CN104036667B - A kind of virtual terminals of intelligent substation connects the implementation method of design training - Google Patents

A kind of virtual terminals of intelligent substation connects the implementation method of design training Download PDF

Info

Publication number
CN104036667B
CN104036667B CN201410210499.9A CN201410210499A CN104036667B CN 104036667 B CN104036667 B CN 104036667B CN 201410210499 A CN201410210499 A CN 201410210499A CN 104036667 B CN104036667 B CN 104036667B
Authority
CN
China
Prior art keywords
training
design
intelligent substation
paper
virtual terminals
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410210499.9A
Other languages
Chinese (zh)
Other versions
CN104036667A (en
Inventor
仇群辉
纪陵
裘愉涛
周卫国
方磊
江伟建
史建立
檀庭芳
俞兴坤
朱群
蔡溢行
费云中
颜彦
钱海东
罗硕军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Guodiannanzi Software Engineering Co Ltd
State Grid Corp of China SGCC
Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Nanjing SAC Automation Co Ltd
Zhoushan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Nanjing Guodiannanzi Software Engineering Co Ltd
State Grid Corp of China SGCC
Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Nanjing SAC Automation Co Ltd
Zhoushan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Guodiannanzi Software Engineering Co Ltd, State Grid Corp of China SGCC, Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Nanjing SAC Automation Co Ltd, Zhoushan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Nanjing Guodiannanzi Software Engineering Co Ltd
Priority to CN201410210499.9A priority Critical patent/CN104036667B/en
Publication of CN104036667A publication Critical patent/CN104036667A/en
Application granted granted Critical
Publication of CN104036667B publication Critical patent/CN104036667B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Instructional Devices (AREA)

Abstract

A kind of implementation method of virtual terminals of intelligent substation design training, it includes: a) increase the library of three types at SCD system configurator, these three library comprises correct empty terminal connect the baseline configuration file of configuration to being applied to deposit respectively, carries out empty terminal to student connect the training project file of design training and the training formed after empty terminal connects design configurations for depositing student to complete is presented a paper for depositing;B) training teacher is by virtual terminals of intelligent substation design training teacher's human-computer interaction interface, completes configuration and the establishment of training project file of the baseline configuration file of each training project;C) trainee designs trainee's human-computer interaction interface by virtual terminals of intelligent substation, chooses appropriate training project, completes virtual terminals of intelligent substation design training operation, and forms training and present a paper, is saved in and presents a paper in storehouse;D) by checking module in SCD system configurator increase virtual terminals of intelligent substation design configurations, it is achieved the benchmark training documentation of corresponding identical training project and the check training middle empty terminal connection definition content of presenting a paper.

