CN102646980B - 单元火力发电机组一次调频补偿控制方法 - Google Patents

单元火力发电机组一次调频补偿控制方法 Download PDF

Info

Publication number
CN102646980B
CN102646980B CN201210107052.XA CN201210107052A CN102646980B CN 102646980 B CN102646980 B CN 102646980B CN 201210107052 A CN201210107052 A CN 201210107052A CN 102646980 B CN102646980 B CN 102646980B
Authority
CN
China
Prior art keywords
unit
primary frequency
frequency modulation
modulation
generating set
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210107052.XA
Other languages
English (en)
Other versions
CN102646980A (zh
Inventor
韩英昆
毕贞福
郎澄宇
王文宽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201210107052.XA priority Critical patent/CN102646980B/zh
Publication of CN102646980A publication Critical patent/CN102646980A/zh
Application granted granted Critical
Publication of CN102646980B publication Critical patent/CN102646980B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

本发明公开了一种新型单元火力发电机组一次调频补偿控制方法,根据发电机组瞬时发电负荷指令及发电机组一次调频投入上、下限值,通过算法模块,自动计算出一次调频理论补偿负荷限幅值,设定H/L限幅模块的高低限幅值;2)根据电网运行频率波动差值或汽轮机转速波动值,通过设定函数F1(x)计算出发电机组一次调频理论补偿负荷值,通过H/L限幅模块保证发电机组调频动作不超过发电机组正常调节范围,限制发电机组一次调频补偿指令在-ΔP~ΔP之间;3)一次调频补偿修正,根据发电机组运行实时调节级压力、主汽压、主气温参数,通过F2(x)计算修正一次调频指令输出,保证发电机组一次调频动作满足设计要求,稳定电网供电频率。

