CN102624909A - Resource scheduling system based on internet-of-things technology and scheduling method thereof - Google Patents

Resource scheduling system based on internet-of-things technology and scheduling method thereof Download PDF

Info

Publication number
CN102624909A
CN102624909A CN2012100657758A CN201210065775A CN102624909A CN 102624909 A CN102624909 A CN 102624909A CN 2012100657758 A CN2012100657758 A CN 2012100657758A CN 201210065775 A CN201210065775 A CN 201210065775A CN 102624909 A CN102624909 A CN 102624909A
Authority
CN
China
Prior art keywords
resource
temporary
internet
temporary resource
things
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100657758A
Other languages
Chinese (zh)
Inventor
林野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Smart Bit Information Technology Zhenjiang Co ltd
Original Assignee
Smart Bit Information Technology Zhenjiang Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Smart Bit Information Technology Zhenjiang Co ltd filed Critical Smart Bit Information Technology Zhenjiang Co ltd
Priority to CN2012100657758A priority Critical patent/CN102624909A/en
Publication of CN102624909A publication Critical patent/CN102624909A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a resource scheduling system based on an internet-of-things technology and a scheduling method thereof. A managing end is relied on the internet of things, and a temporary resource end is scheduled according to the shortage condition of fixed resources so as to balance the shortage of the resources. The system and method provided by the invention have the advantages that an effective software system is used for scheduling and managing temporary scattered resources so as to solve the problem of the shortage of the resources in a specific time period, and the temporary resources are scheduled, managed and monitored by virtue of the internet-of-things technology so as to ensure sequential proceeding and maximized reasonable application and enhance economic benefit and social benefit.

Description

A kind of resource scheduling system and dispatching method thereof based on technology of Internet of things
Technical field
The present invention relates to computer software, particularly a kind of resource scheduling system and dispatching method thereof based on technology of Internet of things.
Background technology
In the social production activity, the fixed resource that one type of limited quantity often occurs is very in short supply and influence the phenomenon of ordinary production life in some special time period.If only rely on the quantity that increases fixed resource to solve this phenomenon in short supply interim, that be interrupted, obviously be uneconomic, also be unfavorable for the reasonable resources utilization.Can take under the prerequisite that does not increase fixed resource quantity, to solve the resource scarcity problem of special time period with integrate the way of utilization in good time with the resource of loosing facing of the fixed resource same item of this type limited quantity.
But how to realize effective management, scheduling to temporary resource through technological means, be the actual techniques problem that needs solution.
Summary of the invention
Goal of the invention: to the problems referred to above, the purpose of this invention is to provide and a kind ofly integrate utilization to solve the resource scheduling system and the dispatching method thereof of special time period resource scarcity problem to facing the resource of loosing in good time based on technology of Internet of things.
Technical scheme: a kind of resource scheduling system based on technology of Internet of things, management end relies on Internet of Things, and is according to the situation scheduling temporary resource end in short supply of fixed resource, in short supply with balancing resources;
Said management end comprises at least:
(1) monitoring module: flow, the state of keeping watch on, write down fixed resource and temporary resource;
(2) storage module: carry and include the schedulable temporary resource client information of system in;
(3) communication module: be used for and of the real time data transmission of temporary resource end group in Internet of Things;
(4) scheduler module: carry out Real-Time Scheduling management of information and control with the temporary resource end;
Said temporary resource end comprises at least:
(1) communication module: be used for and the real time data transmission of management end based on Internet of Things; The schedule information of receiving management end; To information such as management end feedback temporary resource end state and geographical position;
(2) block of state: the state of expression temporary resource end;
(3) display module: show the state of temporary resource end, for identification.
The state of said temporary resource end comprises:
Readiness: show that the temporary resource end prepares to accept the scheduling of resource scheduling system at any time;
Halted state: show that the temporary resource end after accomplishing current task, no longer accepts the scheduling of resource scheduling system;
Down status: show that the temporary resource end has withdrawed from resource scheduling system.
The dispatching method of above-mentioned a kind of resource scheduling system based on technology of Internet of things; The temporary resource end is put its time period that can be scheduled on record the management end storage; The temporary resource end that is in readiness constitutes the set that can be scheduled; Control and management is called in or accessed to management end according to the monitoring to fixed resource situation in short supply to the temporary resource end.
The temporary resource end passes through the audit of resource scheduling system in advance.
Beneficial effect: advantage of the present invention is to dispatch and manage facing the resource of loosing through effective software systems; To solve special time period resource scarcity problem; Rely on technology of Internet of things; Enforcement is to the dispatching management and the monitoring of temporary resource, carries out in order and maximizes utilization rationally guaranteeing, improves the economic and social benefits.
Embodiment
Below in conjunction with specific embodiment; Further illustrate the present invention; Should understand these embodiment only be used to the present invention is described and be not used in the restriction scope of the present invention; After having read the present invention, those skilled in the art all fall within the application's accompanying claims institute restricted portion to the modification of the various equivalent form of values of the present invention.
The present invention a kind ofly integrates utilization to solve the resource scheduling system and the dispatching method thereof of special time period resource scarcity problem based on technology of Internet of things to facing the resource of loosing in good time.In taxi operation, be applied as example with the present invention, specify resource scheduling system of the present invention and dispatching method thereof.
Similar resource is divided into fixed resource and faces the resource of loosing and distinguish, and fixed resource satisfies the normal user demand of society steadily in the long term, and its quantity is relatively stable constant in one period, i.e. the taxi of normal operation; Facing the resource of loosing is the general designation of each vehicle except that the taxi of normal operation, comprises the private car.Face the resource of loosing according to its wish, can provide time, the self information of public operation service to submit to resource scheduling system audit of the present invention to put on record it, audit is accepted dispatching management through promptly becoming temporary resource.
On software systems were formed, management end was arranged at the control centre, comprises at least: (1) monitoring module: flow, the state of keeping watch on, write down fixed resource and temporary resource; (2) storage module: carry and include the schedulable temporary resource client information of system in; (3) communication module:, be used for the real time data transmission between temporary resource end and the control centre based on technology of Internet of things; (4) scheduler module: be used for carrying out Real-Time Scheduling management of information and control with the temporary resource end.The temporary resource end is arranged at includes the removing the taxi of normally runing on the vehicle of resource scheduling system management in, comprises at least: (1) communication module: based on technology of Internet of things, be used for and control centre's management end between the real time data transmission; The schedule information of receiving management end; To information such as management end feedback temporary resource end oneself state and geographical position; (2) block of state: the state of expression temporary resource end is divided into readiness: show that the temporary resource end prepares to accept the scheduling of resource scheduling system at any time; Halted state: show that the temporary resource end after accomplishing current task, no longer accepts the scheduling of resource scheduling system; Down status: show that the temporary resource end has withdrawed from the dispatching patcher of control centre; (3) display module: show the state of temporary resource end, for identification.
The software running method that the temporary resource vehicle drops into public operation is: control centre's management end is according to the monitoring to the fixed resource taxi; Confirm whether the fixed resource taxi is in state in short supply; If management end is searched the temporary resource end vehicle that is in readiness from storage module, through Internet of Things it is sent the dispatching command of " putting into effect " this moment; Corresponding temporary resource end vehicle receives the instruction back and drops into public operation service, and the operation sign of demonstration regulation is for identification.Temporary resource end vehicle sends the management end that is prompted to of readiness after current task is accomplished, wait for the scheduling once more of management end.Control centre's management end can directly be controlled the display module of temporary resource end, locks or release, in case do not pretend to be temporary resource through the vehicle that looses facing of audit, adds operation without authorization, causes monitoring and managerial confusion.
The temporary resource vehicle withdraws from the software running method of public operation: the one, when control centre's management end monitors fixed resource when no longer in short supply; Through Internet of Things the temporary resource end vehicle that drops into public operation is sent the dispatching command of " withdrawing from operation "; Make its temporary resource end after accomplishing current task, withdraw from public operation; The 2nd, temporary resource end vehicle initiatively withdraws from public operation; For example; When temporary resource end vehicle is in readiness for a long time, exceed wish scope service time of oneself, temporary resource end vehicle just can send the request that stops to run and give control centre's management end at this moment; Send the prompting of down status again, withdraw from public operation.
Adopt urban taxi operation system of the present invention, can not only solve the taxi usage quantity short supply state of peak period, but also can solve the problem that the common illegal black taxi in various places exists.

