CN102612903A - System for monitoring seeding absence of sugarcane planter - Google Patents

System for monitoring seeding absence of sugarcane planter Download PDF

Info

Publication number
CN102612903A
CN102612903A CN2012100812202A CN201210081220A CN102612903A CN 102612903 A CN102612903 A CN 102612903A CN 2012100812202 A CN2012100812202 A CN 2012100812202A CN 201210081220 A CN201210081220 A CN 201210081220A CN 102612903 A CN102612903 A CN 102612903A
Authority
CN
China
Prior art keywords
module
central processing
sugarcane
broadcast leakage
monitoring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100812202A
Other languages
Chinese (zh)
Inventor
区颖刚
王美美
陈联诚
刘庆庭
邹小平
冯加模
李跃金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China Agricultural University
Original Assignee
South China Agricultural University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China Agricultural University filed Critical South China Agricultural University
Priority to CN2012100812202A priority Critical patent/CN102612903A/en
Publication of CN102612903A publication Critical patent/CN102612903A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Fertilizing (AREA)

Abstract

The invention discloses a system for monitoring seeding absence of a sugarcane planter. The system comprises monitoring sensors, a central processing module, a marking module and a power module, wherein the monitoring sensors are installed on the two sides of the short side of a seeding tube; the output ends of the sensors are connected with the input end of the central processing module; the output end of the central processing module is connected with the input end of the marking module; the power module supplies power to the central processing module and the marking module respectively; the monitoring ranges of the sensors cover the areas of the zones where sugarcanes fall; when the sugarcane seeds fall, the sensors instantly send signals to the central processing module; the central processing module judges whether seeding absence exists according to the seed falling time intervals, transmits the data to a PC (personal computer) in real time to be output, and sends a control signal to the marking module; and the seeding absence marking module scatters markers as seeding absence markers on the sides of the planting rows according to the control signal. The system has accurate monitoring results, can monitor sugarcane planting in real time and timely mark the seeding absence positions and distances to provide convenience for reseeding, and can effectively make up for sugarcane output reduction caused by seeding absence.

