CN102623923B - Lifting type rail insulation operation platform - Google Patents

Lifting type rail insulation operation platform Download PDF

Info

Publication number
CN102623923B
CN102623923B CN201210077578.8A CN201210077578A CN102623923B CN 102623923 B CN102623923 B CN 102623923B CN 201210077578 A CN201210077578 A CN 201210077578A CN 102623923 B CN102623923 B CN 102623923B
Authority
CN
China
Prior art keywords
lifting
guide rail
pulley
platform
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210077578.8A
Other languages
Chinese (zh)
Other versions
CN102623923A (en
Inventor
王俊
唐峥
曹稼祥
韩佩利
张正钧
徐晓华
沈国平
沈耀铭
付祎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI DONGJIE ELECTRIC POWER HIGH-PRESSURE LIVE WORKING Co Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
SHANGHAI DONGJIE ELECTRIC POWER HIGH-PRESSURE LIVE WORKING Co Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI DONGJIE ELECTRIC POWER HIGH-PRESSURE LIVE WORKING Co Ltd, State Grid Corp of China SGCC, Shanghai Municipal Electric Power Co filed Critical SHANGHAI DONGJIE ELECTRIC POWER HIGH-PRESSURE LIVE WORKING Co Ltd
Priority to CN201210077578.8A priority Critical patent/CN102623923B/en
Publication of CN102623923A publication Critical patent/CN102623923A/en
Application granted granted Critical
Publication of CN102623923B publication Critical patent/CN102623923B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Platform Screen Doors And Railroad Systems (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention discloses a lifting type rail insulation operation platform which comprises a mobile device and an insulation platform body that is provided with a rail, wherein the mobile device comprises an up-down lifting device, a left-right moving device and an insulation platform bracket; the up-down lifting device comprises a guide rail, a worm and gear device, a pulley block, a lifting rope and a lifting limiter; the worm and gear device is arranged at the bottom end of the guide rail; the pulley block comprises guide rail pulleys fixed on the insulation platform bracket and used for clamping the guide rail and a lifting pulley penetrating and guiding the lifting rope; one end of the lifting limiter is fixed on the insulation platform bracket, the other end of the lifting limiter is matched and fixed with the guide rail; the insulation platform bracket is arranged in front of the guide rail and is fixed with the insulation platform body, the insulation platform bracket moves up and down along the guide rail through the guide rail pulleys arranged at the upper end and the lower end of the bracket; and the left-right moving device comprises a support pulley, two pulley chains and a metal fixing chain. According to the invention, up-down and left-right regulations of an operation position can be carried out, thus the safety of a hot line work is improved.

Description

A kind of lifting mode rail insulation operation platform
Technical field
The present invention relates to the insulated platform that a kind of hot line work uses, be specifically related to a kind of lifting mode rail insulation operation platform.
Background technology
In today that power supply reliability becomes more and more important, hot line work more and more comes into one's own as one of important means improving power supply reliability.This hot line work mode of aerial lift device with insulated arm, its advantage is apparent, and production time is short, work efficiency is high, but have quite a few power supply user owing to being subject to the restriction of road environment, aerial lift device with insulated arm cannot enter camp site and carry out the work, and interruption maintenance of having to.Insulation operation platform operation, as a ripe hot line work project, obtains at work and uses widely.Original insulated platform there are certain requirements the installation site on electric pole, and can not adjust operation height up and down after installing.When running into level device operation (in as 10kV triangular arrangement phase conductor); then can only by stepping down in deficiency insulated platform fence overcoming height; now operating personnel just loses the available protecting of fence, and needing keeps one's balance by individual control ability and operating skill completely guarantees the safety of operation.
Summary of the invention
The object of this invention is to provide a kind of insulated platform for carrying out charged ascend operation, smaller to environmental requirement, take up room also less, and it is fairly simple to the operation moved up and down, do not need by trampling the deficiency overcoming height on platform rail, the safety of operation can be guaranteed, expand the scope of hot line work.
In order to achieve the above object, the invention provides a kind of lifting mode rail insulation operation platform, this platform comprises mobile device and is provided with the insulated platform body of fence; Described mobile device comprises oscilaltion device, sway device and insulated platform support; Described oscilaltion device comprises guide rail, worm gear device, assembly pulley, lifting rope and lifting limiting device; Described guide rail is just facing to insulated platform body, and the back side is towards electric rod column, and on another two sides, correspondence is provided with the through hole of the equidistant arrangement of two row respectively; Described worm gear device is arranged on the bottom of described guide rail, this worm gear is also provided with the joystick extended to outside guide rail, worm gear device can be made to rotate by this joystick; Described assembly pulley comprise be fixed on insulated platform support and clamp described guide rail some Guide rollerses and connect lifting rope some lifting pulleys; Described lifting limiting device one end is fixed on insulated platform support, and the other end coordinates the through hole of described guide rail side to be fixed on guide rail, and this lifting limiting device can prevent platform maloperation; Described insulated platform Bracket setting in the front of described guide rail, and is fixed with insulated platform body; This insulated platform support can be moved up and down along guide rail by the described Guide rollers being arranged on insulated platform pedestal upper end and direction guiding rail front, lower surface, insulated platform support at its upper end both sides and two sides, lower end is respectively equipped with attachment point to insulated platform body place, and respectively at attachment point by bolt and nut and the fixation of insulated platform body; Described Guide rollers clamps the conveniently adjusted operation height of guide rail, and guide rail can make again Guide rollers increase its stability when up-down adjustment operation height; Described some lifting pulleys comprise the first lifting pulley be arranged on the worm screw of guide rail bottom, are arranged on the second lifting pulley of guide rail top central authorities and are arranged on the 3rd lifting pulley of described insulated platform cantilever tip central authorities; Described sway device comprises the metal supporting pulley, two pulley chains and be arranged on described guide rail top and fixes chain; Described support pulley is respectively provided with two on guide rail top and bottom respectively, and two described pulley chains are also located at guide rail top and bottom respectively, and the two ends of every bar pulley chain are located at respectively and support pulley both sides.
Above-mentioned lifting mode rail insulation operation platform, wherein, described guide rail is made up of two parallel tracks.
Above-mentioned lifting mode rail insulation operation platform, wherein, described worm gear device drives the first lifting pulley to rotate, then drives the second lifting pulley and the 3rd lifting pulley successively by lifting rope.That is, connected the lifting pulley of lifting rope by the adjustment of worm gear device, insulated platform can be made to realize the function of oscilaltion.Described lifting rope is worn successively around the first lifting pulley, the second lifting pulley and the 3rd lifting pulley, and the other end of this lifting rope is fixed on guide rail top.
Above-mentioned lifting mode rail insulation operation platform, wherein, described lifting limiting device can the adjustment carrying out position on guide rail by be fixed in different through holes.
Above-mentioned lifting mode rail insulation operation platform, wherein, described insulated platform support is also provided with through described orbit of guide rail, and blocks the divider of this guide rail in rail back.
Above-mentioned lifting mode rail insulation operation platform, wherein, described some Guide rollerses, wherein have two to be arranged on insulated platform pedestal upper end, have four to be arranged on insulated platform pedestal lower end.
Above-mentioned lifting mode rail insulation operation platform, wherein, described Guide rollers is arranged on two of insulated platform pedestal upper end and matches with the inner side of described guide rail two tracks respectively, be arranged on four of insulated platform pedestal lower end, every two coordinate with this track with eminence respectively inside and outside the orbit of guide rail of side; Wherein, be in the Guide rollers located inside track to be fixed on the described divider of insulated platform support.That is, the assembly pulley of oscilaltion device is made up of with 3 lifting pulleys connecting lifting rope 6 Guide rollerses clamping guide rail altogether.
Above-mentioned lifting mode rail insulation operation platform, wherein, the length that described metal fixes chain and pulley chain can adjust.One end that described metal fixes chain can loosen opens, and pulley chain can support pulley by turn and carry out fastening.Metal is fixed after chain unclamps, and by the pulley of pulley chain with support pulley, described mobile device can be made to move around electric pole shaft, after adjusting to suitable location, then metal is fixed chain system prohibit can realize overall fixing.
Above-mentioned lifting mode rail insulation operation platform, wherein, the preferred material of described insulated platform body is glass-felt plastic, and described guide rail preferred material is aluminum alloy, and the preferred material of described assembly pulley, support pulley and pulley chain is nylon pulley.Wherein, glass-felt plastic, i.e. epoxy resin bonded fiber (pipe), add peptizer primarily of glass woven fabric and epoxy resin and form, its density is 1.5-2.0, lighter than steel 3-4 times, and intensity is higher than steel 1.7 times, and therefore, mechanical characteristics and physical property are all good.Diameter is the glass fibre of 10 microns, tensile strength is 3600 MPas, be equivalent to bear on the sectional area of every square millimeter 360 kilograms pulling force and constantly, except intensity height, the plurality of advantages such as quality is light, anticorrosive, insulation, easy to clean that it has.Therefore, glass steel material is adopted to make insulated platform most suitable.Pulley chain required for the adjustment of platform left and right directions and dead sheave and the Guide rollers needed for lifting platform and lifting pulley are nylon material, have that intensity is high, insulativity, lightweight feature.The guide rail of lifting mode rail insulation operation platform have employed aluminum alloy material, and its density is low, but intensity ratio is higher, close to or exceed high-quality steel, and the good non-corrodibility of plasticity is good.
Lifting mode rail insulation operation platform provided by the invention has the following advantages:
Chain is fixed by metal, the integral left right rotation that pulley chain and support pulley achieve platform body and mobile device is moved, guide rail, Guide rollers, lifting rope, lifting pulley, lifting limiting device and worm gear device constitute oscilaltion device, Guide rollers clamps the conveniently adjusted operation height of guide rail, guide rail can make again pulley increase its stability when up-down adjustment operation height, the lifting pulley of lifting rope is connected by the adjustment of worm gear device, insulated platform can be made to realize the function of oscilaltion, lifting limiting device can prevent platform maloperation.Thus under the prerequisite of available protecting operating personnel safety, add safe operation range, the deficiency on the height run into when overcoming general insulation operation platform hot line work.Platform mobile device have employed aluminum alloy material, to alleviate overall weight, facilitates installing/dismounting.
The present invention expands the scope of hot line work, solve production practical problems, smaller to environmental requirement, take up room also less, and its structure design and device operation fairly simple, can be used in environment comparatively severe, the area that landform is more complicated, achieves and carry out hot line work under landform constrained environment.Thus provide better service for user, ensure the safe supply regular power of supply line, avoid the adverse effect brought to power supply enterprise and power consumer that has a power failure.Power supply reliability, electricity sales amount, lifting profession service quality can be improved, guarantee to carry out uninterrupted power supply to client.
Accompanying drawing explanation
Fig. 1 is lifting mode rail insulation operation platform structural representation of the present invention.
Fig. 2 is the rail back schematic diagram of lifting mode rail insulation operation platform of the present invention.
Fig. 3 is the guide rail front schematic view of lifting mode rail insulation operation platform of the present invention.
Fig. 4 is the mobile device front elevation of lifting mode rail insulation operation platform of the present invention.
Fig. 5 is the mobile device lateral plan of lifting mode rail insulation operation platform of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is further described.
As shown in Figure 1, a kind of lifting mode rail insulation operation platform provided by the invention, this platform comprises mobile device and is provided with the insulated platform body 1 of fence 1-1; Mobile device comprises oscilaltion device, sway device and insulated platform support 2; Oscilaltion device comprises guide rail 3, worm gear device 4, assembly pulley, lifting rope 5 and lifting limiting device 6; See Fig. 2 and Fig. 3, guide rail 3 is just facing to insulated platform body 1, and the back side is towards electric rod column, and on another two sides, correspondence is provided with the through hole 3-1 of the equidistant arrangement of two row respectively; Worm gear device 4 is arranged on the bottom of guide rail 3, this worm gear 4-2 is also provided with the joystick 13 extended to outside guide rail, worm gear device 4 can be made to rotate by this joystick 13; Assembly pulley comprises and is fixed on insulated platform support 2 and clamps some Guide rollerses 7 of guide rail 3 and connect some lifting pulleys 8 of lifting rope 5; Lifting limiting device 6 one end is fixed on insulated platform support 2, and the other end coordinates the through hole 3-1 of guide rail 3 side fixing on guides 3, and this lifting limiting device 6 can prevent platform maloperation; Insulated platform support 2 is arranged on the front of guide rail 3, and fixes with insulated platform body 1; This insulated platform support 2 can move up and down along guide rail 3 towards the Guide rollers 7 in guide rail 3 front by being arranged on insulated platform support 2 top and bottom, insulated platform support 2 at its upper end both sides and two sides, lower end is respectively equipped with attachment point to insulated platform body 1 place, and respectively at attachment point by bolt and nut and insulated platform body 1 fixation; Guide rollers 7 clamps the conveniently adjusted operation height of guide rail 3, and guide rail 3 can make again Guide rollers 7 increase its stability when up-down adjustment operation height; Some lifting pulleys 8 comprise the first lifting pulley 8-1 be arranged on the worm screw 4-1 of guide rail 3 bottom, are arranged on the second lifting pulley 8-2 of guide rail 3 top central authorities and are arranged on the 3rd lifting pulley 8-3 of insulated platform support 2 top central authorities; Sway device comprises the metal supporting pulley 9, two pulley chains 10 and be arranged on guide rail 3 top and fixes chain 11; Support pulley 9 and be respectively provided with two on guide rail 3 top and bottom respectively, two pulley chains 10 are also located at guide rail 3 top and bottom respectively, and the two ends of every bar pulley chain 10 are located at respectively and support pulley 9 both sides.Shown in Fig. 4 and Fig. 5.
Guide rail 3 is made up of two parallel track 3-2.
Worm gear device 4 drives the first lifting pulley 8-1 to rotate, then drives the second lifting pulley 8-2 and the 3rd lifting pulley 8-3 successively by lifting rope 5.That is, connected the lifting pulley 8 of lifting rope 5 by the adjustment of worm gear device 4, insulated platform can be made to realize the function of oscilaltion.Lifting rope 5 is worn around the first lifting pulley 8-1, the second lifting pulley 8-2 and the 3rd lifting pulley 8-3 successively, and the other end of this lifting rope 5 is fixed on guide rail 3 top.
Lifting limiting device 6 can the adjustment carrying out position on guides 3 by be fixed in different through hole 3-1.
Insulated platform support 2 is also provided with through guide rail 3 track 3-2, and blocks the divider 12 of this guide rail 3 at guide rail 3 back side.
Some Guide rollerses 7, wherein have two to be arranged on insulated platform support 2 upper end, have four to be arranged on insulated platform support 2 lower end.
Guide rollers 7 is arranged on two of insulated platform support 2 upper end and matches with the inner side of guide rail 3 two track 3-2 respectively, be arranged on four of insulated platform support 2 lower end, every two coordinate with this track 3-2 with eminence respectively inside and outside a side rails 3 track 3-2; Wherein, be in the Guide rollers 7 located inside track 3-2 to be fixed on the divider 12 of insulated platform support 2.That is, the assembly pulley of oscilaltion device is made up of with 3 lifting pulleys 8 connecting lifting rope 56 Guide rollerses 7 clamping guide rail 3 altogether.
The length that metal fixes chain 11 and pulley chain 10 can adjust.One end that metal fixes chain 11 can loosen opens, and pulley chain 10 can support pulley 9 by turn and carry out fastening.Metal is fixed after chain 11 unclamps, and by the pulley of pulley chain 10 with support pulley 9, mobile device can be made to move around electric pole shaft, after adjusting to suitable location, then metal is fixed chain 11 be prohibit can realize overall fixing.
The preferred material of insulated platform body 1 is glass-felt plastic, and guide rail 3 preferred material is aluminum alloy, and the preferred material of assembly pulley, support pulley 9 and pulley chain 10 is nylon pulley.Wherein, glass-felt plastic, i.e. epoxy glass stringing, add peptizer primarily of glass woven fabric and epoxy resin and form, its density is 1.5-2.0, lighter than steel 3-4 times, and intensity is higher than steel 1.7 times, and therefore, mechanical characteristics and physical property are all good.Diameter is the glass fibre of 10 microns, tensile strength is 3600 MPas, be equivalent to bear on the sectional area of every square millimeter 360 kilograms pulling force and constantly, except intensity height, the plurality of advantages such as quality is light, anticorrosive, insulation, easy to clean that it has.Therefore, glass steel material is adopted to make insulated platform most suitable.Pulley chain 10 required for the adjustment of platform left and right directions and dead sheave 9 and the Guide rollers needed for lifting platform 7 and lifting pulley 8 are nylon material, have that intensity is high, insulativity, lightweight feature.The guide rail 3 of lifting mode rail insulation operation platform have employed aluminum alloy material, and its density is low, but intensity ratio is higher, close to or exceed high-quality steel, and the good non-corrodibility of plasticity is good.
Lifting mode rail insulation operation platform of the present invention uses flow process as follows:
First, by electrician in electric pole appropriate location, work in coordination and fix chain 11 and pulley chain 10 by tightening up metal, platform mobile device is mounted on electric rod column, and oscilaltion device is dropped to bottom, and then work in coordination by insulated platform body 1 combination be mounted to insulated platform support 2 and guide rail 3 etc. form mobile device on, by bolt and nut fixation.
Wherein, the sway device of lifting mode rail insulation operation platform of the present invention, by metal fix chain 11, pulley chain 10, support pulley 9 coordinate, mobile device and insulated platform body 1 are fixed on electric rod column.It is fixed by insulated platform when hot line work that metal fixes chain 11 Main Function, prevents its left-right rotation.Now pulley chain 10 and support pulley 9 and electric rod column close contact, plays the effect supporting whole insulated platform.And when insulated platform needs left and right adjustment direction, only metal need be fixed chain 11 slightly just can adjust after pine, now pulley chain 10 and support pulley 9 and electric rod column still close contact, not only play the effect supporting whole insulated platform, can also make insulated platform can left and right adjustment direction and insulated platform can not be made to glide, after adjustment, tighten up sway device just serve fixation again, simple and effective.
The insulated platform body 1 that electrician enters lifting mode rail insulation operation platform carries out hot line work, and No. two electricians, to lifting mode rail insulation operation platform place beneath, adjust the hot line work position of an electrician by adjustment oscilaltion device.
When needs oscilaltion adjusts, push lifting limiting device 6 aside, rotate worm gear device 4 and drive lifting pulley 3 to rotate, tighten up or loosen lifting rope 5, insulated platform support about 2 is adjusted.Close lifting limiting device 6 to prevent platform maloperation after adjustment.When adjusting oscilaltion position, 6 Guide rollerses 7 are had due to what clamp guide rail 3,2, its middle and upper part Guide rollers 7 is installed on inside guide rail 3, bottom is totally 2 to 4 Guide rollerses 7, often pair of Guide rollers 7 is installed on the inside and outside with high side of guide rail 3 respectively, clamping while guide rail 3 facilitates oscilaltion, the effect of stable insulation platform can be played.2 Guide rollerses 7 of guide rail 3 upper inner bear the downward pulling force of insulated platform simultaneously, 2 Guide rollerses 7 of guide rail 3 lower outside bear the downward pressure of insulated platform, and all downward pulling force and pressure all conduct to guide rail 3 by Guide rollers 7 and is applied on electric rod column.The use of oscilaltion device, makes an electrician be in all the time within the scope of the available protecting of fence 1-1 when hot line work, avoids the operational method of trampling on fence 1-1 because operation height is inadequate.
Hot line work is complete, and after fence insulated platform drops to bottom, an electrician departs from insulated platform, and No. two electricians work in coordination and dismantle lifting mode rail insulation operation platform, and dismounting flow process is contrary with installation procedure.
Safety notice and the measure of lifting mode rail insulation operation platform use of the present invention are as follows:
1 meteorological conditions
The present invention should use under good weather;
In case of thunder, rain, snow, mist must not carry out hot line work by this, when wind-force is greater than 5 grades, also should not apply;
The weather that relative air humidity is greater than 80% should stop construction.
2 safety distances and effectively insulated lengths
The present invention uses as major insulation, should through shaking survey before operation, and insulation resistance should be not less than 700M Ω (electrode separation 2cm);
When hot line work, should keep being no less than 0.4m over the ground, adjacent phase conductor is no less than to the safety distance of 0.6m.
Lifting mode rail insulation operation platform provided by the invention is tested as follows:
1. electrical test
I.e. power frequency withstand test, method is as follows:
During insulated platform test, the part metal wool of hard ware in insulated platform should be wound around ground connection, insulated platform body 1 is wound around as the high-pressure side of exerting pressure apart from metal position the shortest effective insulated lengths (0.4 meter) position metal tied silk.Requiring in test without puncturing, ironing without dodging, without obviously generating heat.Electrical test project, the cycle of insulated platform, table 1 will be asked for an interview to.
The electrical test project of table 1 insulated platform, cycle and requirement.
2. mechanical test
When carrying out mechanical robustness testing, the active position of its load should be positioned at the outboard end of insulated platform body 1, and direction vertically downward.D/W test should turn 90 degrees on insulated platform forward, a left side, the right side turn 90 degrees, and rises to top, drops to bottom and respectively carry out once, and continuing under numerical value as listed in table 25 minutes should without distortion, zero damage.Mechanical test project, the cycle of insulated platform, table 2 will be asked for an interview to.
The mechanical test project of table 2 insulated platform, cycle, requirement.
The mechanical test project of insulated platform, cycle, requirement specify according to GB " live line tool main technique requirements and Guidance Rule " 5.2.3.
The rated designs loading of people carrier requires (Qrs):
Human body weight calculates (engineering being got 1kg ≌ 10N) by everyone G1=700N SBW;
The weight of carrying implement articles for use calculates by everyone G2=150N;
The coefficient of impact KC of people carrier generally gets: vertical climbing is 1.6 ~ 2.0, and lateral transfer is 1.5.
The loading of people carrier is pressed Qr=(700+150) n=850n and is calculated.Wherein n is that instrument allows manned number; This instrument allows manned number to get 1 people, therefore Qr=850N.
The rated designs loading of people carrier calculates as follows:
Qrs=KC × Qr (N), during this instrument calculates, KC gets 2.5.
Qrs=2.5 × 850=2125 N ≈ 212.5kg, should be about 212.5kg according to calculating insulated platform trial load.
We carry out machinery static loading test by 2400N load at present, and carry out bilateral 90 ° rotation, rise to top, drop to bottom loading test, continue 5 minutes without distortion, zero damage.Electrical test is according to 0.4M, 45kV, 1min stand the test, and nothing is generated heat, the phenomenons such as distortion.
Lifting mode rail insulation operation platform provided by the invention is suitable for events in operation:
Corresponding development of the present invention and improvement, consider construction environment, carried out a series of hot line work project targetedly.As, changing 10kV from falling fuse device, tearing open, take 10kV lead-in wire, tear open, take 10kV cable tail, demolition, installation fault detector, righting 10kV porcelain is carried on a shoulder pole, and installs 10kV ground loop additional, changes 10kV strain insulator string, taking foreign body, changes linear insulator and cross-arm etc.
Lifting mode rail insulation operation platform provided by the invention, on the basis of existing technology, elevating function is joined in insulation operation platform, make it have the adjustment capability of upper and lower job position, and devise the overall right-left adjusting device of insulated platform, have more alerting ability and reliability, improve the safety that insulation operation platform is used in hot line work, be conducive to carrying out of hot line work, power supply reliability, electricity sales amount, lifting profession service quality can be improved, guarantee to carry out uninterrupted power supply to client, have positive effect to the safety improving whole hot line work.Also should specify by hot line work related tests simultaneously, regularly electrical test, mechanical test be carried out to the formula fence insulated platform that falls of the present invention.
Although content of the present invention has done detailed introduction by above preferred embodiment, will be appreciated that above-mentioned description should not be considered to limitation of the present invention.After those skilled in the art have read foregoing, for multiple amendment of the present invention and substitute will be all apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (8)

1. a lifting mode rail insulation operation platform, is characterized in that, this platform comprises mobile device and is provided with the insulated platform body (1) of fence (1-1);
Described mobile device comprises oscilaltion device, sway device and insulated platform support (2);
Described oscilaltion device comprises guide rail (3), worm gear device (4), assembly pulley, lifting rope (5) and lifting limiting device (6);
Described guide rail (3) is just facing to insulated platform body (1), and the back side is towards electric rod column, and on another two sides, correspondence is provided with the through hole (3-1) of the equidistant arrangement of two row respectively;
Described worm gear device (4) is arranged on the bottom of described guide rail (3);
Described assembly pulley comprise be fixed on insulated platform support (2) go up and clamp described guide rail (3) some Guide rollerses (7) and connect lifting rope (5) some lifting pulleys (8);
Described lifting limiting device (6) one end is fixed on insulated platform support (2), and the other end coordinates the through hole (3-1) of described guide rail (3) side to be fixed on guide rail (3);
Described insulated platform support (2) is arranged on the front of described guide rail (3), and fixes with insulated platform body (1);
Described some lifting pulleys (8) comprise the first lifting pulley (8-1) be arranged on the worm screw (4-1) of guide rail (3) bottom, are arranged on second lifting pulley (8-2) of guide rail (3) top central authorities and are arranged on the 3rd lifting pulley (8-3) of described insulated platform support (2) top central authorities;
Described sway device comprises the metal supporting pulley (9), two pulley chains (10) and be arranged on described guide rail (3) top and fixes chain (11);
Described support pulley (9) is located at guide rail (3) top and bottom respectively, and two described pulley chains (10) are also located at guide rail (3) top and bottom respectively, and the two ends of every bar pulley chain (10) are located at respectively and support pulley (9) both sides.
2. lifting mode rail insulation operation platform as claimed in claim 1, is characterized in that, described guide rail (3) is made up of two parallel tracks (3-2).
3. lifting mode rail insulation operation platform as claimed in claim 1, it is characterized in that, described worm gear device (4) drives the first lifting pulley (8-1) to rotate, then drives the second lifting pulley (8-2) and the 3rd lifting pulley (8-3) successively by lifting rope (5).
4. lifting mode rail insulation operation platform as claimed in claim 1, it is characterized in that, described lifting limiting device (6) can in the adjustment of guide rail (3) enterprising line position in different through holes (3-1) by being fixed on.
5. lifting mode rail insulation operation platform as claimed in claim 1, it is characterized in that, described insulated platform support (2) is also provided with the track (3-2) through described guide rail (3), block the divider (12) of this guide rail (3) at guide rail (3) back side.
6. lifting mode rail insulation operation platform as claimed in claim 1, it is characterized in that, described some Guide rollerses (7), wherein two are arranged on insulated platform support (2) upper end, and four are arranged on insulated platform support (2) lower end.
7. lifting mode rail insulation operation platform as claimed in claim 6, it is characterized in that, described Guide rollers (7) is arranged on two of insulated platform support (2) upper end and matches with the inner side of described guide rail (3) two tracks (3-2) respectively, be arranged on four of insulated platform support (2) lower end, every two coordinate with this track (3-2) in the inside and outside same eminence of a side rails (3) track (3-2) respectively.
8. lifting mode rail insulation operation platform as claimed in claim 1, it is characterized in that, the length that described metal fixes chain (11) and pulley chain (10) can adjust.
CN201210077578.8A 2012-03-22 2012-03-22 Lifting type rail insulation operation platform Active CN102623923B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210077578.8A CN102623923B (en) 2012-03-22 2012-03-22 Lifting type rail insulation operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210077578.8A CN102623923B (en) 2012-03-22 2012-03-22 Lifting type rail insulation operation platform

Publications (2)

Publication Number Publication Date
CN102623923A CN102623923A (en) 2012-08-01
CN102623923B true CN102623923B (en) 2015-04-29

Family

ID=46563668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210077578.8A Active CN102623923B (en) 2012-03-22 2012-03-22 Lifting type rail insulation operation platform

Country Status (1)

Country Link
CN (1) CN102623923B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103532051B (en) * 2013-11-06 2015-10-28 上海凡扬电力器具有限公司 A kind of 180 degree of rotation and lifting insulated platforms
CN104727539B (en) * 2013-12-19 2017-03-15 国家电网公司 Power equipment maintaining operating platform
CN103840398B (en) * 2014-03-05 2016-06-29 国家电网公司 Distribution cement pole hot line job platform
CN103863974A (en) * 2014-04-04 2014-06-18 国家电网公司 Low-voltage live working vehicle
CN106051394A (en) * 2016-07-18 2016-10-26 天津众世机电设备有限公司 Monitor installation device
CN106602464A (en) * 2016-12-20 2017-04-26 国家电网公司 Power transmission line steel pipe tower work platform
CN114477014A (en) * 2022-02-10 2022-05-13 广东电网有限责任公司江门供电局 Operation auxiliary device for replacing high-voltage metering fuse tube in electrified mode
CN114614398B (en) * 2022-05-11 2022-08-02 国网山东省电力公司东营供电公司 Distribution lines switching lifting devices
CN116873826B (en) * 2023-09-06 2023-11-14 山西晋缘电力化学清洗中心有限公司 Insulation construction platform based on safe construction of distribution network
CN116950487B (en) * 2023-09-21 2023-11-21 国网山西省电力公司长治供电公司 Cross arm and device for on-line monitoring of circuit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101174762A (en) * 2007-10-17 2008-05-07 福建省福州电业局 Live-working lifting and rotating insulated platform
CN201113301Y (en) * 2007-10-23 2008-09-10 福建省龙岩电业局 Omnibearing rotation insulation operation platform
CN201132751Y (en) * 2007-11-09 2008-10-15 成都飞机工业(集团)有限责任公司 Multifunction bracket loader
CN201492877U (en) * 2009-07-03 2010-06-02 江苏省电力公司常州供电公司 Device suitable for rising and falling automatically on concrete rod
CN202534978U (en) * 2012-03-22 2012-11-14 上海市电力公司 Lifting type fence insulation platform

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011239588A (en) * 2010-05-11 2011-11-24 Chugoku Electric Power Co Inc:The Pole-mounted workbench

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101174762A (en) * 2007-10-17 2008-05-07 福建省福州电业局 Live-working lifting and rotating insulated platform
CN201113301Y (en) * 2007-10-23 2008-09-10 福建省龙岩电业局 Omnibearing rotation insulation operation platform
CN201132751Y (en) * 2007-11-09 2008-10-15 成都飞机工业(集团)有限责任公司 Multifunction bracket loader
CN201492877U (en) * 2009-07-03 2010-06-02 江苏省电力公司常州供电公司 Device suitable for rising and falling automatically on concrete rod
CN202534978U (en) * 2012-03-22 2012-11-14 上海市电力公司 Lifting type fence insulation platform

Also Published As

Publication number Publication date
CN102623923A (en) 2012-08-01

Similar Documents

Publication Publication Date Title
CN102623923B (en) Lifting type rail insulation operation platform
CN103175998B (en) A kind of portable test shaft tower detected for transmission circuit insulator string high-voltage performance
CN106671829A (en) Insulated combined-type support device for overhead lines
CN104143782B (en) The electrification replacing tool of one ± 800kV line tension insulator chain and method
CN102565607A (en) System and method for performing a disconnection test on a lightning conduction system of a wind turbine
CN102420401A (en) Triangular insulating hanging fulcrum bar
WO2016023141A1 (en) Process for live replacement of tension hard-tube bus-bar jumper insulator of +/- 800kv ultra-high-voltage dc transmission line
CN107994527A (en) A kind of high tension electric tower wire insulation buffer unit
CN102664358B (en) Live replacement method for static contact of 220 kV flexible busbar
CN102623895A (en) Lightning protection device and wind turbine generator system
CN106253145A (en) A kind of aerial line wire tensioning device
CN104299489A (en) Ultrahigh-voltage and extra-high voltage mixed type multifunctional power transmission line training device
CN203481707U (en) Upper pile head drainage wire fixing rod
CN205786901U (en) Insulator detecting robot
CN207660355U (en) A kind of pylon convenient for Maintenance and Repair
CN101771248A (en) Rotary insulating ladder for distribution line live working
CN205615360U (en) Electronic railway connecting net pulley compensation arrangement
CN202611568U (en) Insulation trestle ladder
CN202534978U (en) Lifting type fence insulation platform
CN209282719U (en) A kind of console mode wire tensioning device for transmission line of electricity
CN203398639U (en) Vibration-proof hammer moving recovering device for overhead ground wire
CN205882560U (en) Special circulation cord rack device of distribution live working earth potential
CN202353100U (en) Triangular insulation lifting strut
CN201883932U (en) Hoop-type vertical insulating single ladder
CN201584691U (en) Special tool for 220KV double-circuit common-tower line accessing tension-resistance high-pressure high-electric field

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA SHANGHAI DONGJIE H

Free format text: FORMER OWNER: SHANGHAI DONGJIE HV HOT-LINE OPERATION CO., LTD.

Effective date: 20121204

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121204

Address after: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Applicant after: Shanghai Dongjie Electric Power High-pressure Live Working Co., Ltd.

Address before: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant before: Shanghai Electric Power Corporation

Applicant before: Shanghai Dongjie Electric Power High-pressure Live Working Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant