CN102624823A - Holographic hedging equalization technology for regional value chain network configuration - Google Patents
Holographic hedging equalization technology for regional value chain network configuration Download PDFInfo
- Publication number
- CN102624823A CN102624823A CN2011103421117A CN201110342111A CN102624823A CN 102624823 A CN102624823 A CN 102624823A CN 2011103421117 A CN2011103421117 A CN 2011103421117A CN 201110342111 A CN201110342111 A CN 201110342111A CN 102624823 A CN102624823 A CN 102624823A
- Authority
- CN
- China
- Prior art keywords
- value chain
- area value
- network configuration
- configuration
- chain network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A holographic hedging equalization technology for regional value chain network configuration is novel technology which is set up by taking the internet users as the center and further taking a multi-hierarchy GVC (global value chain) as the center, taking the joint and coordination performed by a cognitive system and a practice system based on computer auxiliary systems and internet as a main line of a developing process of an HIIS (high intelligent integrated system) and setting up a basic model, a normal form and an equation system of network configuration dynamics and a basic model, a normal form and an equation system of game organization synergetics on the basis of setting up new logic foundation, mathematic foundation and scientific foundation and in order to modify a 'cloud' computing system into a universal 'Heaven-Earth' computing system.
Description
Technical field
This invention is 600 patent of invention clusters that applicant Li Zongcheng is formally submitted in September, 2011 by electronic system to State Patent Office(Generic name is " GVC network techniques support system [DCN/IIL (VCSE);] " in the 549th.
This invention and patent of invention cluster(Generic name is " GVC network techniques support system [DCN/IIL (VCSE);] " in the 541st, the 542nd, the 543rd, the 544th, the 545th, the 546th, the 547th, the 548th, the 550th, the 551st, the 552nd, the 553rd, the 554th, the 555th, the 556th, the 557th, the 558th, the 559th, the 560th, together, collectively form patent of invention group " area value chain network configuration ICT technique support systems(ICT-NAM / [ RVC ] )”.
The applicant proposes " the GVC network techniques support system [DCN/IIL (VCSE) constituted including this invention, by 600 patents of invention;] ", its bulking property is aimed at, with global value Chain System(GVC)For core, the connection carried out using Natural Intelligence and Artificial Intelligence based on computer and its network and coordination are used as general intelligence integrated system(GIIS)The main line of Upgrade process, set up brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technical foundation and engineering foundation, for relative closure, " resource pool " of geo-stationary --- system for cloud computing injection soul, intelligence and life, build global intelligent integral contract network computer architecture(CS / HSN ( GII )), Global Internet is made as the real technique support system with life and ecological right joint management property.On this basis, with global value Chain System(GVC)For core, using being coupled of carrying out based on computer aided system and internet of cognitive system and practice system and coordinate to be used as high-grade intelligent integrated system(HIIS)The main line of evolution process, sets up and is based on metasystem(MS)The brand-new theoretical intelligent integrated science system of science(IIS & IIT ;)The new Global Internet of life-giving vigor is combined together with being dispersed in the logistics net of each field all departments, energy net, Network and Finance Network and knowledge knowledge network all over the world, carry out GVC system engineering energetically, set up the dynamic Correspondent network system of the real global intelligent integral with life and ecological right joint management property(DCN / HII ( GVC )), so as to build intelligent integrated net, life internet and ecological operation net.By implementing GVC system engineering technology Cluster Exploitation total strategy --- the present inventor Li Zong is really referred to as " since the beginning of history " plan, and indefinite " cloud " counting system of flicker is transformed into " world " counting system of Correspondent all things on earth, insertion longitude and latitude.
The main purpose of this invention, is, by brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technical foundation and engineering foundation, holographic butt joint equalization technology to be provided for area value chain network configuration.
Involved all Mathematical Modelings are inventor Li Zong and really independently set up in this specification, with original creativity.
This invention belongs to the network techniques support field of facing area value chain network configuration, network organization and network management (NA/RVC), it is the intelligent integrated integrated technique basis of facing area value chain and then facing area value chain network configuration system, is that people, mechanism and tissue is indefinite " cloud " from flicker(Counting system)Guide " world " of Correspondent all things on earth into(Brand-new counting system)Key.
NA/RVC is a kind of solution of area value chain system engineering, by means of brand-new Information technology and the network technology, the service strategy of area value chain and operation mode are imported among the whole inside and outside association system of area value chain network configuration by trunk of information system, it is more than the change in science and technology, but involves the comprehensive integration and configuration of the cross-region of all about personnel, fund, logistics, manufacture and area value chain tissue that area value chain organization internal and outside are associated or the flow on transnational border.
NA/RVC is the physical resources configuration for the inside and outside association of area value chain network configuration(Logistics), human resources configuration(The stream of people), fund resources configuration(Wealth stream), information resource disposition(Information flow)Integrated area value chain configuration software.The DIM analyses of business are generated by the rule designer of the inside and outside association of facing area value chain network configuration, system integrator, module and Li Zong really proposes the ultimate consumer of the inside and outside association of facing area value chain network configuration, social governor motion, the SHF analyses of domestic and international relative, laterally description association department in longitudinal direction of future generation, association department and value resource planning(VRP)Software.It using graphical user interface, makes user/serving system architecture of the inside and outside association of inclusion region value chain network configuration using open system.Except existing standard feature, it also includes other characteristics, the adjustment report of such as configuration of the quality of the inside and outside association of area value chain network configuration, process enactment and the inside and outside association of area value chain network configuration.Particularly, the basic technology that NA/RVC is used is by simultaneously to independence of both the user software and hardware of the inside and outside association of area value chain network configuration so as to be more prone to upgrading.NA/RVC key is that all users of the inside and outside association of area value chain network configuration can cut its application, thus with natural ease for use.
Background technology
In recent years, the fusion of the big network of ICT industries three and system for cloud computing technology were pushed ahead energetically international and domestic always.Grid attempts to realize the overall sharing of interconnection internet resource, including information resources, data resource, computing resource and software resource etc..
But, current, the fusion of the big network of ICT industries three is just absorbed in the desperate situation died young, and the innovative wretched insufficiency of cloud computing technology, the application of cloud computing meets with a variety of limitations, the exploitation experience cold difficult situation hot in the industry, out of trade of cloud computing system.With the fast development of computer technology and the network technology, with financial innovation and the increasingly increase of financial risks, market competition is further exacerbated by, and the space of area value chain competition and scope further expand, and the integration of global economy is also constantly being pushed ahead.Twentieth century is mainly directed towards the thought that area value chain internal resource is configured comprehensively the nineties, progressively develops into the configuration thought for how effectively utilizing and configuring overall resource therewith.Under this situation, Li Zong really first proposed NA/RVC concept report.
On the basis of the Correspondent set based on many attribute measure spaces of intelligent integrated economy, the Correspondent operator based on the economic more rules metric matrix of intelligent integrated, the Correspondent relation based on the economic multiple-factor variable synthesis of intelligent integrated and the Correspondent function based on the economic multiplicity algebra system of intelligent integrated is set up, the present inventor proposes to develop and set up the brand-new network system that logistics network, knowledge network and banking network combine together by platform of information network --- and " whole world dynamic Correspondent network ";And then propose to develop and set up it is a kind of cloud computing and grid computing are included including brand-new counting system --- towards knowledge resource configure, physical resources configuration and allocation of financial resource " world " computation schema;And then propose to develop and set up and a kind of operated various cognitive operations and practice brand-new operation system --- " the holographic cooperating system " that combines together to be crucial using computer operating system and internet operating system(OS / HSO).
The dynamic Correspondent network system DCN/IIL (VCSE) of GVC that the present inventor proposes, refers to the value chain system of multi-layer multi-mode(VCS, from value of the product chain PVC, area value chain RVC, to industry value chain IVC, area value chain RVC, so that national value chain NVC, GVC GVC)For core, major technique is fused to telecommunications network (MCN), computer network (WWW) and the big network of broadcasting and television network (BTN) three to support, by logistics net (MN), can drift net (EN), Information Network (IN), Network and Finance Network (FN) and the big network of knowledge knowledge network (KN) five combine together there is provided full field, total system, overall process comprehensive integration business service the global open network system.
The present inventor proposes that the dynamic Correspondent network in the whole world that develop and set up and its world are calculated and holographic cooperating system (abbreviation OS/HSO, Operating System of Holo-synergetic Oganization), it is a complete complex system.The world calculates the full Correspondent network of the logistics being intended under being supported by information network, knowledge, finance, the computational entity of multiple advantage of lower cost is integrated into a complete Integrated Intelligent System with powerful calculating ability, and by brand-new business models such as information network inside and outside SaaS/HSO, PaaS/HSO, IaaS/HSO, MSP/HSO, this powerful computing capability is distributed in the terminal user's hand of information network inside and outside.
Global dynamic Correspondent network calculations concept can be regarded as a kind of logistics network, knowledge network and banking network being collected into the application model that insertion is got up by platform of information network.Global dynamic Correspondent network calculations not only computer-oriented and information network, and Logistics Oriented network, knowledge network and banking network.It attempts to surmount information calculating and information network is calculated, and information is calculated and information network is calculated to collect insertion with logistics network, knowledge network and banking network and run and is closely linked, intelligent integrated integration is realized.
As the basis of this invention, brand-new logical foundations include holographic Correspondent logic, the two poles of the earth Correspondent logic, the holographic Correspondent logic in the two poles of the earth;Brand-new Fundamentals of Mathematics include holographic Correspondent mathematics, the two poles of the earth Correspondent mathematics, system migration analysis mathematics;Brand-new scientific basic includes resource distribution dynamics, holographic organization synergetics, the system behavio(u)r theory of value, game coordination, the equilibrium economics that liquidates, holographic Correspondent physics, and a series of insertion science as formed by brand-new theoretical great synthesis(Interdisciplinary science and Cross science)--- metasystem science and intelligent integrated science;Brand-new technical foundation is using value chain system as core, towards the brand-new systems technology of holographic concertedness(Cluster);Brand-new engineering foundation is using value chain system as core, towards the brand-new system engineering of holographic concertedness(Cluster).
The content of the invention
The present inventor Li Zong really proposed area value chain network configuration techniques NA/RVC that exploitation is set up by arduous exploration in more than 20 years, was a brand-new technological system.It is set up on resource distribution dynamics, holographic organization synergetics, the system behavio(u)r theory of value, the equilibrium economics that liquidates and game coordination and economic system engineering intelligent integrated configuration basis, and major tuneup is carried out to enterprise effect chain network configuring technical NA/RVC and industry value chain network configuration techniques NA/IVC by the dynamic Correspondent network of intelligent integrated integration and expands and is formed.
Under the brand-new economic science technology of popularization and application and brand-new management science technology, area value chain network configuration techniques NA/RVC is together with area value chain market construction technology MA/RVC and area value chain network configuration techniques NA/RVC, the relation for mutually making up, being substituted for each other is formed, realizes that user runs target jointly.
(1)For area value chain, the present inventor independent sets up brand-new logical foundations, Fundamentals of Mathematics, in scientific basic and brand-new technical foundation and engineering foundation at its, in order to which indefinite " cloud " counting system of flicker to be transformed into " world " counting system of Correspondent all things on earth, insertion longitude and latitude, adhere to using global value Chain System as core, with cognitive system(RS and its computer aided system)With practice system(PS and its computer aided system)Connection and coordinate be used as high-grade intelligent integrated system(HIIS)The main line of evolution process, sets up network configuration effect chain and the principles of science in a balanced way is docked with internet.
Develop in the ascendant, ecommerce just under background of the seeking breakthrough with development in the integration of three networks of ICT industries, cloud computing technology, around a series of basic problems, key problem and key issue, the present inventor studies from resource distribution statics, turns to resource distribution dynamics research;From value of the product opinion(The labour theory of value and marginal utility theory of value)Research, steering effect theory of value research;From the research of single system intelligent integrated, turn to and equilibrium intelligent integrated research is docked into the system organization that the configuration of internal effect combines with outside effect configuration;From the research of simple products intelligent integrated, turn to and the system of values that high-end product configuration and low-end product configuration combine is docked into balanced intelligent integrated research;Studied from simple intelligent integrated in kind, turn to and the complete tissue that natural intelligence configuration and artificial intelligence configuration combine is docked into balanced intelligent integrated research;From the research of simple switched intelligent integrated, turn to the balanced intelligent integrated of game tissue docking for combining competition organization configurations and cooperative association's configuration and study;From regulation arrangement research, Complete Factor synergetics research is turned to;From rule transition research, the research of game coordination is turned to.By these effort, the theoretical foundation system for the integrated science of general intelligence being made up of " resource distribution dynamics ", " the system behavio(u)r theory of value ", " integrated configuration dynamics " and " complete coordination theory " etc. is tentatively founded.
On a series of related bases explored, let us inquires into the new intelligence configuration dynamic analysis basis set up towards the big system of complicated intelligent integrated from natural intelligence chain-artificial intelligence chain.
The integrated configuration dynamics that (1. 1) are set up based on resource distribution dynamics and the system behavio(u)r theory of value, main to include the system organization that the configuration of internal effect combines with outside effect configuration docking equilibrium intelligent integrated research, this configuration is relevant with regular innovation;By the balanced intelligent integrated research of system of values docking that high-end product is configured and low-end product configuration combines, this configuration is relevant with technological innovation;By the balanced intelligent integrated research of complete tissue docking that natural intelligence is configured and artificial intelligence configuration combines, this configuration is relevant with electronic banking innovation;The balanced intelligent integrated research of game tissue docking that organization configurations and cooperative association's configuration combine will be competed, this configuration is relevant with organizational innovation.Complex configurations game coordination analytical framework is the combination of resource distribution dynamic analysis framework, Complete Factor Analysis with Synergetics framework, system behavio(u)r theory of value analytical framework and integrated configuration dynamic analysis framework, can accommodate the various researchs of information science technology.
The present inventor proposes docking balanced type throw-in play, and counts the natural intelligence configuration output YM that connects relative with artificial intelligence field of configuration various projects, can be represented simply as:
We can propose to dock balanced type throw-in play, and count the artificial intelligence configuration output YF that connects relative with natural intelligence field of configuration various projects, can be represented simply as:
IfDM The demand of system output is configured to artificial intelligence for natural intelligence field of configuration,SF Output for artificial intelligent configuration system to natural intelligence field of configuration, then docking equilibrium condition is:。
Equilibrium constraints condition is docked meetingUnder, configure the configuration under relative connect with the statistics natural intelligence configuration of docking balanced type throw-in play and artificial intelligence and export HY(Or HGDP)Various projects, can be represented simply as:
The present inventor will dock Equilibrium constraints condition for whole analyses that the integrated configuration metasystem of natural intelligence chain and artificial intelligence chain is made meetingIt is lower to carry out.
Equilibrium constraints condition is docked meetingUnder, we can set up following exported based on artificial intelligence and experience the relative IIH types connect with I types and experience function:
For artificial intelligence resource output for, from natural intelligence export experience expenditure be it is spontaneous, it is typically unrelated with the output of artificial intelligence resource, therefore,a 2 + C 0Constitute spontaneous sexual experience expenditure.IIH types experience function as shown in Fig. 2.
(1. 2) the docking equilibrium experience function and liquidity preference function of extension
IfUThe effectiveness of=mono- unique individual user;q i =theiThe demand of information products is planted,i = 1, 2, , n;b i =the current period hold when terminating theiItem artificial intelligence product,i = 1, 2, , s;m The closing balance the held when=current period terminates, then the utility function of the personal user be
OrderC experience expenditures,Artificial intelligence product holds sum, if there is an appropriate summation process(Slightly), then have
Wherein,pWithrFor the configuration intensity and interest rate after totalling,
Current assets when the whole artificial intelligence product=current periods held when closing balance+current period starts when=the current period starts start.
If (1. 11. 92) are homogeneous function, (1. 11. 92) are represented by
If (1. 11. 93) are linear function, (1. 11. 93) are represented by
(1. 11. 94) are respectively measured into indexingi(pWithrExcept), (1. 11. 94) are added up, Ze get social demand functions
It can equally obtain
Whereind 2 , d 3 , e 2, e 3 , f 2 , f 3For the weighted average of parameter, and to be currency export or current assets flexible strategy, for example
If the distribution and the distribution of property of output without acute variation, can regard these weighted average as the parameter rather than variable of stabilization in a short time.
Known by summation process, (1. 11. 95) are substituted into, are then eliminated, obtain simply experience function and liquidity preference function
Under usual situationd 7 = 0。
(1. 3) resources reserve function, resource Correspondent function and artificial intelligence tendency
For meeting docking Equilibrium constraints conditionConfiguration scheme, we can not be referred to as resources reserve by the resources reserve of ICT departments and the resources reserve of non-ICT departments of artificial intelligence Resource Exchange by all from the circulation channel of fund, be denoted asS;All artificial intelligence products by artificial intelligence Resource Exchange are circulated to circulate with unartificial intelligent artifact and are referred to as resource Correspondent, are denoted asS H 。
On the basis of in view of channel of inter-financing, we can be from purposes by the resources reserve of ICT departmentsSIt is divided into two parts:One is the I type resources reserves for natural intelligence resource input, and two be the II type resources reserves for artificial intelligence resource input, i.e.,:;The former can be denoted asS MM , the latter can be denoted asS MF .By resource Correspondent from purposesS H It is divided into two parts:One is the I type resource Correspondents for natural intelligence resource input, and two be the II type resource Correspondents for artificial intelligence resource input, i.e.,:;The former can be denoted asS F M , the latter can be denoted asS H F 。
Yet further, discounting for resource Correspondent channel, resource Correspondent can be divided into two classes by us from purposes completely:
One class is the resource Correspondent for natural intelligence resource input, referred to as IH types docking resource Correspondent, can be denoted asS M , i.e.,:
One class is the resource Correspondent for artificial intelligence resource input, referred to as IIH types docking resource Correspondent, can be denoted asS F , i.e.,:
As shown in Fig. 3, II types are experienced and resource Correspondent is all the function of artificial intelligence resource output, and resource Correspondent curve is closely related with II types experience curve.
By(C1)Butt up against the simple balanced relation of artificial intelligence resourceIt is not difficult to draw IH type resource Correspondent functions:
By(C2)Butt up against the simple balanced relation of artificial intelligence resourceDraw IH type resource Correspondent functions:
The differentiation that (1. 4) make according to the present inventor, real economy, network virtual economy, electronic transaction activity can all be attributed to a class economy, can be referred to as tangible effect economy;And financial product economy and financial derivative product economy can all be attributed to another kind of economy, virtual effect economy, or fictitious capital economy can be referred to as.Just for the sake of fictitious capital economy can be attributed in the real estate speculation activity essence for obtaining increment transaction.
Tangible effect economy more and more nearly interconnects with virtual effect economy, interacted under contemporary society's historical conditions, we can this economy be called the balanced economy that liquidates.
Tangible effect economy is mainly manifested in contemporary society's assets increasingly securitisation to impulsive motion with virtual effect economy.So-called asset securitization, refers to that mobility will be lacked but can produce the assets of foreseeable stable cash flow, by structural restructuring, form the security that can be sold and circulate on financial market, and the process financed according to this.Can securitisation underlying assets it is various in style, including all kinds of loans, accounts receivable, commercial paper, royalty income, rental charge, public utility charges etc. are all kinds of can produce the assets of expected stable cash flows.According to different classes of assets, asset securitization can correspondingly be divided into different species, such as House Mortgage-backed Securitization, loan for purchasing car securitisation, credit card funds on account securitisation, commercial paper securitisation.
Under the social and historical conditions of information networking, financial liberalization and economic globalization, no matter only inquiring into tangible effect economy from microcosmic, or from tangible effect economy is macroscopically only inquired into, fairly obvious limitation has all been showed.The harmony of harmonious and virtual effect economy of tangible effect economy is more and more closely related.
DSS/the LS (DC) set up in the present inventor based on resource distribution dynamics and holographic organization synergetics(And DSS/GO (DC) below)Under analytical framework, we can set up a series of brand-new model analysis.This analysis set up by the present inventor, can be described as the balanced economy analysis model that liquidates, and it at least may include following content:
Substantially liquidate market analysis --- it is related to tangible effect product market, money market and fictitious capital market.Tangible effect product market includes consumer goods market, factor market, virtual technology market, network information market etc., money market includes money market and social idle money market under Central Bank's control distribution, and fictitious capital market includes financial product market and financial derivative product market.
The whole world liquidates market analysis --- it is related to global tangible effect market, Global money market and global virtual capital market.Global tangible effect product market includes global consumer goods market, the worldwide production market for factors of production, global virtual technical market, global network information market etc., Global money market includes the Central Bank of various countries and controls the social idle money market in money market and various countries under distribution, global virtual capital market includes Global finance product market and Global finance derivatives market, as shown in Fig. 4.
Value chain takes in expenditure income relation as shown in Fig. 5 with financing chain to the national economy of impulsive motion.Herein, income can be divided into two classes by we:I classes income is the income from savings, and II classes income is that the income raised and taken in secondary transaction is issued from fictitious capital;Further, expenditure can be divided into four classes by we:I classes pay to be used for the expenditure of Value creation or consumer field from savings, II classes expenditure is used for the expenditure of Value creation or consumer field to be raised from fictitious capital distribution with secondary transaction income, Group III expenditure is is used for the expenditure in value Transfer field from savings, and IV classes expenditure is used for the expenditure in value Transfer field to be raised from fictitious capital distribution with secondary transaction income.
Tangible effect value-added content of product is come across in production chain, and virtual effect value-added content of product is come across in chain transaction.
IfYFor whole tangible effect value-added content of product summation in a certain economy,Ω i ForiPlant tangible effect value-added content of product;Set again sharedNTangible effect product is planted, theiPlanting the value of tangible effect product hasJ i It is secondary additional, then have
Necessary effect of society of entire society's economic system is exactly the system behavio(u)r for meeting the economic supply-and-demand equilibrium relation of tangible effect, is the substance of value for determining proportionable national income.
If the of tangible effect productjSecondary added value accounts foriThe proportion of kind tangible effect added value of product summation isη i j , then the manufacturer in the high-end manufacturer of tangible effect economic industry chain and in tangible effect economic industry chain low side has different added value proportions, and the added value proportion that the former is possessed is more than the added value proportion that the latter is possessed, i.e.,:
If the of virtual effect productkSecondary surplus value accounts forrThe proportion of kind virtual effect product surplus value summation isθ r k , then the manufacturer in the high-end manufacturer of virtual effect economic industry chain and in virtual effect economic industry chain low side has different surplus value proportions, and the surplus value proportion that the former is possessed is more than the surplus value proportion that the latter is possessed, i.e.,:
Protfolio choice is chosen from product mix, selected from protfolio choice to the industrial structure, it is last to select macroeconomy structure choice from the industrial structure, this process reflects to economics, us are needed to set up enterprise's chain input Portfolio selection theory, to be used as enterprise's chain game coordination analysis foundation;Industry chain input Portfolio selection theory is set up, to be used as industry chain game coordination analysis foundation;Industrial chain input Portfolio selection theory is set up, to be used as industrial chain game coordination analysis foundation;Industrial zone input Portfolio selection theory is set up, to be used as industrial zone game coordination analysis foundation;Industry cluster input Portfolio selection theory is set up, to be used as industry cluster game coordination analysis foundation;And then trans-regional industrial system input Portfolio selection theory is set up, to be used as trans-regional industrial system game coordination analysis foundation;And then global industry alliance system input Portfolio selection theory is set up, to be used as global industry alliance's system game coordination analysis foundation.
The balanced substantially exactly equilibrium that liquidates of tangible effect economic behaviour people and virtual effect economic behaviour people that liquidates of tangible effect economy and virtual effect economy.For the balanced economy that liquidates collectively formed by tangible effect economy and virtual effect economy, we should be by four segment analysises(I.e. about family, manufacturer, government and external analysis)It is expanded into five departments(Five class economic behaviour people)Analysis --- i.e. about family, manufacturer, fictitious capital investor, government, external analysis, as shown in Fig. 6.
Under the macroanalysis framework that the present inventor sets up, national income should be divided into four major classes first, i.e.,:
The domestic production total amount adjusted by monistic homogeneity type products in kind, can be denoted as GNM (gross domestic magnitude);
The domestic production total price adjusted by multifarious heterogeneous type products in kind(I.e. commonly referred GDP), still can be denoted as GDP (gross domestic product);
By multifarious heterogeneous type products in kind and financial product adjust to stamp domestic production total price(Or make GDP), HGDP (hedge type of gross domestic product) can be denoted as;
The domestic production total value adjusted by multifarious heterogeneous type products in kind and financial product, can be denoted as GDPF (gross domestic product and fictitious product).
Further, can be by HGDP(To stamp domestic production total price)It is divided into two kinds:By the accounting of multifarious heterogeneous type products in kind to stamp domestic production total price(Or make GDP), IHGDP can be denoted as;By the accounting of multifarious heterogeneous type financial product to stamp domestic production total price(Or make GDP), IIHGDP can be denoted as.
Obviously, there should be following relation here:
GDP(I.e. currently a popular GDP)=domestic production total price ≠ to stamp domestic production total price HGDP
IHGDP = GDP [ I ] + GDP [ II ]
Wherein, GDP [I]=I classes expenditure, i.e., equal to being used for the expenditure of Value creation or consumer field from savings,
GDP [II]=II classes expenditure, i.e., be used for the expenditure of Value creation or consumer field equal to being taken in from fictitious capital distribution recruitment and secondary transaction;
IIHGDP = GDP [ III ] + GDP [ IV ]
Wherein, GDP [III]=Group III expenditure, i.e., equal to being used for the expenditure in value Transfer field from savings,
GDP [IV]=IV classes expenditure, i.e., be used for the expenditure in value Transfer field equal to being taken in from fictitious capital distribution recruitment and secondary transaction.
GDPF(I.e. domestic value is created and transfer total amount)= GDP [ I ] + GDP [ II ] + GDP [ III ] + GDP [ IV ]
IfDVC For value chain system to finance chain fund demand,SFC It is financing catenary system to the fund supply of value chain system, then we can provide generalized equilibrium problem constraints of the value chain-financing chain to impulsive motion:
Wherein,ξCoordinate control parameter for economic metasystem.
The requirement of this constraints:The overall size (IIHGDP) of fictitious capital economy must be suitable with the overall size (IHGDP) of tangible effect economy.Because, the former is too small, it is difficult to support and progradation are played to the latter;The former is excessive, it is easy to cause social economy to expand and economic upheaval.
Meeting generalized equilibrium problem constraints of the value chain-financing chain to impulsive motionUnder, GDPF can regard the proportionable national income that liquidates as, i.e.,:
We can be summarized the above results with Fig. 7.
Under brand-new macroanalysis framework, we can set up
National income accounting system(Product price total amount Accounting System);
National income liquidates Accounting System(The Accounting System of actual product and financial product price total amount to impulsive motion);
National economy measure of value system(Value of the product total amount counting system --- product price total amount N Reference Alignment system).
(2)For area value chain, the present inventor independent sets up brand-new logical foundations, Fundamentals of Mathematics, in scientific basic and brand-new technical foundation and engineering foundation at its, in order to which indefinite " cloud " counting system of flicker to be transformed into " world " counting system of Correspondent all things on earth, insertion longitude and latitude, adhere to using global value Chain System as core, with cognitive system(RS and its computer aided system)With practice system(PS and its computer aided system)Connection and coordinate be used as high-grade intelligent integrated system(HIIS)The main line of evolution process, sets up network configuration effect chain and know-why in a balanced way is docked with internet.
(2. 1) present inventors have postulated that:Existed in organization mechanism is concentrated has the Principal-agency Relationship clearly contacted with global;Be not present in dispersion tissue's mechanism has the Principal-agency Relationship clearly contacted with the overall situation;Existed in collecting and distributing organization mechanism has the Principal-agency Relationship loosely contacted with the overall situation.
In general, a complicated economic society is made up of the feature of all participants, and it is also referred to as environment, is designated ase = ( e 1 , e 2 , , e n ).All possible environment forms a set, is designated asE .ByiThe information that individual passes out can be designated asm i , also referred to as language (messages).The set of all these language is designated asM i 。n Individual is in the timet One group of language be designated asm ( t ) = ( m 1( t ), m 2 ( t ), ,
m n ( t ))。
If information response's function can be divided into information response's function that organizational process is concentrated in the reflection on the basis of certain Technological Economy foundation structure TKS/EBSf [C, [TKS, EBS]], the information response's function for reflecting on the basis of certain Technological Economy foundation structure TKS/EBS dispersion tissue processf [D, [TKS, EBS]] and the information response's function for reflecting collecting and distributing organizational process on the basis of certain Technological Economy foundation structure TKS/EBSf [ M, [ TKS, EBS ]];Gambling activity setG The set that gambling activity is competed on the basis of certain Technological Economy foundation structure TKS/EBS can be divided intoG[K, [TKS, EBS]], on the basis of certain Technological Economy foundation structure TKS/EBS cooperative game activity setG[C, [TKS, EBS]] and the movable set of Coordination Game on the basis of certain Technological Economy foundation structure TKS/EBSG[H, [TKS, EBS]], the general expression of static Incompletely information games is
G = { A 1 , A 2 , , A n ;W 1 , W 2 , , W n ;u 1 , u 2 , , u n , [TKS, EBS] },
WhereinA i For game sideiAction space(Internet resources configuration mode space),W i It is game sideiType space, game sideiBenefitu i ( s 1 , a 2 , , a n ) combined for Internet resources configuration modeS = ( s 1 , s 2 , , s n ) and typew i Function, then gambling activity joint management patternSMG = ( G, < M , f , h >, [TKS, EBS]) and include the subpatterns of following nine kinds of fundamental types:
SMG [ TKS, EBS ] = SMG [ CK, CH, CC, MK, MH, MC, DK, DH, DC, [ TKS, EBS ]]
(2. 2) overall coordination is mainly manifested in following several respects:
( a) variable coupling.This coupling refers mainly to the coupling of entirety (total system) design variable and local (subsystem) design variable.In the optimization of general overall coordination, the design variable of each part (subsystem) is not separate with the design variable of overall (total system), i.e., all dividers are drawnDesign vectorWith general planning TP design variable again between be commonly present the coupled relation of available equation or inequation description:
They are probably general Nonlinear System of Equations.This coupled relation is exactly on design variableWithConstraints.Because the constraint of equation can turn to a pair of inequality constraints, so it can still be included in general planning TP general restriction.In formulaIt is the design vector drawn when there is weak coupling between each several part (subsystem) by each dividerThe amount that sum is obtained,It is the design vector drawn when there is close coupling between each several part (subsystem) by each dividerThe amount that sum is obtained.
( b) target coupling.This coupling refers mainly to the coupling of entirety (total system) target and local (subsystem) target.In the optimization of general overall coordination, general objective should be following generic function
( c) constraint coupling.This coupling refers mainly to the coupling of entirety (total system) constraint and local (subsystem) constraint.In the optimization of general overall coordination, total constraint should be following generic function
Divider is drawn and its optimal solution
Because single object optimization just has optimal solution, if toiSubsystem individually optimizes design available following theiDivider is drawnSPiTo describe:
This model is designed with generality for the static optimization of intelligent integrated subsystem (or unit).
If Lagrange functions:
IfSPiIt is convex programming, thenIt is exactly its optimal solution.Using the various methods of ordinary optimal design Mathematical Planning, solve respectivelylThe divider of individual subsystem (or unit) is drawnSP i ( i =1, 2, …, I) it is that can obtain the optimal solution of all subsystems( i = 1, 2, …, I )。
General planning and its optimal solution
If the Global Optimum Design of whole system can use following general planning TP to describe:
TP is not yet drawn with divider in formSPiHave any relation, this just leaves extensive leeway for description system optimization from the various different relations that subsystem optimizes.If
( 2. 120 )
TP existsPoint takes the Tucker necessary conditions of Kuhn mono- of extreme value to be:Point should have
Under two kinds of different holographic joint management structures of scattered competition and collecting and distributing competition, the holographic cooperative system behavior of configuration tissue selects different certainly.But, holographic cooperative system behavior is not exclusively influenceed by holographic joint management structure.
Connecting each other and interacting with subsystem, system and nonsystematic with local, system as overall, the overall hierarchical structure with complexity.General overall hierarchical structure is represented by Fig. 5.In this figure, total systemSBelong to overallQ , subsystemBelong to localQ i ;It is overallQByK ( K ≥ I ) individual local composition, total systemSByISubsystem that is individual not only separate but also connecting each otherS i Composition.Popularization, which is come, to be seen, any oneS i Both it had been probably base unit, it is also possible to the system being made up of smaller subsystem or unit;SIt is also likely to be the subsystem of bigger system.
Now, between resource distribution and configuration load, between system behavio(u)r and system consumption and between summation configuration and system configuration, between summation effect and system behavio(u)r, we can combine the configured in one piece dynamic effect and local configuration dynamic effect of metasystem, make united analysis.
First, we can regard the holographic collaborative configuration basic motive effect of metasystem one of as following four kinds of situations:
(A)Concentrate Cooperation configuration and concentrate tissue competition configuration in resource distribution and configuration load, influence each other between system behavio(u)r and system consumption formed by dynamic effect(Behavior, relation and its process);
(B)Dynamic effect formed by concentration Cooperation is configured and dispersion tissue's competition configuration influences each other between resource distribution and configuration load, system behavio(u)r and system consumption(Behavior, relation and its process);
(C)Dynamic effect formed by dispersion tissue's cooperation is configured and concentration tissue competition configuration influences each other between resource distribution and configuration load, system behavio(u)r and system consumption(Behavior, relation and its process);
(D)Dynamic effect formed by dispersion tissue's cooperation is configured and dispersion tissue's competition configuration influences each other between resource distribution and configuration load, system behavio(u)r and system consumption(Behavior, relation and its process).
Area value chain network configuration basic motive effect relation is as shown in Fig. 6.
As shown in Fig. 5, we can regard competition configuration mode as competition configuration targetO K (Index set), competition configuring technical constituteT K , competition configuration composition of capitalK K , competition configuration resource distribution basisP K (Platform), competition configuration resource distribution approachW K With the organization type of competition configuration resource distribution main bodyS K Function, i.e.,F K ( O K , T K , K K , P K , W K , S K );Regard cooperation configuration mode as cooperation configure targetO C (Index set), cooperation configuring technical constituteT C , cooperation configuration composition of capitalK C , cooperation configuration resource distribution basisP C (Platform), cooperation configuration resource distribution approachW C The organization type of resource distribution main body is configured with cooperationS C Function, i.e.,F C ( O C , T C , K C , P C , W C , S C );Regard collaborative configuration mode as collaborative configuration targetO S (Index set), collaborative configuration technological maheupT S , collaborative configuration composition of capitalK S , collaborative configuration resource distribution basisP S (Platform), collaborative configuration resource distribution approachW S With the organization type of collaborative configuration resource distribution main bodyS S Function, i.e.,F S ( O S , T S , K S , P S , W S , S S )。
(2. 3) resource distribution network is considered as by one kind by certain amount(Or variable number)Node and certain amount(Or variable number)The set that is constituted of chain.