Description

单元火力发电机组一次调频补偿控制方法
技术领域
本发明涉及一种火力发电机组调频补偿控制方法,尤其是一种单元火力发电机组一次调频补偿控制方法。
背景技术
火电发电机组在我国电力生产中占有重要地位,随着我国大型发电机组发展及特高压、智能电网的建设,对火力发电机组灵活调频功能要求越来越高。而现实情况是电力生产企业由于燃料质量、机组运行方式等因素的影响,机组一次调频性能不能按照机组设计实现预定调频补偿,进而影响电网的供电质量。
火力发电机组一次调频能力设计有明确要求,按照机组的额定容量设有多大的机组调频能力,调频动态响应时间必须满足电网运行需求。但是,发电机组的一次调频能力受机组多方面因素影响,比如机组燃料变化、机组的运行方式等。按照当前机组一次调频设计,当机组滑压运行时,尤其机组调节阀门开度大时,机组一次调频能力明显下降,不能完成设计出力,影响电网的供电质量。综合考虑火力发电单元机组安全运行及保证机组设计一次调频设计能力实现是该控制系统设计着重解决的问题。
发明内容
本发明的目的是为克服上述现有技术的不足,提供一种单元火力发电机组一次调频补偿控制方法,该方法的一次调频灵活限幅,保证机组负荷工作在可控范围内;并根据机组运行状态自动修正一次调频指令,保证机组一次调频出力达到设计出力,稳定电网供电频率。
为实现上述目的,本发明采用下述技术方案:
1.一种单元火力发电机组一次调频控制方法,步骤如下:
1)根据发电机组瞬时发电负荷P及发电机组一次调频投入上、下限值P1、P2,通过SUB、MAX、MIN算法模块,自动计算出一次调频理论补偿负荷限幅值,来设定H/L限幅模块的高低限幅值。
2)根据电网运行频率波动差值或汽轮机转速波动值Δf/Δn,通过设定函数F1(x)计算出发电机组一次调频理论补偿负荷值,通过H/L限幅模块保证发电机组调频动作不超过发电机组正常调节范围内,限制发电机组一次调频补偿指令在-ΔP~ΔP之间,防止发电机组出现大幅扰动,保证发电机组安全稳定运行。
3)一次调频补偿修正,根据发电机组运行实时调节级压力、主蒸汽压力、主蒸汽温度参数,通过F2(x)计算修正一次调频指令输出,保证发电机组一次调频动作在各个运行工况下满足设计要求,尽快修正电网频率波动,保证电网供电质量。
其中,ΔP:机组一次调频补偿理论值,取ΔP=机组额定容量*k1,国家电网印发《火力发电机组一次调频试验导则》技术要求规定:机组额定容量小于250MW时,k1不小于10%;机组额定容量大于等于250MW小于等于350MW级机组,k1不小于8%;机组额定容量大于350MW小于等于500MW级机组,k1不小于7%;500MW以上机组,k1不小于6%。
SUB:减法计算模块。
MAX:两输入变量,输出取大计算模块。
MIN:两输入变量,输出取小计算模块。
F1(x):计算函数,根据机组转速不等率设置一次调频补偿曲线,该函数为六点分段函数,即x0、x1、x2、x3、x4、x5,其中x2与x3之间为一次调频动作死区,对应调频指令为0,机组最大调频补偿作用转速差(x1、x4)=3000*机组转速不等率*k1+死区;最大调频补偿负荷ΔP(F1(x1)、F1(x4))=机组额定容量*k1;最大调频转速差(x0、x5)=3000*机组转速不等率;此处k1与ΔP中k1为同一变量参数。
F2(x):计算函数,根据调节级压力、主蒸汽压力、主蒸汽温度计算出一次调频补偿系数,具体函数表达式如下:
Figure GDA0000437271490000021
其中:P额定为机组机前额定主蒸汽压力;P实际为机组机前实际运行主蒸汽压力;P1额定为机组额定调节级压力;P1实际为机组实际运行调节级压力;T额定为机组机前额定主蒸汽温度;T实际为机组机前实际运行主蒸汽温度;k2为比例修正系数,取k2=1。
本发明的有益效果是,本发明主要解决了两个问题:一是一次调频灵活限幅,保证机组发电负荷工作在可控范围内,防止机组发电负荷在机组稳燃负荷及接近满负荷出力附近时,机组一次调频大幅度动作引起机组运行工况恶化,造成机组设备损坏,避免机组非计划停运带来的较大经济损失;二是根据机组运行状态自动修正一次调频指令,保证机组调频出力在发电机组各个不同运行工况下,快速响应达到设计一次调频补偿出力,稳定电网供电频率,保障电网运行安全。
附图说明
图1是本发明的设计原理框图;
图2是本发明控制逻辑框图。
具体实施方式
下面结合附图和实施例对本发明进一步说明。
如图1所示,单元火力发电机组一次调频补偿控制方法设计原理各个环节如下:
块1:修正前一次调频指令高限值;
块2:修正前一次调频指令;
块3:修正前一次调频指令低限值;
块4:一次调频指令限幅块,保证调频指令在机组运行允许范围内;
块5:一次调频指令修正算法块,运算得出修正后一次调频指令值;
块6:一次调频修正系数算法块,得出一次调频修正调整系数;
块7:来自现场测量设备的介质数据,提供一次调频指令修正数据源。
块8:机组指令修正块,得出机组瞬时负荷指令值;
块9:机组高压调节阀门执行机构,通过开关调门,完成机组负荷的调节。
如图2所示,单元火力发电机组一次调频补偿控制方法,步骤如下:
1)根据发电机组瞬时发电负荷指令P及发电机组一次调频投入上、下限值P1、P2,通过SUB、MAX、MIN算法模块,自动计算出一次调频理论补偿负荷限幅值,来设定H/L限幅模块的高低限幅值;
2)根据电网运行频率波动差值或汽轮机转速波动值Δf/Δn,通过设定函数F1(x)计算出发电机组一次调频理论补偿负荷值,通过H/L限幅模块保证发电机组调频动作不超过发电机组正常调节范围内,限制发电机组一次调频补偿指令在-ΔP~ΔP之间,防止发电机组出现大幅扰动,保证发电机组安全稳定运行;
3)一次调频补偿修正,根据发电机组运行实时调节级压力、主蒸汽压力、主蒸汽温度参数,通过F2(x)计算修正一次调频指令输出,保证发电机组一次调频动作在各个运行工况下满足设计要求,尽快修正电网频率波动,保证电网供电质量;
其中,P:机组瞬时发电负荷指令;
P1:机组一次调频投入负荷上限;
P2:机组一次调频投入负荷下限;
Δf/Δn:电网运行频率波动差值或汽轮机转速波动值;
ΔP:机组一次调频补偿理论值,取ΔP=机组额定容量*k1(国家电网印发《火力发电机组一次调频试验导则》技术要求规定:机组额定容量小于250MW时,k1不小于10%;机组额定容量大于等于250MW小于等于350MW级机组,k1不小于8%;机组额定容量大于350MW小于等于500MW级机组,k1不小于7%;500MW以上机组,k1不小于6%);
SUB:减法计算模块;
MAX:两输入变量,输出取大计算模块;
MIN:两输入变量,输出取小计算模块;
MUL:乘法计算模块;
H/L限幅模块:限制输出值在固定范围内;
F1(x):计算函数,根据机组转速不等率设置一次调频补偿曲线,该函数为六点分段函数,即x0、x1、x2、x3、x4、x5,其中x2与x3之间为一次调频动作死区,对应调频指令为0,机组最大调频补偿作用转速差(x1、x4)=3000*机组转速不等率*k1+死区;最大调频补偿负荷ΔP(F1(x1)、F1(x4))=机组额定容量*k1;最大调频转速差(x0、x5)=3000*机组转速不等率;此处k1与ΔP中k1为同一变量参数。
例如某发电机组额定容量为600MW,机组转速不等率为5%,k1=6%,调频死区为±2rpm,此函数设置为:
Figure GDA0000437271490000041
F2(x):计算函数,根据调节级压力、主蒸汽压力、主蒸汽温度计算出一次调频补偿系数,具体函数表达式如下:
Figure GDA0000437271490000042
其中:P额定为机组机前额定主蒸汽压力;P实际为机组机前实际运行主蒸汽压力;P1额定为机组额定调节级压力;P1实际为机组实际运行调节级压力;T额定为机组机前额定主蒸汽温度;T实际为机组机前实际运行主蒸汽温度;k2为比例修正系数,取k2=1。
上述虽然结合附图对本发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,所属领域技术人员应该明白,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。

