CN102620628B - Steel pipe drifter and method for realizing concentricity of steel pipe and drift diameter head - Google Patents
Steel pipe drifter and method for realizing concentricity of steel pipe and drift diameter head Download PDFInfo
- Publication number
- CN102620628B CN102620628B CN201210085048.8A CN201210085048A CN102620628B CN 102620628 B CN102620628 B CN 102620628B CN 201210085048 A CN201210085048 A CN 201210085048A CN 102620628 B CN102620628 B CN 102620628B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- path head
- steel
- drifter
- clamping mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 116
- 239000010959 steel Substances 0.000 title claims abstract description 116
- 238000000034 method Methods 0.000 title claims abstract description 17
- 230000007246 mechanism Effects 0.000 claims abstract description 26
- 230000008569 process Effects 0.000 claims abstract description 9
- 229910052802 copper Inorganic materials 0.000 claims description 7
- 239000010949 copper Substances 0.000 claims description 7
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 6
- 230000000694 effects Effects 0.000 claims description 6
- 230000009471 action Effects 0.000 claims description 4
- 230000007306 turnover Effects 0.000 claims description 2
- 238000001514 detection method Methods 0.000 abstract description 6
- 230000005484 gravity Effects 0.000 abstract description 3
- 239000000523 sample Substances 0.000 abstract 1
- 239000003208 petroleum Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
Images
Landscapes
- Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)
- A Measuring Device Byusing Mechanical Method (AREA)
Abstract
The invention relates to a steel pipe drifter used for detecting the inner diameter, straightness, roundness, and inner burr removal quality of a steel pipe, and a method for realizing concentricity of the steel pipe and a drift diameter head. The steel pipe drifter includes a pipe storing rack, a steel pipe conveyor roll table, a pipe inverter, a probe, the drift diameter head, a lifting platform, an operation platform and a pinch roll. The steel pipe drifter is characterized in that a steel pipe clamping mechanism is arranged on the lifting platform, and a guide wheel for avoiding the gravity center of the drift diameter head from moving downwards is arranged at the lower part of the drift diameter head; the lifting platform and the steel pipe clamping mechanism adjust the center line of the steel pipe, and the guide wheel supports the drift diameter head, so that the center of the drift diameter head and the center of the steel pipe still keep on one straight line during the detection process. The steel pipe drifter can prevent the gravity center of the drift diameter head from moving downwards when the drift diameter head enters the steel pipe detection process, keep the drift diameter head to always move at the center of the steel pipe, and ensure the detection result accuracy.
Description
Technical field
The present invention relates to a kind of path drifting machine for detection of pipe diameter size, linearity, circularity and inner burr removal quality and realize steel pipe and the method for path head concentricity.
Background technology
In oil exploitation, detection informational needs to oilbearing stratum obtains from oil pipe, even detecting instrument also will be from oil pipe, lower to oil reservoir in sleeve pipe, if petroleum steel pipe internal diameter size, linearity, circularity or burr are removed non-conformity of quality and are closed requirement, probably cause checkout equipment to be stuck in petroleum steel pipe, in serious situation, even cause whole oil well to be scrapped.Therefore,, in petroleum steel pipe production run, need to detect some parameters of pipe diameter.
At present; path drifting machine in practical application; simple in structure; use, easy to maintenance; but due to the fault of construction of self, because feeler lever is elongate objects, the path head of its head is meeting decentralization in testing process conventionally; cause the center of feeler lever and steel pipe can not keep point-blank, cause testing result inaccurate.
Summary of the invention
For overcoming the deficiencies in the prior art, the object of this invention is to provide a kind of steel tube drifter and realize steel pipe and the method for path head concentricity, this path drifting machine can be realized path head in entering steel pipe testing process, avoid decentralization, make path head remain at the central motion of steel pipe, guarantee the accuracy of testing result.
For achieving the above object, the present invention is achieved through the following technical solutions:
A kind of steel tube drifter, comprise storage pipe stand, steel tube conveying roller bed, turn over pipe device, feeler lever, path head, hoistable platform, operator's console, pinch roll, it is characterized in that, described hoistable platform is provided with steel tube clamping mechanism, is provided with the guide wheel of avoiding path head decentralization in the bottom of path head; Described hoistable platform and steel tube clamping mechanism regulate the center line of steel pipe, and guide wheel supports path head, and while making in testing process, the center of path head and the center of steel pipe are all the time point-blank.
Described steel tube clamping mechanism comprises base, upper clip arm, lower clip arm, hydraulic cylinder, guide pillar, rubber slab, copper sheathing, upper clip arm, lower clip arm are arranged on the guide pillar of both sides removable, guide pillar is fixed on base, the upper and lower jig arm being positioned on a side guide pillar connects by hydraulic cylinder, between upper and lower jig arm and guide pillar, be provided with copper sheathing, and be provided with rubber slab in the contact site of upper and lower jig arm and steel pipe.