The various networks of area value chain can be divided into following four levels by we:
Area value chain resource network (URN):Resource node (rn) --- resource chain (rc) --- resource collection (rs)
Area value chain Configuration network (UDN):Configure node (dn) --- configuration chain (dc) --- configuration set (ds)
Area value chain tissue network (UON):Organize node (on) --- tissue chain (oc) --- tissue set (os)
Area value chain group network (UGN):Group's node (gn) --- group's chain (gc) --- group gathers (gs)
Area value chain resource network can be denoted as:URN = URN ( rn, rc, rs );
Area value chain Configuration network can be denoted as:UDN = URN ( udn, dc, ds );
Area value chain tissue network can be denoted as:UON = URN ( on, oc, os );
Area value chain group network can be denoted as:UGN = UGN ( gn, gc, gs ).
From the point of view of the status of resource distribution and effect, in area value chain resource Correspondent network UCN, area value chain resource distribution network can be divided into following three types:Major flow MF, support stream SF, auxiliary flow AF.
In general terms, area value chain resource Correspondent network UCN can be divided into following nine kinds of subtype:
UCN [ MF ( IN ); SF ( RN ), AF ( MN ) ], UCN [ MF ( IN ); SF ( MN ), AF ( RN ) ],
UCN [ MF ( IN ); SF ( RN ), SF ( MN ) ];
UCN [ MF ( RN ); SF ( IN ), AF ( MN ) ], UCN [ MF ( RN ); SF ( MN ), AF ( IN ) ],
UCN [ MF ( RN ); SF ( IN ), SF ( MN ) ];
UCN [ MF ( MN ); SF ( IN ), AF ( RN ) ], UCN [ MF ( MN ); SF ( RN ), AF ( IN ) ],
UCN [ MF ( MN ); SF ( IN ), SF ( RN ) ]。
(3)For area value chain, the present inventor independent sets up brand-new logical foundations at its, Fundamentals of Mathematics, in scientific basic and brand-new technical foundation and engineering foundation, in order to which indefinite " cloud " counting system of flicker is transformed into Correspondent all things on earth, " world " counting system of insertion longitude and latitude, adhere to using global value Chain System as core, introduce suitably, for reflecting general Complex Adaptive Systems basic motive respectively, base load, basic effect, basic consumption, inside cooperation and competition and external collaboration and the various basic collaboration variables of competition, set up network configuration effect chain and engineering scheme in a balanced way is docked with internet.
NA/RVC is a brand-new holographic collaboration sexual system, and it can be regarded as the vertical and horizontal association of encircled area value chain, is formed by expanding, improving industry value chain network configuration techniques NA/IVC comprehensively.One NA/RVC system must be embodied in the graphic user interface of the technical demand that meets, such as inside and outside association of area value chain network configuration(GUI), the relational database of the inside and outside association of area value chain network configuration, the supplier's of the inside and outside association of area value chain network configuration is integrated, can optionally make various report etc..
Future scenarios:NA/RVC main functional modules prospect
Because the product style of each NA/RVC manufacturer is not quite similar with emphasis, thus the modular structure of its NA/RVC product must also differ larger.For for the first time understand NA/RVC reader for, there may come a time when to feel not making clear on earth which be only real NA/RVC systems.So, herein, we bypass actual product, the functional structure of the inside and outside association of NA/RVC system realms value chain network configuration is briefly described from the angle of the inside and outside association of area value chain network configuration, that is what NA/RVC can do for area value chain tissue, and which content is its inside and outside relating module function of area value chain network configuration include on earth.
NA/RVC is together with area value chain market construction technology MA/RVC and area value chain network configuration techniques NA/RVC, form the relation for mutually making up, being substituted for each other, common all resources by the inside and outside association of area value chain network configuration carry out integration configuration, in brief, it is by the three of the inside and outside association of area value chain network configuration big streams --- logistics, cash flow, the configuration information system of information flow progress entirely integrating configuration.Its inside and outside correlation function module of area value chain network configuration is with the module different from NA/IVC and ERP, it cannot be only used for the configuration of the inside and outside association of area value chain network configuration, and MRP and the configuration of the inside and outside association of area value chain network configuration are carried out also into NA/RVC systems in the area value chain of the area value chain of many other types such as some unproductive utilities.Here we design NA/RVC functional module by Fig. 8.
In the inside and outside association of area value chain network configuration, general configuration is main to include the content of three aspects:Operation control(The planning and implementation of the inside and outside association of area value chain network configuration), resource distribution(The supply and configuration of the inside and outside association of area value chain network configuration)And funding arrangement(Resource distribution is adjusted, finance configuration).This three digest journals inherently conglomerate, they have corresponding interface from each other, can be good at combining configuring area value chain.In addition, want special one to be mentioned that, the reinforcement with area value chain to the resource distribution of stakeholder, it will have increasing NA/RVC manufacturers by benefit community(DIM and SHF)Resource distribution include an important component of NA/RVC systems.
(3. 1) funding arrangement module(The resource distribution of the inside and outside association of area value chain network configuration is adjusted, finance configuration)
In area value chain, clear clearly demarcated funding arrangement is extremely important.So, it is an indispensable part in the whole schemes of NA/RVC.The monetary items module of the inside and outside association of NA/RVC area value chain network configurations is different from general monetary items software, it is used as a part for the inside and outside association of NA/RVC system realm value chain network configurations, it has corresponding interface with other modules of system, can be mutually integrated, such as:Information by the economical operation activity of the inside and outside association of area value chain network configuration, logistics arrangement activity input can be included in monetary items module automatically and generate total design schedule, resource distribution design schedule by it, the cumbersome process of input document is eliminated, in the past traditional manual operations is almost substituted completely.The monetary items part of the general inside and outside association of NA/RVC software area value chain network configurations is divided into resource distribution accounting and the funding arrangement two major parts of the inside and outside association of area value chain network configuration.
The resource distribution of the inside and outside association of C1 area value chain network configurations is adjusted
The mainly change process and its result of record, accounting, reflection and analysis fund in the economic activity of the inside and outside association of area value chain network configuration is adjusted in the resource distribution of the inside and outside association of area value chain network configuration.It by the inside and outside association of area value chain network configuration total design schedule, put into department income design schedule and expenditure design schedule, the income design schedule of output department and expenditure design schedule, cash, fixed assets, multi-currency etc. partly constitute.
a, the inside and outside association of area value chain network configuration total design schedule module
Its function is the design schedule voucher input of the inside and outside association of processing region value chain network configuration, registration, output day design schedule, general detailed account and account as recorded in a ledger, establishment Main Resources configuration design schedule.It is the core that whole resource distribution is adjusted, and puts into each modules such as income design schedule and expenditure design schedule, the income design schedule of output department and expenditure design schedule, fixed assets accounting, cash configuration, wage accounting, multi-currency of department all to carry out mutual information transmission centered on it.
b, the inside and outside association of area value chain network configuration income design schedule module
Income design schedule, the income design schedule of system integration department and the module of regular design department generate the income design schedule of department;
The income design schedule of forward conjunction department, the income design schedule and the income design schedule of cooperative association department of backward association department.
c, the inside and outside association of area value chain network configuration expenditure design schedule module
Expenditure design schedule, the expenditure design schedule of system integration department and the module of regular design department generate the expenditure design schedule of department;
The expenditure design schedule of forward conjunction department, the expenditure design schedule and the expenditure design schedule of cooperative association department of backward association department.
d, the inside and outside association of area value chain network configuration cash configuration module
It is mainly the control of the cash inflow outflow to the inside and outside association of area value chain network configuration and the accounting of petty cash and ICT departments deposit.It includes the configuration of the coin to the inside and outside association of area value chain network configuration, bank note, check, draft and ICT departments deposit.In NA/RVC the function relevant with cash with check lookup etc. is inquired about there is provided the bill maintenance of the inside and outside association of area value chain network configuration, bill printing, payment maintenance, ICT departments list print, payment inquiry, ICT departments.In addition, it also and the inside and outside association of area value chain network configuration income design schedule, to pay design schedule, the module such as total design schedule integrated, voucher is automatically generated, into total design schedule.
e, the inside and outside association of area value chain network configuration fixed assets accounting module
Complete the calculation work that the increase and decrease to the fixed assets of the inside and outside association of area value chain network configuration is changed and depreciation is carried and distributed about fund meter.It can help the configuration person of the inside and outside association of area value chain network configuration to have gained some understanding the present situation of current fixed assets, and the various methods that can be provided by the module configure assets, and carry out corresponding accounting process.Its concrete function has:The fixed assets card of the inside and outside association of logging zone value chain network configuration and detailed account, the depreciation of the inside and outside association of zoning value chain network configuration, work out form, and the transfer voucher of the automatic establishment inside and outside association of area value chain network configuration, and it is transferred to total design schedule.It is integrated with the expenditure design schedule of the inside and outside association of area value chain network configuration, cost, total design schedule module.
f, the inside and outside association of area value chain network configuration multi-currency module
This is run to adapt to the internationalization of current area value chain, and the requirement to foreign currency settlement process increases and produced.The various functions of the whole monetary items system of the inside and outside association of area value chain network configuration represent and are settled accounts with various currency systems by multi-currency, and customer order, inventory rationing and logistics arrangement etc. could be used that multi-currency is traded configuration.Each module such as the multi-currency of the inside and outside association of area value chain network configuration and the income design schedule of the inside and outside association of area value chain network configuration, expenditure design schedule, total design schedule, customer order, logistics arrangement has interface, can automatically generate required data.
g, the inside and outside association of area value chain network configuration personal income adjust module
The automatic personal income for carrying out area value chain stakeholder is settled accounts, distributed, adjusting and the meter of every related funds is carried.It is capable of personal income, printing personal income inventory and all kinds of consolidated statements of the inside and outside association of logging zone value chain network configuration, calculate every expense relevant with personal income that meter proposes the inside and outside association of area value chain network configuration, automatically voucher, total design schedule of the inside and outside association of ingress area value chain network configuration are made.This module is integrated with the total design schedule and cost module of the inside and outside association of area value chain network configuration.
h, the inside and outside association of area value chain network configuration cost module
It will carry out the calculating of the various costs of department according to information such as the area value chain structure of the inside and outside association of area value chain network configuration, the project center, each link of area value chain, logistics arrangements, to carry out cost analysis and planning.The cost of the inside and outside association of place maintenance area value chain network configuration can also be pressed with standard costs or average cost method.
The funding arrangement of the inside and outside associations of area value chain network configuration of C 2
The function of the funding arrangement of the inside and outside association of area value chain network configuration, is mainly based upon the data that the resource distribution of the inside and outside association of area value chain network configuration is adjusted, then is analyzed, so as to be predicted accordingly, configures and control activity.It lays particular emphasis on monetary items planning, control, analysis and predicted:
The monetary items planning of the inside and outside association of area value chain network configuration:Monetary items planning, budget of next period etc. are made according to the analysis of early stage monetary items.
The monetary items analysis of the inside and outside association of area value chain network configuration:Query function is provided and monetary items performance evaluation, account analysis etc. is carried out by the figure shows of user-defined variance data.
The monetary items decision-making of the inside and outside association of area value chain network configuration of the inside and outside association of area value chain network configuration:The core of funding arrangement, centre point is to make the decision-making about fund, including fund procurement, dispensing and fund configuration.
