- Prior art keywords
- inlet wire
- row
- power supply
- row inlet
- function test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
Description
Claims (8)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210122182.0A CN102638095B (zh) | 2012-04-24 | 2012-04-24 | 一种核电厂冷态功能试验的供电方法 |
PCT/CN2013/071309 WO2013113289A1 (zh) | 2012-02-02 | 2013-02-03 | 一种核电厂冷态功能试验的供电方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210122182.0A CN102638095B (zh) | 2012-04-24 | 2012-04-24 | 一种核电厂冷态功能试验的供电方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102638095A CN102638095A (zh) | 2012-08-15 |
CN102638095B true CN102638095B (zh) | 2015-09-23 |
Family
ID=46622388
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210122182.0A Active CN102638095B (zh) | 2012-02-02 | 2012-04-24 | 一种核电厂冷态功能试验的供电方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102638095B (zh) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013113289A1 (zh) * | 2012-02-02 | 2013-08-08 | 中广核工程有限公司 | 一种核电厂冷态功能试验的供电方法 |
CN103456376B (zh) * | 2013-09-05 | 2016-04-13 | 上海核工程研究设计院 | 非能动核电厂钢制安全壳热移出过程的比例分析方法 |
CN103440889B (zh) * | 2013-09-05 | 2016-03-23 | 上海核工程研究设计院 | 非能动核电厂安全壳系统热移出过程的比例分析方法 |
CN104715800A (zh) * | 2013-12-17 | 2015-06-17 | 中广核工程有限公司 | 核电厂应急电源供电试验方法及系统 |
WO2016169012A1 (zh) * | 2015-04-22 | 2016-10-27 | 中广核工程有限公司 | 核电厂一回路水压试验的供电方法和系统 |
CN105119364B (zh) * | 2015-07-30 | 2017-11-14 | 苏州热工研究院有限公司 | 一种核电厂应急供电方法及系统 |
CN105098968B (zh) * | 2015-08-18 | 2018-03-09 | 中广核工程有限公司 | 一种核电厂一回路水压试验失电控制方法和系统 |
CN105355241A (zh) * | 2015-10-22 | 2016-02-24 | 中广核工程有限公司 | 核电厂冷态功能试验的超压保护系统和方法 |
CN105427911B (zh) * | 2015-11-10 | 2017-07-11 | 中广核工程有限公司 | 压水堆核电厂厂用电源切换试验的控制方法及控制系统 |
CN106374619A (zh) * | 2016-11-14 | 2017-02-01 | 苏州热工研究院有限公司 | 一种核电厂稳压器安全阀供电装置以及系统 |
CN107947333A (zh) * | 2017-11-02 | 2018-04-20 | 广东核电合营有限公司 | 实现双列电源交叉供电的安全性方法、系统以及控制装置 |
CN107947348A (zh) * | 2017-12-13 | 2018-04-20 | 中广核工程有限公司 | 核电厂一回路水压试验的供电系统 |
CN109004738B (zh) * | 2018-07-04 | 2021-06-04 | 中广核研究院有限公司 | 一种核动力船舶一回路应急供电系统及方法 |
CN114121317A (zh) * | 2021-10-18 | 2022-03-01 | 中广核工程有限公司 | 核电厂厂用电源切换试验方法、装置及设备 |
CN114172261B (zh) * | 2021-11-02 | 2023-12-12 | 广东核电合营有限公司 | 核电厂应急电源供电系统及控制方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102163051A (zh) * | 2010-12-10 | 2011-08-24 | 中国广东核电集团有限公司 | 一种压水堆核电站一回路水压试验数字化控制方法和系统 |
CN102568629A (zh) * | 2012-02-02 | 2012-07-11 | 中广核工程有限公司 | 一种核电厂冷态功能试验的供电方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100984020B1 (ko) * | 2008-11-13 | 2010-09-28 | 한국원자력연구원 | 원자로 시스템의 중수누설 검지장치 및 이를 이용한 중수누설 검지방법 |
-
2012
- 2012-04-24 CN CN201210122182.0A patent/CN102638095B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102163051A (zh) * | 2010-12-10 | 2011-08-24 | 中国广东核电集团有限公司 | 一种压水堆核电站一回路水压试验数字化控制方法和系统 |
CN102568629A (zh) * | 2012-02-02 | 2012-07-11 | 中广核工程有限公司 | 一种核电厂冷态功能试验的供电方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102638095A (zh) | 2012-08-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102638095B (zh) | 一种核电厂冷态功能试验的供电方法 | |
CN102568629B (zh) | 一种核电厂冷态功能试验的供电方法 | |
CN106160202B (zh) | 一种核电厂一回路水压试验的供电方法和系统 | |
