CN102635046B - Method for controlling paving and segregation of asphalt macadam - Google Patents

Method for controlling paving and segregation of asphalt macadam Download PDF

Info

Publication number
CN102635046B
CN102635046B CN201210148438.5A CN201210148438A CN102635046B CN 102635046 B CN102635046 B CN 102635046B CN 201210148438 A CN201210148438 A CN 201210148438A CN 102635046 B CN102635046 B CN 102635046B
Authority
CN
China
Prior art keywords
paver
compound
vehicle
mixture
segregation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210148438.5A
Other languages
Chinese (zh)
Other versions
CN102635046A (en
Inventor
潘民
司殿平
安航
吴爱军
安建影
梁迎辉
王玉桥
侯卫堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongxing Road & Bridge Engineering Co Ltd
Original Assignee
Zhongxing Road & Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongxing Road & Bridge Engineering Co Ltd filed Critical Zhongxing Road & Bridge Engineering Co Ltd
Priority to CN201210148438.5A priority Critical patent/CN102635046B/en
Publication of CN102635046A publication Critical patent/CN102635046A/en
Application granted granted Critical
Publication of CN102635046B publication Critical patent/CN102635046B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Machines (AREA)

Abstract

The invention relates to a method for controlling paving and segregation of asphalt macadam, and the method is applied in highway construction. The method comprises the following steps of: for mixture loading and transporting on site, jacking a vehicle sideboard at a position approaching to 45 degrees at a time when a vehicle pours the mixture into a receiving hopper of a paver, blanking the mixture evenly and intensively, fully filling a rear packing auger in time and ensuring that the mixture is 5-10cm higher than the auger when the mixture achieves at the two thirds position of the receiving hopper of the paver, starting the paver at a speed of 1-3m/min and maintaining the position of the auger to a mixture level position, maintaining the mixture in the receiving hopper not to be lower than one fourth when the vehicle completely discharges the mixture and drives away, strictly forbidding the hopper close, immediately performing the material receiving of a next vehicle, and performing hopper collection after the everyday construction is completed. Under the condition of not changing the paving equipment, the segregation phenomenon of the asphalt macadam in the paving process can be solved through scientific and reasonable flow arrangement and control so as to improve the integrity, slab entirety and load-carrying capability.

