CN204679570U - Secondary equipment of intelligent converting station Commissioning Analysis platform - Google Patents
Secondary equipment of intelligent converting station Commissioning Analysis platform Download PDFInfo
- Publication number
- CN204679570U CN204679570U CN201520429108.2U CN201520429108U CN204679570U CN 204679570 U CN204679570 U CN 204679570U CN 201520429108 U CN201520429108 U CN 201520429108U CN 204679570 U CN204679570 U CN 204679570U
- Authority
- CN
- China
- Prior art keywords
- intelligent
- embedded type
- cpu system
- type cpu
- fpga
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of secondary equipment of intelligent converting station Commissioning Analysis platform; comprise embedded type CPU system, clock module, FPGA and intelligent terminal; the signal end of described FPGA is connected with the signal end of described embedded type CPU system; described FPGA is provided with multiple luminiferous ether interface; described FPGA to be communicated with described intelligent terminal by described luminiferous ether interface and merge cells, light numerical protection and to communicate; the signal end of described clock module is connected with the clock signal terminal of described FPGA, and described embedded type CPU system is provided with electric Ethernet interface.The complexity of the test of the utility model secondary equipment of intelligent converting station Commissioning Analysis platform simplified intelligent transformer station secondary system application function and integrated debugging, improve efficiency and the level of secondary system of intelligent substation test and integrated debugging, the markers receiving message is made to be accurate to nanosecond, synchronized transmission many groups message, and in real time alarm is detected to message, and parsing SCD that can be accurately complete.
Description
Technical field
The utility model relates to a kind of intelligent substation Commissioning Analysis platform, particularly relates to a kind of secondary equipment of intelligent converting station Commissioning Analysis platform.
Background technology
Intelligent substation adopts smart machine that is advanced, reliable, integrated and environmental protection; basic demand is standardized as with information digitalization of entirely standing, communications platform networking, information sharing; automatically the basic functions such as information acquisition, measurement, control, protection, metering and detection are completed; meanwhile, the transformer station supporting the Premium Features such as electrical network control automatically in real time, Intelligent adjustment, on-line analysis decision-making and collaborative interaction is possessed.For the Commissioning Analysis platform of intelligent substation, prior art can only carry out packet capturing, analysis to the SV on network, GOOSE message, lacks and carries out complete debugging to secondary device, and can not send GOOSE message, more can not carry out MMS communication debugging.
Utility model content
The purpose of this utility model is just to provide a kind of secondary equipment of intelligent converting station Commissioning Analysis platform to solve the problem.
The utility model is achieved through the following technical solutions above-mentioned purpose:
A kind of secondary equipment of intelligent converting station Commissioning Analysis platform; comprise embedded type CPU system, clock module, FPGA and intelligent terminal; the signal end of described FPGA is connected with the signal end of described embedded type CPU system; described FPGA is provided with multiple luminiferous ether interface; described FPGA to be communicated with described intelligent terminal by described luminiferous ether interface and merge cells, light numerical protection and to communicate; the signal end of described clock module is connected with the clock signal terminal of described FPGA, and described embedded type CPU system is provided with electric Ethernet interface.
Preferably, when described clock module meets IEEE 1588 or light IRIG-B couple.
Further, described embedded type CPU system is connected with multiple intelligent apparatus by described electric Ethernet interface.
Particularly, described intelligent apparatus comprises protection, observing and controlling and oscillograph, is communicated to connect between described embedded type CPU system and described intelligent apparatus by MMS.
Particularly, described embedded type CPU system is provided with VGA output port and external input port, described embedded type CPU system is connected with display device by described VGA output port, and described embedded type CPU system is connected with input equipment by described external input port.
The beneficial effects of the utility model are:
The complexity of the test of the utility model secondary equipment of intelligent converting station Commissioning Analysis platform simplified intelligent transformer station secondary system application function and integrated debugging, improve efficiency and the level of secondary system of intelligent substation test and integrated debugging, the markers receiving message is made to be accurate to nanosecond, synchronized transmission many groups message, and in real time alarm is detected to message, and parsing SCD that can be accurately complete.