Claims (4)

1. resource scheduling system based on technology of Internet of things is characterized in that: management end relies on Internet of Things, and is according to the situation scheduling temporary resource end in short supply of fixed resource, in short supply with balancing resources;
Said management end comprises at least:
(1) monitoring module: flow, the state of keeping watch on, write down fixed resource and temporary resource;
(2) storage module: carry and include the schedulable temporary resource client information of system in;
(3) communication module: be used for and of the real time data transmission of temporary resource end group in Internet of Things;
(4) scheduler module: carry out Real-Time Scheduling management of information and control with the temporary resource end;
Said temporary resource end comprises at least:
(1) communication module: be used for and the real time data transmission of management end based on Internet of Things; The schedule information of receiving management end; To information such as management end feedback temporary resource end state and geographical position;
(2) block of state: the state of expression temporary resource end;
(3) display module: show the state of temporary resource end, for identification.
2. a kind of resource scheduling system according to claim 1 based on technology of Internet of things, it is characterized in that: the state of said temporary resource end comprises:
Readiness: show that the temporary resource end prepares to accept the scheduling of resource scheduling system at any time;
Halted state: show that the temporary resource end after accomplishing current task, no longer accepts the scheduling of resource scheduling system;
Down status: show that the temporary resource end has withdrawed from resource scheduling system.
3. the dispatching method of a kind of resource scheduling system based on technology of Internet of things according to claim 1; It is characterized in that: the temporary resource end is put its time period that can be scheduled on record the management end storage; The temporary resource end that is in readiness constitutes the set that can be scheduled; Control and management is called in or accessed to management end according to the monitoring to fixed resource situation in short supply to the temporary resource end.
4. the dispatching method of a kind of resource scheduling system based on technology of Internet of things according to claim 3, it is characterized in that: the temporary resource end passes through the audit of resource scheduling system in advance.
CN2012100657758A 2012-03-14 2012-03-14 Resource scheduling system based on internet-of-things technology and scheduling method thereof Pending CN102624909A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100657758A CN102624909A (en) 2012-03-14 2012-03-14 Resource scheduling system based on internet-of-things technology and scheduling method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100657758A CN102624909A (en) 2012-03-14 2012-03-14 Resource scheduling system based on internet-of-things technology and scheduling method thereof

Publications (1)

Publication Number Publication Date
CN102624909A true CN102624909A (en) 2012-08-01

Family

ID=46564591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100657758A Pending CN102624909A (en) 2012-03-14 2012-03-14 Resource scheduling system based on internet-of-things technology and scheduling method thereof

Country Status (1)

Country Link
CN (1) CN102624909A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103761585A (en) * 2014-01-27 2014-04-30 北京市交通运行监测调度中心 Airport continuous transport dynamic matching, transport capacity monitoring and early warning and intelligent dispatching method
CN107211236A (en) * 2014-12-29 2017-09-26 康维达无线有限责任公司 The link resource management of service layer
CN108053086A (en) * 2017-09-30 2018-05-18 广州筑网网络科技有限公司 The resource intelligent dispatching method and system of a kind of remains processing procedure
CN111931101A (en) * 2020-06-30 2020-11-13 汉海信息技术(上海)有限公司 Information pushing method and device, electronic equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070072625A1 (en) * 2001-11-01 2007-03-29 Airbiquity Inc. Remote method for wireless transmission of location data
CN101799991A (en) * 2010-04-12 2010-08-11 济南格林节能开发有限公司 Road lamp management and taxi call automatic dispatching system based on Internet of things
CN102025775A (en) * 2010-10-29 2011-04-20 北京工业大学 Monitoring system for automobiles in internet of things
CN102346470A (en) * 2011-08-17 2012-02-08 江苏吉美思物联网产业股份有限公司 IOT (the Internet of Things)-based comprehensive operation and dispatching management system of engineering machinery

