CN102655348A - Method utilizing electric quantity collector simulation software to carry out communication failure investigation - Google Patents

Method utilizing electric quantity collector simulation software to carry out communication failure investigation Download PDF

Info

Publication number
CN102655348A
CN102655348A CN2011100512966A CN201110051296A CN102655348A CN 102655348 A CN102655348 A CN 102655348A CN 2011100512966 A CN2011100512966 A CN 2011100512966A CN 201110051296 A CN201110051296 A CN 201110051296A CN 102655348 A CN102655348 A CN 102655348A
Authority
CN
China
Prior art keywords
electric quantity
quantity collector
energy meter
electric energy
simulation software
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100512966A
Other languages
Chinese (zh)
Inventor
牛春霞
耿建坡
陶鹏
王俊龙
王永辉
史轮
马红明
唐广通
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Hebei Electric Power Construction Adjustment Test Institute
Original Assignee
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Priority to CN2011100512966A priority Critical patent/CN102655348A/en
Publication of CN102655348A publication Critical patent/CN102655348A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a method utilizing electric quantity collector simulation software to carry out communication failure investigation. The method comprises the following steps of (1) constructing a testing platform, wherein the testing platform comprises a master collection station system, a notebook computer with the electric quantity collector simulation software, and a multifunctional electric energy meter; (2) starting the electric quantity collector simulation software; (3) allocating a simulation electric quantity collector parameters of which is same as those of a practical electric quantity collector on the electric quantity collector simulation software; (4) selecting a communication agreement of the master collection station system and a communication agreement of the multifunctional electric energy meter on the electric quantity collector simulation software; (5) allocating communication parameters of the multifunctional electric energy meter and communication parameters of the multifunctional electric energy meter and the like on the electric quantity collector simulation software; (6) judging whether the condition that the electric quantity collector simulation software is in communication with the collection master station system is normal; and (7) judging whether the condition that the electric quantity collector simulation software is in communication with the multifunctional electric energy meter is normal. The method provided by the invention has the advantage of being capable of achieving and rapidly positioning a failure position of an electric quantity acquisition system of a transformer substation.

