench frame apparatus according to claim 1 is characterized in that the ground tackle pedestal is made up of the lumps of wood, reinforced mesh and reinforcing bar guardrail, and reinforced mesh places on the lumps of wood, and the reinforcing bar guardrail places on the reinforced mesh.
3. prestressed stretch-draw auxiliary construction bench frame apparatus according to claim 1, mould bases is connected to form by scaffolding steel pipe in it is characterized in that, and interior mould bases top is connected with liftable jacking.
CN2012101708564A 2012-05-29 2012-05-29 Prestressed tension auxiliary construction stage device Pending CN102661050A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101708564A CN102661050A (en) 2012-05-29 2012-05-29 Prestressed tension auxiliary construction stage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101708564A CN102661050A (en) 2012-05-29 2012-05-29 Prestressed tension auxiliary construction stage device

Publications (1)

Publication Number Publication Date
CN102661050A true CN102661050A (en) 2012-09-12

Family

ID=46770616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101708564A Pending CN102661050A (en) 2012-05-29 2012-05-29 Prestressed tension auxiliary construction stage device

Country Status (1)

Country Link
CN (1) CN102661050A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2121318U (en) * 1992-05-15 1992-11-11 北京市城市建设工程总公司构件厂 Split prestressed stretch-draw fiddle
JPH07166603A (en) * 1993-12-15 1995-06-27 Taisei Corp Construction method for end part rc-made steel frame beam
CN201826262U (en) * 2010-10-26 2011-05-11 中铁十三局集团有限公司 Prestress tensioning trolley
CN201873949U (en) * 2010-11-11 2011-06-22 中铁十三局集团电务工程有限公司 Bride prestress stretch-draw trolley
CN202200389U (en) * 2011-07-21 2012-04-25 天津永生鑫和管桩有限公司 Tensioning machine moving trolley
CN202627540U (en) * 2012-05-29 2012-12-26 中国水利水电第十四工程局有限公司 Constructing rack device for assisting prestress tension

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2121318U (en) * 1992-05-15 1992-11-11 北京市城市建设工程总公司构件厂 Split prestressed stretch-draw fiddle
JPH07166603A (en) * 1993-12-15 1995-06-27 Taisei Corp Construction method for end part rc-made steel frame beam
CN201826262U (en) * 2010-10-26 2011-05-11 中铁十三局集团有限公司 Prestress tensioning trolley
CN201873949U (en) * 2010-11-11 2011-06-22 中铁十三局集团电务工程有限公司 Bride prestress stretch-draw trolley
CN202200389U (en) * 2011-07-21 2012-04-25 天津永生鑫和管桩有限公司 Tensioning machine moving trolley
CN202627540U (en) * 2012-05-29 2012-12-26 中国水利水电第十四工程局有限公司 Constructing rack device for assisting prestress tension

Similar Documents

Publication Publication Date Title
CN103334356B (en) The dark beam slab pavement system of bridge-type prefabricated reinforced concrete and construction method thereof
CN102605719B (en) Construction method for splicing and erecting concrete precast beam sections
CN202627540U (en) Constructing rack device for assisting prestress tension
CN204898736U (en) Underground garage roof or bottom plate post -cast strip prestressing tendons structure
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN202945798U (en) Overhanging type scaffold corner device
CN106013783A (en) Formwork support and erecting method thereof
CN103061518A (en) Method for constructing composite floor slabs of multi-storey residential building
CN103334360B (en) The dark beam slab wear-resistant pavement system of bridge-type prefabricated reinforced concrete and construction method thereof
CN205296197U (en) Prefabricated cushion cap of anticorrosive industry factory building concrete rim of a cup formula
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method
CN107299596B (en) Concrete support trestle plate lower supporting beam template system and construction method thereof
CN203403434U (en) Basement
CN203613464U (en) Slip form construction cargo transportation device
CN110080299A (en) A kind of shallow embedding mountain tunnel open-cut engineering method
CN102661050A (en) Prestressed tension auxiliary construction stage device
CN201343705Y (en) Auxiliary device for anchoring rear supporting legs of lower guide beam of bridge-erecting machine
CN203373624U (en) Bridge prefabricated reinforced concrete hidden beam slab wearproof pavement system
CN203373631U (en) Prefabricated reinforced concrete pavement slab
CN203373630U (en) Prefabricated hollow reinforced concrete pavement slab
CN203613461U (en) Slip form construction lifting system
CN208267393U (en) A kind of set aside pre-embedded finished product protection device of electrical spool
CN202299422U (en) Laterally constraint cement mortar grouting tube bracing rod in concrete formwork
CN206503311U (en) A kind of precast concrete daughter wall member and its attachment structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120912