The operation control configuration module of the inside and outside association of (3. 2) area value chain network configuration(The planning and implementation of the inside and outside association of area value chain network configuration)
This part is the core place of NA/RVC systems.Under the brand-new economic science technology of popularization and application and brand-new management science technology, on the basis of popularization and application modern network information technology and Devoting Major Efforts To Developing set up the dynamic Correspondent network of intelligent integrated integration, NA/RVC and MA/RVC and NA/RVC is connected with each other, the inside and outside association process of whole region value chain network configuration of area value chain is combined jointly, enable area value chain to be effectively reduced system cost, improve system benefit.Each originally scattered department's flow forms automatic connection simultaneously, also enables the progress of department's flow contextual, is disconnected without economical operation, the influence economical operation cycle.
The operation control configuration of the inside and outside association of area value chain network configuration is one to be planned to the advanced area value chain method for organizing being oriented to.First, area value chain determines its a total system operation planning, then after system is segmented layer by layer, is issued to all departments and goes execution.I.e. the department of the inside and outside association of area value chain network configuration participates in area value chain activity with this, and logistics arranges department by this various resource of arrangement etc..
C1, the main system operation planning of the inside and outside association of area value chain network configuration
It is the product category and quantity planned, predict and provided in each cycle for inputting to arrange future of customer order according to the system operation of the inside and outside association of area value chain network configuration, it switchs to the system operation planning of the inside and outside association of area value chain network configuration the product programming of the inside and outside association of area value chain network configuration, after balancing the need for the resource and ability of the inside and outside association of area value chain network configuration, time, the detailed schedule monitor of quantity are accurate to.It is arrangement of the area value chain in total operation of one section of period inside and outside association of inner region value chain network configuration, it is a stable planning, is to predict what is produced with the system operation planning of the inside and outside association of area value chain network configuration, actual order and to what history run analysis was got.
C2, the material demand planning of the inside and outside association of area value chain network configuration
After the main system operation planning of the inside and outside association of area value chain network configuration determines production how many final products, further according to BOM, the quantity for the parts that the quantity for the product that whole region value chain is produced is produced needed for being changed into, and compare existing quantity in stock, processing can also be needed how much, logistics arranges how many final amts.This be only whole department it is real according to planning.
C3, the ability need planning of the inside and outside association of area value chain network configuration
It is after preliminary material demand planning is drawn, by total project load at all items center of the inside and outside association of area value chain network configuration, the detail items planning produced after the power balance with the project center, whether the material demand planning to determine generation is demand planning feasible in area value chain production capacity.The ability need planning of the inside and outside association of area value chain network configuration is a kind of short-term, planning of currently practical application.
C4, the DIM controls of the inside and outside association of area value chain network configuration
This is the inside and outside association dynamic item planning of the area value chain network configuration changed over time, it is, to regular designer, system integration person and module generator, then to carry out entry sorting, project configuration, project monitoring by the allocation of items of the inside and outside association of area value chain network configuration.
C5, the manufacturer's standard of the inside and outside association of area value chain network configuration
Many essential informations of the system operation of the inside and outside association of area value chain network configuration are needed in establishment planning, these essential informations are exactly the operation standard of the inside and outside association of area value chain network configuration, collaboration items, supporting project, area value chain structure, program and the project center including the inside and outside association of area value chain network configuration, are all recognized in a computer with unique code.
aThe collaboration items code of the inside and outside association of area value chain network configuration, the configuration to collaboration items resource, unique code identification is given to every kind of material.
b The relevant item inventory of the inside and outside association of area value chain network configuration, definition region is worth the technological document of chain structure, for working out various planning.
cThe program of the inside and outside association of area value chain network configuration, describes the implementation of system operation step, stage and vertical and horizontal associated item of the inside and outside association of area value chain network configuration sequentially.It includes implementation procedure, indicates each stage, the implementation means of each link, technology and required timetable and distribution of earnings etc..
dThe project center of the inside and outside association of area value chain network configuration, is constituted using the means, technology and human resources of same or similar program, is engaged in the scheduling of economical operation, accounting ability, the base unit for calculating cost.
(3. 3) logistics configuration module(The supply and configuration of the inside and outside association of area value chain network configuration)
The distribution configuration of the inside and outside associations of area value chain network configuration of C 1
The configuration of the inside and outside association sale of area value chain network configuration is since the merchandise planning of the inside and outside related product of area value chain network configuration, to sale product, sales territory, the configuration of the various information of trade debtor and the statistics of the inside and outside association of area value chain network configuration, and comprehensive analysis can be made to sales volume, the amount of money, profit, performance, customer service, so substantially there is the function of three aspects in distribution configuration module.
a, for the configuration and service of the inside and outside related information of area value chain network configuration
It can set up a customer information archives, and classification configurations are carried out to it, and then carry out targetedly customer service to it, to reach the reservation frequent customer of peak efficiency, strive for new client.Herein, what be should be particularly mentioned that is exactly that nearest emerging CRM softwares, i.e. customer relationship are configured, and NA/RVC and its combination will greatly increase the benefit of area value chain.
b, for area value chain network configuration it is inside and outside association sales order configuration
The sales order of the inside and outside association of area value chain network configuration is NA/RVC entrance, and all area value chain system operation planning are all assigned and arranged according to it.And the configuration of the inside and outside association sales order of area value chain network configuration has been through the whole flow process of area value chain system.It includes:
The customers' credit examination & verification and inquiry of the inside and outside association of area value chain network configuration(Customers' credit is classified, to audit order transaction).
The product inventory inquiry of the inside and outside association of area value chain network configuration(Decide whether to back order, split shipment or delivered with substitute).
The products quotation of the inside and outside association of area value chain network configuration(Make the quotation of different product for client).
Order input, change and the tracking of the inside and outside association of area value chain network configuration(Order input after, the amendment of change, and order trace analysis).
Confirmation and the delivery processing (determining delivery date and the arrangement of delivery things) at the delivery date of the inside and outside association of area value chain network configuration.
c, for area value chain network configuration it is inside and outside association sale statistics and analysis
At this moment system is according to the inside and outside performance for associating sales order of area value chain network configuration, statistics is made according to the inside and outside various indexs of association of area value chain network configuration, such as client segmentation is counted, sale agent statistic of classification etc., then these statisticses are evaluated area value chain effective sale effect:
The inside and outside association sale result of area value chain network configuration(Counted respectively according to sale form, product, agent, area, sales force, the amount of money, quantity).
The inside and outside association marketing analysis of area value chain network configuration(Compare including contrast target, the same period and delivery analysis of ordering goods, to be made a relevant analysis in terms of quantity, the amount of money, profit and performance).
The customer service of the inside and outside association of area value chain network configuration(Customer complaint is noted down, the analysis of causes).
The storage controlling of the inside and outside associations of area value chain network configuration of C 2
For the quantity of the inside and outside associated storage material of control area value chain network configuration, to ensure that stable logistics is supported normally to produce, but minimal occupancy capital.It is a kind of related, dynamic and real system of inventory control.It can combine, meet the demand of relevant departments, change over time and dynamically adjust stock, accurate reflection stock's present situation.The function of this system is further related to:
aThe all materials for the inside and outside association of area value chain network configuration set up stock, determine logistics arrangement of when ordering goods, while being used as the foundation for giving logistics to arrange department's logistics arrangement, production division to make system operation planning.
bOrdered items are received, are put in storage by quality inspection, the product of production similarly will be by examining storage.
cThe daily flow processing work of material is received and dispatched.
The logistics arrangement of the inside and outside associations of area value chain network configuration of C 3
Rational order quantity, outstanding supplier are determined in the link of the inside and outside association of area value chain network configuration and optimal safety stock is kept.The information ordered, checked and accepted can be provided at any time, and tracking and urgency are to outsourcing or the material of external processing, it is ensured that goods is reached in time.The archives of supplier are set up in the link of the inside and outside association of area value chain network configuration, the cost of stock is adjusted with newest cost information.Specifically have:
aThe supplier information inquiry of the inside and outside association of area value chain network configuration(Inquire about ability, prestige of supplier etc.).
bGoods is urged in area value chain network configuration inside and outside association(The material of outsourcing or external processing is carried out with urging).
cThe logistics arrangement of the inside and outside association of area value chain network configuration is counted with external processing(Count, set up archives, calculate cost).
dThe price analysis of the inside and outside association of area value chain network configuration(Cost of material is analyzed, inventory cost is adjusted).
The batch tracking configuration of the inside and outside associations of area value chain network configuration of C 4
Department and link for the inside and outside association of area value chain network configuration, it is desirable to goods and materials among the process of circulation, it is necessary to carry out product batches tracking configuration, when quality problems occurs in product, can be reviewed by product batches.So it is clear which raw material parts or the technique of which procedure go wrong.At this moment same problematic product is isolated.
(3. 4) human resources configuration module
From direct aspect, await NA/RVC systems that exploitation is set up, substantially with the area value chain running of the inside and outside association of area value chain network configuration(Effect chain)Centered on, people can configure the resource relevant with manufacturing recourses as the core resource of area value chain.But, in a deeper sense, the human resources inside area value chain will especially should be paid close attention to by area value chain tissue, can be considered the resource of area value chain originally.In this case, human resources configuration, as an independent module, should be added to NA/RVC systems, together with the monetary items in NA/RVC, production system, constitute an efficient, area value chain resource system with high integration.It has basic difference with the occurrences in human life configuration under traditional approach.
The HRP aid decision of the inside and outside associations of area value chain network configuration of C 1
Area value chain human resources, the kinds of schemes of institutional framework establishment for the inside and outside association of area value chain network configuration, simulation are compared and operating analysis, and are aided with the visual assessment of figure, and auxiliary configuration person makes final decision.
Department and link for the inside and outside association of area value chain network configuration, formulate post model, including job requirement, promotion path and training planning, according to the qualification and condition for serving as position stakeholder, system can propose a series of training suggestions for this stakeholder, once mechanism is reorganized or position changes, system can propose that a series of position changes or be transferred and promoted suggestion.
Department and link for the inside and outside association of area value chain network configuration, carry out cost of human resources analysis, analysis can be made to the cost of human resources in past, present, future and is predicted, and by NA/RVC the integration environments, foundation is provided for area value chain cost analysis.
The human resources configuration of the inside and outside associations of area value chain network configuration of C 2
The personal income of the inside and outside associations of area value chain network configuration of C 3 is adjusted
aThe department for the inside and outside association of area value chain network configuration and link, according to company it is trans-regional, trans-departmental, formulate wages accounting method adaptable therewith across the different pay structures and handling process of work post.
bThe department for the inside and outside association of area value chain network configuration and link, are directly integrated with time configuration, can upgrade in time, and mobilism is adjusted to the wages of stakeholder.
cArea value chain network configuration inside and outside association is back-calculated function.By integrated with other modules, automatically according to requiring adjustment pay structure and data.
The man-hour configuration of the inside and outside associations of area value chain network configuration of C 4
aThe department for the inside and outside association of area value chain network configuration and link, according to this country or local calendar, the running time of arrangement region value chain and the daily schedule of labour.
bThe department for the inside and outside association of area value chain network configuration and link, with distal end attendance checking system, the actually situation of turning out for work of stakeholder can be recorded in main system, and the time data relevant with stakeholder's wages, bonus is imported in wages system and cost accounting.
4th, illustrate
Fig. 1 explanations:
The present inventor proposes docking balanced type throw-in play, and counts the natural intelligence configuration output YM that connects relative with artificial intelligence field of configuration various projects, can be represented simply as:
We can propose to dock balanced type throw-in play, and count the artificial intelligence configuration output YF that connects relative with natural intelligence field of configuration various projects, can be represented simply as:
IfDM The demand of system output is configured to artificial intelligence for natural intelligence field of configuration,SF Output for artificial intelligent configuration system to natural intelligence field of configuration, then docking equilibrium condition is:。
Equilibrium constraints condition is docked meetingUnder, configure the configuration under relative connect with the statistics natural intelligence configuration of docking balanced type throw-in play and artificial intelligence and export HY(Or HGDP)Various projects, can be represented simply as:
Fig. 2 explanations:
Equilibrium constraints condition is docked meetingUnder, we can set up following exported based on artificial intelligence and experience the relative IIH types connect with I types and experience function:
For artificial intelligence resource output for, from natural intelligence export experience expenditure be it is spontaneous, it is typically unrelated with the output of artificial intelligence resource, therefore,a 2 + C 0Constitute spontaneous sexual experience expenditure.IIH types experience function is as shown in Figure 2.
Fig. 3 explanations:
Discounting for resource Correspondent channel, resource Correspondent can be divided into two classes by us from purposes completely:
One class is the resource Correspondent for natural intelligence resource input, referred to as IH types docking resource Correspondent, can be denoted asS M ,;
One class is the resource Correspondent for artificial intelligence resource input, referred to as IIH types docking resource Correspondent, can be denoted asS F ,。
As shown in figure 3, the experience of II types and resource Correspondent are all the functions of artificial intelligence resource output, resource Correspondent curve is closely related with II types experience curve.
Fig. 4 explanations:
Substantially liquidate market analysis --- it is related to tangible effect product market, money market and fictitious capital market.Tangible effect product market includes consumer goods market, factor market, virtual technology market, network information market etc., money market includes money market and social idle money market under Central Bank's control distribution, and fictitious capital market includes financial product market and financial derivative product market.
The whole world liquidates market analysis --- it is related to global tangible effect market, Global money market and global virtual capital market.Global tangible effect product market includes global consumer goods market, the worldwide production market for factors of production, global virtual technical market, global network information market etc., Global money market includes the Central Bank of various countries and controls the social idle money market in money market and various countries under distribution, global virtual capital market includes Global finance product market and Global finance derivatives market, as shown in Figure 4.
Fig. 5 explanations:
Value chain takes in expenditure income relation as shown in Fig. 5 with financing chain to the national economy of impulsive motion.Herein, income can be divided into two classes by we:I classes income is the income from savings, and II classes income is that the income raised and taken in secondary transaction is issued from fictitious capital;Further, expenditure can be divided into four classes by we:I classes pay to be used for the expenditure of Value creation or consumer field from savings, II classes expenditure is used for the expenditure of Value creation or consumer field to be raised from fictitious capital distribution with secondary transaction income, Group III expenditure is is used for the expenditure in value Transfer field from savings, and IV classes expenditure is used for the expenditure in value Transfer field to be raised from fictitious capital distribution with secondary transaction income.
Fig. 6 explanations:
The balanced substantially exactly equilibrium that liquidates of tangible effect economic behaviour people and virtual effect economic behaviour people that liquidates of tangible effect economy and virtual effect economy.For the balanced economy that liquidates collectively formed by tangible effect economy and virtual effect economy, we should be by four segment analysises(I.e. about family, manufacturer, government and external analysis)It is expanded into five departments(Five class economic behaviour people)Analysis --- i.e. about family, manufacturer, fictitious capital investor, government, external analysis, as shown in Fig. 6.
Under the macroanalysis framework that the present inventor sets up, national income should be divided into four major classes first, i.e.,:The domestic production total amount adjusted by monistic homogeneity type products in kind, can be denoted as GNM (gross domestic magnitude);The domestic production total price adjusted by multifarious heterogeneous type products in kind(I.e. commonly referred GDP), still can be denoted as GDP (gross domestic product);By multifarious heterogeneous type products in kind and financial product adjust to stamp domestic production total price(Or make GDP), HGDP (hedge type of gross domestic product) can be denoted as;The domestic production total value adjusted by multifarious heterogeneous type products in kind and financial product, can be denoted as GDPF (gross domestic product and fictitious product).
Fig. 7 explanations:
The equilibrium condition that liquidates requirement:The overall size (IIHGDP) of fictitious capital economy must be suitable with the overall size (IHGDP) of tangible effect economy.Because, the former is too small, it is difficult to support and progradation are played to the latter;The former is excessive, it is easy to cause social economy to expand and economic upheaval.In the case where meeting generalized equilibrium problem constraints of the value chain-financing chain to impulsive motion, GDPF can regard the proportionable national income that liquidates as, i.e.,:
We can be summarized the above results with Fig. 7.
Fig. 8 explanations:
NA/RVC is together with area value chain market construction technology MA/RVC and area value chain network configuration techniques NA/RVC, form the relation for mutually making up, being substituted for each other, common all resources by the inside and outside association of area value chain network configuration carry out integration configuration, in brief, it is by the three of the inside and outside association of area value chain network configuration big streams --- logistics, cash flow, the configuration information system of information flow progress entirely integrating configuration.Its inside and outside correlation function module of area value chain network configuration is with the module different from NA/IVC and ERP, it cannot be only used for the configuration of the inside and outside association of area value chain network configuration, and MRP and the configuration of the inside and outside association of area value chain network configuration are carried out also into NA/RVC systems in the area value chain of the area value chain of many other types such as some unproductive utilities.Here NA/RVC functional module is designed by Fig. 8.
Fig. 9 explanations:
Connecting each other and interacting with subsystem, system and nonsystematic with local, system as overall, the overall hierarchical structure with complexity.General overall hierarchical structure is represented by Fig. 9.In this figure, total systemSBelong to overallQ , subsystemBelong to localQ i ;It is overallQByK ( K ≥ I ) individual local composition, total systemSByISubsystem that is individual not only separate but also connecting each otherS i Composition.Popularization, which is come, to be seen, any oneS i Both it had been probably base unit, it is also possible to the system being made up of smaller subsystem or unit;SIt is also likely to be the subsystem of bigger system.
Figure 10 explanations:
Now, between resource distribution and configuration load, between system behavio(u)r and system consumption and between summation configuration and system configuration, between summation effect and system behavio(u)r, we can combine the configured in one piece dynamic effect and local configuration dynamic effect of metasystem, make united analysis.
We can regard the holographic collaborative configuration basic motive effect of metasystem one of as the following two kinds situation:
(A)Concentrate Cooperation configuration and concentrate tissue competition configuration in resource distribution and configuration load, influence each other between system behavio(u)r and system consumption formed by dynamic effect(Behavior, relation and its process);
(B)Dynamic effect formed by concentration Cooperation is configured and dispersion tissue's competition configuration influences each other between resource distribution and configuration load, system behavio(u)r and system consumption(Behavior, relation and its process);
(C)Dynamic effect formed by dispersion tissue's cooperation is configured and concentration tissue competition configuration influences each other between resource distribution and configuration load, system behavio(u)r and system consumption(Behavior, relation and its process);
(D)Dynamic effect formed by dispersion tissue's cooperation is configured and dispersion tissue's competition configuration influences each other between resource distribution and configuration load, system behavio(u)r and system consumption(Behavior, relation and its process).
Area value chain network configuration basic motive effect relation is as shown in Figure 10.
5th, embodiment
Await NA/RVC systems that exploitation is set up, undoubtedly a kind of advanced economic science technical system, a kind of advanced management science system and a kind of advanced system engineering theory and practice, it involves a wide range of knowledge, throw the National People's Congress, implementation cycle is long, difficulty is big, there is certain risk, it is necessary to take the method for science to ensure the success of the project implementation.
The area value chain network configuration project implementations of C 1 are planned
It is actual according to area value chain tissue, it is determined that whole project is carried out in two stages:
First stage, the main system control for implementing the inside and outside association of area value chain network configuration, sale configuration, receivable configuration, logistics arrangement, deals with configuration, inventory rationing, inventory auditing, product data and configures(The configuration of structure containing area value chain, Process configuration), expense budget configuration(Containing expense configuration), monetary items adjust, PDM data preparations and demand analysis, hardware net environmental structure, area value chain network configuration.Cycle is 12 months or so.It is main to complete the inside and outside association logistics of area value chain network configuration and integrated, specification, the transparent configurations of cash flow.
Second stage, is the production master program of the inside and outside association of integrated region value chain network configuration, material demand planning, power balance, workshop project configuration, quality configuration, equipment the configuration of metering, human resources configuration, solves analysis, area value chain network configuration.Cycle is 16 months or so.Mainly realize using the market of the inside and outside association of area value chain network configuration as demand, core, the holographic concertedness enterprise schema by main contents of the input and output of the inside and outside association of area value chain network configuration are divided into using longitudinal direction and the horizontal master ga(u)ge driven, it is efficiently controlled in product, stock is compressed to greatest extent, delivery date is improved, market needs are rapidly met.
The overall goal of the network configurations of C 2
aTo implement area value chain network configuration project as opportunity, promote area value chain from it is traditional close, inefficient, extensive style configuration mode to transparent, collaboration, specification, the configuration mode of lean transformation, the realization of supporting zone value chain strategy target.
bReinforced region value chain configurations.The inside and outside associated data standard of area value chain network configuration and coding scheme of specification are set up, promotes area value chain basis to rectify;The product design of the inside and outside association of reinforced region value chain network configuration, technical papers standard configurations;Ration allocation when refining the raw materials consumption of the inside and outside association of area value chain network configuration, man-hour, the occupation of capital, table of equipment;The area value chain production period standard of the inside and outside association of tolerance zone value chain network configuration;The customer resources information configuration of the inside and outside association of reinforced region value chain network configuration;Refine cost and the price configuration of the inside and outside association of area value chain network configuration;Delivery flow and the role norm configuration of the inside and outside association of reinforced region value chain network configuration.
cConfiguration, decision-making technique are improved.Realize that IRP, the data integration of each subsystem and the database of the inside and outside association of area value chain network configuration are globally shared;Set up the area value chain Back ground Information structure of the inside and outside association of area value chain network configuration, including integrated information network and comprehensively unified data interaction form;The neat set inventory rationing of the inside and outside association of area value chain network configuration and analysis;The process consuming cost of the inside and outside association of area value chain network configuration is adjusted;The risk of sale on credit control and customer resources configuration of the inside and outside association of area value chain network configuration;Longitudinal direction and the main system operation planning laterally driven, material demand planning, the integrated application of order configuration;The real-time cost accounting of point product of the inside and outside association of area value chain network configuration;Fast Quotation;The profit budget of the inside and outside association of area value chain network configuration and breakeven analysis;Online multidimensional data analysis, supports decision-making application.
dUsing area value chain network configuration as specification, system improving area value chain configuration, supporting zone value chain carries out phyletic evolution, forms transparent, open, collaboration, specification, the culture of the area value chain of lean.
The implementation content of the network configurations of C 3
aThe logistics arrangement of the inside and outside association of area value chain network configuration.Brand-new information system is relied on to support, the demand of the timely inside and outside association production system of delivery areas value chain network configuration, and pass through the information integration with the inside and outside association logistics system of area value chain network configuration, the demand of rapid association production inside and outside to area value chain network configuration makes fast reaction, it is ensured that the Qi Taoxing of the inside and outside association production material of area value chain network configuration.Area value chain network configuration system is planned according to system operation, proposes the demand planning of the inside and outside association production of area value chain network configuration;The inside and outside association production system of area value chain network configuration can plan the neat set situation of inquiry raw material and parts according to material, propose the inside and outside association logistics arrangement planning of area value chain network configuration;Rely on the inside and outside related information of area value chain network configuration of area value chain network configuration system integrated, the inside and outside affiliated supplier's configuration scheme of area value chain network configuration of Erecting and improving;Using the information such as the delivery date of the inside and outside affiliated supplier of area value chain network configuration, article quality as supplier evaluation foundation;Share distribution, Payments Policy is arranged to combine with logistics the inside and outside affiliated supplier's evaluation result of area value chain network configuration;The information bank that the inside and outside association logistics of area value chain network configuration arranges the configurations such as cycle, economic lot size, safety inventory is set up, to ensure that material supply provides foundation in time.
bSale, stock and the production system of the inside and outside association of area value chain network configuration.System operation planning is the programmatic document for instructing the inside and outside association production activity of area value chain network configuration.For the implementation of safeguards system operation planning, while a series of supporting planning such as the material logistics arrangement planning of the inside and outside association of generating region value chain network configuration, cooperation part planning, workshop project planning, equipment use planning, moulds of industrial equipment planning.System operation plans that with these planning be guiding principle and purpose relation, and guiding principle is lifted could mesh.
cThe cost configuration of the inside and outside association of area value chain network configuration.The production cost of the inside and outside association of area value chain network configuration is planned, is adjusted, controlled and configured, set up the departmental cost budget method of the inside and outside association of area value chain network configuration, and compared with cost analysis in thing, making budget, progressively department is learned, accurately, and useful data is provided for area value chain organizational decision making.
dConfiguration is dealt with area value chain network configuration inside and outside association.The various contact funds that the main configuring area value chain of account payable subsystem of the inside and outside association of area value chain network configuration occurs with supplier in the process of running, area value chain configuration person is effectively helped to grasp the flow direction of fund, by monitoring payment situation come the outflow of control area value chain fund, the good circulation of circulating fund is formed.The account payable subsystem of the inside and outside association of area value chain network configuration is filled in invoice, tax and logistics operational costs based on logistics arrangement activity and used, and can also directly invoke the order that logistics arranges subsystem generation.Invoice amount is shared with storage material, it may be determined that storage material payment situation.Invoice generates account payable account after transferring items, and payment order is settled accounts with account payable account, the received payment amount of money and the arrearage amount of money is determined, while advance payment can be handled.The cash flow artificial situation following in order to grasp area value chain tissue in real time, the system of the inside and outside association of area value chain network configuration also provides abundant query statistic function, and with the logistics of the inside and outside association of area value chain network configuration arranges subsystem, account subsystem is integrated uses.
eThe receivable configuration of the inside and outside association of area value chain network configuration.Area value chain tissue realizes shared, the exchange of completion data message on network of data between the monetary items department and sales department of the inside and outside association of area value chain network configuration by the application to area value chain network configuration system;The income design schedule money in the monetary items portion of the inside and outside association of area value chain network configuration will be registered by foundation of the invoice for sales of sales department;The income design schedule money of the inside and outside association of area value chain network configuration is collected by toward vostro account.The gathering of the inside and outside association of area value chain network configuration, invoice for sales are evidence-based, specify flow source.Returned money can be assigned to each account due when settling accounts, and make income design schedule age, the reflection of advance aging in time, accurately, can not only carry out income design schedule age, advance aging analysis of accounts, can also carry out returned money aging analysis of accounts.
6th, 600 patent of invention common implementing plan brief introductions
By 30 years freely explore, independent inventor Li Zongcheng teaches formal to State Patent Office's 600 applications for a patent for invention of submission by electronic application system in September, 2011, and submits the materials such as claims, specification, the accompanying drawing of 600 parts of a total of about 36,000,000 words.
By 30 years freely explore, independent inventor Li Zongcheng professors were delivering more than 80 paper by international and domestic academic journals and academic conference(The achievement completed without cooperation)On the basis of, independent writing, which completes eight 600 technological inventions declared with this, recently the academic monumental work of substantial connection(30,000,000 word altogether), it is intended to handle formal publication matters successively after in September, 2011.
This 600 technological invention patent declared, it is the inventor Li Zong brand new technical clusters that really one of foundation established one's own system by independence and freedom exploration in 30 years, its generic name is " GVC network techniques support system " [DCN/HII (GVC); ].
A series of great initiative academic research achievement completed based on independence and freedom and 600 state-of-the-art technology inventions, inventor Li Zong really propose that can be referred to as strategy --- a GVC system engineering technology Cluster Exploitation total strategy for plan " since the beginning of history ".
The total strategy target of GVC network techniques support system can be attributed to following content:
1st, in terms of the basis of technological development(The front end of ICT industrial chains), with the global value Chain System of multi-layer multi-mode(GVC)For core, the connection carried out using Natural Intelligence and Artificial Intelligence based on computer and its network and coordination are used as general intelligence integrated system(IIS)The main line of Upgrade process, set up brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technical foundation and engineering foundation, for relative closure, " resource pool " of geo-stationary --- system for cloud computing injection soul, intelligence and life, build global intelligent integral network computer system(CS / HSN ( GII )), Global Internet is made as the real technique support system with life and ecological right joint management.
2nd, in the application aspect of brand new technical(The end of ICT industrial chains), with the global value Chain System of multi-layer multi-mode(GVC)For core, using being coupled of carrying out based on computer aided system and internet of cognitive system and practice system and coordinate to be used as high-grade intelligent integrated system(HIIS)The main line of evolution process, sets up and is based on metasystem(MS)The brand-new theoretical intelligent integrated science system of science(IIS & IIT;), the new Global Internet of life-giving vigor is combined together with being dispersed in the logistics net of each field all departments, energy net, Network and Finance Network and knowledge knowledge network all over the world(DCN), carry out GVC system engineering energetically, set up the dynamic Correspondent network system of the real global intelligent integral with life and ecological right joint management(DCN / HII ( GVC )), so as to build intelligent integrated net, life internet and ecological operation net.
By implementing GVC system engineering technology Cluster Exploitation total strategy --- the present inventor is referred to as " since the beginning of history " plan, and indefinite " cloud " counting system of flicker is transformed into " world " counting system of Correspondent all things on earth, insertion longitude and latitude.Revolution is calculated based on the world that cloud computing is changed, global value catenary system using multi-layer multi-mode is core, it is basic using modern electronic technology, modern communication technology and present information network technology to support, logistics network, energy network, information network, banking network and knowledge network are combined closely, set up it is efficient, intensive, with life(Or it is ecological)The big system of the dynamic Correspondent network of intelligent integrated integration of Self-Organization.
Claims (7)
1. independent claims --- area value chain network configuration holographic butt joint equalization technology, it is the applicant setting up brand-new logical foundations, Fundamentals of Mathematics, in scientific basic and brand-new technical foundation and engineering foundation, in order to which indefinite " cloud " counting system of flicker to be transformed into " world " counting system of Correspondent all things on earth, insertion longitude and latitude, centered on Internet user, and then with global value Chain System(GVC)Centered on, the connection and coordination carried out using Natural Intelligence and Artificial Intelligence based on computer and its network is used as general intelligence integrated system(IIS)The main line of Upgrade process, by the new technology set up network configuration dynamics basic model and normal form and put forward, this right is characterised by:
A, for area value chain network configuration holographic butt joint equalization technology, brand-new logical foundations include holographic Correspondent logic, the two poles of the earth Correspondent logic, the holographic Correspondent logic in the two poles of the earth;Brand-new Fundamentals of Mathematics include holographic Correspondent mathematics, the two poles of the earth Correspondent mathematics, system migration analysis mathematics;Brand-new scientific basic includes resource distribution dynamics, holographic organization synergetics, the system behavio(u)r theory of value, game coordination, the equilibrium economics that liquidates, holographic Correspondent physics, and a series of insertion science as formed by brand-new theoretical great synthesis(Interdisciplinary science and Cross science)--- metasystem science and intelligent integrated science;Brand-new technical foundation is using value chain system as core, towards the brand-new systems technology of holographic concertedness(Cluster);Brand-new engineering foundation is using value chain system as core, towards the brand-new system engineering of holographic concertedness(Cluster);
B, for area value chain network configuration holographic butt joint equalization technology, " world " calculating is an extremely complex system in itself, with sufficiently complex holographic joint management structure, herein, on the one hand, various computers and its infrastructure, auxiliary device and the network equipment(Including server, browser)With holographic joint management pattern(Including ICC, ICK, ICH, IDC, IDK, IDH, IMC, IMK, IMH, ECC, ECK, ECH, EDC, EDK, EDH, EMC, EMK, EMH)Connect and form computer interconnected network tissue;On the other hand, various users and its effect chain are with holographic joint management pattern(Including ICC, ICK, ICH, IDC, IDK, IDH, IMC, IMK, IMH, ECC, ECK, ECH, EDC, EDK, EDH, EMC, EMK, EMH)Connect and form natural intelligence socialization tissue, this natural intelligence socialization tissue is collectively forming " world " counting system CS/HSN (GII) that the present inventor is censured with computer interconnected network tissue;
C, for area value chain network configuration holographic butt joint equalization technology, set up network configuration effect chain and the principles of science in a balanced way docked with internet, and then set up network configuration effect chain and know-why in a balanced way is docked with internet;
D, for area value chain network configuration holographic butt joint equalization technology, introduce it is appropriate, for reflecting general Complex Adaptive Systems basic motive, base load, basic effect, basic consumption, internal cooperation and competition and external collaboration and the various basic collaboration variables of competition respectively, set up network configuration effect chain and design basis in a balanced way docked with internet.
2. dependent claims --- for area value chain, the present inventor according to independent claims 1, which sets up network configuration effect chain, docks fundamental relation in a balanced way with internet, and this right is characterised by:
The present inventor according to independent claims 1 proposes docking balanced type throw-in play, and counts the natural intelligence configuration output YM that connects relative with artificial intelligence field of configuration various projects, can be represented simply as:
We can propose to dock balanced type throw-in play, and count the artificial intelligence configuration output YF that connects relative with natural intelligence field of configuration various projects, can be represented simply as:
IfDM The demand of system output is configured to artificial intelligence for natural intelligence field of configuration,SF Output for artificial intelligent configuration system to natural intelligence field of configuration, then docking equilibrium condition is:;
Equilibrium constraints condition is docked meetingUnder, configure the configuration under relative connect with the statistics natural intelligence configuration of docking balanced type throw-in play and artificial intelligence and export HY(Or HGDP)Various projects, can be represented simply as:
The present inventor according to independent claims 1 will dock Equilibrium constraints condition for whole analyses that the integrated configuration metasystem of natural intelligence chain and artificial intelligence chain is made meetingIt is lower to carry out;
Equilibrium constraints condition is docked meetingUnder, we can set up following exported based on artificial intelligence and experience the relative IIH types connect with I types and experience function:
For artificial intelligence resource output for, from natural intelligence export experience expenditure be it is spontaneous, it is typically unrelated with the output of artificial intelligence resource, therefore,a 2 + C 0Constitute spontaneous sexual experience expenditure.
3. dependent claims --- for area value chain, the present inventor according to independent claims 1, which sets up network configuration effect chain, docks master-plan framework in a balanced way with internet, and this right is characterised by:
On the basis of in view of channel of inter-financing, we can be from purposes by the resources reserve of ICT departmentsSIt is divided into two parts:One is the I type resources reserves for natural intelligence resource input, and two be the II type resources reserves for artificial intelligence resource input, i.e.,:;The former can be denoted asS MM , the latter can be denoted asS MF ;By resource Correspondent from purposesS H It is divided into two parts:One is the I type resource Correspondents for natural intelligence resource input, and two be the II type resource Correspondents for artificial intelligence resource input, i.e.,:;The former can be denoted asS F M , the latter can be denoted asS H F ;
Yet further, discounting for resource Correspondent channel, resource Correspondent can be divided into two classes by us from purposes completely:
One is the resource Correspondent for natural intelligence resource input, referred to as IH types docking resource Correspondent, is denoted asS M ,;
One is the resource Correspondent for artificial intelligence resource input, referred to as IIH types docking resource Correspondent, is denoted asS F ,;
DSS/the LS (DC) set up in the present inventor according to independent claims 1 based on resource distribution dynamics and holographic organization synergetics(And DSS/GO (DC) below)Under analytical framework, we can set up a series of brand-new model analysis;This analysis set up by the present inventor according to independent claims 1, can be described as the balanced economy analysis model that liquidates, it at least may include following content:
Substantially liquidate market analysis --- it is related to tangible effect product market, money market and fictitious capital market;Tangible effect product market includes consumer goods market, factor market, virtual technology market, network information market etc., money market includes money market and social idle money market under Central Bank's control distribution, and fictitious capital market includes financial product market and financial derivative product market;
The whole world liquidates market analysis --- it is related to global tangible effect market, Global money market and global virtual capital market;Global tangible effect product market includes global consumer goods market, the worldwide production market for factors of production, global virtual technical market, global network information market etc., Global money market includes the Central Bank of various countries and controls the social idle money market in money market and various countries under distribution, and global virtual capital market includes Global finance product market and Global finance derivatives market.
4. dependent claims --- for area value chain, the present inventor according to independent claims 1, which sets up network configuration effect chain, docks synergistic mechanism design in a balanced way with internet, and this right is characterised by:
If information response's function can be divided into information response's function that organizational process is concentrated in the reflection on the basis of certain Technological Economy foundation structure TKS/EBSf [C, [TKS, EBS]], the information response's function for reflecting on the basis of certain Technological Economy foundation structure TKS/EBS dispersion tissue processf [D, [TKS, EBS]] and the information response's function for reflecting collecting and distributing organizational process on the basis of certain Technological Economy foundation structure TKS/EBSf [ M, [ TKS, EBS ]];Gambling activity setG The set that gambling activity is competed on the basis of certain Technological Economy foundation structure TKS/EBS can be divided intoG[K, [TKS, EBS]], on the basis of certain Technological Economy foundation structure TKS/EBS cooperative game activity setG[C, [TKS, EBS]] and the movable set of Coordination Game on the basis of certain Technological Economy foundation structure TKS/EBSG[H, [TKS, EBS]], the general expression of static Incompletely information games is
G = { A 1 , A 2 , , A n ;W 1 , W 2 , , W n ;u 1 , u 2 , , u n , [TKS, EBS] },
WhereinA i For game sideiAction space(Internet resources configuration mode space),W i It is game sideiType space, game sideiBenefitu i ( s 1 , a 2 , , a n ) combined for Internet resources configuration modeS = ( s 1 , s 2 , , s n ) and typew i Function, then gambling activity joint management patternSMG = ( G, < M , f , h >, [TKS, EBS]) and include the subpatterns of following nine kinds of fundamental types:
SMG [ TKS, EBS ] = SMG [ CK, CH, CC, MK, MH, MC, DK, DH, DC, [ TKS, EBS ]]。
5. dependent claims --- for the network configuration of area value chain, the present inventor according to independent claims 1, which sets up network configuration effect chain, docks master-plan framework in a balanced way with internet, and this right is characterised by:
Because single object optimization just has optimal solution, if toiSubsystem individually optimizes design available following theiDivider is drawnSPiTo describe:
This model is designed with generality for the static optimization of intelligent integrated subsystem (or unit);
If Lagrange functions:
IfSPiIt is convex programming, thenIt is exactly its optimal solution;Using the various methods of ordinary optimal design Mathematical Planning, solve respectivelylThe divider of individual subsystem (or unit) is drawnSP i ( i =1, 2, …, I) it is that can obtain the optimal solution of all subsystems( i = 1, 2, …, I );
In general terms, area value chain resource Correspondent network UCN can be divided into following nine kinds of subtype:
UCN [ MF ( IN ); SF ( RN ), AF ( MN ) ], UCN [ MF ( IN ); SF ( MN ), AF ( RN ) ],
UCN [ MF ( IN ); SF ( RN ), SF ( MN ) ];
UCN [ MF ( RN ); SF ( IN ), AF ( MN ) ], UCN [ MF ( RN ); SF ( MN ), AF ( IN ) ],
UCN [ MF ( RN ); SF ( IN ), SF ( MN ) ];
UCN [ MF ( MN ); SF ( IN ), AF ( RN ) ], UCN [ MF ( MN ); SF ( RN ), AF ( IN ) ],
UCN [ MF ( MN ); SF ( IN ), SF ( RN ) ]。
6. dependent claims --- for the network configuration of area value chain, the present inventor according to independent claims 1 establishes the funding arrangement module and operation control configuration module of area value chain, and this right is characterised by:
A funding arrangement modules(The resource distribution of the inside and outside association of area value chain network configuration is adjusted, finance configuration)
The resource distribution of the inside and outside association of A1 area value chain network configurations is adjusted
a, the inside and outside association of area value chain network configuration total design schedule module
b, the inside and outside association of area value chain network configuration income design schedule module
c, the inside and outside association of area value chain network configuration expenditure design schedule module
d, the inside and outside association of area value chain network configuration cash configuration module
e, the inside and outside association of area value chain network configuration fixed assets accounting module
f, the inside and outside association of area value chain network configuration multi-currency module
g, the inside and outside association of area value chain network configuration personal income adjust module
h, the inside and outside association of area value chain network configuration cost module
The funding arrangement of the inside and outside associations of area value chain network configuration of A 2
The operation control configuration module of the inside and outside association of B area value chain network configurations(The planning and implementation of the inside and outside association of area value chain network configuration)
B1, the main system operation planning of the inside and outside association of area value chain network configuration
B2, the material demand planning of the inside and outside association of area value chain network configuration
B3, the ability need planning of the inside and outside association of area value chain network configuration
B4, the DIM controls of the inside and outside association of area value chain network configuration
B5, the manufacturer's standard of the inside and outside association of area value chain network configuration
aThe collaboration items code of the inside and outside association of area value chain network configuration, the configuration to collaboration items resource, unique code identification is given to every kind of material;
bThe relevant item inventory of the inside and outside association of area value chain network configuration, definition region is worth the technological document of chain structure, for working out various planning;
cThe program of the inside and outside association of area value chain network configuration, describes the implementation of system operation step, stage and vertical and horizontal associated item of the inside and outside association of area value chain network configuration sequentially;
dThe project center of the inside and outside association of area value chain network configuration, is constituted using the means, technology and human resources of same or similar program, is engaged in the scheduling of economical operation, accounting ability, the base unit for calculating cost.
7. dependent claims --- for the network configuration of area value chain, the present inventor according to independent claims 1 establishes the logistics configuration module and human resources configuration module of area value chain, and this right is characterised by:
C logistics configuration modules(The supply and configuration of the inside and outside association of area value chain network configuration)
The distribution configuration of the inside and outside associations of area value chain network configuration of C 1
a, for the configuration and service of the inside and outside related information of area value chain network configuration
b, for area value chain network configuration it is inside and outside association sales order configuration
c, for area value chain network configuration it is inside and outside association sale statistics and analysis
The storage controlling of the inside and outside associations of area value chain network configuration of C 2
aThe all materials for the inside and outside association of area value chain network configuration set up stock, determine logistics arrangement of when ordering goods, while being used as the foundation for giving logistics to arrange department's logistics arrangement, production division to make system operation planning;
bOrdered items are received, are put in storage by quality inspection, the product of production similarly will be by examining storage;
cThe daily flow processing work of material is received and dispatched;
The logistics arrangement of the inside and outside associations of area value chain network configuration of C 3
aThe supplier information inquiry of the inside and outside association of area value chain network configuration(Inquire about ability, prestige of supplier etc.);
bGoods is urged in area value chain network configuration inside and outside association(The material of outsourcing or external processing is carried out with urging);
cThe logistics arrangement of the inside and outside association of area value chain network configuration is counted with external processing(Count, set up archives, calculate cost);
dThe price analysis of the inside and outside association of area value chain network configuration(Cost of material is analyzed, inventory cost is adjusted);
The batch tracking configuration of the inside and outside associations of area value chain network configuration of C 4
D human resources configuration modules
The HRP aid decision of the inside and outside associations of area value chain network configuration of D 1
The human resources configuration of the inside and outside associations of area value chain network configuration of D 2
The personal income of the inside and outside associations of area value chain network configuration of D 3 is adjusted
aThe department for the inside and outside association of area value chain network configuration and link, according to company it is trans-regional, trans-departmental, formulate wages accounting method adaptable therewith across the different pay structures and handling process of work post;
bThe department for the inside and outside association of area value chain network configuration and link, are directly integrated with time configuration, can upgrade in time, and mobilism is adjusted to the wages of stakeholder;
cArea value chain network configuration inside and outside association is back-calculated function;By integrated with other modules, automatically according to requiring adjustment pay structure and data;
The man-hour configuration of the inside and outside associations of area value chain network configuration of D 4
aThe department for the inside and outside association of area value chain network configuration and link, according to this country or local calendar, the running time of arrangement region value chain and the daily schedule of labour;
bThe department for the inside and outside association of area value chain network configuration and link, with distal end attendance checking system, the actually situation of turning out for work of stakeholder can be recorded in main system, and the time data relevant with stakeholder's wages, bonus is imported in wages system and cost accounting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103421117A CN102624823A (en) | 2011-11-03 | 2011-11-03 | Holographic hedging equalization technology for regional value chain network configuration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103421117A CN102624823A (en) | 2011-11-03 | 2011-11-03 | Holographic hedging equalization technology for regional value chain network configuration |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102624823A true CN102624823A (en) | 2012-08-01 |
Family
ID=46564506
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011103421117A Pending CN102624823A (en) | 2011-11-03 | 2011-11-03 | Holographic hedging equalization technology for regional value chain network configuration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102624823A (en) |
-
2011
- 2011-11-03 CN CN2011103421117A patent/CN102624823A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102938773A (en) | Information and communications technology (ICT) technical support design for planning and configuring function module by internet user terminal | |
CN102624823A (en) | Holographic hedging equalization technology for regional value chain network configuration | |
CN102710685A (en) | Holographic butt joint equalization technology for regional value chain market allocation | |
CN102638491A (en) | National value chain planning and configuring holographic abutting balancing technique | |
CN102638493A (en) | Global value chain market allocation holographic butting equalization technology | |
CN102739747A (en) | Holographic docking balancing technology of global value chain network configuration | |
CN102724260A (en) | National value chain market configuration holograph docking equalization technology | |
CN102811246A (en) | Holographic connection equalization technology for global value chain plan configuration | |
CN103118041A (en) | National value chain market allocation holographic hedging balance listing technology | |
CN102857542A (en) | Industrial value chain market allocation holographic docking balance technology | |
CN102932395A (en) | Industrial value chain planning configuration holographic butt joint balancing technology | |
CN103051662A (en) | Holographic docking balancing technology of enterprise value chain market distribution | |
CN103051660A (en) | Industry value chain network configuration holographical coupling equalization technology | |
CN103095775A (en) | National value chain network configuration holographic docking balancing technology | |
CN102710694A (en) | Enterprise value chain network allocation holographic butt balance list technology | |
CN102651759A (en) | Holographic butt-joint balancing technology for market configuration of Internet user terminal | |
CN102938774A (en) | Information and communications technology (ICT) technical support design for global value chain network configuration function module | |
CN102624822A (en) | ICT (information and communication technology) technical support design for providing functional module for regional value chain network configuration | |
CN103023951A (en) | Holographic butt joint balanced listing technology for network configuration of global value chain | |
CN103078890A (en) | Holographic docking balance tabulating technology for market allocation of enterprise value chain | |
CN102638501A (en) | Enterprise value chain network configuration holographic butting equalization technology | |
CN102624801A (en) | Holographic docking equalization technology for planning and configuring regional value chain | |
CN102882912A (en) | Holographic hedging balancing tabulating technology for global value chain (GVC) plan configuration | |
CN103023958A (en) | Holographic docking balanced tabulation technology for industrial value chain planning and configuration | |
CN102752349A (en) | Holographic butt joint equalization technology for planning and allocating enterprise value chains |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120801 |