Prior art keywords
arch
vertical
deviation
closure
steel truss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210074004.5A
Other languages
Chinese (zh)
Other versions
CN102619170A (en
Inventor
方继
张庆发
张雪松
张时利
梁崇双
宋进军
开前正
魏清
李荣浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Steel Structure Construction Co Ltd of CTCE Group
Original Assignee
STEEL STRUCTURE Co Ltd OF CHINA TIESIJU CIVIL ENGINEERING GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STEEL STRUCTURE Co Ltd OF CHINA TIESIJU CIVIL ENGINEERING GROUP filed Critical STEEL STRUCTURE Co Ltd OF CHINA TIESIJU CIVIL ENGINEERING GROUP
Priority to CN201210074004.5A priority Critical patent/CN102619170B/en
Publication of CN102619170A publication Critical patent/CN102619170A/en
Application granted granted Critical
Publication of CN102619170B publication Critical patent/CN102619170B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a large-span flexible arch skew back joining construction method. The method includes steps that (1) a beam erecting crane is mounted on an upper chord member of a steel truss beam when skew backs of the steel truss beam are pushed to a position above a temporary pier support; (2) the beam erecting crane automatically runs to positions of the skew backs after being mounted and debagged, and begins to erect flexible arch members, a one-way backslide method for erecting is adopted for the beam erecting crane, suspenders are mounted at first, then a flexible arch temporary support is mounted, and finally arch ribs are mounted; (3) the step (2) is repeated until only a last arch section space of a flexible arch is not erected, and a skew back joining opening is reserved; and (4) a finite-element analysis software is utilized to realize analog computation for the state of the joining opening, and a software analysis result basically matches with an actual joining opening measurement result, but still has vertical deviation, transverse deviation and longitudinal and horizontal deviation. By the aid of the method, the flexible arches can be erected outside an operation limit of a highway, stress-free joining of the skew backs of the flexible arches is realized, and the difficulty in erection of the flexible arches above the highway is resolved.