Claims (1)

1.一种单元火力发电机组一次调频控制方法,其特征是,步骤如下: 
1)根据发电机组瞬时发电负荷P及发电机组一次调频投入上、下限值P1、P2,通过SUB、MAX、MIN算法模块,自动计算出一次调频理论补偿负荷限幅值,来设定H/L限幅模块的高低限幅值; 
2)根据电网运行频率波动差值或汽轮机转速波动值Δf/Δn,通过设定函数F1(x)计算出发电机组一次调频理论补偿负荷值,通过H/L限幅模块保证发电机组调频动作不超过发电机组正常调节范围内,限制发电机组一次调频补偿指令在-ΔP~ΔP之间,防止发电机组出现大幅扰动,保证发电机组安全稳定运行; 
3)一次调频补偿修正,根据发电机组运行实时调节级压力、主蒸汽压力、主蒸汽温度参数,通过F2(x)计算修正一次调频指令输出,保证发电机组一次调频动作在各个运行工况下满足设计要求,尽快修正电网频率波动,保证电网供电质量; 
其中,ΔP:机组一次调频补偿理论值,取ΔP=机组额定容量*k1,国家电网印发《火力发电机组一次调频试验导则》技术要求规定:机组额定容量小于250MW时,k1不小于10%;机组额定容量大于等于250MW小于等于350MW级机组,k1不小于8%;机组额定容量大于350MW小于等于500MW级机组,k1不小于7%;500MW以上机组,k1不小于6%; 
SUB:减法计算模块; 
MAX:两输入变量,输出取大计算模块; 
MIN:两输入变量,输出取小计算模块; 
F1(x):计算函数,根据机组转速不等率设置一次调频补偿曲线,该函数为六点分段函数,即x0、x1、x2、x3、x4、x5,其中x2与x3之间为一次调频动作死区,对应调频指令为0,机组最大调频补偿作用转速差(x1、x4)=3000*机组转速不等率*k1+死区;最大调频补偿负荷ΔP(F1(x1)、F1(x4))=机组额定容量*k1;最大调频转速差(x0、x5)=3000*机组转速不等率;此处k1与ΔP中k1为同一变量参数; 
F2(x):计算函数,根据调节级压力、主蒸汽压力、主蒸汽温度计算出一次调频补偿系数,具体函数表达式如下: 
Figure FDA0000437271480000011
其中:P额定为机组机前额定主蒸汽压力; 
P实际为机组机前实际运行主蒸汽压力; 
P1额定为机组额定调节级压力; 
P1实际为机组实际运行调节级压力; 
T额定为机组机前额定主蒸汽温度; 
T实际为机组机前实际运行主蒸汽温度; 
k2为比例修正系数,取k2=1。 
CN201210107052.XA 2012-04-12 2012-04-12 单元火力发电机组一次调频补偿控制方法 Active CN102646980B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210107052.XA CN102646980B (zh) 2012-04-12 2012-04-12 单元火力发电机组一次调频补偿控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210107052.XA CN102646980B (zh) 2012-04-12 2012-04-12 单元火力发电机组一次调频补偿控制方法

Publications (2)

Publication Number Publication Date
CN102646980A CN102646980A (zh) 2012-08-22
CN102646980B true CN102646980B (zh) 2014-04-16

Family

ID=46659631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210107052.XA Active CN102646980B (zh) 2012-04-12 2012-04-12 单元火力发电机组一次调频补偿控制方法

Country Status (1)

Country Link
CN (1) CN102646980B (zh)

Families Citing this family (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787870B (zh) * 2012-08-25 2014-11-26 华北电力大学(保定) 一种提高供热机组一次调频能力的方法
CN102979628B (zh) * 2012-12-12 2015-09-02 天津市电力公司 一种实现燃气-蒸汽联合循环机组调频功能的方法
CN103545840B (zh) * 2013-10-23 2015-08-05 国家电网公司 保证300mw发电机组一次调频动作有效性的方法
CN103633642B (zh) * 2013-11-06 2015-11-18 南方电网科学研究院有限责任公司 一种水电主导的孤岛电网频率稳定规划分析方法
CN103777556B (zh) * 2014-02-12 2016-08-17 国家电网公司 单元机组一次调频优先调节方法及系统
CN105322561B (zh) * 2014-06-10 2018-11-09 国网山西省电力公司电力科学研究院 基于网频波动幅度动态调整的一次调频控制方法及装置
CN104009474B (zh) * 2014-06-17 2021-11-02 贵州电网有限责任公司 一种用于电网孤网方式下的一次调频设置方法
CN106410860B (zh) * 2015-07-31 2019-04-23 宝山钢铁股份有限公司 多燃料混烧直流炉发电机组一次调频方法
CN105207198B (zh) * 2015-09-06 2017-09-01 国家电网公司 一种基于频率下垂调节方法的一次调频控制系统及方法
CN105388754B (zh) * 2015-10-28 2018-02-02 广东电网有限责任公司电力科学研究院 火力发电单元机组协调控制方法和系统
CN105512367B (zh) * 2015-11-26 2019-02-15 广东电网有限责任公司电力科学研究院 并网火电机组一次调频转速不等率的临界稳定值确定方法
CN105785859B (zh) * 2016-03-03 2019-04-09 国网山东省电力公司电力科学研究院 火电机组agc方式下确保一次调频动作的优化控制系统及方法
CN106208852B (zh) * 2016-07-08 2018-08-10 云南电力试验研究院(集团)有限公司 一种火电机组一次调频备用容量控制策略优化方法
CN107341559B (zh) * 2016-11-25 2018-05-29 国网山东省电力公司电力科学研究院 一种基于主汽压力允许偏差的一次调频能力预测方法
CN106899027B (zh) * 2017-03-29 2019-06-11 哈尔滨工业大学 汽轮机高调阀门流量动态非线性的一次调频能力补偿方法
CN107725123B (zh) * 2017-08-18 2020-07-14 中国神华能源股份有限公司 汽轮机的控制方法和装置
CN107465371B (zh) * 2017-08-31 2019-09-10 国网山东省电力公司电力科学研究院 发电机组一次调频在线自校正控制器、控制系统及方法
CN108695863B (zh) * 2018-04-28 2020-04-21 国网山东省电力公司电力科学研究院 一种电源友好型受端电网一次调频控制方法及系统
CN110021942B (zh) * 2019-04-17 2022-12-20 华能国际电力股份有限公司德州电厂 一种基于dcs的调频控制方法
CN110673569B (zh) * 2019-10-25 2022-09-23 国网安徽省电力有限公司电力科学研究院 一种绿色能源与火力发电机组协同控制方法及装置
CN111509739B (zh) * 2020-05-29 2021-08-31 国网山东省电力公司电力科学研究院 一种电网频率控制方法及系统
CN112564169B (zh) * 2020-12-14 2021-10-26 济宁华源热电有限公司 一种基于负荷反馈的火力发电一次调频系统及方法
CN113078658B (zh) * 2021-03-19 2023-09-05 中国大唐集团科学技术研究院有限公司西北电力试验研究院 一种基于机组出力限制的一次调频控制方法
CN113835372B (zh) * 2021-08-27 2023-04-28 吉林省电力科学研究院有限公司 电极式电锅炉辅助火电机组一次调频的控制系统及方法
CN114336683B (zh) * 2021-12-31 2024-05-24 山西世纪中试电力科学技术有限公司 一种火电机组一次调频在线自动补偿系统的方法
CN114243735B (zh) * 2021-12-31 2023-07-25 浙江浙能嘉华发电有限公司 一种基于一次调频性能指标的频率和转速选择投入的方法
CN114961887B (zh) * 2022-06-23 2024-03-22 浙江浙能台州第二发电有限责任公司 带补汽阀汽轮机的一次调频方法
CN115498706B (zh) * 2022-11-21 2023-03-10 西安热工研究院有限公司 一种电容储能辅助涉网调节系统及控制方法
CN116914781B (zh) * 2023-09-12 2023-12-01 中国三峡新能源(集团)股份有限公司辽宁分公司 一种新能源快速频率响应系统及方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4075872B2 (ja) * 2004-08-03 2008-04-16 株式会社日立製作所 供給力の運用計画作成方法および運用計画作成装置
CN101364735A (zh) * 2008-08-28 2009-02-11 华东电力试验研究院有限公司 燃气轮机发电机组调速系统负荷频率调节测试的试验方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5373041A (en) * 1990-08-27 1994-12-13 E. I. Du Pont De Nemours And Company Hot melt pressure sensitive adhesives

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4075872B2 (ja) * 2004-08-03 2008-04-16 株式会社日立製作所 供給力の運用計画作成方法および運用計画作成装置
CN101364735A (zh) * 2008-08-28 2009-02-11 华东电力试验研究院有限公司 燃气轮机发电机组调速系统负荷频率调节测试的试验方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
1000MW火电机组DEH一次调频控制方式应用与探讨;韩英昆等;《华东电力》;20080331;第36卷(第3期);第95-97页 *
JP特许第4075872号B2 2008.04.16
韩英昆等.1000MW火电机组DEH一次调频控制方式应用与探讨.《华东电力》.2008,第36卷(第3期),第95-97页.

Also Published As

Publication number Publication date
CN102646980A (zh) 2012-08-22

Similar Documents

Publication Publication Date Title
CN102646980B (zh) 单元火力发电机组一次调频补偿控制方法
CN104022522B (zh) 一种多端柔性直流输电系统协调控制方法
CN103501021B (zh) 一种具有二次调频调压特性的逆变器下垂控制方法
CN102619580B (zh) 一次调频控制方法及系统
CN106499452B (zh) 提升调整抽汽式汽轮机组一次调频补偿能力的控制方法及系统
CN102185341A (zh) 基于主从控制策略微网的主电源双模式运行控制方法
CN108011378B (zh) 受端分层接入特高压直流低负荷无功控制方法及控制装置
CN103178764B (zh) 柔性直流输电联接变压器有载分接开关的调节方法及系统
CN105785859A (zh) 火电机组agc方式下确保一次调频动作的优化控制系统及方法
CN105391078A (zh) 发电机组一次调频闭环控制方法
CN105870943A (zh) 基于安全稳定运行的火电机组一次调频控制系统及方法
CN103618308B (zh) 一种交流与柔性直流并联输电系统的交流线路潮流自动控制方法
CN100561822C (zh) 受端为弱小系统的直流输电调频控制方法
US10865774B2 (en) Wind turbine control method and system
CN102361324A (zh) 双馈风电机组无功支撑的机端电压调节方法及其系统
CN104578084A (zh) 一种动态无功补偿装置与avc相结合的控制系统
CN105226700B (zh) 基于阀门流量特性动态调整的一次调频控制方法及装置
CN114498748A (zh) 含电压受控源的新能源场站主动支撑协调控制方法及系统
CN104993502A (zh) 一种功率闭环模式下的一次调频实现方法及装置
CN108448644A (zh) 一种电池储能系统用虚拟同步发电机的控制方法和系统
CN104269871B (zh) 提高火力发电机组一次调频正确动作合格率的方法
CN104917170A (zh) 一种基于pi控制的微电网自适应下垂控制调节电压频率的方法
CN112072678A (zh) 风电机组一次调频控制方法
Huang Adaptive integrated coordinated control strategy for MMC-MTDC Systems
Prompinit et al. Ramp rate consideration of a BESS using active power control for PV generation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20121101

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121101

Address after: 250002 Ji'nan City Central District, Shandong, No. 2 South Road, No. 500

Applicant after: SHANDONG ELECTRIC POWER Research Institute

Applicant after: State Grid Corporation of China

Address before: 250002 Ji'nan City Central District, Shandong, No. 2 South Road, No. 500

Applicant before: SHANDONG ELECTRIC POWER Research Institute

C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee after: Shandong Electric Power Research Institute

Patentee after: State Grid Corporation of China

Address before: 250002, No. 500, South Second Ring Road, Shizhong District, Shandong, Ji'nan

Patentee before: Shandong Electric Power Research Institute

Patentee before: State Grid Corporation of China

CP02 Change in the address of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee after: SHANDONG ELECTRIC POWER Research Institute

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee before: SHANDONG ELECTRIC POWER Research Institute

Patentee before: State Grid Corporation of China

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20220207

Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee before: SHANDONG ELECTRIC POWER Research Institute

Patentee before: STATE GRID CORPORATION OF CHINA

TR01 Transfer of patent right