Description

A kind of sugarcane planting machine broadcast leakage monitoring system
Technical field
The present invention relates to a kind of agricultural machinery technological field, is a kind of sow information and to the monitoring system of broadcast leakage zone marker of sugarcane planting machine of monitoring.
Background technology
Plantation is that the demand labour is many in the present sugarcane production of China, the mechanization level is low and then restricts one of critical process of Mechanization Development.Several kinds of sugarcane planting machines of China's development are in experimental study, and it is discontinuous in the process of using, to exist the feeding worker to operate, and causes the problem of broadcast leakage easily, and reseed and need wait until that the sugarcane seedling just can carry out after longer.Be different from seed shape seed, the sugarcane kind is longer, broadcast leakage occurs and will have a strong impact on sugarcane yield.Therefore sugarcane broadcast leakage monitoring system will play an important role with the development that promotes planter mechanization to improving the sugarcane planting machine operation quality.
Summary of the invention
Do not have the defective of supporting monitoring system to present China sugarcane planting machine, the purpose of this invention is to provide a kind of to sugarcane broadcast leakage monitoring accurately and can carry out the system of broadcast leakage mark in real time.
To achieve these goals, the present invention adopts following technical scheme:
A kind of sugarcane planting machine broadcast leakage monitoring system; Comprise sugarcane planting machine; Also comprise sensor, central processing module, mark module, power module, the output of said sensor is connected with the input of central processing module, and the output of central processing module is connected with the input of mark module; Power module is respectively to central processing module, mark module power supply.
Sensor is installed in the sow both sides of pipe minor face of sugarcane planting machine, and sensor covers the region area that sugarcane falls, and when the sugarcane kind fell, sensor promptly sent signal and is sent to central processing module.Central processing module is according to judging whether broadcast leakage the blanking time that the sugarcane kind falls kind, leaks kind then sends control signal and give the broadcast leakage mark module if having.Mark module spreads marking objects according to control signal broadcast leakage mark module at plantation row side.
Native system adopts sensor can cover the region area that the whole sugarcane of monitoring falls, as long as the sugarcane kind falls just can monitor, and can not judge other impurity by accident.
Said central processing module comprises and is used for the work initial module whether monitoring sensor has pulse to produce, and is used to calculate the counting module in the time interval that adjacent sugarcane kind falls, and is used to monitor the broadcast leakage monitoring modular of sugarcane kind whereabouts information.The output of work initial module is connected with the input of counting module, and the output of counting module is connected with the input of broadcast leakage monitoring modular.When pulse produces, judge that sugarcane planting machine begins plantation, the initialization of work initial module, counting module is started working, otherwise continues to wait for; Whether the broadcast leakage monitoring modular exceeds preset interval time according to the pulse interval time judges whether broadcast leakage; And the whereabouts information of sugarcane kind arranged through the bright indication of indicator lamp; The working condition of mark module and the state of power module reach the effect of being convenient in time pinpoint the problems.
Said broadcast leakage monitoring modular comprises data transmission module, and said data transmission module is used to transmit the time interval that time that the sugarcane kind sows and sugarcane kind are sowed.Various information comprises the working condition of the time interval, mark module working condition and the power module of sugarcane kind whereabouts in twos.
Said mark module is made up of housing, roller set, running part, motor, carrying case; Roller set is fixed on the housing by axle and bearing block, and sprocket wheel on the axle and motor are through chain drive power, and wheel rolls group through gear drive.Carrying case is fixed by bolts to the housing top.The roller set reverse rotation is stirred the label that loads in the casing to both sides, label gets into roller and loads the space between the casing, falls under arriving when being rotated further.
The motor of mark module is controlled start-stop according to control signal by driver module, and is mandatory with label row down through two roller backward rotation in the roller set.Can adjust the amount of sowing through changing rotating speed as required.Carrying case loads label and can supply the omnidistance minimizing loading number of times that uses of one-stop operation to reduce labour intensity.The color of label is selected for use with the big identification easily of soil difference and to the free of contamination material of soil in the mark module.
Said power module is the accumulator or the independent power supply of sugarcane planting machine; Power module is supplied power to the motor of central processing module and mark module respectively; Power module comprises straightening and filtering unit and apparatus for protecting power supply.Because the required electric current of motor of mark module is bigger, for preventing that influencing central processing module in the start-up course normally uses, power supply divides two parts processing to supply with central processing module and motor respectively, and does rectifying and wave-filtering, and power protection is handled.
Driver module drove the motor of mark module afterwards by two FET parallel connections, so the big electric current shunting of motor and FET was furnished with fin and can strengthens functional reliability and stability greatly.
Said monitoring system also comprises driver module, and the output of central processing module is connected with the input of driver module, and the output of driver module is connected with the input of mark module; The output of driver module is connected with the motor of mark module.
Said monitoring system is PC also, and central processing module is connected with PC through data transmission module; Sugarcane planting machine broadcast leakage monitoring system will be saved in PC blanking time in real time.