Description

A kind of method controlling asphalt macadam Segregation
Technical field
The present invention relates to highway engineering field, be specifically related to a kind of being applied in highway construction construction and control the method for asphalt macadam Segregation.
Technical background
Asphalt macadam is the bituminous mixture being widely used in speedway cutting optimal in recent years, play the stressed effect of transition surface layer and basic unit, but because its particle diameter is larger, compound is thicker, asphalt content is few, cause the uniformity of compound itself, workability poor, in construction and easily, cause segregation, permeable, roll result inequality, even vehicle travel time cause loose phenomenon.
Summary of the invention
Of the present invention objectjust be to provide a kind of method controlling asphalt macadam Segregation, it can when not changing laying equipment, the segregation phenomenon of asphalt macadam in paving process is solved, to improve globality, plate body and supporting capacity by scientific and reasonable flow arrangement and control.
The present invention realizes that foregoing invention object adopts technical schemefor:
A kind of method controlling the on-the-spot Segregation of asphalt macadam of the present invention, its method step realized is:
One, asphalt remixer is in place, require that lower position adjusted to by paver screw distributing device; Screed horizontal wall inscription has adjusted, and the faulting of slab ends of two pieces of screeds is within 1mm, and heating-up temperature has arrived 100 degree;
Two, according to before, during and after vehicle three sections, upper and lower two-layer requirement is by the compound entrucking of segmentation, layering, be transported to job site, vehicle is in asphalt paver travel direction, and at the position temporary shut down of distance 100-200 rice, then reversing is stopped to during distance paver 20-30cm, waits for that paver promotes transport vehicle tire running, and when paver contact transport vehicle, vehicle opens top; Side board is once raised to the positions of 40 to 50 degree, make compound evenly, concentrate and drop in the hopper of paver;
Three, when compound is discharged to 2/3 position of paver hopper, start spiral distributor and stock guide, compound is longitudinally transported to the position of paver screw distributing device, batch turning speed and the distributing device speed of batch turning plate match, and do not occur the situation of windrow, fracture; Spiral distributor is utilized compound to be laterally transported to uniformly the whole face that paves of paver, compound to be covered with on the whole face that paves during spiral distributor cloth, on bituminous concrete moxture spiral extreme lower position must cloth to exceeding spiral distributor spiral end face 5-10cm, during to reduce due to spiral distributor rotary work, cause the segregation of compound, increase the object evenly transmitted;
After travelling system of spreader starts, its travel speed at the uniform velocity controls at 1-3m/min,
Four, in transport vehicle, compound is unsnatched, and vehicle drives away immediately, when a upper car drives away, compound in hopper be kept to be not less than 1/5; And forbid to receive bucket, carry out the material feeding of next car immediately, paver does not stop, and repeats above-mentioned discharging, pave work; Construct every day and finally carried out the receipts bucket of hopper, and cleaned out;
Five, comprehensively observe the asphalt macadam surface that paver has paved, local is occurred to the position of segregation, people stands in segregation position, uses 10mm sieve to sieve to compound, is repaired by lower for sieve compound to segregation position, and levelling;
Six, made up a deficiency arrange immediately to carry out compound roll work, pneumatic-tired rollers must be used during cal rolling to roll first pass, play compacting, rub, impel the uniform filling of fines to enter object in space, till then using two road roller that shakes to roll regulation degree of compaction; No matter adopt which kind of plant equipment to roll, adopt dislocation, angle-park, the mode of rolling of overlap joint rolls;
Seven, after having rolled, until mixture temperature to drop to after atmospheric temperature just open to traffic thoroughly, to ensure to there will not be in the too high situation down train of temperature, cause wheelmark, situation that loose and planeness reduces occurs.
Of the present invention beneficial effectfor: the method adopting the present invention above-mentioned, after practice of construction operates, finds the dense surface of the compound of having constructed, even, the mutual embedded squeezing of thickness material bonds, segregation Fundamental Solutions is determined.Water permeability obviously reduces, and degree of compaction improves, and uniformity improves, elementary solution mixture segregation situation.We use normal construction method and the inventive method to construct respectively at the construction field (site), and degree of compaction, infiltration coefficient are measured, its result is as follows: do not adopt normal construction method of the present invention to detect degree of compaction 11 point, average 94.2%, standard deviation 0.96%, maximum value and minimum value difference 2.5%; Detect infiltration coefficient 25 point, average 258ml/min, standard deviation 17.75ml/min, maximum value and minimum value difference 67ml/min.Degree of compaction 13 point is detected, average 95.0%, standard deviation 0.72%, maximum value and minimum value difference 1.9% after adopting construction method of the present invention; Detect infiltration coefficient 35 point, average 215ml/min, standard deviation 9.07ml/min, maximum value and minimum value difference 36ml/min.Found by the contrast of above-mentioned data, the degree of compaction on the road surface of having constructed after adopting method of the present invention significantly improves, and deviation is less, and uniformity is fine; Infiltration coefficient obviously reduces, and deviation is less, and uniformity is fine, totally reaches the object controlling segregation.Adopt this method not need to change original construction equipment simultaneously, after only little adjustment being carried out to equipment, can construct, not increase cost, but improve construction pavement quality.
Detailed description of the invention
be below the present inventionadopt method of the present invention to carry out the specific embodiment of constructing when certain speedway contract section is constructed, its detailed process is:
One, asphalt remixer is in place, require that lower position adjusted to by paver screw distributing device; Screed horizontal wall inscription has adjusted, and the faulting of slab ends of two pieces of screeds is within 1mm, and heating-up temperature has arrived 100 degree;
Two, according to before, during and after vehicle three sections, upper and lower two-layer requirement is by the compound entrucking of segmentation, layering, be transported to job site, vehicle is in asphalt paver travel direction, and at the position temporary shut down of distance 100-200 rice, then reversing is stopped to during distance paver 20-30cm, waits for that paver promotes transport vehicle tire running, and when paver contact transport vehicle, vehicle opens top; Side board is once raised to the positions of 40 to 50 degree, make compound evenly, concentrate and drop in the hopper of paver;
Three, when compound is discharged to 2/3 position of paver hopper, start spiral distributor and stock guide, compound is longitudinally carried the position obtaining paver screw distributing device, batch turning speed and the distributing device speed of batch turning plate match, and do not occur the situation of windrow, fracture; Spiral distributor is utilized compound to be laterally transported to uniformly the whole face that paves of paver, compound to be covered with on the whole face that paves during spiral distributor cloth, on bituminous concrete moxture spiral extreme lower position must cloth to exceeding spiral distributor spiral end face 5-10cm, during to reduce due to spiral distributor rotary work, cause the segregation of compound, increase the object evenly transmitted;
After travelling system of spreader starts, its travel speed at the uniform velocity controls at 1-3m/min;
Four, in transport vehicle, compound is unsnatched, and vehicle drives away immediately, when a upper car drives away, compound in the hopper by paver be kept to be not less than 1/5; And forbid to receive bucket, carry out the material feeding of next car immediately, paver does not stop, and repeats above-mentioned discharging, pave work; Construct every day and finally carried out the receipts bucket of hopper, and cleaned out;
Five, comprehensively observe the asphalt macadam surface that paver has paved, local is occurred to the position of segregation, people stands in segregation position, uses 10mm sieve to sieve to compound, is repaired by lower for sieve compound to segregation position, and levelling;
Six, made up a deficiency arrange immediately to carry out compound roll work.Pneumatic-tired rollers must be used during cal rolling to roll first pass, play compacting, rub, impel the uniform filling of fines to enter object in space, till then using two road roller that shakes to roll regulation degree of compaction.No matter adopt which kind of plant equipment to roll, adopt dislocation, angle-park, the mode of rolling of overlap joint rolls;
Seven, after having rolled, certain extend the open to traffic time, make mixture temperature drop to open to traffic after atmospheric temperature thoroughly, to ensure to there will not be in the too high situation down train of temperature, cause wheelmark, situation that loose and planeness reduces occurs.
After adopting method of the present invention by reality, find the dense surface of the compound of having constructed, even, the mutual embedded squeezing of thickness material bonds, segregation Fundamental Solutions is determined.Water permeability obviously reduces, and degree of compaction improves, and uniformity improves, elementary solution mixture segregation situation.Adopt this method not change original construction equipment simultaneously, after only little adjustment being carried out to equipment, can construct, not increase cost, but improve construction pavement quality.