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070072625A1 (en) * 2001-11-01 2007-03-29 Airbiquity Inc. Remote method for wireless transmission of location data
CN101799991A (en) * 2010-04-12 2010-08-11 济南格林节能开发有限公司 Road lamp management and taxi call automatic dispatching system based on Internet of things
CN102025775A (en) * 2010-10-29 2011-04-20 北京工业大学 Monitoring system for automobiles in internet of things
CN102346470A (en) * 2011-08-17 2012-02-08 江苏吉美思物联网产业股份有限公司 IOT (the Internet of Things)-based comprehensive operation and dispatching management system of engineering machinery

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103761585A (en) * 2014-01-27 2014-04-30 北京市交通运行监测调度中心 Airport continuous transport dynamic matching, transport capacity monitoring and early warning and intelligent dispatching method
CN103761585B (en) * 2014-01-27 2017-07-07 北京市交通运行监测调度中心 Continue transport Dynamic Matching, transport power monitoring and early warning and intelligent dispatching method on airport
CN107211236A (en) * 2014-12-29 2017-09-26 康维达无线有限责任公司 The link resource management of service layer
CN107211236B (en) * 2014-12-29 2020-10-27 康维达无线有限责任公司 Resource link management equipment and method for service layer
US11134365B2 (en) 2014-12-29 2021-09-28 Convida Wireless, Llc Resource link management at service layer
CN108053086A (en) * 2017-09-30 2018-05-18 广州筑网网络科技有限公司 The resource intelligent dispatching method and system of a kind of remains processing procedure
CN108053086B (en) * 2017-09-30 2019-01-11 广州筑网网络科技有限公司 A kind of the resource intelligent dispatching method and system of remains treatment process
CN111931101A (en) * 2020-06-30 2020-11-13 汉海信息技术(上海)有限公司 Information pushing method and device, electronic equipment and storage medium
CN111931101B (en) * 2020-06-30 2024-06-18 汉海信息技术(上海)有限公司 Information pushing method and device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
US10169070B1 (en) Managing dedicated and floating pool of virtual machines based on demand
US10289190B2 (en) Power management and priority charging assignments
CN108876140B (en) Scheduling method, device, server and medium for power communication maintenance task
JP4338126B2 (en) Network system, server, device management method and program
CN112434980A (en) Efficient automatic dispatching method and system for public service vehicles
CN102738801A (en) Power demand responding method and system
CN102624909A (en) Resource scheduling system based on internet-of-things technology and scheduling method thereof
WO2012055295A1 (en) Battery charge/swap monitoring system and method based on internet of things
CN110400040A (en) A kind of quick transmission system of management and running information based on mobile Internet
CN102387173A (en) MapReduce system and method and device for scheduling tasks thereof
WO2017171123A1 (en) Method for selecting and configuring optimum distributed resources for economic dr bid of demand management company
CN101968859A (en) Business process management method and system based on cloud computing environment
CN102096600A (en) Information processor and resource scheduling method and program
CN109359804A (en) A kind of online order logistic management system
CN107404519B (en) Distributed shared service management system
CN201946109U (en) Vehicle monitoring and management system
CN103092645A (en) Geographic spatial information application system and implement method thereof based on microkernel technology
CN104182846A (en) Client management system
CN106095581B (en) Network storage virtualization scheduling method under private cloud condition
CN105225098A (en) The office automation system of commercial presence enterprise
CN102571413A (en) Method for resource management under cluster environment
CN106022562A (en) Management system based on intelligent tourism and method
CN103699977A (en) Workflow management system and method based on mobile communication
CN101866458A (en) Method and system for obtaining schedule data of task
CN111695879A (en) OA system based on big data

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120801