Description

A kind of virtual terminals of intelligent substation connects the implementation method of design training
Technical field
The present invention relates to the technical method of a kind of intelligent substation design training, particularly relate to a kind of secondary equipment of intelligent converting station void terminal and connect the implementation method of design training, belong to lation training course for power system field.
Background technology
The cable of tradition Substation secondary circuit and secondary device external terminal connects design and generally utilizes AutoCAD instrument to realize, and is carried out the connection construction of on-the-spot secondary cable according to design drawing by power construction personnel.Transformer station compares with tradition, the secondary circuit of intelligent substation and arrangement terminal connection have a very large change, the empty loop of intelligent substation digitlization instead of the secondary circuit of tradition transformer station, and the empty terminal of secondary equipment of intelligent converting station instead of the external physical terminal of tradition substation secondary device.Configure by completing the connection of the empty terminal in intelligent substation each secondary device CID file, intelligent substation secondary loop and the design of secondary device void terminal connection and configuration can be completed.Connection design and the configuration work of secondary equipment of intelligent converting station void terminal at present is essentially all and utilizes SCD system configurator to be finally completed.
nullAt present,The substation secondary designer of Electric Power Design Institute for utilize SCD system configurator complete secondary equipment of intelligent converting station void terminal design and configuration be unfamiliar with the most very much,Substantially still, the secondary circuit connection using the design Pattern completion substation secondary device of tradition transformer station designs,And the connection configuration of secondary equipment of intelligent converting station void terminal is completed by integrated manufacturer,The design pattern that the secondary circuit of this intelligent substation of present stage and empty terminal connect greatly reduces intelligent substation secondary loop and the operating efficiency of empty terminal design,And there is difference owing to traditional secondary loop and terminal connect the definition mode connecting design designed with secondary equipment of intelligent converting station void terminal,This design pattern is connected design also can to the secondary device void terminal of intelligent substation and be brought certain hidden danger,Therefore,Urgent need to be strengthened the substation secondary designer to Electric Power Design Institute and directly carry out secondary equipment of intelligent converting station void terminal design and the training of configuration technical ability based on SCD system configurator,The substation secondary designer allowing Electric Power Design Institute grasps connection design and the using method of configuration being done directly intelligent substation secondary void loop and empty terminal by SCD system configurator,Thus effectively promote secondary equipment of intelligent converting station void terminal and connect design and the operating efficiency of configuration.
Summary of the invention
nullIt is an object of the invention to the deficiency overcoming prior art to exist,And provide a kind of and based on SCD system configurator, the substation secondary designer of Electric Power Design Institute is carried out intelligent substation secondary loop and the connection design of secondary device void terminal and the method for configuration training,Utilize the method to be capable of the substation secondary designer of Electric Power Design Institute and use SCD system configurator directly to carry out connection design and the training of configuration technical ability of intelligent substation secondary void loop and empty terminal,So that the substation secondary designer of Electric Power Design Institute grasps is done directly intelligent substation secondary void loop and secondary device void terminal design and the using method of configuration by SCD system configurator,The substation secondary designer promoting Electric Power Design Institute carries out the connection design of secondary equipment of intelligent converting station void terminal and configuration technical ability based on SCD system configurator,Improve secondary equipment of intelligent converting station void terminal the most further and connect design and the operating efficiency of configuration,Decrease the link being carried out the connection configuration of secondary device void terminal by system integrator again,Improve secondary equipment of intelligent converting station void terminal and connect design and the correctness of configuration.
For achieving the above object, realize that the substation secondary designer of Electric Power Design Institute is carried out virtual terminals of intelligent substation and connect the training of design, the present invention is achieved through the following technical solutions: the implementation method of a kind of virtual terminals of intelligent substation design training, and this implementation method comprises the following steps:
A) library of three types is increased at SCD system configurator, the library of three types respectively reference file storehouse, training documentation storehouse and storehouse of presenting a paper, the library of these three type comprises correct empty terminal connect the baseline configuration file of configuration to being applied to deposit respectively, carries out empty terminal to student connect the training project file of design training and the training formed after empty terminal connects design configurations for depositing student to complete is presented a paper for depositing;
B) training teacher is by the virtual terminals of intelligent substation design training teacher's human-computer interaction interface provided, and completes configuration and the establishment of training project file of the baseline configuration file of each training project;
C trainee, by the virtual terminals of intelligent substation design trainee's human-computer interaction interface provided, chooses appropriate training project, completes virtual terminals of intelligent substation design training operation, and forms training and present a paper, is saved in and presents a paper in storehouse;
D) by increasing virtual terminals of intelligent substation design configurations check module at SCD system configurator, realize the benchmark training documentation of corresponding identical training project and train the check of middle empty terminal connection definition content of presenting a paper, simultaneously by increasing virtual terminals of intelligent substation connection design visual presentation module at SCD system configurator, realize the visual presentation that virtual terminals of intelligent substation connects, thus the empty terminal being carried out student connects design and configuration carries out visual guidance and displaying.
Described step a), choose several typical secondary device for carrying out typical transforming plant primary wiring and correspondence thereof that virtual terminals of intelligent substation connects design training in advance to configure, first comprise typical case's transformer substation virtual terminal in SCD system configurator increase and connect the reference file storehouse of configuration, designed the correct empty terminal of each secondary device by training teacher according to typical case's Substation secondary circuit and connected configuration, and form the baseline configuration file of empty terminal design training;Then on SCD system configurator, increase the training documentation storehouse being carried out empty terminal connection design training by trainee, it is saved in being used for the training project file that student gives training in training documentation storehouse, student chooses the training project file connecting design training for carrying out empty terminal being provided previously by by teacher from training documentation storehouse again, then student is based on SCD system configurator, complete secondary device void terminal and connect design and the operation of configuration, and be formed as training and present a paper, it is saved in and presents a paper in storehouse.