CN103460298B (zh) | 核反应堆自动减压系统 | |
US5343507A (en) | Shutdown cooling system for operation during lapse of power | |
US20120281802A1 (en) | Emergency system | |
CN202111518U (zh) | 用于核电站水压试验系统和事故后监测系统的应急电源 | |
CN109903863B (zh) | 一种安全注入系统及核电系统 | |
CN105427911A (zh) | 压水堆核电厂厂用电源切换试验的控制方法及控制系统 | |
Yun et al. | Verification of SAMG entry condition for APR1400 | |
Hao et al. | Modeling and simulation of loss of power in nuclear power plant | |
KR102238068B1 (ko) | 원자력 시설의 직류 전원 공급 계통들의 부하 제어 방법 | |
Yang et al. | The simulation and study of ELAP event with URG and FLEX mitigation strategies for PWR by using TRACE code | |
WO2013113289A1 (zh) | 一种核电厂冷态功能试验的供电方法 | |
Shih et al. | RPV depressurization strategy analysis for Chinshan nuclear power plant by using MAAP5 | |
Wang et al. | Analysis of PWR RCS injection strategy during severe accident | |
Do Yeon Kima et al. | A Study on SGTR accident management using the MELCOR code | |
Tang et al. | Study on Modifications of CPR1000 Nuclear Plants for Design Extension Conditions | |
Saiu et al. | Loss-of-normal-feedwater sensitivity studies for AP600 behavior characterization | |
Muellner et al. | Investigation of a possible emergency procedure for the VVER 1000 NPP in case of a total loss of feedwater and a main steam line break | |
Yi et al. | Research on ultimate response guidelines (URGs) of floating nuclear power plant | |
Sadek et al. | RCP seal leakage analysis during station blackout for NPP Krsko | |
Chaudhary et al. | Thermal Hydraulics Study on Inadvertent Opening of Primary Pressurizer Safety Valve leading to Inventory Loss for VVER-1000 Reactor | |
CN116613871A (zh) | 一种电源系统及延伸运行方法 | |
WO2016169012A1 (zh) | 核电厂一回路水压试验的供电方法和系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB02 | Change of applicant information |
Address after: Futian District Shenzhen City, Guangdong province 518023 Shennan Road No. 69 Applicant after: China Nuclear Power Engineering Co., Ltd. Applicant after: China General Nuclear Power Corporation Address before: Futian District Shenzhen City, Guangdong province 518023 Shennan Road No. 69 Applicant before: China Nuclear Power Engineering Co., Ltd. Applicant before: China Guangdong Nuclear Power Group Co., Ltd. |
|
CB03 | Change of inventor or designer information |
Inventor after: Zhou Chuangbin Inventor after: Chen Jun Inventor after: Huang Qingwu Inventor after: Yang Weijia Inventor after: Hou Yousheng Inventor after: Guo Jun Inventor after: Zu Youjun Inventor after: Li Xian Inventor before: Zhou Chuangbin Inventor before: Chen Jun Inventor before: Huang Qingwu Inventor before: Hou Yousheng Inventor before: Guo Jun Inventor before: Zu Youjun Inventor before: Li Xian |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: ZHOU CHUANGBIN CHEN JUN HUANG QINGWU HOU YOUSHENG GUO JUN ZU YOUJUN LI XIAN TO: ZHOU CHUANGBIN CHEN JUN HUANG QINGWU YANG WEIJIA HOU YOUSHENG GUO JUN ZU YOUJUN LI XIAN Free format text: CORRECT: APPLICANT; FROM: CHINA GUANGDONG NUCLEAR POWER GROUP CO., LTD. TO: CHINA GENERAL NUCLEAR GROUP CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |