CN102629284A - Design method for intelligent substation communication based on intelligent device physical port modeling - Google Patents
Design method for intelligent substation communication based on intelligent device physical port modeling Download PDFInfo
- Publication number
- CN102629284A CN102629284A CN2011104586687A CN201110458668A CN102629284A CN 102629284 A CN102629284 A CN 102629284A CN 2011104586687 A CN2011104586687 A CN 2011104586687A CN 201110458668 A CN201110458668 A CN 201110458668A CN 102629284 A CN102629284 A CN 102629284A
- Authority
- CN
- China
- Prior art keywords
- intelligent apparatus
- model
- intelligent
- port
- physical network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110458668.7A CN102629284B (en) | 2011-12-31 | 2011-12-31 | Design method for intelligent substation communication based on intelligent device physical port modeling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110458668.7A CN102629284B (en) | 2011-12-31 | 2011-12-31 | Design method for intelligent substation communication based on intelligent device physical port modeling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102629284A true CN102629284A (en) | 2012-08-08 |
CN102629284B CN102629284B (en) | 2014-02-19 |
Family
ID=46587544
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110458668.7A Active CN102629284B (en) | 2011-12-31 | 2011-12-31 | Design method for intelligent substation communication based on intelligent device physical port modeling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102629284B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108092809A (en) * | 2017-12-12 | 2018-05-29 | 南京国电南自电网自动化有限公司 | Intelligent substation network switch modeling method and asset of equipments model mapping method |
CN117376116A (en) * | 2023-10-08 | 2024-01-09 | 苏州异格技术有限公司 | Configuration method and device of virtual switch, computer equipment and storage medium |
CN117376116B (en) * | 2023-10-08 | 2024-05-17 | 苏州异格技术有限公司 | Configuration method and device of virtual switch, computer equipment and storage medium |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101035099A (en) * | 2007-02-09 | 2007-09-12 | 浙江大学 | General gateway design method for realizing the IEC61850 standard |
CN102209108A (en) * | 2011-05-16 | 2011-10-05 | 广东电网公司深圳供电局 | Method and system for realizing seamless communication between master scheduling station and substation of power grid |
-
2011
- 2011-12-31 CN CN201110458668.7A patent/CN102629284B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101035099A (en) * | 2007-02-09 | 2007-09-12 | 浙江大学 | General gateway design method for realizing the IEC61850 standard |
CN102209108A (en) * | 2011-05-16 | 2011-10-05 | 广东电网公司深圳供电局 | Method and system for realizing seamless communication between master scheduling station and substation of power grid |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108092809A (en) * | 2017-12-12 | 2018-05-29 | 南京国电南自电网自动化有限公司 | Intelligent substation network switch modeling method and asset of equipments model mapping method |
CN108092809B (en) * | 2017-12-12 | 2020-11-06 | 南京国电南自电网自动化有限公司 | Intelligent substation network switch modeling method and equipment asset model mapping method |
CN117376116A (en) * | 2023-10-08 | 2024-01-09 | 苏州异格技术有限公司 | Configuration method and device of virtual switch, computer equipment and storage medium |
CN117376116B (en) * | 2023-10-08 | 2024-05-17 | 苏州异格技术有限公司 | Configuration method and device of virtual switch, computer equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN102629284B (en) | 2014-02-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102622463B (en) | Drawing-model uniformity based method for automatic check of design drawings | |
CN104133953B (en) | Intelligent substation secondary design system | |
CN102006193B (en) | Automatic layout method for network topology in SNMP (simple network management protocol) network management system | |
CN109062145A (en) | Numerically-controlled machine tool motion control card based on WIFI communication | |
CN104699801A (en) | Method and device of secondary equipment associating configuration | |
CN103199617B (en) | Representing method of corresponding relationship between virtual circuits and physical ports in secondary circuit graph | |
CN103093007A (en) | Power transmission iron tower three-dimensional virtual assembly method | |
CN102270261A (en) | Design method for intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration | |
CN106408207A (en) | Modeling method and system for secondary virtual loop of intelligent substation | |
CN110059402A (en) | A kind of intelligent substation method for optimizing configuration based on semantic modeling | |
CN105449668A (en) | Dynamic modeling method for intelligent electronic equipment for monitoring electric energy quality of intelligent transformer station | |
CN107543986A (en) | A kind of relay protection test system based on mobile platform | |
CN103713523A (en) | Influencing analysis method of whole intelligent substation model | |
CN202872468U (en) | Real-time data access interface devic of SCADA (Supervisory Control and Data Acquisition) system | |
CN107885552B (en) | Intelligent remote motivation unified configuration method | |
CN102629284B (en) | Design method for intelligent substation communication based on intelligent device physical port modeling | |
CN103699395B (en) | A kind of method that IEC61850 standards are changed to IEC61970 master patterns | |
CN104036667B (en) | A kind of virtual terminals of intelligent substation connects the implementation method of design training | |
CN102262703B (en) | Method for constructing figure and RDF (Radio Direction Finder) model for designing intelligent transformer substation | |
CN102710025B (en) | Power system communication device and method | |
CN102624607B (en) | Intelligent transformer substation communication method capable of modeling on basis of physical port of Ethernet switch | |
CN107480883B (en) | Transformer substation secondary system resource configuration method and system | |
CN103294878A (en) | Unified modeling method of multidimensional grid models based on DMS (database management system) | |
CN108306414A (en) | A kind of monitoring of intelligent power distribution and control method and system | |
CN103606023A (en) | Graph platform-based management method for materials of newly input electric power system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20151211 Address after: 250014 Shandong Province, Lixia District of Ji'nan city Min Zi Qian Road No. 106 Patentee after: Shandong Electric Power Engineering Consulting Institute Co., Ltd. Patentee after: SHANDONG ROOF NEW INFORMATION TECHNOLOGY CO., LTD. Address before: 250014 Shandong Province, Lixia District of Ji'nan city Min Zi Qian Road No. 106 Patentee before: Shandong Electric Power Engineering Consulting Institute Co., Ltd. Patentee before: Jinan Rongfu Technology Co., Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20190627 Address after: 250014 No. 106 Minziqian Road, Lixia District, Jinan City, Shandong Province Patentee after: Shandong Electric Power Engineering Consulting Institute Co., Ltd. Address before: 250014 No. 106 Minziqian Road, Lixia District, Jinan City, Shandong Province Co-patentee before: SHANDONG ROOF NEW INFORMATION TECHNOLOGY CO., LTD. Patentee before: Shandong Electric Power Engineering Consulting Institute Co., Ltd. |
|
TR01 | Transfer of patent right |