Description

Utilize the electric quantity collector simulation software to communicate the method for malfunction elimination
Technical field
The present invention relates to a kind of method of utilizing the electric quantity collector simulation software to communicate malfunction elimination.
Background technology
The electric energy meter electric weight collector of transformer station, power plant is connected with the polylith electric energy meter below often; When the collection main station system can't normally be called survey electric energy meter data together; Often can't judge it is the electric quantity collector fault; Still electric energy meter communication failure, cause on-the-spot needs repeatedly more exchange device can confirm faulty equipment.
Summary of the invention
Technical problem to be solved by this invention provides a kind of method of utilizing the electric quantity collector simulation software to communicate malfunction elimination.
The technical solution adopted for the present invention to solve the technical problems:
Step of the present invention is following:
(1) build test platform:
Said test platform comprises gathers main station system, the notebook computer that the electric quantity collector simulation software is housed and multifunctional electric energy meter; Said collection main station system is connected with notebook computer is two-way; Said notebook computer is connected with multifunctional electric energy meter is two-way through interface circuit, and said interface circuit adopts RS485 communication interface RS 232 communication interface;
(2) start the electric quantity collector simulation software;
(3) the configuration simulation electric quantity collector consistent in the electric quantity collector simulation software with actual electric quantity collector parameter;
(4) in the electric quantity collector simulation software, select and the communication protocol of gathering main station system and the communication protocol of multifunctional electric energy meter;
(5) configuration and the messaging parameter of gathering main station system and the messaging parameter of multifunctional electric energy meter in the electric quantity collector simulation software; Said messaging parameter with the collection main station system is main website IP address, the electric quantity collector address; The messaging parameter of said multifunctional electric energy meter is baud rate, method of calibration, check digit, position of rest;
(6) with gather main station system and communicate and be connected; Main station system display simulation electric quantity collector is online and when gathering main station system and initiatively calling the multifunctional electric energy meter data consistent of storing in the multifunctional electric energy meter data surveyed in the simulation electric quantity collector and the simulation electric quantity collector together when gathering, and explain with the collection main station system and communicates by letter normally; Said multifunctional electric energy meter data are the meritorious electric weight of forward, oppositely meritorious electric weight, forward capacity of idle power, reverse capacity of idle power;
(7) communicate with multifunctional electric energy meter and be connected, when the data consistent of a certain check meter the cycle multifunctional electric energy meter data and the multifunctional electric energy meter liquid crystal display of being stored in the simulation electric quantity collector, explain with multifunctional electric energy meter and communicate by letter normally; The data of the said a certain cycle multifunctional electric energy meter of checking meter are the meritorious electric weight of forward, oppositely meritorious electric weight, forward capacity of idle power, reverse capacity of idle power.
Beneficial effect of the present invention is following:
The present invention utilizes the electric quantity collector simulation software to replace the electric quantity collector that uses in the reality; Confirm whether the electric quantity collector that uses in the reality exists communication failure; Reach the purpose of quick location transformer station coulomb collection system trouble location, thereby realize convenient and swift solution transformer station coulomb collection system communication failure.
Description of drawings
Fig. 1 is a hardware configuration of the present invention;
Fig. 2 is a test flow chart of the present invention.
Embodiment
Embodiment (referring to Fig. 1,2)
The step of present embodiment is following:
(1) build test platform:
Said test platform comprises gathers main station system, the notebook computer that the electric quantity collector simulation software is housed and multifunctional electric energy meter; Said collection main station system is connected with notebook computer is two-way; Said notebook computer is connected with multifunctional electric energy meter is two-way through interface circuit, and said interface circuit adopts RS485 communication interface RS 232 communication interface;
(2) start the electric quantity collector simulation software;
(3) the configuration simulation electric quantity collector consistent in the electric quantity collector simulation software with actual electric quantity collector parameter;
(4) in the electric quantity collector simulation software, select and the communication protocol of gathering main station system and the communication protocol of multifunctional electric energy meter; The communication protocol of said collection main station system is IEC102 stipulations, DL/T719 stipulations, SCTM stipulations etc.; The communication protocol of said multifunctional electric energy meter is DL/T645-1997, DL/T645-2007, wasion's stipulations etc.;
(5) configuration and the messaging parameter of gathering main station system and the messaging parameter of multifunctional electric energy meter in the electric quantity collector simulation software; Said messaging parameter with the collection main station system is main website IP address, the electric quantity collector address; The messaging parameter of said multifunctional electric energy meter is baud rate, method of calibration, check digit, position of rest;
(6) with gather main station system and communicate and be connected; Main station system display simulation electric quantity collector is online and when gathering main station system and initiatively calling the multifunctional electric energy meter data consistent of storing in the multifunctional electric energy meter data surveyed in the simulation electric quantity collector and the simulation electric quantity collector together when gathering, and explain with the collection main station system and communicates by letter normally; Said multifunctional electric energy meter data are the meritorious electric weight of forward, oppositely meritorious electric weight, forward capacity of idle power, reverse capacity of idle power;
(7) communicate with multifunctional electric energy meter and be connected, when the data consistent of a certain check meter the cycle multifunctional electric energy meter data and the multifunctional electric energy meter liquid crystal display of being stored in the simulation electric quantity collector, explain with multifunctional electric energy meter and communicate by letter normally; The data of the said a certain cycle multifunctional electric energy meter of checking meter are the meritorious electric weight of forward, oppositely meritorious electric weight, forward capacity of idle power, reverse capacity of idle power.

Claims (1)

1. method of utilizing the electric quantity collector simulation software to communicate malfunction elimination is characterized in that the step of said method is following:
(1) build test platform:
Said test platform comprises gathers main station system, the notebook computer that the electric quantity collector simulation software is housed and multifunctional electric energy meter; Said collection main station system is connected with notebook computer is two-way; Said notebook computer is connected with multifunctional electric energy meter is two-way through interface circuit, and said interface circuit adopts RS485 communication interface RS 232 communication interface;
(2) start the electric quantity collector simulation software;
(3) the configuration simulation electric quantity collector consistent in the electric quantity collector simulation software with actual electric quantity collector parameter;
(4) in the electric quantity collector simulation software, select and the communication protocol of gathering main station system and the communication protocol of multifunctional electric energy meter;
(5) configuration and the messaging parameter of gathering main station system and the messaging parameter of multifunctional electric energy meter in the electric quantity collector simulation software; Said messaging parameter with the collection main station system is main website IP address, the electric quantity collector address; The messaging parameter of said multifunctional electric energy meter is baud rate, method of calibration, check digit, position of rest;
(6) with gather main station system and communicate and be connected; Main station system display simulation electric quantity collector is online and when gathering main station system and initiatively calling the multifunctional electric energy meter data consistent of storing in the multifunctional electric energy meter data surveyed in the simulation electric quantity collector and the simulation electric quantity collector together when gathering, and explain with the collection main station system and communicates by letter normally; Said multifunctional electric energy meter data are the meritorious electric weight of forward, oppositely meritorious electric weight, forward capacity of idle power, reverse capacity of idle power;
(7) communicate with multifunctional electric energy meter and be connected, when the data consistent of a certain check meter the cycle multifunctional electric energy meter data and the multifunctional electric energy meter liquid crystal display of being stored in the simulation electric quantity collector, explain with multifunctional electric energy meter and communicate by letter normally; The data of the said a certain cycle multifunctional electric energy meter of checking meter are the meritorious electric weight of forward, oppositely meritorious electric weight, forward capacity of idle power, reverse capacity of idle power.
CN2011100512966A 2011-03-04 2011-03-04 Method utilizing electric quantity collector simulation software to carry out communication failure investigation Pending CN102655348A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100512966A CN102655348A (en) 2011-03-04 2011-03-04 Method utilizing electric quantity collector simulation software to carry out communication failure investigation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100512966A CN102655348A (en) 2011-03-04 2011-03-04 Method utilizing electric quantity collector simulation software to carry out communication failure investigation

Publications (1)

Publication Number Publication Date
CN102655348A true CN102655348A (en) 2012-09-05

Family

ID=46730906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100512966A Pending CN102655348A (en) 2011-03-04 2011-03-04 Method utilizing electric quantity collector simulation software to carry out communication failure investigation

Country Status (1)

Country Link
CN (1) CN102655348A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103632521A (en) * 2013-11-20 2014-03-12 国家电网公司 Electricity consumption information collection and fault detection system and local channel detection method thereof
CN103700235A (en) * 2013-11-20 2014-04-02 国家电网公司 Electricity consumption information gathering fault detection system and remote channel detection method therefor
CN104269042A (en) * 2014-09-29 2015-01-07 广东电网有限责任公司佛山供电局 Automatic debugging method and system of automatic metering terminal
CN105699931A (en) * 2016-01-19 2016-06-22 国网河北省电力公司电力科学研究院 Method for determining communication faults of intelligent electric energy meter
CN105807131A (en) * 2016-04-15 2016-07-27 国网江苏省电力公司盐城供电公司 Communicating simulation type metering electric energy meter
CN112289018A (en) * 2020-05-25 2021-01-29 国网江苏省电力有限公司常州供电分公司 Troubleshooting test method and system of multi-table-in-one test system
CN112580191A (en) * 2020-11-24 2021-03-30 吉林松江河水力发电有限责任公司 Fault troubleshooting method for intelligent instrument acquisition system of hydropower station

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007103924A2 (en) * 2006-03-08 2007-09-13 Distribution Control Systems Intelligent fault detector system and method
CN201247311Y (en) * 2008-08-18 2009-05-27 天津市电力公司 Electric meter tester

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007103924A2 (en) * 2006-03-08 2007-09-13 Distribution Control Systems Intelligent fault detector system and method
CN201247311Y (en) * 2008-08-18 2009-05-27 天津市电力公司 Electric meter tester

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
阮宵君等: "浅谈引起电量采集系统异常的原因及处理方法", 《浙江电力》 *
陶鹏等: "智能电能表及智能终端通信规约测试平台的研究与应用", 《河北电力技术》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103632521A (en) * 2013-11-20 2014-03-12 国家电网公司 Electricity consumption information collection and fault detection system and local channel detection method thereof
CN103700235A (en) * 2013-11-20 2014-04-02 国家电网公司 Electricity consumption information gathering fault detection system and remote channel detection method therefor
CN103632521B (en) * 2013-11-20 2016-08-17 国家电网公司 A kind of power information gathers the local channel detection method of fault detection system
CN104269042A (en) * 2014-09-29 2015-01-07 广东电网有限责任公司佛山供电局 Automatic debugging method and system of automatic metering terminal
CN104269042B (en) * 2014-09-29 2018-03-06 广东电网有限责任公司佛山供电局 The automatic adjustment method of metering automation terminal and system
CN105699931A (en) * 2016-01-19 2016-06-22 国网河北省电力公司电力科学研究院 Method for determining communication faults of intelligent electric energy meter
CN105807131A (en) * 2016-04-15 2016-07-27 国网江苏省电力公司盐城供电公司 Communicating simulation type metering electric energy meter
CN112289018A (en) * 2020-05-25 2021-01-29 国网江苏省电力有限公司常州供电分公司 Troubleshooting test method and system of multi-table-in-one test system
CN112580191A (en) * 2020-11-24 2021-03-30 吉林松江河水力发电有限责任公司 Fault troubleshooting method for intelligent instrument acquisition system of hydropower station

Similar Documents

Publication Publication Date Title
CN102655348A (en) Method utilizing electric quantity collector simulation software to carry out communication failure investigation
CN102655464A (en) Method for conducting communication failure troubleshooting by utilizing multifunctional electric energy meter simulation software
CN206541430U (en) A kind of data capture management device based on cloud platform
AU2011367734A1 (en) Electric quantity collection terminal function tester
CN204287908U (en) Flow computer
CN103354562A (en) Energy consumption collector, energy consumption collecting system and energy consumption collecting method
CN103617501B (en) A kind of operation maintenance method of substation
CN202084086U (en) GPRS (General Packet Radio Service) attendance acquisition system
CN102841595A (en) Multi-stage resource scheduling management system
CN202486596U (en) Remote running state monitoring system of security monitoring equipment
CN202353318U (en) Distribution automation experiment system integrating a plurality of communication modes
CN204679570U (en) Secondary equipment of intelligent converting station Commissioning Analysis platform
CN203632664U (en) Portable fault detector for remote power-collecting system equipment
CN202998167U (en) Protocol converter
CN105929296A (en) Cable fault test system
CN202454974U (en) Device for electric power production inspection tour
CN202548557U (en) Clock network system
CN205430277U (en) GPRS terminal communication fault finding system
CN202018506U (en) On-site check meter for electric energy metering device
CN204965728U (en) IoT (Internet of things) data acquisition terminal
CN203588032U (en) Power generation efficiency monitoring device for base station
CN202759446U (en) A mobile power line carrier universal on-site adaptor
CN203224606U (en) Storage battery online monitoring device
CN206400113U (en) A kind of personnel positioning networking structure based on GPRS mobile terminals
CN203366520U (en) Wireless data collection and transmission system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA HEBEI ELECTRIC POW

Effective date: 20121220

Owner name: HEBEI ELECTRIC POWER CORPORATION ELECTRIC POWER RE

Free format text: FORMER OWNER: HEBEI ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20121220

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121220

Address after: 050021 No. 238 South Sports street, Yuhua Road, Hebei, Shijiazhuang

Applicant after: Electric Power Research Institute of Hebei Electric Power Corporation

Applicant after: State Grid Corporation of China

Applicant after: Hebei Electric Power Construction & Adjustment Research Institute

Address before: 050021 No. 238 South Sports street, Hebei, Shijiazhuang

Applicant before: Hebei Electric Power Research Institute

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120905