The present invention adopts sensor, can all cover the region area that sugarcane falls.Sugarcane kind length is generally about 350-400mm, and sensor will send electric impulse signal in the dropping process, and this monitoring system is calculated the blanking time between the sugarcane kind according to pulse signal, leaves sensor from the preceding paragraph sugarcane kind and begins to get into end to next section sugarcane kind.System will reach PC through serial communication in real time and preserve data blanking time; And according to judging whether broadcast leakage blanking time; If surpass the time interval that broadcast leakage defines then output signal to mark module, start mark module and spread down label and when sugarcane kind whereabouts is arranged, stops.Monitoring result of the present invention is accurate, can to cane planting monitor in real time and can and tense marker broadcast leakage position and distance conveniently reseed, can effectively remedy because the sugarcane underproduction that causes of broadcast leakage.
Description of drawings
Fig. 1 operation principle block diagram of the present invention.
Fig. 2 mark module structure chart of the present invention.
Fig. 3 circuit theory diagrams of the present invention.
Specific embodiment
Below in conjunction with accompanying drawing patent of the present invention is described.
As shown in Figure 1, comprise sensor 1, central processing module 2, mark module 3, the power module 4 that is installed in the pipe minor face both sides of sowing, the driver module 5 that drives mark module 3, the PC 6 of storage broadcast leakage information; Wherein the signal output part of sensor is connected with the signal input part of central processing module 2; The signal output part of central processing module 2 is connected with the signal input part of mark module 3, driver module 5 respectively, and the signal output part of driver module 5 is connected with the signal input part of mark module 3; Power module is respectively to central processing module 2 and mark module 3 power supplies; Central processing module 2 comprises the work initial module 21 that is used for monitoring sensor and whether has pulse to produce, be used to calculate the time interval that adjacent sugarcane kind falls counting module 22, be used to monitor the broadcast leakage monitoring modular 23 of sugarcane kind whereabouts information; The output of work initial module 21 is connected with the input of counting module 22, and the output of counting module 22 is connected with the input of broadcast leakage monitoring modular 23; The signal output part of broadcast leakage monitoring modular 23 is connected with the input of PC 6.
In the present embodiment, central processing module 2 adopts single-chip microcomputer, and sensor 1 monitoring range covers the region area that sugarcane falls, and when the sugarcane kind fell, sensor promptly sent signal and is sent to single-chip microcomputer.Single-chip microcomputer reaches data in real time PC 6 outputs and sends control signal to the broadcast leakage mark module according to falling to judging whether kind of a blanking time broadcast leakage.Spread label as the broadcast leakage mark according to control signal broadcast leakage mark module at plantation row side.
Monitoring sensor 1 can cover the region area that whole sugarcane falls, as long as the sugarcane kind falls just can monitor, and can not judge other impurity by accident.
Sensor 1 will send low level signal in the sugarcane kind dropping process, not have the sugarcane kind to fall to just sending high level.Sugarcane kind falling state converts electric impulse signal into, through Signal Pretreatment, forms the TTL pulse.
Whether work initial module 21 is used for monitoring sensor 1 has pulse to produce, and when pulse produces, judges that planter begins plantation, and counting module 22 is started working otherwise system continues to wait for; Whether broadcast leakage detection module 23 exceeds preset interval time according to the pulse interval time judges whether broadcast leakage.
Broadcast leakage monitoring modular 23 has sugarcane whereabouts information through the bright indication of indicator lamp, and mark module 3 working conditions and power supply status are convenient in time pinpoint the problems.When first section sugarcane falls, be judged as and start working, start timer T1 timing, no sugarcane falls in Preset Time, and then output low level is to driver module, and red light lights simultaneously.In Preset Time, have sugarcane to fall then timer T1 zero clearing reclocking, and the output high level knocks out for driver module while red light.
Broadcast leakage monitoring modular 23 will sow in real time the time interval data and be transferred to PC writing time.
Power module 4 can directly utilize dilatory ship battery, also can adopt independent power supply.Because of the required electric current of mark module 3 motors is bigger, for preventing that influencing single-chip microcomputer in the start-up course normally uses, power supply divides two parts processing to supply with SCM system and motor respectively, and power module 4 comprises straightening and filtering unit, apparatus for protecting power supply.
Driver module 5 drove the motor of mark module 3 afterwards by two FET parallel connections, so the big electric current shunting of motor and FET was furnished with fin and can strengthens functional reliability and stability greatly.
Mark module 3 as shown in Figure 2 comprises housing, roller set, running part, motor, compositions such as carrying case.Roller set is fixed on the housing by axle and bearing block, and sprocket wheel on the axle and motor are through chain drive power, and wheel rolls group through gear drive.Carrying case is fixed by bolts to the housing top.The roller set reverse rotation is stirred the label that loads in the casing to both sides, label gets into roller and loads the space between the casing, falls under arriving when being rotated further.
The motor of mark module 3 is controlled start-stop according to control signal by driver module, and is mandatory with label row down through the roller set backward rotation.Can adjust the amount of sowing through changing rotating speed as required.
Carrying case can be convenient to transportation with the housing parts dismounting.Carrying case loads lime and can supply the omnidistance minimizing loading number of times that uses of one-stop operation to reduce labour intensity.The lime color has the big identification and pollution-free to soil easily of soil difference.
It is low level that triode conducting when control signal as shown in Figure 3 is high level, the colelctor electrode of triode are equivalent to ground connection, the not conducting of FET that be connected with colelctor electrode this moment, and driver module 3 can not rotate by drive motors.Not conducting of triode when control signal is low level, current collection is high level very, FET conducting this moment, driver module 3 can rotate by drive motors.

Claims (10)

1. sugarcane planting machine broadcast leakage monitoring system; It is characterized in that comprising sensor (1), central processing module (2), mark module (3), power module (4); The output of said sensor (1) is connected with the input of central processing module (2), and the output of central processing module (2) is connected with the input of mark module (3); Power module (4) is respectively to central processing module (2), mark module (3) power supply.
2. according to the said sugarcane planting machine broadcast leakage of claim 1 monitoring system, it is characterized in that said sensor (1) is installed in the sugarcane planting machine pipe minor face both sides of sowing.
3. according to the said sugarcane planting machine broadcast leakage of claim 1 monitoring system, it is characterized in that said central processing module (2) comprise the work initial module (21) that is used for monitoring sensor and whether has pulse to produce, be used to calculate the time interval that adjacent sugarcane kind falls counting module (22), be used to monitor the broadcast leakage monitoring modular (23) of sugarcane kind whereabouts information; The output of work initial module (21) is connected with the input of counting module (22), and the output of counting module (22) is connected with the input of broadcast leakage monitoring modular (23).
4. according to the said sugarcane planting machine broadcast leakage of claim 3 monitoring system, it is characterized in that said broadcast leakage monitoring modular (23) comprises data transmission module.
5. according to the said sugarcane planting machine broadcast leakage of claim 1 monitoring system, it is characterized in that said mark module (3) is made up of housing, roller set, running part, motor, carrying case; Roller set is fixed on the housing by axle and bearing block, and the sprocket wheel on the axle is connected through running part with motor, and wheel rolls group through gear drive, and carrying case is fixed by bolts to the housing top.
6. according to the said sugarcane planting machine broadcast leakage of claim 1 monitoring system, it is characterized in that said power module (4) is the accumulator of sugarcane planting machine or independent power supply.
7. according to the said sugarcane planting machine broadcast leakage of claim 1 monitoring system, it is characterized in that said power module (4) comprises straightening and filtering unit and apparatus for protecting power supply.
8. according to the said sugarcane planting machine broadcast leakage of claim 1 monitoring system, it is characterized in that said driver module (5) is composed in parallel by two FETs.
9. according to the said sugarcane planting machine broadcast leakage of claim 1 monitoring system; It is characterized in that said monitoring system also comprises driver module (5); The output of central processing module (2) is connected with the input of driver module (5), and the output of driver module (5) is connected with the input of mark module (3); The output of said driver module (5) is connected with the motor of mark module (5).
10. according to the said sugarcane planting machine broadcast leakage of claim 1 monitoring system, it is characterized in that also PC (6) of said monitoring system, said central processing module (2) is connected with PC (6) through data transmission module.
CN2012100812202A 2012-03-26 2012-03-26 System for monitoring seeding absence of sugarcane planter Pending CN102612903A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100812202A CN102612903A (en) 2012-03-26 2012-03-26 System for monitoring seeding absence of sugarcane planter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100812202A CN102612903A (en) 2012-03-26 2012-03-26 System for monitoring seeding absence of sugarcane planter

Publications (1)

Publication Number Publication Date
CN102612903A true CN102612903A (en) 2012-08-01

Family

ID=46553387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100812202A Pending CN102612903A (en) 2012-03-26 2012-03-26 System for monitoring seeding absence of sugarcane planter

Country Status (1)

Country Link
CN (1) CN102612903A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106092636A (en) * 2016-08-26 2016-11-09 华中农业大学 Small particle seed flow sequence sensing device
CN107258177A (en) * 2017-06-05 2017-10-20 广西民族大学 The intelligent sugarcane planting machine of one kind storage sugarcane formula
CN107889582A (en) * 2017-10-26 2018-04-10 华南农业大学 It is a kind of to monitor matching used covering device with feed mechanism for seed broadcast leakage with seeder
CN108541428A (en) * 2018-03-22 2018-09-18 福建江夏学院 A kind of sugarcane broadcast leakage kind detecting system
CN114467438A (en) * 2022-03-10 2022-05-13 华南农业大学 Miss-seeding monitoring device and monitoring method of real-time segmenting type sugarcane seeder
CN114651580A (en) * 2022-04-27 2022-06-24 华南农业大学 Sugarcane planter missed seeding monitoring system based on collision vibration monitoring

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1568644A (en) * 2003-07-24 2005-01-26 中国农业大学 Miss seeding automatic compensating unit and method thereof
CN101441455A (en) * 2008-12-19 2009-05-27 华南农业大学 System for monitoring seed sowing state of seed sowing device of rice direct seeding machine
CN101715668A (en) * 2009-12-22 2010-06-02 中国农业机械化科学研究院 Planter, planting monitoring equipment and method thereof
CN201541461U (en) * 2009-12-10 2010-08-11 天津工程师范学院 Precise monitoring system of seeder

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1568644A (en) * 2003-07-24 2005-01-26 中国农业大学 Miss seeding automatic compensating unit and method thereof
CN101441455A (en) * 2008-12-19 2009-05-27 华南农业大学 System for monitoring seed sowing state of seed sowing device of rice direct seeding machine
CN201541461U (en) * 2009-12-10 2010-08-11 天津工程师范学院 Precise monitoring system of seeder
CN101715668A (en) * 2009-12-22 2010-06-02 中国农业机械化科学研究院 Planter, planting monitoring equipment and method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丁至成等: "单片机排种均匀度检测系统的研究与试验", 《农业工程学报》 *
王美美等: "光电传感器快速监测甘蔗种植均匀性研究", 《中国农业工程学会2011年学术年会论文集》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106092636A (en) * 2016-08-26 2016-11-09 华中农业大学 Small particle seed flow sequence sensing device
CN106092636B (en) * 2016-08-26 2018-07-31 华中农业大学 Small particle kind subflow sequence sensing device
CN107258177A (en) * 2017-06-05 2017-10-20 广西民族大学 The intelligent sugarcane planting machine of one kind storage sugarcane formula
CN107258177B (en) * 2017-06-05 2022-11-11 广西民族大学 Store up sugarcane formula intelligence sugarcane planter
CN107889582A (en) * 2017-10-26 2018-04-10 华南农业大学 It is a kind of to monitor matching used covering device with feed mechanism for seed broadcast leakage with seeder
CN108541428A (en) * 2018-03-22 2018-09-18 福建江夏学院 A kind of sugarcane broadcast leakage kind detecting system
CN114467438A (en) * 2022-03-10 2022-05-13 华南农业大学 Miss-seeding monitoring device and monitoring method of real-time segmenting type sugarcane seeder
CN114651580A (en) * 2022-04-27 2022-06-24 华南农业大学 Sugarcane planter missed seeding monitoring system based on collision vibration monitoring
CN114651580B (en) * 2022-04-27 2023-11-28 华南农业大学 Sugarcane planter leaks and broadcast monitoring system based on collision vibration monitoring

Similar Documents

Publication Publication Date Title
CN102612903A (en) System for monitoring seeding absence of sugarcane planter
CN103609234B (en) Intelligence seeder broadcast leakage bucking-out system
CN104704953A (en) Reseeding type potato seeding machine
CN103858571B (en) Pneumatic type corn precise quatity feed run circumference motor direct-drive device and control method thereof
CN103994787B (en) A kind of wheat seeder working-condition monitoring system and method
CN203661568U (en) Non-independent large-grain crop miss-seeding compensation device
CN103636324A (en) Non-independent large-grain crop miss-seeding compensation device
CN204482244U (en) Novel potato sower
CN202889916U (en) Air-aspiration type no-tillage precision seeding machine
CN101441455A (en) System for monitoring seed sowing state of seed sowing device of rice direct seeding machine
CN208029403U (en) A kind of intelligent precise seeder broadcast leakage compensation device
CN102948284A (en) Electrically controlled plant spacing rotation knob adjusting type corn accurate-sowing fertilization machine
CN109041645A (en) A kind of rotate cuts kind of an equipment for kind of a sugarcane
CN102645907A (en) System for detecting and controlling seeding state and seed discharging fault of seeding machine
CN102550169A (en) Intelligent seeding control device driven by step motor
CN203618324U (en) Intelligent miss-seeding compensation system of seeding machine
CN107615950A (en) A kind of pneumatic seeder seeding monitoring device and monitoring method
CN106105513A (en) A kind of seed filling device
CN203423945U (en) Miss-seeding detection device based on CPLD (Complex Programmable Logic Device)
CN204579083U (en) A kind of intelligent seeding monitoring device of monitoring speed of drilling, amount of seed metering, Amount of Base Fertilizer and mouth fertilizer and controlling
CN211267659U (en) Seed metering performance monitoring system of pseudo-ginseng precision seeder
CN206005158U (en) Precision direct sowing machine for rape broadcast leakage and the amount of broadcasting wireless monitor system
CN202587827U (en) Seeding omission monitoring and positioning system for seeding machine
CN103329669A (en) Miss-seeding detection device based on complex programmable logic device (CPLD)
CN202958143U (en) Electric-control row spacing knob transferring type precise corn seeding and fertilizing machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120801