CN102660921A - Connected support applicable to mounting precast beam - Google Patents

Connected support applicable to mounting precast beam Download PDF

Info

Publication number
CN102660921A
CN102660921A CN201210177515XA CN201210177515A CN102660921A CN 102660921 A CN102660921 A CN 102660921A CN 201210177515X A CN201210177515X A CN 201210177515XA CN 201210177515 A CN201210177515 A CN 201210177515A CN 102660921 A CN102660921 A CN 102660921A
Authority
CN
China
Prior art keywords
steel plate
bearing
conjuncted
precast beam
support body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210177515XA
Other languages
Chinese (zh)
Other versions
CN102660921B (en
Inventor
朱波
黄锦源
刘晓苹
吴刚
周成
钟小军
卢兴
丁佳元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Group Co Ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Co ltd filed Critical Shanghai Urban Construction Design Research Institute Co ltd
Priority to CN201210177515.XA priority Critical patent/CN102660921B/en
Publication of CN102660921A publication Critical patent/CN102660921A/en
Application granted granted Critical
Publication of CN102660921B publication Critical patent/CN102660921B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a connected support applicable to mounting a precast beam. The connected support comprises a connected steel plate, a plurality of upper positioning connectors fixedly connected with the precast beam are arranged on the upper side of the connected steel plate, the lower side of the connected steel plate is fixedly connected with a first support body through a first upper steel plate and is fixedly connected with a second support body through a second upper steel plate, the upper positioning connectors are positioned between the first support body and the second support body, a first lower steel plate is further fixedly arranged below the first support body, a second lower steel plate is further fixedly arranged below the second support body, and a plurality of lower positioning connectors fixedly connected with a bridge pier cap beam are arranged on the first lower steel plate and the second lower steel plate respectively. The connected steel plate on the connected support is integrally connected with the precast beam, the connected support has the advantages of better durability, firmness in connection, convenience in construction and the like, and close contact between the connected support and the upper precast beam and between the connected support and the lower bridge pier cap beam can be ensured by means of cast-in-situ cushion block construction.

Description

Be applicable to the conjuncted bearing that precast beam is installed
Technical field
The present invention relates to road and bridge building technology field, relate in particular to a kind of conjuncted bearing that is applicable to that precast beam is installed.
Background technology
The bearing that is installed at present at the bottom of the precast beam adopts patterns such as common laminated rubber bearing, pot rubber bearing, ball shaped steel bearing, lead core rubber support usually.
The carrying tonnage of common laminated rubber bearing is less; Frictionally and upper and lower part structure interrelate, and lean on the shear strain of himself to adapt to the flexible of bridge, but can not resist bigger horizontal force and distortion demand; Owing to reasons such as material agings, service life is short, durability is relatively poor.
The bearing of forms such as pot rubber bearing, ball shaped steel bearing, lead core rubber support, service life is long, durability is better, the bearing tonnage is bigger, in overhead road of city bridge and highway bridge, uses comparatively general.These bearings all carry positioning bolt, can stretch into the beam that is positioned at its top and be positioned at the bridge bent cap of its underpart, thereby can guarantee the reliable connection between the structure of upper and lower part.
But when superstructure was precast beam, the construction technique of these bearings can be very complicated.Common mounting method is: when the bridge pier bent cap of cast-in-place bottom, reserve bearing positioning bolt hole at the top of bent cap, the while is pre-buried connection steel plate at the bottom of the beam of the precast beam on top; Positioning bolt with the bearing bottom inserts in the reserving hole on the bridge pier bent cap of reserving then; And the hole of positioning bolt taked grouting treatment; When treating that the beam lifting is set up, with basin steel plate welding on steel plate and the bearing at the bottom of the beam of top beam, make bearing be connected in aggregates again with the upper and lower part structure.
According to the requirement of existing highway bridge and culvert standard, when bearing is arranged on the great slope, should between at the bottom of abutment surface and the beam, the bearing cushion block be set, make bearing maintenance level.No matter adopt the bearing of any type, need the bearing cushion block to be set at the bottom of beam when all existing the gradient big so that the problem of bearing maintenance level.In order to satisfy aforesaid technical requirements, when making precast beam, the cushion block according on the prefabricated bearing of the vertical and horizontal gradient of bridge sticks on Liang Dishang usually.But this technical scheme still is 4 supports on the one hand, is difficult to adapt to the natural law of three faces, is difficult for closely connected, discontinuity with bearing at the bottom of the precast beam, the noise in the time of can increasing driving.On the other hand, along with the increase of cushion block kind, quantity, all bring great difficulty for construction cost, management, quality control.
Therefore, those skilled in the art be devoted to develop a kind of fit tight, stressed evenly, construction is applicable to the conjuncted bearing that precast beam is installed easily.
Summary of the invention
Because the above-mentioned defective of prior art, technical problem to be solved by this invention provide a kind of fit tight, stressed evenly, construction is applicable to the conjuncted bearing that precast beam is installed easily.
For realizing above-mentioned purpose, the invention provides a kind of conjuncted bearing that is applicable to that precast beam is installed, comprise a conjuncted steel plate; The upside of said conjuncted steel plate is provided with a plurality of positioning links of going up that are fixedly connected with precast beam; The downside of said conjuncted steel plate is fixedly connected with first support body through first upper steel plate, is fixedly connected with second support body through second upper steel plate; The said positioning link of going up is between said first support body and said second support body; The below of said first support body also is set with first lower steel plate, and the below of said second support body also is set with second lower steel plate; Be respectively arranged with a plurality of positioning links down that are fixedly connected with the bridge pier bent cap on said first lower steel plate, said second lower steel plate.
Preferably, said first upper steel plate, said second upper steel plate are fixedly connected with said conjuncted steel plate through connecting bolt respectively.
Preferably, said upward positioning link, said positioning link down are connecting bolt.
The invention has the beneficial effects as follows:
Conjuncted steel plate and precast beam on the conjuncted bearing of the present invention unify; Has better durability; And can guarantee closely connected contact the between the bridge pier bent cap of precast beam, bottom on conjuncted bearing and top through the construction of cast-in-place cushion block, have the advantage that is connected firmly.Simultaneously, the present invention has also solved the problem of the prefabricated cushion block execution control difficulty of bringing of a great variety, has the beneficial effect easily of constructing.
Below will combine accompanying drawing that the technique effect of design of the present invention, concrete structure and generation is described further, to understand the object of the invention, characteristic and effect fully.
Description of drawings
Fig. 1 is the structural representation of a specific embodiment of the present invention.
Fig. 2 is the local structure for amplifying sketch map in concrete application the embodiment illustrated in fig. 1.
The specific embodiment
Like Fig. 1, shown in Figure 2, a specific embodiment that is applicable to the conjuncted bearing that precast beam is installed of the present invention mainly comprises a conjuncted steel plate 3, and the upside of conjuncted steel plate 3 is provided with a plurality of positioning links 31 of going up that are fixedly connected with precast beam 4.The downside of conjuncted steel plate 3 is fixedly connected with first support body 1 through first upper steel plate 11, is fixedly connected with second support body 2 through second upper steel plate 21.
Special character of the present invention is that last positioning link 31 is between first support body 1 and second support body 2.Last positioning link 31 is arranged between first support body 1 and second support body 2 (centre position that also is the precast beam 4 of later stage lifting) rather than is arranged on both sides, and the precast beam 4 that can avoid top is arranged on the prestressing with bond steel bundle and the ground tackle of both sides.
The below that the below of first support body 1 also is set with first lower steel plate, 12, the second support body 2 also is set with second lower steel plate 22.Be respectively arranged with a plurality of positioning links 13,23 down that are fixedly connected with bridge pier bent cap 5 on first lower steel plate 12, second lower steel plate 22.
First upper steel plate 11, second upper steel plate 21 are fixedly connected with conjuncted steel plate 3 through connecting bolt 32 respectively.
Last positioning link 31, positioning link 13,23 is connecting bolt down.
The construction technology of conjuncted bearing of the present invention below is described:
Accomplish the making that is applicable to the conjuncted bearing that precast beam is installed of the present invention in bearing factory, and be transported to the job site.
Synchronously, accomplish the making of precast beam, reserve the installing space 42 of the last positioning link 31 on the conjuncted bearing on the precast beam 4 at the precasting yard of precast beam 4, and reservation pouring hole 41.This precast beam 4 is transported to the job site.
Step 1 is built bridge pier bent cap 5 at the construction field (site), when building with first support body 1 of conjuncted bearing through first lower steel plate 12, positioning link 13 is installed in the top of bridge pier bent cap 5 down; With second support body 2 of conjuncted bearing through second lower steel plate 22, positioning link 23 is installed in the top of bridge pier bent cap 5 down.
To having the bridge pier bent cap 5 of constant slope, can level up through leveling pinner 51.
Step 2, through connecting bolt 32 together with first upper steel plate 11, second upper steel plate 21 and conjuncted steel plate 3 crab-bolts, forms conjuncted, and on installation on the conjuncted steel plate 3 is a plurality of positioning link 31.
Step 3 is provided with temporary support in conjuncted bearing both sides.
Step 4, precast beam 4 is set up in lifting, is shelved on precast beam 4 on the temporary support earlier when setting up; A plurality of positioning links 31 of going up are placed in the installing space 42 of precast beam 4.
Step 5 is built cast-in-situ concrete from the pouring hole 41 at precast beam 4 tops, fills up installing space 42, utilizes grouting material concrete to form bearing cushion block 43.
Step 6, treat that cast-in-situ concrete reaches design strength after, remove temporary support; After 43 moulding of bearing cushion block, conjuncted bearing is fixedly connected with the precast beam 4 on top.
In the construction technology of the present invention, last positioning link 31 is a cast in situs grouting material concrete with the connected mode of the precast beam 4 on top.Be specially: when the precast beam 4 on prefabricated top; With conjuncted bearing on positioning link 31 correspondence positions; Offer the pouring hole 41 of 150 millimeters of diameters; The vertical elongated layout of this pouring hole 41 precast beam 4 along top, and reaming forms installing space 42 in one section altitude range at the bottom of beam, so that cast-in-situ concrete can be contained a plurality of scopes that go up positioning links 31.
Utilize grouting material concrete casting building technology, conjuncted bearing that level shelves and the bearing cushion block 43 on the conjuncted bearing are fitted tightly.Be specially: between the conjuncted steel plate 3 and top precast beam 4 of conjuncted bearing, on vertically, reserve the height (realizing) of bearing cushion block 43 through temporary support.Around conjuncted steel plate 3, according to the construction size of bearing cushion block 43 template is set, thereby makes the grouting material concrete that from the pouring hole 41 at precast beam 4 tops, injects flow into the position of bearing cushion block 43 and moulding naturally.
In practical implementation, the conjuncted steel plate 3 that the top of conjuncted bearing is provided with also can be used as the bed die of bearing cushion block 43, is convenient to the construction of bearing cushion block 43.
The bearing cushion block 43 of conjuncted bearing adopts grouting material concrete cast-in-situ, thereby guarantees conjuncted bearing integral level, has the beneficial effect of reliable in quality, easy construction.
Reserve the last positioning link 31 in the installing space 42 that stretches into precast beam 4 on the conjuncted steel plate 3 at conjuncted bearing top, be connected with top precast beam 4 through grouting material concrete, solid and reliable.
Conjuncted bearing can also carry dismountable anchor bolt (being connecting bolt 32), is convenient to the maintenance and the replacing of conjuncted bearing.
Conjuncted steel plate and precast beam on the conjuncted bearing of the present invention unify; Has better durability; And can guarantee closely connected contact the between the bridge pier bent cap of precast beam, bottom on conjuncted bearing and top through the construction of cast-in-place cushion block, have the advantage that is connected firmly.Simultaneously, the present invention has also solved the problem of the prefabricated cushion block execution control difficulty of bringing of a great variety, has the beneficial effect easily of constructing.
More than describe preferred embodiment of the present invention in detail.Should be appreciated that those of ordinary skill in the art need not creative work and just can design according to the present invention make many modifications and variation.Therefore, all technician in the art all should be in the determined protection domain by claims under this invention's idea on the basis of existing technology through the available technical scheme of logical analysis, reasoning, or a limited experiment.

Claims (3)

1. a conjuncted bearing that is applicable to that precast beam is installed is characterized in that: comprise a conjuncted steel plate; The upside of said conjuncted steel plate is provided with a plurality of positioning links of going up that are fixedly connected with precast beam; The downside of said conjuncted steel plate is fixedly connected with first support body through first upper steel plate, is fixedly connected with second support body through second upper steel plate; The said positioning link of going up is between said first support body and said second support body; The below of said first support body also is set with first lower steel plate, and the below of said second support body also is set with second lower steel plate; Be respectively arranged with a plurality of positioning links down that are fixedly connected with the bridge pier bent cap on said first lower steel plate, said second lower steel plate.
2. conjuncted bearing as claimed in claim 1 is characterized in that: said first upper steel plate, said second upper steel plate are fixedly connected with said conjuncted steel plate through connecting bolt respectively.
3. conjuncted bearing as claimed in claim 1 is characterized in that: said upward positioning link, said positioning link down are connecting bolt.
CN201210177515.XA 2012-06-01 2012-06-01 Connected support applicable to mounting precast beam Active CN102660921B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210177515.XA CN102660921B (en) 2012-06-01 2012-06-01 Connected support applicable to mounting precast beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210177515.XA CN102660921B (en) 2012-06-01 2012-06-01 Connected support applicable to mounting precast beam

Publications (2)

Publication Number Publication Date
CN102660921A true CN102660921A (en) 2012-09-12
CN102660921B CN102660921B (en) 2014-03-05

Family

ID=46770490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210177515.XA Active CN102660921B (en) 2012-06-01 2012-06-01 Connected support applicable to mounting precast beam

Country Status (1)

Country Link
CN (1) CN102660921B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001012546A (en) * 1999-06-25 2001-01-16 Kumagai Gumi Co Ltd Sliding bearing
KR20020079049A (en) * 2001-04-12 2002-10-19 주식회사 화인 earthquake insulating composite bearing
KR20060016195A (en) * 2004-08-17 2006-02-22 한국건설기술연구원 Elastomeric bearing
KR101002232B1 (en) * 2010-06-25 2010-12-20 림버스산업 주식회사 Installation method of construction of bridge bearing where shear resistance equipment for aseismic reinforcement was adherent and this
CN102162305A (en) * 2011-05-16 2011-08-24 江苏兴邦建工集团有限公司 Construction process for installing elastic slippage shock isolation support
CN202577138U (en) * 2012-06-01 2012-12-05 上海市城市建设设计研究总院 Integrated support suitable for mounting precast beams

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001012546A (en) * 1999-06-25 2001-01-16 Kumagai Gumi Co Ltd Sliding bearing
KR20020079049A (en) * 2001-04-12 2002-10-19 주식회사 화인 earthquake insulating composite bearing
KR20060016195A (en) * 2004-08-17 2006-02-22 한국건설기술연구원 Elastomeric bearing
KR101002232B1 (en) * 2010-06-25 2010-12-20 림버스산업 주식회사 Installation method of construction of bridge bearing where shear resistance equipment for aseismic reinforcement was adherent and this
CN102162305A (en) * 2011-05-16 2011-08-24 江苏兴邦建工集团有限公司 Construction process for installing elastic slippage shock isolation support
CN202577138U (en) * 2012-06-01 2012-12-05 上海市城市建设设计研究总院 Integrated support suitable for mounting precast beams

Also Published As

Publication number Publication date
CN102660921B (en) 2014-03-05

Similar Documents

Publication Publication Date Title
CN101424075B (en) Concrete box girder bridge widening and reinforced structure and construction method thereof
CN103485279A (en) Wet joint for straddle type monorail traffic
CN109853381B (en) Transitional structure for preventing bridge head from jumping and construction method thereof
CN112941975B (en) Combined track slab, prefabricated slab track system and installation and construction method thereof
CN102767141A (en) Construction method for huge capping beam utilizing reinforced concrete thin wall as permanent formwork
CN103009477A (en) Construction method for prefabricated components for prefabricated component factory
CN106245670B (en) Exposed steel column base construction method
CN104481166A (en) Additionally assembled type balcony structure for old community and construction method of additionally assembled type balcony structure
CN111502347A (en) Three-layer single-column assembled elevated station for rail transit
CN202577138U (en) Integrated support suitable for mounting precast beams
CN105133493A (en) Embedded track structure suitable for middle-span and small-span bridge and construction method
CN215947749U (en) Prefabricated assembled ballast bed
CN102660921B (en) Connected support applicable to mounting precast beam
CN215104790U (en) Reinforced structure for existing railway underpass frame bridge construction
CN216427849U (en) Prefabricated track plate
CN108330745A (en) The implementation of soft clay area tramcar assembled sub-rail foundation
CN211229702U (en) Assembly structure for overhauling stand column and train overhauling platform
CN211229701U (en) Assembled maintenance stand column and train maintenance platform
CN210621630U (en) Concrete panel rock-fill dam
CN211446606U (en) Segment beam temporary prestress tensioning platform and lifting point integrated structure
CN110055888B (en) Beam end telescoping device of embedded track and construction method
CN205741794U (en) A kind of reparation structure for switch area plate-type ballastless track
CN109695205A (en) System reinforcement method for steel plate combination continuous beam
CN216838985U (en) Accurate adjusting device of precast beam vertical and horizontal slope wedge
CN108330744B (en) A kind of track foundation construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 200011 Tibet South Road, Shanghai, No. 1170, No.

Patentee after: Shanghai urban construction design & Research Institute (Group) Co., Ltd.

Address before: 200125 Dongfang Road, Shanghai, Pudong New Area, No. 3447

Patentee before: Shanghai Urban Construction Design & Research Institute

CP03 Change of name, title or address