Description

Large span sliding roadway arch arch springing closure construction method
Technical field
What the present invention relates to is that longspan steel truss girder sliding roadway arch band vault pushes away---arch springing closure construction method, and be mainly used in large span sliding roadway arch and join the two sections of a bridge, etc in arch springing position, belong to bridge steel structure technical field.
Background technology
Flexible arch bridge with steel truss beam, as a kind of form of structure of Long-span railway bridge, has vertical rigidity large, and structure stress is clear and definite, modern design, and the advantage such as architectural image is attractive in appearance, is used in the bridge in some crossing highways, railway, river.Large span sliding roadway arch mostly is in the reserved closure mouthful of vault at present, at vault, realizes sliding roadway arch closure.
This flexible arch rib adopts circular curve, rise 45m, and ratio of rise to span is 1/4.5.Arch rib adopts box-type section, high 1460~1860mm in rod member, inner width 1100mm.Between arch rib, be provided with longitudinal lateral, arranged crosswise.Suspension rod adopts box-type section, rod member inner width 800mm, and interior high 1100mm, adopts the mode of four sides docking to be connected with main truss node, and full-bridge arranges 15 pairs of suspension rods altogether.
Because speedway can not whole enclosed construction, and the special topography condition such as bridge and speedway small-angle skew, Temporary Piers cannot be set in the middle of road.By the overall merit to the two-way auxiliary cantilever of tower with suspended cable, the two-way auxiliary cantilever of Temporary Piers and steel truss girder multi-point pushing scheme of architecture, all need to sliding roadway arch be installed at arranged above expressway, difficulty of construction is large, security risk is high, relate to road construction safety protection complicated and changeable, be difficult to guarantee the operation security of speedway.
Through fully proving, selected steel truss girder band vault pushes away---sliding roadway arch arch springing closure construction method, the steel truss girder of a round had both been installed on assembling support, by the steel truss girder pushing tow reach of a round, every pushing tow round of advancing, on the assembling support of rear portion, continue the consolidation service of next one, so circulation, until steel truss girder arch springing place arrives Temporary Piers support top.At steel truss girder upper chord, girder erection crane is installed, is adopted unidirectional retreating, suspension rod is first installed, then sliding roadway arch temporary supporting is installed, setting up sequentially of last arch rib erection, until sliding roadway arch is inserted into while remaining last section between the arch, reserves arch springing closure mouthful.Utilize vertical jack top lifting steel truss girder on the main pier of end bay, dwindle closure mouthful opening value, the lateral shift of correcting closure mouth, to realize the unstressed closure at arch springing place.
Summary of the invention
The object of the present invention is to provide a kind of large span sliding roadway arch arch springing closure construction method, realization is set up sliding roadway arch outward in speedway operation gauge, and in arch springing position, realize the unstressed closure of sliding roadway arch, solved the construction difficult problem that sets up sliding roadway arch at arranged above expressway.
Technical solution problem of the present invention provides following scheme:
A large span sliding roadway arch arch springing closure construction method, includes following construction sequence:
(1), when steel truss girder arch springing pushing tow is to Temporary Piers support when top, at steel truss girder upper chord, girder erection crane is installed;
(2), after girder erection crane Installation and Debugging, travel voluntarily to arch springing position, start to set up sliding roadway arch rod member, girder erection crane adopts unidirectional retreating, and suspension rod is first installed, then sliding roadway arch temporary supporting is installed, last arch rib erection sets up order;
(3), repeating step (2), until sliding roadway arch is inserted into residue during last section between the arch, reserved arch springing closure mouthful;
(4), utilize the involutory Longkou of finite element analysis software state to carry out analog computation, software analysis result is substantially identical with closure mouthful actual measured results, but still has vertical deviation, lateral deviation, vertical equity deviation;
(5), by finite element analysis software computational analysis, utilize vertical jack, vertical top lifting steel truss girder below closure mouth, can correct the vertical deviation of closure mouth, need carry out at twice top lifting operation, half that vertical top lifting displacement is for the first time vertical deviation, a now closure mouthful vertical skew reduces, need to use total powerstation accurately to locate, and use steel ruler checking measurements result, check errorless after, in steel truss girder rear end, carry out for the first time half of vertical top lifting steel truss girder vertical equity deviation, the vertical equity deviation that can correct closure mouthful becomes and reduces;
(6), then below closure mouth, steel truss girder carries out the operation of top lifting for the second time, by second half of the vertical deviation of the vertical top lifting of steel truss girder, can correct the vertical skew of closure mouth completely, in steel truss girder rear end, also carry out the operation of top lifting for the second time, by steel truss girder rear end vertical top lifting vertical equity deviation second half, can correct the along track bias of closure mouthful completely, in operating process, must use total powerstation accurately to locate, and use steel ruler checking measurements result;
(7), then at a closure mouthful arch rib, be built-in with horizontal jack, laterally a jack overhead closure mouthful arch rib is laterally rectified a deviation, can correct closure mouthful lateral deviation, because vertical deviation, lateral deviation, vertical equity deviation are eliminated, can realize large span sliding roadway arch in the unstressed closure in arch springing place.
Steel truss girder arch springing pushing tow is to Temporary Piers support top, and described Temporary Piers support is: for reducing steel truss girder maximum cantilever length, and the temporary rest pier arranging outside speedway operation gauge; Described steel truss girder arch springing pushing tow to Temporary Piers support top is: the steel truss girder that a round is installed on assembling support, by the steel truss girder pushing tow reach of a round, every pushing tow round of advancing, on the assembling support of rear portion, continue the consolidation service of next one, so circulation, until steel truss girder arch springing place arrives Temporary Piers support top.
Setting up of sliding roadway arch adopts unidirectional retreating, and described unidirectional retreating is: first the suspension rod of a section between the arch, temporary supporting system, arch rib, arch lateral are set up after complete, closure, a girder erection crane slow astern internode carries out the erection method of a rear section between the arch.
Sliding roadway arch sets up, and also comprises synchronously setting up of sliding roadway arch temporary supporting system, and suspension rod and interim strut are first installed, then arch rib erection and arch rib lateral; The upper and lower two ends of suspension rod are rigidly connected with arch rib and steel truss girder respectively, and temporary supporting system and suspension rod are rigidly connected.
Reserved closure mouthful, described closure mouthful is: when the arch rib of last section between the arch and arch lateral are not all installed, the open state of last section between the arch.
Advantage of the present invention:
1, in speedway operation gauge, set up sliding roadway arch outward, solved the technical barrier in arranged above expressway construction, guaranteed the traffic safety of speedway.
2, in main pier top lifting, realize the closure of sliding roadway arch arch springing, top lifting power and top lifting shift value are little, and closure opertation is simple to operate, easily realize.
3, make full use of existing supporting facility and adjust the linear of steel truss girder, a closure mouthful opening value can realize pre-control, has dissolved the technical barriers such as closure technical sophistication, required precision is high, work high above the ground difficulty is large.
4, large span sliding roadway arch arch springing closure construction method technical feasibility, safe and reliable, and economical rationality has larger promotional value.
Accompanying drawing explanation
Fig. 1 steel truss girder arch springing of the present invention pushing tow during to span centre Temporary Piers, starts to set up sliding roadway arch schematic diagram.
Fig. 2 the present invention realizes sliding roadway arch arch springing closure schematic diagram.
The specific embodiment
Referring to accompanying drawing, a kind of large span sliding roadway arch arch springing closure construction method, includes following construction sequence:
(1), when steel truss girder arch springing pushing tow is to Temporary Piers support when top, at steel truss girder upper chord, girder erection crane is installed;
(2), after girder erection crane Installation and Debugging, travel voluntarily to arch springing position, start to set up sliding roadway arch rod member, girder erection crane adopts unidirectional retreating, and suspension rod is first installed, then sliding roadway arch temporary supporting is installed, last arch rib erection sets up order;
(3), repeating step (2), until sliding roadway arch is inserted into residue during last section between the arch, reserved arch springing closure mouthful;
(4), utilize the involutory Longkou of finite element analysis software state to carry out analog computation, software analysis result is substantially identical with closure mouthful actual measured results, but still has vertical deviation, lateral deviation, vertical equity deviation;
(5), by finite element analysis software computational analysis, utilize vertical jack, vertical top lifting steel truss girder below closure mouth, can correct the vertical deviation of closure mouth, need carry out at twice top lifting operation, half that vertical top lifting displacement is for the first time vertical deviation, a now closure mouthful vertical skew reduces, need to use total powerstation accurately to locate, and use steel ruler checking measurements result, check errorless after, in steel truss girder rear end, carry out for the first time half of vertical top lifting steel truss girder vertical equity deviation, the vertical equity deviation that can correct closure mouthful becomes and reduces;
(6), then below closure mouth, steel truss girder carries out the operation of top lifting for the second time, by second half of the vertical deviation of the vertical top lifting of steel truss girder, can correct the vertical skew of closure mouth completely, in steel truss girder rear end, also carry out the operation of top lifting for the second time, by steel truss girder rear end vertical top lifting vertical equity deviation second half, can correct the along track bias of closure mouthful completely, in operating process, must use total powerstation accurately to locate, and use steel ruler checking measurements result;
(7), then at a closure mouthful arch rib, be built-in with horizontal jack, laterally a jack overhead closure mouthful arch rib is laterally rectified a deviation, can correct closure mouthful lateral deviation, because vertical deviation, lateral deviation, vertical equity deviation are eliminated, can realize large span sliding roadway arch in the unstressed closure in arch springing place.
At main pier 1 consolidation shed of end bay, multispan assembling support 2 is set, in across main pier 3 and another side, across main Dun Chu, pier-side bracket 4 is set, span centre arranges a Temporary Piers support 5.For guaranteeing safety in work progress of suspension rod 6 and arch rib 7 and stable, suspension rod 6 in length and breadth between temporary supporting system 8 is set.
On assembling support 2, utilize gantry crane machine 9 that the steel truss girder 10 of a round is installed, and by the steel truss girder pushing tow reach of this round, every pushing tow round of advancing, on rear portion assembling support 2, continue the consolidation service of next one, so circulation, until steel truss girder arch springing 11 arrives Temporary Piers support 5 tops, at steel truss girder 10 upper chords, install back slewing crane 12.
After girder erection crane 12 Installation and Debugging, travel voluntarily to steel truss girder arch springing position 11, start to set up sliding roadway arch rod member.Girder erection crane 12 adopts unidirectional retreating, suspension rod 6 is first installed, then sliding roadway arch temporary supporting 8 is installed, and finally arch rib erection 7 sets up sequentially; Until sliding roadway arch is inserted into while remaining last section between the arch, reserve arch springing closure mouth 13.

Claims (1)

1. a large span sliding roadway arch arch springing closure construction method, is characterized in that: include following construction sequence:
(1), when steel truss girder arch springing pushing tow is to Temporary Piers support when top, at steel truss girder upper chord, girder erection crane is installed;
(2), after girder erection crane Installation and Debugging, travel voluntarily to arch springing position, start to set up sliding roadway arch rod member, girder erection crane adopts unidirectional retreating, and suspension rod is first installed, then sliding roadway arch temporary supporting is installed, last arch rib erection sets up order;
(3), repeating step (2), until sliding roadway arch is inserted into residue during last section between the arch, reserved arch springing closure mouthful;
(4), utilize the involutory Longkou of finite element analysis software state to carry out analog computation, software analysis result is substantially identical with closure mouthful actual measured results, but still has vertical deviation, lateral deviation, vertical equity deviation;
(5), by finite element analysis software computational analysis, utilize vertical jack, vertical top lifting steel truss girder below closure mouth, can correct the vertical deviation of closure mouth, need carry out at twice top lifting operation, half that vertical top lifting displacement is for the first time vertical deviation, a now closure mouthful vertical skew reduces, need to use total powerstation accurately to locate, and use steel ruler checking measurements result, check errorless after, in steel truss girder rear end, carry out for the first time half of vertical top lifting steel truss girder vertical equity deviation, can make the vertical equity deviation of closure mouthful become and reduce;
(6), then below closure mouth, steel truss girder carries out the operation of top lifting for the second time, by second half of the vertical deviation of the vertical top lifting of steel truss girder, can correct the vertical skew of closure mouth completely, in steel truss girder rear end, also carry out the operation of top lifting for the second time, by steel truss girder rear end vertical top lifting vertical equity deviation second half, can correct the along track bias of closure mouthful completely, in operating process, must use total powerstation accurately to locate, and use steel ruler checking measurements result;
(7), then at a closure mouthful arch rib, be built-in with horizontal jack, laterally a jack overhead closure mouthful arch rib is laterally rectified a deviation, closure mouthful lateral deviation can be corrected, because vertical deviation, lateral deviation, vertical equity deviation are eliminated, large span sliding roadway arch can be realized in the unstressed closure in arch springing place.
CN201210074004.5A 2012-03-20 2012-03-20 Large-span flexible arch skew back joining construction method Active CN102619170B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210074004.5A CN102619170B (en) 2012-03-20 2012-03-20 Large-span flexible arch skew back joining construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210074004.5A CN102619170B (en) 2012-03-20 2012-03-20 Large-span flexible arch skew back joining construction method

Publications (2)

Publication Number Publication Date
CN102619170A CN102619170A (en) 2012-08-01
CN102619170B true CN102619170B (en) 2014-09-10

Family

ID=46559354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210074004.5A Active CN102619170B (en) 2012-03-20 2012-03-20 Large-span flexible arch skew back joining construction method

Country Status (1)

Country Link
CN (1) CN102619170B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821088B (en) * 2014-02-13 2015-12-30 中铁四局集团第四工程有限公司 Railway is grown up Arch rib positioning intelligent measure construction method
CN104612058B (en) * 2014-12-26 2016-05-25 中铁大桥勘测设计院集团有限公司 A kind of construction method of buckstay flexible arch bridge
CN104790297A (en) * 2015-04-20 2015-07-22 中国铁建大桥工程局集团有限公司 Flexible arch splicing method for steel trussed beams
CN105544410A (en) * 2016-01-07 2016-05-04 中铁四局集团钢结构有限公司 Joining method for rigid suspension cable stiffening chord in incremental launching method construction
CN107059644B (en) * 2017-06-09 2018-12-18 中交第一公路工程局有限公司 A kind of asymmetric unsupported installation method of sliding roadway arch
CN108374340B (en) * 2018-01-10 2019-07-02 中交第二航务工程局有限公司 The method of longspan steel truss girder upper bracket assembly sliding roadway arch
CN109778716B (en) * 2019-01-04 2021-06-04 腾达建设集团股份有限公司 Plane position adjusting method for cantilever bridge folding opening
CN110027987A (en) * 2019-04-30 2019-07-19 中国十七冶集团有限公司 A kind of arc cantilever steel girder construction method for hanging
CN112342917A (en) * 2020-10-20 2021-02-09 上海市政工程设计研究总院(集团)有限公司 Combined construction method for pushing beam first and then lifting arch of large-span tied arch bridge
CN113255039B (en) * 2021-05-26 2022-04-29 中铁大桥勘测设计院集团有限公司 Method for determining main beam closure opening of steel truss girder cable-stayed suspension cable cooperation system bridge
CN113863151A (en) * 2021-10-21 2021-12-31 中铁第四勘察设计院集团有限公司 Steel box tied arch bridge construction method
CN114293473B (en) * 2021-12-22 2023-05-09 中铁九桥工程有限公司 Basket arch bridge construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101117795A (en) * 2007-08-29 2008-02-06 中铁大桥局股份有限公司 Mounting method for steel case basket arch single-frame segment
CN101117792A (en) * 2007-08-22 2008-02-06 中铁大桥局股份有限公司 Erection method of large-span continuous steel truss arch
CN101446074A (en) * 2008-12-26 2009-06-03 中铁大桥局集团第二工程有限公司 Installation and closure construction method for steel sliding roadway arch on top surface of steel trussed beam bridge
JP4801764B2 (en) * 2009-09-28 2011-10-26 日本車輌製造株式会社 Single string rose bridge girder material delivery method
CN102261039A (en) * 2011-04-25 2011-11-30 长沙理工大学 Integral thrusting construction method of network tied arch bridge
CN102373671A (en) * 2011-11-18 2012-03-14 中铁四局集团有限公司 Steel trussed beam and flexible arch bridge construction method with vault pushing