Claims (1)

1. control a method for the on-the-spot Segregation of asphalt macadam, it is characterized in that, its method step is:
One, asphalt remixer is in place, require that lower position adjusted to by paver screw distributing device; Screed horizontal wall inscription has adjusted, and the faulting of slab ends of two pieces of screeds is within 1mm, and heating-up temperature arrives l00 degree Celsius;
Two, according to before, during and after vehicle three sections, upper and lower two-layer requirement is by the compound entrucking of segmentation, layering, be transported to job site, vehicle is in asphalt paver travel direction, and at the position temporary shut down of distance 100-200 rice, then reversing is stopped to during distance paver 20-30cm, waits for that paver promotes vehicle tyre and travels, and when paver contact vehicle, vehicle opens top; Side board is once raised to the positions of 40 to 50 degree, make compound evenly, concentrate and drop in the hopper of paver;
Three, when compound is discharged to 2/3 position of paver hopper, start spiral distributor and stock guide, compound is longitudinally transported to the position of paver screw distributing device, batch turning speed and the distributing device speed of batch turning plate match, and do not occur the situation of windrow, fracture; Spiral distributor is utilized compound to be laterally transported to uniformly the whole face that paves of paver, compound to be covered with on the whole face that paves during spiral distributor cloth, on bituminous concrete moxture spiral extreme lower position must cloth to exceeding spiral distributor spiral end face 5-10cm, during to reduce due to spiral distributor rotary work, cause the segregation of compound, increase the object evenly transmitted;
After travelling system of spreader starts, its travel speed at the uniform velocity controls at 1-3m/min;
Four, in vehicle, compound is unsnatched, and vehicle drives away immediately, when a upper car drives away, compound in hopper be kept to be not less than 1/5; And forbid to receive bucket, carry out the material feeding of next car immediately, paver does not stop, and repeats above-mentioned discharging, pave work; Construct every day and finally carried out the receipts bucket of hopper, and cleaned out;
Five, comprehensively observe the asphalt macadam surface that paver has paved, local is occurred to the position of segregation, people stands in segregation position, uses 10mm sieve to sieve to compound, is repaired by lower for sieve compound to segregation position, and levelling;
Six, made up a deficiency arrange immediately to carry out compound roll work, pneumatic-tired rollers must be used during cal rolling to roll first pass, play compacting, rub, impel the uniform filling of fines to enter object in space, till then using two road roller that shakes to roll regulation degree of compaction; No matter adopt which kind of plant equipment to roll, adopt dislocation, angle-park, the mode of rolling of overlap joint rolls;
Seven, after having rolled, until mixture temperature to drop to after atmospheric temperature just open to traffic thoroughly, to ensure to there will not be in the too high situation down train of temperature, cause wheelmark, situation that loose and planeness reduces occurs.
CN201210148438.5A 2012-05-15 2012-05-15 Method for controlling paving and segregation of asphalt macadam Active CN102635046B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210148438.5A CN102635046B (en) 2012-05-15 2012-05-15 Method for controlling paving and segregation of asphalt macadam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210148438.5A CN102635046B (en) 2012-05-15 2012-05-15 Method for controlling paving and segregation of asphalt macadam

Publications (2)

Publication Number Publication Date
CN102635046A CN102635046A (en) 2012-08-15
CN102635046B true CN102635046B (en) 2015-02-18

Family

ID=46619613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210148438.5A Active CN102635046B (en) 2012-05-15 2012-05-15 Method for controlling paving and segregation of asphalt macadam

Country Status (1)

Country Link
CN (1) CN102635046B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104251805A (en) * 2014-09-26 2014-12-31 洛阳广鑫建设集团有限公司 Rapid mixed asphalt material gradation detection method and equipment thereof
CN111485469A (en) * 2020-04-23 2020-08-04 中交路桥建设有限公司 Anti-segregation flexible base layer construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4765772A (en) * 1987-05-29 1988-08-23 Angelo Benedetti, Inc. Method and apparatus for filling voids in recycled asphalt
JPH10121404A (en) * 1996-10-22 1998-05-12 Kajima Doro Kk Low mu road construction method using semiflexible ganolithic pavement
CN101666064A (en) * 2009-08-06 2010-03-10 中铁四局集团有限公司 Construction method of asphalt crack pavement
CN101746996A (en) * 2008-12-13 2010-06-23 深圳市海川实业股份有限公司 Warm mixing and antiflaming asphalt mixture and preparation method thereof
CN101812825A (en) * 2010-04-09 2010-08-25 华南理工大学 Method for heating and rolling cold plant-mixed recycled asphalt mixtures with emulsion asphalt
CN101906745A (en) * 2010-07-15 2010-12-08 中煤第三建设(集团)有限责任公司 Method for constructing pavements by transporting bituminous concrete at normal temperature
KR20120007236A (en) * 2010-07-14 2012-01-20 삼성물산 주식회사 Asphalt concrete for racing track pavement, and manufacturing method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4765772A (en) * 1987-05-29 1988-08-23 Angelo Benedetti, Inc. Method and apparatus for filling voids in recycled asphalt
JPH10121404A (en) * 1996-10-22 1998-05-12 Kajima Doro Kk Low mu road construction method using semiflexible ganolithic pavement
CN101746996A (en) * 2008-12-13 2010-06-23 深圳市海川实业股份有限公司 Warm mixing and antiflaming asphalt mixture and preparation method thereof
CN101666064A (en) * 2009-08-06 2010-03-10 中铁四局集团有限公司 Construction method of asphalt crack pavement
CN101812825A (en) * 2010-04-09 2010-08-25 华南理工大学 Method for heating and rolling cold plant-mixed recycled asphalt mixtures with emulsion asphalt
KR20120007236A (en) * 2010-07-14 2012-01-20 삼성물산 주식회사 Asphalt concrete for racing track pavement, and manufacturing method thereof
CN101906745A (en) * 2010-07-15 2010-12-08 中煤第三建设(集团)有限责任公司 Method for constructing pavements by transporting bituminous concrete at normal temperature

Also Published As

Publication number Publication date
CN102635046A (en) 2012-08-15

Similar Documents

Publication Publication Date Title
CN102071613B (en) Asphalt-treated permeable-base (ATB) construction process
CN103669152A (en) Road surface construction method of ultrathin stone mastic asphalt mixture
US20140270953A1 (en) Road strengthening and reinforcement during a recycling process
CN104762862A (en) Stone mastic asphalt (SMA) pavement construction method
CN110258236A (en) A kind of high-performance steel slag road surface and its construction method
WO2023020630A1 (en) Construction method for upper surface course made of steel slag-asphalt mixture
CN107805989A (en) Temporary road rolling compacted concrete pavement reconstruction structure and its construction method
CN101532273B (en) Anti-rutting road surface RS2000 modified asphalt mixture proportion and construction technology
CN111485468A (en) Premixed foam asphalt base layer and subbase layer in-situ cold regeneration construction method
CN104099843A (en) One-step forming construction method for expressway high-modulus asphalt composite
CN106758711B (en) A kind of construction of the highway maintenance process
CN111172845A (en) Double-layer synchronous continuous-paving continuous-pressing integral forming construction method for water-stable large-thickness double-unit
CN102635046B (en) Method for controlling paving and segregation of asphalt macadam
CN115110371A (en) Construction method of asphalt composite pavement of highway tunnel
CN101429746B (en) Road paving method
CN104631260A (en) Upper-layer and lower-layer joined-paving construction method of cement stabilized macadam
CN113652931A (en) Construction process for paving cement stabilized macadam foundation with super-large thickness of 40-50cm
CN105401502A (en) Road bituminous pavement maintenance method
CN211472012U (en) Signal lamp crossing filling type composite pavement
CN107151961A (en) A kind of construction method of town road
CN105714639A (en) Asphalt concrete pavement adopting rubbles with particle size equal to pavement thickness and construction method thereof
CN114016430B (en) Asphalt concrete bridge deck pavement method
CN102704379A (en) Construction method for asphalt road surface of road
CN110644322A (en) Municipal road construction method
CN112982058A (en) Vibration mixing construction method for cement stabilized macadam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Pan Min

Inventor after: Si Dianping

Inventor after: An Hang

Inventor after: Wu Aijun

Inventor after: An Jianying

Inventor after: Liang Yinghui

Inventor after: Wang Yuqiao

Inventor after: Hou Weitang

Inventor before: An Jianying

Inventor before: Zhao Wenming

Inventor before: Shao Feng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: AN JIANYING ZHAO WENMING SHAO FENG TO: PAN MIN SI DIANPING AN HANG WU AIJUN AN JIANYING LIANG YINGHUI WANG YUQIAO HOU WEITANG

C14 Grant of patent or utility model
GR01 Patent grant