It is that the training project file prefix name by identical is mated that baseline configuration file of the present invention, training project file are presented a paper with training, and is carried out the differentiation of type by different file suffixes names;nullOn SCD system configurator, finally increase empty terminal connection compare and visual presentation function,The baseline configuration file and training with identical training project file prefix name are presented a paper and compared,And according to the modeling specification of " IEC 61850 engineering relay protection application model ",GOOSE wire definition or SV wire definition to the Inputs part definition having under identical IED Name in LLNO logical node in two files compare,Find out difference therein,And GOOSE wire definition or the inconsistent entry of SV wire definition are identified in present a paper training under identical IED middle GOOSE wire definition or SV wire definition and baseline configuration file,So that can be by visual mode,Show empty terminal to connect in design clearly to student and connect wrong empty terminal,The visualization realizing connecting virtual terminals of intelligent substation design is instructed and training.
The invention has the beneficial effects as follows: it can effectively allow the substation secondary designer of Electric Power Design Institute quickly grasp and complete the connection design of secondary equipment of intelligent converting station void terminal and the using method of configuration by SCD system configurator, the substation secondary designer improving Electric Power Design Institute directly carries out ability and the level of empty terminal connection design by system configurator, so that the transformation of the working method of Substation secondary circuit design and connection configuration can be realized directly being carried out based on SCD system configurator by the substation secondary designer of Electric Power Design Institute as early as possible, improve secondary system of intelligent substation void loop and empty terminal connects design and the operating efficiency of configuration, the most also the designer for cultivation adaptation secondary system of intelligent substation new design pattern tempers troop.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of implementation method of the present invention;
Fig. 2 is file structure schematic diagram of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention done detailed introduction: shown in Fig. 1, the implementation method of a kind of virtual terminals of intelligent substation of the present invention design training, this implementation method comprises the following steps:
A) library of three types is increased at SCD system configurator, the library of three types respectively reference file storehouse, training documentation storehouse and storehouse of presenting a paper, the library of these three type comprises correct empty terminal connect the baseline configuration file of configuration to being applied to deposit respectively, carries out empty terminal to student connect the training project file of design training and the training formed after empty terminal connects design configurations for depositing student to complete is presented a paper for depositing;
B) training teacher is by the virtual terminals of intelligent substation design training teacher's human-computer interaction interface provided, and completes configuration and the establishment of training project file of the baseline configuration file of each training project;
C trainee, by the virtual terminals of intelligent substation design trainee's human-computer interaction interface provided, chooses appropriate training project, completes virtual terminals of intelligent substation design training operation, and forms training and present a paper, is saved in and presents a paper in storehouse;
D) by increasing virtual terminals of intelligent substation design configurations check module at SCD system configurator, realize the benchmark training documentation of corresponding identical training project and train the check of middle empty terminal connection definition content of presenting a paper, simultaneously by increasing virtual terminals of intelligent substation connection design visual presentation module at SCD system configurator, realize the visual presentation that virtual terminals of intelligent substation connects, thus the empty terminal being carried out student connects design and configuration carries out visual guidance and displaying.
Described step a), choose several typical secondary device for carrying out typical transforming plant primary wiring and correspondence thereof that virtual terminals of intelligent substation connects design training in advance to configure, first comprise typical case's transformer substation virtual terminal in SCD system configurator increase and connect the reference file storehouse of configuration, designed the correct empty terminal of each secondary device by training teacher according to typical case's Substation secondary circuit and connected configuration, and form the baseline configuration file of empty terminal design training;Then on SCD system configurator, increase the training documentation storehouse being carried out empty terminal connection design training by trainee, it is saved in being used for the training project file that student gives training in training documentation storehouse, student chooses the training project file connecting design training for carrying out empty terminal being provided previously by by teacher from training documentation storehouse again, then student is based on SCD system configurator, complete secondary device void terminal and connect design and the operation of configuration, and be formed as training and present a paper, it is saved in and presents a paper in storehouse.
Fig. 2 show the present invention and connects the file structure schematic diagram designing the three types file generated in training implementation method at described virtual terminals of intelligent substation, wherein: baseline configuration file, training project file are presented a paper with training and mated by identical training project file prefix name, and are carried out the differentiation of type by different file suffixes names.The file name formats of three types is as it can be seen, the file content form of three types should meet the code requirement of " IEC 61850 engineering relay protection application model ", all by IED in each type of file nullInputs in LLN0 logical node part definition GOOSE void terminal line or SV void terminal line under Name,What each empty terminal connected is defined in every ExtRef reflection,Wherein in baseline configuration file, ExtRef item comprises the internal empty terminal input signal of this logical device and the output signal information of external device (ED),Internal empty terminal and the output signal one_to_one corresponding of external device (ED),To reflect the annexation of this equipment void terminal and external equipment,In training project file, ExtRef item only comprises the internal empty terminal input signal information of this logical device,Do not comprise the output signal information of connected external secondary equipment,So that the connection being completed this part void terminal by trainee defines,Training middle ExtRef item of presenting a paper comprises and is completed empty terminal by student and connect the internal empty terminal input signal of this logical device and output signal information of external device (ED) after configuration,The GOOSE wire definition or the SV wire definition that are defined by the Inputs part having under identical IED Name in LLNO logical node in presenting a paper the baseline configuration file of identical training project and training are compared,Find out difference therein,And GOOSE wire definition or the inconsistent item entries of SV wire definition are identified in present a paper training under identical IED middle GOOSE wire definition or SV wire definition and baseline configuration file,So that can be by visual mode,Show empty terminal to connect in design clearly to student and connect wrong empty terminal,The visualization realizing connecting virtual terminals of intelligent substation design is instructed and training.
The present invention can effectively allow the substation secondary designer of Electric Power Design Institute quickly grasp and complete the connection design of secondary equipment of intelligent converting station void terminal and the using method of configuration by SCD system configurator, the substation secondary designer improving Electric Power Design Institute directly carries out ability and the level of empty terminal connection design by system configurator, so that the transformation of the working method of Substation secondary circuit design and connection configuration can be realized directly being carried out based on SCD system configurator by the substation secondary designer of Electric Power Design Institute as early as possible, improve secondary system of intelligent substation void loop and empty terminal connects design and the operating efficiency of configuration, the most also the designer for cultivation adaptation secondary system of intelligent substation new design pattern tempers troop.