Described guide wheel comprises roller, roller mount, brace summer, support column, adjusting nut, spring, hold-down nut, roller is arranged at roller mount below, roller mount is provided with support column, support column and roller mount are connected and fixed by hold-down nut, on support column, cover has spring, spring top is provided with adjusting nut, and support column top is provided with the brace summer that supports path head.
Adopt described steel tube drifter to realize the method for steel pipe and path head concentricity, comprise the following steps:
1) first turning over pipe machine will be detected steel pipe and be transitioned on steel tube conveying roller bed;
2) steel tube conveying roller bed is delivered to the steel pipe clamping mechanism on hoistable platform by steel pipe;
3) action of the hydraulic cylinder between the upper and lower jig arm of steel pipe clamping mechanism, upper clip arm falls after rise and contacts with steel pipe, now steel pipe is fixing, hydraulic cylinder shrinks, upper clip arm contacts with steel pipe upper surface, at this moment under the drive that lower clip arm shrinks at hydraulic cylinder, move upward until steel pipe lower surface contacts, and clamp steel pipe;
4) by the adjusting of lower clip arm in guide pillar position in the height Ji Dui steel pipe clamping mechanism of adjustment hoistable platform, make steel pipe center and path head point-blank;
5) by pinch roll, carry path head to steel duct, and the guide wheel that is arranged at path head bottom plays the supporting role to path head, guarantee that path head, in the course of the work along the center line movement of steel pipe, avoids itself and steel pipe inner wall to rub.
Compared with prior art, the invention has the beneficial effects as follows:
By being provided with the guide wheel of steel pipe clamping mechanism and support path head, again by the adjusting of hoistable platform, can guarantee that the center of path head and the center of steel pipe remain point-blank, can realize the accuracy of testing result completely, increase the serviceable life of path head.
Accompanying drawing explanation
Fig. 1 is the vertical view of steel tube drifter.
Fig. 2 is the structural representation of the steel tube clamping mechanism of steel tube drifter shown in Fig. 1.
Fig. 3 is the structural representation of steel tube drifter guide wheel.
Fig. 4 is the work schematic diagram that steel tube drifter path head and guide wheel detect in steel pipe.
In figure: the 1-storage pipe stand 2-steel tube conveying roller bed 3-initiatively passive roller-way 5-of roller-way 4-turns over pipe device 6-steel tube clamping mechanism 6a-base 6b-lower clip arm 6c-hydraulic cylinder 6d-upper clip arm 6e-guide pillar 6f-rubber slab 6g-copper sheathing 7-path head 8-pinch roll 9-feeler lever 10-carrying roller 11-hoistable platform 12-operator's console 13-guide wheel 13a-roller 13b-roller mount 13c-brace summer 13d-support column 13e-adjusting nut 13f-spring 13g-hold-down nut
Embodiment
Below in conjunction with accompanying drawing, to the present invention, structure and the use in concrete production is described in further detail.
See Fig. 1-Fig. 4, a steel tube drifter, comprises storage pipe stand 1, the steel tube conveying roller bed 2 being comprised of active roller-way 3 and passive roller-way 4, turns over pipe device 5, steel pipe clamping mechanism 6, path head 7, pinch roll 8, feeler lever 9, carrying roller 10, hoistable platform 11, operator's console 12.Steel pipe clamping mechanism 6, path head 7, pinch roll 8, feeler lever 9 are installed on hoistable platform 11, testing starts the level height of front adjustment hoistable platform 11 and the position of steel pipe clamping mechanisms grip steel pipe, makes the center of steel pipe on path head 7 and steel tube conveying roller bed 2 point-blank.
See Fig. 2, steel tube clamping mechanism comprises base 6a, upper clip arm 6d, lower clip arm 6b, hydraulic cylinder 6c, guide pillar 6e, rubber slab 6f, copper sheathing 6g, the guide pillar 6e that upper clip arm 6d, lower clip arm 6b are arranged at both sides goes up removable, guide pillar 6e is fixed on base 6a, the upper and lower jig arm being positioned on a side guide pillar 6e connects by hydraulic cylinder 6c, between upper and lower jig arm and guide pillar 6e, be provided with copper sheathing 6g, and in the contact site of upper and lower jig arm and steel pipe, be provided with the rubber slab 6f of placing steel tubes surface tear.
See Fig. 3, Fig. 4, guide wheel comprises roller 13a, roller mount 13b, brace summer 13c, support column 13d, adjusting nut 13e, spring 13f, hold-down nut 13g.Roller 13a is arranged at roller mount 13b below, roller mount 13b is provided with support column 13d, support column 13d and roller mount 13b are connected and fixed by hold-down nut 13g, the upper cover of support column 13d has spring 13f, spring 13f top is provided with adjusting nut 13e, and support column 13d top is provided with the brace summer 13c that supports path head 7.
Adopt described steel tube drifter to realize the method for steel pipe and path head concentricity, comprise the following steps:
1) first turning over pipe machine will be detected steel pipe and be transitioned on steel tube conveying roller bed 2;
2) steel tube conveying roller bed 2 is delivered to the steel pipe clamping mechanism 6 on hoistable platform 11 by steel pipe;
3) action of the hydraulic cylinder 6c between the upper and lower jig arm of steel pipe clamping mechanism 6, upper clip arm 6d falls after rise and contacts with steel pipe, and lower clip arm 6b moves upward under the effect of hydraulic cylinder 6c, clamps steel pipe;
4) by the adjusting of lower clip arm in guide pillar 6e position in the height Ji Dui steel pipe clamping mechanism 6 of adjustment hoistable platform 11, make steel pipe center and path head 7 point-blank; In this process, the fine setting effect to the fixation of steel pipe and steel pipe position is played by steel pipe clamping mechanism.
5) by pinch roll 8, carry path head 7 to steel duct, and the guide wheel 13 that is arranged at path head 7 bottoms plays the support of path head 7 and guide effect, avoid path head motion process in because excessive the moving down with steel pipe inner wall of change center of gravity of the arm of force rubbed;
6) after detection finishes, control main motor reversal, make path head get back to initial position; Steel pipe clamping mechanism unclamps, and steel tube conveying roller bed just steel pipe is delivered to next station.
In testing process, if while improper product being detected, path head stops action under drag effect, and system can be sent alarm.
Claims (4)
1. a steel tube drifter, comprise storage pipe stand, steel tube conveying roller bed, turn over pipe device, feeler lever, path head, hoistable platform, operator's console, pinch roll, it is characterized in that, described hoistable platform is provided with steel tube clamping mechanism, is provided with the guide wheel of avoiding path head decentralization in the bottom of path head; Described hoistable platform and steel tube clamping mechanism regulate the center line of steel pipe, and guide wheel supports path head, makes in testing process, and the center of path head and the center of steel pipe are all the time point-blank.
2. a kind of steel tube drifter according to claim 1, it is characterized in that, described steel tube clamping mechanism comprises base, upper clip arm, lower clip arm, hydraulic cylinder, guide pillar, rubber slab, copper sheathing, upper clip arm, lower clip arm are arranged on the guide pillar of both sides removable, guide pillar is fixed on base, the upper and lower jig arm being positioned on a side guide pillar connects by hydraulic cylinder, between upper and lower jig arm and guide pillar, is provided with copper sheathing, and is provided with rubber slab in the contact site of upper and lower jig arm and steel pipe.
3. a kind of steel tube drifter according to claim 1, it is characterized in that, described guide wheel comprises roller, roller mount, brace summer, support column, adjusting nut, spring, hold-down nut, roller is arranged at roller mount below, roller mount is provided with support column, and support column and roller mount are connected and fixed by hold-down nut, and on support column, cover has spring, spring top is provided with adjusting nut, and support column top is provided with the brace summer that supports path head.
4. adopt steel tube drifter described in claims 1 to 3 any one to realize the method for steel pipe and path head concentricity, it is characterized in that, comprise the following steps:
1) turning over pipe machine will be detected steel pipe and be transitioned on steel tube conveying roller bed;
2) steel tube conveying roller bed is delivered to the steel pipe clamping mechanism on hoistable platform by steel pipe;
3) action of the hydraulic cylinder between the upper and lower jig arm of steel pipe clamping mechanism, upper clip arm falls after rise and contacts with steel pipe, and lower clip arm moves upward under the effect of hydraulic cylinder, clamps steel pipe;
4) by the adjusting of lower clip arm in guide pillar position in the height Ji Dui steel pipe clamping mechanism of adjustment hoistable platform, make steel pipe center and path head point-blank;
5) by pinch roll, carry path head to steel duct, and the guide wheel that is arranged at path head bottom plays the supporting role to path head, avoid path head due to effect head decentralization and the tube fraction of weight.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210085048.8A CN102620628B (en) | 2012-03-27 | 2012-03-27 | Steel pipe drifter and method for realizing concentricity of steel pipe and drift diameter head |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210085048.8A CN102620628B (en) | 2012-03-27 | 2012-03-27 | Steel pipe drifter and method for realizing concentricity of steel pipe and drift diameter head |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102620628A CN102620628A (en) | 2012-08-01 |
CN102620628B true CN102620628B (en) | 2014-05-07 |
Family
ID=46560703
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210085048.8A Active CN102620628B (en) | 2012-03-27 | 2012-03-27 | Steel pipe drifter and method for realizing concentricity of steel pipe and drift diameter head |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102620628B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102865837B (en) * | 2012-09-27 | 2015-04-15 | 青岛恒基泰机电科技有限公司 | Drift bullet buffering device of pneumatic drifter |
JP6417948B2 (en) * | 2015-01-13 | 2018-11-07 | 新日鐵住金株式会社 | Drift gauge and drift inspection method |
CN106123735A (en) * | 2016-08-31 | 2016-11-16 | 苏州润吉驱动技术有限公司 | A kind of traction machine braked wheel jitter detection apparatus |
CN107782230B (en) * | 2017-12-12 | 2023-06-23 | 重庆望江工业有限公司 | Measuring tool for measuring radius of concave arc surface of non-whole circular shaft piece |
CN108856340B (en) * | 2018-06-06 | 2020-03-13 | 安徽工业大学 | Automatic drift diameter system |
CN110906834A (en) * | 2019-11-22 | 2020-03-24 | 宝钢工程技术集团有限公司 | Drift diameter machine |
CN115468524B (en) * | 2022-09-20 | 2024-06-14 | 宝钢工程技术集团有限公司 | Flexible steel pipe drift diameter machine |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000136923A (en) * | 1998-11-04 | 2000-05-16 | Kubota Corp | Contact-type pipe-inside-diameter measuring apparatus |
CN201163175Y (en) * | 2008-03-11 | 2008-12-10 | 上海宝钢工程技术有限公司 | Improved mechanical drifter |
CN201548171U (en) * | 2009-11-06 | 2010-08-11 | 上海西重所重型机械成套有限公司 | Novel device for clamping and automatic centering steel pipes in front of drift diameter |
CN201764935U (en) * | 2010-09-02 | 2011-03-16 | 宝钢工程技术集团有限公司 | Machinery diameter detection machine |
-
2012
- 2012-03-27 CN CN201210085048.8A patent/CN102620628B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN102620628A (en) | 2012-08-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102620628B (en) | Steel pipe drifter and method for realizing concentricity of steel pipe and drift diameter head | |
CN201799485U (en) | Automatic centering coil material feeding device | |
CN104607860B (en) | A kind of fixture of pipeline boxing jig | |
CN105526897B (en) | Pipe and rod length measuring device for work-over work | |
CN202786995U (en) | Precise railway measuring device | |
CN103394746B (en) | Pantograph pan air flue girdling tool | |
CN202639738U (en) | Workpiece positioning device of pipeline and main branch pipe automatic welding machine | |
CN202470971U (en) | Steel pipe drifter | |
CN104076091B (en) | Gantry type non-falling wheel for wheel diagnostic machine | |
CN201464189U (en) | Device for detecting side protection of automobile | |
CN205581053U (en) | Automatic supersonic wave inspection equipment of steel pipe | |
CN202939245U (en) | Lithium battery protection board detection device | |
CN203965389U (en) | A kind of gantry type does not fall to taking turns detecting flaw of wheel machine | |
CN102320013A (en) | Accurate lifting positioning device | |
CN204938485U (en) | A kind of storage rack | |
CN204924631U (en) | U -shaped bolt test device | |
CN204777235U (en) | Plate conveying equipment | |
CN203189982U (en) | Long shaft surface hardness testing support | |
CN105417143A (en) | Automatic discharging mechanism for jack | |
CN202428759U (en) | Automatic positioning and coiling device for material coil of gravure press | |
CN202021239U (en) | Calibration equipment for steel pipe nozzle | |
JP2007245934A (en) | Trolley wire oil coating device and trolley wire oil coating system | |
CN204122966U (en) | Double-C-shaped steel docking straight seam welding device | |
CN104249160A (en) | Long roll machining support device | |
CN203265997U (en) | Multi-station side plate box-assembling tool changeable with shapes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240312 Address after: 114000 105 Jiancai Road, Lishan District, Anshan City, Liaoning Province Patentee after: CHINA THIRD METALLURGICAL GROUP Co.,Ltd. Country or region after: China Address before: No. 101 Jiancai Road, Lishan District, Anshan City, Liaoning Province, 114031 Patentee before: MCC LIAONING DRAGON PIPE INDUSTRIES Co.,Ltd. Country or region before: China |
|
TR01 | Transfer of patent right |