Accompanying drawing explanation
Fig. 1 is the structured flowchart of secondary equipment of intelligent converting station Commissioning Analysis platform described in the utility model.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail:
As shown in Figure 1, the utility model secondary equipment of intelligent converting station Commissioning Analysis platform, comprise embedded type CPU system, clock module, FPGA and intelligent terminal, the signal end of FPGA is connected with the signal end of embedded type CPU system, FPGA is provided with multiple luminiferous ether interface, FPGA is by luminiferous ether interface and merge cells, light numerical protection is communicated with intelligent terminal and communicates, the signal end of clock module is connected with the clock signal terminal of FPGA, embedded type CPU system is provided with electric Ethernet interface, embedded type CPU system is connected with multiple intelligent apparatus by electric Ethernet interface, when clock module meets IEEE 1588 or light IRIG-B couple, intelligent apparatus comprises protection, observing and controlling and oscillograph, communicated to connect by MMS between embedded type CPU system and intelligent apparatus, embedded type CPU system is provided with VGA output port and external input port, embedded type CPU system is connected with display device by VGA output port, embedded type CPU system is connected with input equipment by external input port.
The utility model secondary equipment of intelligent converting station Commissioning Analysis platform there is following several functions:
CONFIG.SYS (SCD) visual analyzing: FPGA and embedded type CPU system are stood entirely by carrying out figure high visualization processing to the parsing of SCD file by transformer station, realize the high visual analyzing in full station intuitively, by network connection layout and the logic connectivity diagram at the main interface of this platform, visual means can be carried out check, analyze the IED network connection, Virtual Channel, empty terminal connection etc. of entirely standing or in each interval, make commissioning, analytic process more directly perceived, simple, quick.Platform realizes supporting that the freedom of high visual check and user is mutual by display device and input equipment, user can select arbitrarily the IED needing to check, according to model, various level expansion is carried out to IED, the wherein display device intelligent display terminal etc. that is display or connected by Wi-Fi, input equipment is mouse, keyboard etc.
Network message monitors: PFGA is monitored by the process layer of luminiferous ether network interface to transformer station; judge network message fault; and the SV data of merge cells output are received by luminiferous ether network interface; SV real-time packet is supported to analyze and the analysis of SV real-time waveform; PFGA receives the goose data of light numerical protection and intelligent terminal transmission; and can be simulated and by luminiferous ether network interface, the goose data of simulation are sent to intelligent terminal, support that GOOSE real-time packet is analyzed and GOOSE real-time graph analytic function.
SCL version comparison: by comparing the SCD configuration file of different period of history, check.Can from different business angle, the SCD file for different editions performs comparison in difference, supports filing and the historical query of comparative result, supports that the derivation of comparative result is preserved.
MMS pattern checking: the model on the online fetch equipment of mode that embedded type CPU system is communicated with MMS by electric Ethernet card, and compare with the model in SCD configuration file, check out the data item do not conformed to.
The utility model adopts FPGA; the markers receiving message is made to be accurate to nanosecond; synchronized transmission many groups message; adopt high precision clock module for FPGA and cpu system provide accurate pair time; the complete parsing SCD of energy; rate of accuracy reached, to 100%, can be carried out MMS communication test to intelligent apparatus such as protection, observing and controlling, oscillographs, carry out Real-Time Monitoring and intelligent alarm to network message.
The technical solution of the utility model is not limited to the restriction of above-mentioned specific embodiment, and every technology distortion made according to the technical solution of the utility model, all falls within protection domain of the present utility model.
Claims (5)
1. a secondary equipment of intelligent converting station Commissioning Analysis platform; it is characterized in that: comprise embedded type CPU system, clock module, FPGA and intelligent terminal; the signal end of described FPGA is connected with the signal end of described embedded type CPU system; described FPGA is provided with multiple luminiferous ether interface; described FPGA to be communicated with described intelligent terminal by described luminiferous ether interface and merge cells, light numerical protection and to communicate; the signal end of described clock module is connected with the clock signal terminal of described FPGA, and described embedded type CPU system is provided with electric Ethernet interface.
2. secondary equipment of intelligent converting station Commissioning Analysis platform according to claim 1, is characterized in that: when described clock module meets IEEE 1588 or light IRIG-B couple.
3. according to secondary equipment of intelligent converting station Commissioning Analysis platform according to claim 1, it is characterized in that: described embedded type CPU system is connected with multiple intelligent apparatus by described electric Ethernet interface.
4. according to secondary equipment of intelligent converting station Commissioning Analysis platform according to claim 3, it is characterized in that: described intelligent apparatus comprises protection, observing and controlling and oscillograph, communicated to connect by MMS between described embedded type CPU system and described intelligent apparatus.
5. according to secondary equipment of intelligent converting station Commissioning Analysis platform according to claim 1, it is characterized in that: described embedded type CPU system is provided with VGA output port and external input port, described embedded type CPU system is connected with display device by described VGA output port, and described embedded type CPU system is connected with input equipment by described external input port.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520429108.2U CN204679570U (en) | 2015-06-19 | 2015-06-19 | Secondary equipment of intelligent converting station Commissioning Analysis platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520429108.2U CN204679570U (en) | 2015-06-19 | 2015-06-19 | Secondary equipment of intelligent converting station Commissioning Analysis platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204679570U true CN204679570U (en) | 2015-09-30 |
Family
ID=54179253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520429108.2U Expired - Fee Related CN204679570U (en) | 2015-06-19 | 2015-06-19 | Secondary equipment of intelligent converting station Commissioning Analysis platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204679570U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109660415A (en) * | 2017-10-11 | 2019-04-19 | 国家电网公司 | Secondary equipment of intelligent converting station Commissioning Analysis system based on network communication |
CN113110370A (en) * | 2021-03-10 | 2021-07-13 | 北京天能继保电力科技有限公司 | Test system and method |
-
2015
- 2015-06-19 CN CN201520429108.2U patent/CN204679570U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109660415A (en) * | 2017-10-11 | 2019-04-19 | 国家电网公司 | Secondary equipment of intelligent converting station Commissioning Analysis system based on network communication |
CN113110370A (en) * | 2021-03-10 | 2021-07-13 | 北京天能继保电力科技有限公司 | Test system and method |
CN113110370B (en) * | 2021-03-10 | 2021-11-19 | 北京天能继保电力科技有限公司 | Test system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202720296U (en) | Platform for detecting function and performance of power distribution automatic terminal apparatus | |
CN103412208B (en) | The method of intelligent substation electric power telemechanical device closed loop test | |
CN103326469B (en) | Method and device for monitoring GOOSE communication status of intelligent substation | |
CN204515048U (en) | Digital transformer substation intelligent tester | |
CN103869190A (en) | Real time simulation system-based power distribution terminal automatic closed-loop test platform | |
CN103412520B (en) | Various energy resources centralized monitoring system and monitoring method thereof | |
CN205177145U (en) | Power consumption information acquisition test terminal | |
CN104020374A (en) | Intelligent substation secondary equipment site-wide simulation test system | |
CN103149547A (en) | Transformer substation measurement return circuit online monitoring system and state maintenance method | |
CN105403793A (en) | Automatic transformer station digital relay protection tester | |
CN204291050U (en) | A kind of dispatching and monitoring information check system | |
CN103684907A (en) | Regional power network intelligent equipment time analyzer | |
CN107942167A (en) | Intelligent substation synchronous phasor measuring device boss, which stands, tests system and method | |
CN106921522A (en) | Intelligent substation network message record analysis device networked information model inspection device | |
CN110174564A (en) | The filed detection system and its detection method of equipment for monitoring power quality access main website | |
CN103235217B (en) | Dual protection act consistance monitoring device and monitoring method | |
CN109613906A (en) | Third generation intelligent substation observing and controlling handset test macro and its application method | |
CN110927503A (en) | Intelligent station secondary equipment detection method, device and system | |
CN104392603B (en) | A kind of live power information collecting device intelligent diagnosis system | |
CN204679570U (en) | Secondary equipment of intelligent converting station Commissioning Analysis platform | |
CN203849393U (en) | Function and performance detection system of distribution line fault indication integrated apparatus | |
CN204945365U (en) | Gate energy meter supervising device | |
CN204331019U (en) | A kind of digital electricity meter IEC61850 compliance test system | |
CN104601220A (en) | LTE (Long Term Evolution) wireless communication intelligent substation test device | |
CN203365573U (en) | Electric power parameter monitoring device for intelligent electrical network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150930 Termination date: 20180619 |