Claims (3)

1. the implementation method of a virtual terminals of intelligent substation design training, it is characterised in that this implementation method comprises the following steps:
A) library of three types is increased at SCD system configurator, the library of three types respectively reference file storehouse, training documentation storehouse and storehouse of presenting a paper, the library of these three type comprises correct empty terminal connect the baseline configuration file of configuration to being applied to deposit respectively, carries out empty terminal to student connect the training project file of design training and the training formed after empty terminal connects design configurations for depositing student to complete is presented a paper for depositing;
B) training teacher is by the virtual terminals of intelligent substation design training teacher's human-computer interaction interface provided, and completes configuration and the establishment of training project file of the baseline configuration file of each training project;
C) trainee is by the virtual terminals of intelligent substation design trainee's human-computer interaction interface provided, and chooses appropriate training project, completes virtual terminals of intelligent substation design training operation, and forms training and present a paper, is saved in and presents a paper in storehouse;
D) by increasing virtual terminals of intelligent substation design configurations check module at SCD system configurator, realize the baseline configuration file of corresponding identical training project and train the check of middle empty terminal connection definition content of presenting a paper, simultaneously by increasing virtual terminals of intelligent substation connection design visual presentation module at SCD system configurator, realize the visual presentation that virtual terminals of intelligent substation connects, thus the empty terminal being carried out student connects design and configuration carries out visual guidance and displaying.
The implementation method of virtual terminals of intelligent substation the most according to claim 1 design training, it is characterised in that in described step:
Choose in advance and configure for the typical secondary device carrying out typical transforming plant primary wiring and correspondence thereof that virtual terminals of intelligent substation connects design training, first comprise typical case's transformer substation virtual terminal in SCD system configurator increase and connect the reference file storehouse of configuration, designed the correct empty terminal of each secondary device by training teacher according to typical case's Substation secondary circuit and connected configuration, and form the baseline configuration file of empty terminal design training;Then on SCD system configurator, increase the training documentation storehouse being carried out empty terminal connection design training by trainee, it is saved in being used for the training project file that student gives training in training documentation storehouse, student chooses the training project file connecting design training for carrying out empty terminal being provided previously by by teacher from training documentation storehouse again, then student is based on SCD system configurator, complete secondary device void terminal and connect design and the operation of configuration, and be formed as training and present a paper, it is saved in and presents a paper in storehouse.
The implementation method of virtual terminals of intelligent substation the most according to claim 1 and 2 design training, it is characterized in that described baseline configuration file, training project file is presented a paper with training is that the training project file prefix name by identical is mated, and is carried out the differentiation of type by different file suffixes names;nullOn SCD system configurator, finally increase empty terminal connection compare and visual presentation function,The baseline configuration file and training with identical training project file prefix name are presented a paper and compared,And according to the modeling specification of " IEC 61850 engineering relay protection application model ",GOOSE wire definition or SV wire definition to input (Inputs) the part definition having in two files under identical IED title (IED Name) in LLNO logical node compare,Find out difference therein,And GOOSE wire definition or the inconsistent entry of SV wire definition are identified in present a paper training under identical IED middle GOOSE wire definition or SV wire definition and baseline configuration file,So that can be by visual mode,Show empty terminal to connect in design clearly to student and connect wrong empty terminal,The visualization realizing connecting virtual terminals of intelligent substation design is instructed and training.
CN201410210499.9A 2014-05-19 2014-05-19 A kind of virtual terminals of intelligent substation connects the implementation method of design training Active CN104036667B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410210499.9A CN104036667B (en) 2014-05-19 2014-05-19 A kind of virtual terminals of intelligent substation connects the implementation method of design training

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410210499.9A CN104036667B (en) 2014-05-19 2014-05-19 A kind of virtual terminals of intelligent substation connects the implementation method of design training

Publications (2)

Publication Number Publication Date
CN104036667A CN104036667A (en) 2014-09-10
CN104036667B true CN104036667B (en) 2016-08-24

Family

ID=51467420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410210499.9A Active CN104036667B (en) 2014-05-19 2014-05-19 A kind of virtual terminals of intelligent substation connects the implementation method of design training

Country Status (1)

Country Link
CN (1) CN104036667B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106199323A (en) * 2016-07-27 2016-12-07 国网河北省电力公司电力科学研究院 A kind of virtual terminals of intelligent substation connects correctness method of discrimination
CN107481598A (en) * 2017-08-08 2017-12-15 国网四川省电力公司电力科学研究院 A kind of emulation training platform of intelligent substation
CN107741952B (en) * 2017-09-12 2021-05-25 国网江苏省电力公司技能培训中心 Automatic scoring and examination system based on SCD configuration file comparison of intelligent substation
CN109884422B (en) * 2019-01-22 2020-12-11 许昌许继软件技术有限公司 On-site protection device load testing method and device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102291277A (en) * 2011-08-09 2011-12-21 上海思源弘瑞自动化有限公司 Automatic test system and method for intelligent substation spacing apparatus
CN102647025A (en) * 2012-04-13 2012-08-22 广东省电力调度中心 Method for realizing plug and play of protective device based on center server manner
CN102801213A (en) * 2012-08-10 2012-11-28 广东省电力调度中心 Integrated method and integrated device of SCD (System Configuration Document) of transformer station
CN103439592A (en) * 2013-06-27 2013-12-11 国家电网公司 Method for intelligently testing intelligent substation on site
CN103441571A (en) * 2013-06-18 2013-12-11 国家电网公司 Integrated monitoring system information platform for transformer substation
CN103647717A (en) * 2013-11-26 2014-03-19 华南理工大学 Message accurate recognition-based substation communication network deterministic path switching method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102291277A (en) * 2011-08-09 2011-12-21 上海思源弘瑞自动化有限公司 Automatic test system and method for intelligent substation spacing apparatus
CN102647025A (en) * 2012-04-13 2012-08-22 广东省电力调度中心 Method for realizing plug and play of protective device based on center server manner
CN102801213A (en) * 2012-08-10 2012-11-28 广东省电力调度中心 Integrated method and integrated device of SCD (System Configuration Document) of transformer station
CN103441571A (en) * 2013-06-18 2013-12-11 国家电网公司 Integrated monitoring system information platform for transformer substation
CN103439592A (en) * 2013-06-27 2013-12-11 国家电网公司 Method for intelligently testing intelligent substation on site
CN103647717A (en) * 2013-11-26 2014-03-19 华南理工大学 Message accurate recognition-based substation communication network deterministic path switching method