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101117792A (en) * 2007-08-22 2008-02-06 中铁大桥局股份有限公司 Erection method of large-span continuous steel truss arch
CN101117795A (en) * 2007-08-29 2008-02-06 中铁大桥局股份有限公司 Mounting method for steel case basket arch single-frame segment
CN101446074A (en) * 2008-12-26 2009-06-03 中铁大桥局集团第二工程有限公司 Installation and closure construction method for steel sliding roadway arch on top surface of steel trussed beam bridge
JP4801764B2 (en) * 2009-09-28 2011-10-26 日本車輌製造株式会社 Single string rose bridge girder material delivery method
CN102261039A (en) * 2011-04-25 2011-11-30 长沙理工大学 Integral thrusting construction method of network tied arch bridge
CN102373671A (en) * 2011-11-18 2012-03-14 中铁四局集团有限公司 Steel trussed beam and flexible arch bridge construction method with vault pushing

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
宋伟俊,董广文.《南京大胜关长江大桥钢梁架设与合龙技术》.《桥梁建设》.2009,(第6期),第8-9页. *

Also Published As

Publication number Publication date
CN102619170A (en) 2012-08-01

Similar Documents

Publication Publication Date Title
CN102619170B (en) Large-span flexible arch skew back joining construction method
CN102373671B (en) Steel trussed beam and flexible arch bridge construction method with vault pushing
CN105568866B (en) Across the large-span steel box beam push construction method of existing road
CN102121234B (en) Quick construction method of two-tower five-span steel truss girder cable-stayed bridge
CN105970836A (en) Method for erecting large-span lower chord variable truss high continuous steel trussed beam cantilever
CN106758748A (en) Long-Span Concrete Filled Steel Tubular Arch Bridges structure
CN110205938B (en) Steel pipe arch installation method of through beam-arch combination bridge
CN203498760U (en) Guiding device for large-span box girder pushing
CN106978777B (en) A kind of make-shift bridge device
CN106702909B (en) A kind of double width steel box-girder entirety swivel structure and construction method
CN106193117B (en) A kind of assembling and construction method of the prefabricated pipe gallery in underground
CN203668833U (en) Steel web locating device
CN104481546A (en) Doubly curved arch construction method for enabling inclined shaft of soft rock tunnel to enter main tunnel
CN102535348A (en) Method for tensioning stayed cables of hinged tower cable stayed bridge
CN103774560B (en) The curved bridge construction engineering method of suspension type cast-in-situ template
CN105714692A (en) Cast-in-cantilever beam concrete filled steel tube temporary concretion system
CN203498761U (en) Lateral position-specified and deviation rectifying device for box girder pushing
CN203021884U (en) Internal double-layer prefabricated carriageway structure of shield tunnel
CN113338952A (en) Construction method for large-section tunnel with turnout line led out from railway tunnel
CN101324054B (en) Incremental launching positioning construction method of bridge subsection girder temporary pier
CN103628416A (en) Stiffening girder counter-straining near-pier bracket of suspension bridge
CN110468734A (en) Steel lagging jack pushing tow system and steel lagging jack push construction method
CN104047223B (en) Light assembling structure bridge and construction method thereof
CN203700937U (en) Connecting piece for tower and girder of cable-stayed fabricated highway steel bridge
CN102587280B (en) Main tower area steel truss girder erection method of base support auxiliary frame beam crane and base support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 230022 No. 388 East Huanhu Road, Shushan District, Hefei City, Anhui Province

Patentee after: Steel structure building Co., Ltd. of the four Bureau of China Railway

Address before: 230022 No. 388 East Huanhu Road, Shushan District, Hefei City, Anhui Province

Patentee before: Steel Structure Co., Ltd. of China Tiesiju Civil Engineering Group

CP01 Change in the name or title of a patent holder