Also Published As

Publication number Publication date
CN104036667A (en) 2014-09-10

Similar Documents

Publication Publication Date Title
CN102622463B (en) Drawing-model uniformity based method for automatic check of design drawings
CN104008223B (en) Graphical expressing method for connection of virtual terminals of secondary system of intelligent substation
CN104133953B (en) Intelligent substation secondary design system
CN101989312B (en) Graphical intelligent transformer substation model design method based on computer-aided design (CAD)
CN103904779B (en) A kind of full station intelligent terminal analogue means of intelligent substation and using method thereof
CN104036667B (en) A kind of virtual terminals of intelligent substation connects the implementation method of design training
CN110852023B (en) Automatic generation method and device for primary main wiring diagram of intelligent substation
CN110535236B (en) Intelligent substation bay level simulation self-acceptance system and method
CN102779156B (en) Configuration method for database of communication device in digital substation
CN103593809A (en) Intelligent operation-ticket semanteme verification method of automatic power dispatching system
CN109766586A (en) A kind of method and system automatically generating large scale electric network electromagnetic transient simulation model
CN103902763A (en) Automatic matching method of virtual terminals of cross-interval device of intelligent substation
BR102015007965A2 (en) SYSTEM, COMPUTER-RELATED NON-TRANSIENT MEDIA AND METHOD
CN108733928B (en) SCD file virtual circuit automatic checking method based on intermediate model file
CN102184280A (en) Drawing and model integrated visual integration design method
CN103514336A (en) Intelligent substation optical cable connection automatic design method based on virtual-true mapping mode
CN106485599A (en) A kind of visual presentation method of intelligent substation SSD configuration file
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN103577628A (en) Optimization method for virtual circuit design of smart substation
CN106301976A (en) A kind of intelligent substation schedule information automated testing method
CN113095059B (en) Method, device, equipment and storage medium for verifying substation configuration description file
CN111611665B (en) Intelligent substation design method based on three-dimensional modular design
CN107025329B (en) Virtual circuit automatic connection method of intelligent substation
CN102411646A (en) Distribution data processing method and device
CN106229974A (en) A kind of method that electric power networks rapid topology based on chart database is analyzed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: JIAXING POWER SUPPLY COMPANY, STATE GRID ZHEJIANG

Free format text: FORMER OWNER: JIAXING POWER SUPPLY COMPANY, STATE GRID ZHEJIANG ELECTRIC POWER COMPANY NANJING GUODIAN NANJING AUTOMATION SOFTWARE ENGINEERING CO., LTD. NANJING GUODIAN NANJING-AUTOMATION POWER GRID AUTOMATION CO., LTD.

Effective date: 20140910

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Chou Qunhui

Inventor after: Zhu Qun

Inventor after: Cai Yixing

Inventor after: Fei Yunzhong

Inventor after: Yan Yan

Inventor after: Qian Haidong

Inventor after: Luo Shuojun

Inventor after: Ji Ling

Inventor after: Qiu Yutao

Inventor after: Zhou Weiguo

Inventor after: Fang Lei

Inventor after: Jiang Weijian

Inventor after: Shi Jianli

Inventor after: Tan Tingfang

Inventor after: Yu Xingkun

Inventor before: Chou Qunhui

Inventor before: Zhu Qun

Inventor before: Cai Yixing

Inventor before: Fei Yunzhong

Inventor before: Ji Ling

Inventor before: Qiu Yutao

Inventor before: Zhou Weiguo

Inventor before: Fang Lei

Inventor before: Jiang Weijian

Inventor before: Shi Jianli

Inventor before: Tan Tingfang

Inventor before: Yu Xingkun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CHOU QUNHUI JI LING QIU YUTAO ZHOU WEIGUO FANG LEI JIANG WEIJIAN SHI JIANLI TAN TINGFANG YU XINGKUN ZHU QUN CAI YIXING FEI YUNZHONG TO: CHOU QUNHUI JI LING QIU YUTAO ZHOU WEIGUO FANG LEI JIANG WEIJIAN SHI JIANLI TAN TINGFANG YU XINGKUN ZHU QUN CAI YIXING FEI YUNZHONG YAN YAN QIAN HAIDONG LUO SHUOJUN

TA01 Transfer of patent application right

Effective date of registration: 20140910

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Jiaxing Power Supply Company, State Grid Zhejiang Electronic Power Company

Applicant after: Nanjing Guodiannanzi Software Engineering Co., Ltd

Applicant after: Nanjing Guodian Nanjing Grid Automation Co., Ltd.

Applicant after: ZHOUSHAN POWER SUPPLY COMPANY OF STATE GRID ZHEJIANG ELECTRIC POWER COMPANY

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: Jiaxing Power Supply Company, State Grid Zhejiang Electronic Power Company

Applicant before: Nanjing Guodiannanzi Software Engineering Co., Ltd

Applicant before: Nanjing Guodian Nanjing Grid Automation Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant