CN102609810A - Hydraulic power plant intelligent management system based on geographic information system - Google Patents

Hydraulic power plant intelligent management system based on geographic information system Download PDF

Info

Publication number
CN102609810A
CN102609810A CN2012100162064A CN201210016206A CN102609810A CN 102609810 A CN102609810 A CN 102609810A CN 2012100162064 A CN2012100162064 A CN 2012100162064A CN 201210016206 A CN201210016206 A CN 201210016206A CN 102609810 A CN102609810 A CN 102609810A
Authority
CN
China
Prior art keywords
data
power plant
management
management module
gis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100162064A
Other languages
Chinese (zh)
Inventor
唐洪
黄强
王春林
何军
胡川华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN YITIAN JIQUN TECHNOLOGY Co Ltd
Original Assignee
SICHUAN YITIAN JIQUN TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN YITIAN JIQUN TECHNOLOGY Co Ltd filed Critical SICHUAN YITIAN JIQUN TECHNOLOGY Co Ltd
Priority to CN2012100162064A priority Critical patent/CN102609810A/en
Publication of CN102609810A publication Critical patent/CN102609810A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a hydraulic power plant intelligent management system based on a geographic information system, and the hydraulic power plant intelligent management system comprises a data core part, wherein the data core part is respectively in communication connection with a data managing module, a business integrating module and a data validation module through the Internet; the data core part is further respectively in communication connection with a WEB application terminal and an intelligent terminal; a user sends out a data request through the WEB application terminal; and the system organizes a data source according to a user request and a protocol requirement so as to realize data presentation. The hydraulic power plant intelligent management system disclosed by the invention has the positive effects that the application of a GIS (Geographic Information System) technology in a hydraulic power plant is achieved; a plurality of data comes from the hydraulic power plant and a large quantity of equipment does not need to be additionally arranged based on the currently-operated equipment and system, so as to reduce the capital investment of the user; and a data transmission network and a software platform only need to be constructed on the basis of a GIS.

Description

Hydroelectric power plant's intelligent management system based on GIS-Geographic Information System
Technical field
The present invention relates to a kind of hydroelectric power plant's intelligent management system based on GIS-Geographic Information System (GIS).
Background technology
The most information such as the symbol through manual drawing power equipment on map, position, absolute altitude of electric power generalized information system on the traditional sense, workload is big, upgrades untimelyly, and is not easy to inquiry and certainly.At present domestic and international multiple GIS-Geographic Information System input is used, and generally is used for municipal administration and capital construction abroad; The intelligent grid planning of China country proposes; The focus of power grid construction concentrates in the development of extra-high voltage and intelligent grid; Be useful on the intelligent field of electrical network method and system, for be located in the failing of rugged surroundings, join, converting equipment production management, operation maintenance, asset management have positive meaning.
To the patent retrieval of electric power GIS system and method,, also be in blank basically for the research of hydroelectric power plant's electric power GIS system and method though mention electricity power enterprise's electric power GIS.
Summary of the invention
In order to overcome the above-mentioned shortcoming of prior art; The invention provides a kind of hydroelectric power plant's intelligent management system based on GIS-Geographic Information System; Electric power GIS system to basin water power plant and factory's station equipment researches and develops; Problems such as the quality of data that from be applied to the electric power GIS system applies at present, exists emphatically is unstable, database design is lack of standardization, data archival is imperfect, data layout is inconsistent, compatibility and practicality are not strong; A cover supporting industry standard, general format have been developed, flexible and convenient, safe hydroelectric power plant intelligence GIS system.
The technical solution adopted for the present invention to solve the technical problems is: a kind of hydroelectric power plant's intelligent management system based on GIS-Geographic Information System; Comprise the data core, said data core is carried out communication with data management module, business integration module and data verification module respectively through the Internet and is connected; Said data core is also carried out communication with WEB application terminal and intelligent terminal respectively and is connected; The user sends request of data through the WEB application terminal, and system organizes data source according to user's request and protocol requirement, realizes that data appear.
Compared with prior art; Good effect of the present invention is: the present invention has fully combined requirements such as hydroelectric power plant's production management, operation maintenance; A kind of solution that is used for hydroelectric power plant's geographical information management, utilizes the aspect is provided; Filled up based on of the application of GIS technology in the hydroelectric power plant, many put into operation the basis of equipment and system at present data from the hydroelectric power plant on, do not need extra increase large number quipments; Reduce user's fund input, only need on the generalized information system basis, make up data transmission network and software platform; The present invention adopts special-purpose development platform; Software, hardware are the modular design exploitation; Have according to strategy and carry out data modeling, support vector and 3 d grid data model; Automatically three dimensions appear, the function of equipment condition monitoring and fault analysis, judgement, situation such as operational outfit state change process, transient process can be provided.System has cross-platform (Unix, Linux, Windows), the visual information of cross-region is issued and the data sharing function; Application systems such as the compatible SCADA of power plant, MIS, production management; Simultaneously carry out seamless interfacing with multiple pattern process software; Realize functions such as picture library is shared, conversion, the isomerism of shielding different software is realized data sharing, is interconnected.System presents basin power plant position distribution through automatic three-dimensional picture; Inner all automation equipments in factory station, electrical equipment, the physical location of plant equipment, operational factor, state parameter; When certain equipment breaks down; In picture, show current failure condition, handle suggestion, failure cause, case analysis, and prompting needs to prepare which kind of Work tool, calculate and provide the optimum path of overhauling with mode intuitively.Being convenient to the operation maintenance personnel can in time handle, and for equipment control, repair and maintenance, searching and remover apparatus fault provide effective decision-making.System has good self-reparability and robustness, provides general safety to guarantee according to application requirements, guarantees the stability and the security of system, comprises mechanism such as perfect authority identification, data security, network security.
Description of drawings
The present invention will explain through example and with reference to the mode of accompanying drawing, wherein:
Fig. 1 is a system construction drawing of the present invention.
Embodiment
A kind of hydroelectric power plant's intelligent management system based on GIS-Geographic Information System, as shown in Figure 1, comprising: data core 1, said core 1 are carried out communication with data management module 3, business integration module 4 with data verification module 5 respectively through the Internet 2 and are connected; Said core 1 is also carried out communication with WEB application terminal 6 with intelligent terminal 7 respectively and is connected; Wherein:
Data core 1 comprises data Layer 11, Business Logic 12 and presentation layer 13 etc.Data Layer 11 is special-purpose Database Systems, comprises three-dimensional space data storehouse, attribute database and application data base etc., to guarantee real-time, the security of data manipulation; Support multipoint access and interoperability; The multiple spot user can not cause the mistake and the non-uniqueness of data to the operation of data set, supports standard agreement (XML standard soap protocol) and industrial interface standard, the access of compatible SQL database or private database; Break information island, set up special-purpose data center.The data of each database storing come from internet and production scene system, like SCADA, MIS, production management system etc., also comprise three-dimensional picture library, intermediate data and the decision-making data etc. of power industry.
Business Logic 12 comprises service logic core, service logic shell and MDAC; Wherein: the service logic core is the functional module based on bottom according to the application requirements exploitation; Main function is will store, process, handle, analyze, judge from the data that the data Layer transmission comes according to service function requirement; And carry out data interaction through service logic shell and presentation layer, to accomplish the different application requirements of user.Said application requirements is that coupling system modular software function realizes; Comprise: anticipation of dynamo-electric machine status monitoring and pre-processing module, network management module, security mechanism management module and electric power ADVANCED APPLICATIONS functional module etc. in hydroelectric power plant's plant asset management module, operation maintenance management module, production management document management module, the factory, wherein:
(1) function of hydroelectric power plant's plant asset management module realization is: the technical information of various kinds of equipment is inquired about and added up; Set up the production equipment management database, comprise device numbering, manufacturer, nameplate, technical parameter, the date of putting into operation, maintenance number of times, mechanism map, the wiring diagram of equipment.This storehouse content needs manual entry; Regularly safeguard, the user interface query that the user can be through this module, call the basic condition of hydroelectric power plant's equipment, realize equipment bidirectional inquiry function; Both can pass through graphic attribute query facility attribute, again can be through its relevant position, device attribute location.
Managerial personnel add up, analyze defective according to information such as device type, manufacturers, and the guidance management personnel formulate overhaul and technological transformation plan; The associating information of equipment control and work ticket management, operation order management, Analysis about Dangerous Point and control system, standardized work guiding book, but the maintenance of standard equipment, the scarce work that disappears, the maintenance that realizes disappearing, the standardized work that lacks work that disappears are managed.
Device numbering in this storehouse, device name, technical parameter and other functional modules are shared.
(2) function that realizes of operation maintenance management module is: by the management of maintenance flow process layering default access, and formulate according to plan-apply for-examine-give an written reply-flow process such as overhaul to transmit successively.The overhaul of the equipments management is arranged turnaround plan progress and action according to production schedule charter; Open that work ticket, work ticket are signed for, work ticket is accomplished and inquire about; Automatic retrieval facility production schedule storehouse, the service work content that prompt facility is relevant etc.
(3) function of production management document management module realization is: be all documents in user's production management process; Comprise that operating standard, working regulation, conservation regulation, work ticket, operation order, operation circulation audit file; Realize electronic management, functions such as the issue of standardized work guiding book standard, standardized work guiding book management system, standardized work guiding book model and standardized work guiding book applicable cases are provided.
(4) function that anticipation of dynamo-electric machine status monitoring and pre-processing module realize in the factory is: collect the real time execution parameter that comes from production scene equipment; Comprise electric parameters and mechanical quantity, like vibration, throw, electric current, voltage, power, the position of the switch, working conditions change process etc.Completion is to processing, the analysis of equipment work situation, running status, transient process, variation tendency, for overhaul of the equipments, maintenance provide decision references.
(5) function that realizes of network management module is: the state indication that on user circle, presents network traffic conditions, communication apparatus duty, failure condition with dynamic coloring; After having the logging in system by user of administration authority; Check the function of flow restriction, parameter setting and fault detect, recovery with WEB mode browse network equipment.
(6) function that realizes of security mechanism management module is: for system provides accurate, strict rights management, perfect return to school, affirmation mechanism cryptographic signatures and signature area protection, device security fate, accident statistics; Submit to integrality, the correctness of content to check to system, generate the safety evaluatio standard automatically and can safeguard form, the automatic statistical report form of safety evaluatio score and safety evaluatio form.Basic datas such as the equipment safety operation fate that is showed in the system, the number of stoppages, time of origin are all collected from the device network of production scene.
(7) function that realizes of electric power ADVANCED APPLICATIONS functional module is: the application function targetedly of the GIS of tie water power plant management expectancy and present situation customized development, as Report Server Management, engineering management, and power plant's other system between function such as integrated.
The user sends request of data through WEB application terminal 6, and system organizes data source according to user's request and protocol requirement, realizes that data appear.System supports communications protocol, support multipoint access and the interoperability of standard, possesses perfect data verification administrative mechanism, error in data and inconsistency can not take place.
Said intelligent terminal 7 comprises mobile MMI, mobile phone and PAD etc., and system supports intelligent terminal visit, WEB issue, polynary inquiry, checks factory's station equipment, query facility ruuning situation with visual means.

Claims (5)

1. the hydroelectric power plant's intelligent management system based on GIS-Geographic Information System is characterized in that, comprises the data core, and said data core is carried out communication with data management module, business integration module and data verification module respectively through the Internet and is connected; Said data core is also carried out communication with WEB application terminal and intelligent terminal respectively and is connected; The user sends request of data through the WEB application terminal, and system organizes data source according to user's request and protocol requirement, realizes that data appear.
2. the hydroelectric power plant's intelligent management system based on GIS-Geographic Information System according to claim 1; It is characterized in that: said data core comprises data Layer, Business Logic and presentation layer, and wherein: said data Layer comprises three-dimensional space data storehouse, attribute database and application data base; Said Business Logic comprises service logic core, service logic shell and MDAC; The service logic core will store, process, handle, analyze, judge according to service function requirement from the data that the data Layer transmission comes; And carry out data interaction through service logic shell and presentation layer, to accomplish the different application requirements of user.
3. the hydroelectric power plant's intelligent management system based on GIS-Geographic Information System according to claim 2; It is characterized in that: said application requirements comprises: the anticipation of dynamo-electric machine status monitoring and pre-processing module, network management module and security mechanism management module in hydroelectric power plant's plant asset management module, operation maintenance management module, production management document management module, the factory, wherein:
(1) function of hydroelectric power plant's plant asset management module realization is: the technical information of various kinds of equipment is inquired about and added up, set up the production equipment management database;
(2) function of operation maintenance management module realization is: manage by maintenance flow process layering default access, and transmit successively by the maintenance flow process;
(3) function of production management document management module realization is: for all documents in user's production management process are filed; Realize electronic management, the issue of standardized work guiding book standard, standardized work guiding book management system, standardized work guiding book model and standardized work guiding book applicable cases are provided;
(4) function that anticipation of dynamo-electric machine status monitoring and pre-processing module realize in the factory is: collect the real time execution parameter that comes from production scene equipment, accomplish processing, analysis to equipment work situation, running status, transient process, variation tendency;
(5) function that realizes of network management module is: the state indication that on user circle, presents network traffic conditions, communication apparatus duty, failure condition with dynamic coloring; After having the logging in system by user of administration authority, with WEB mode browse network equipment, check flow restriction, carry out parameter setting and fault detect, system recovery;
(6) function of security mechanism management module realization is: for system provides rights management, and the affirmation mechanism of returning to school, cryptographic signatures and signature area protection, device security fate, accident statistics; Submit to integrality, the correctness of content to check to system, generate the safety evaluatio standard automatically and can safeguard form, the automatic statistical report form of safety evaluatio score and safety evaluatio form.
4. the hydroelectric power plant's intelligent management system based on GIS-Geographic Information System according to claim 3 is characterized in that: said maintenance flow process for the plan formulate-apply for-examine-give an written reply-overhaul.
5. the hydroelectric power plant's intelligent management system based on GIS-Geographic Information System according to claim 1 is characterized in that: said intelligent terminal comprises mobile MMI, mobile phone and PAD.
CN2012100162064A 2012-01-19 2012-01-19 Hydraulic power plant intelligent management system based on geographic information system Pending CN102609810A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100162064A CN102609810A (en) 2012-01-19 2012-01-19 Hydraulic power plant intelligent management system based on geographic information system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100162064A CN102609810A (en) 2012-01-19 2012-01-19 Hydraulic power plant intelligent management system based on geographic information system

Publications (1)

Publication Number Publication Date
CN102609810A true CN102609810A (en) 2012-07-25

Family

ID=46527162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100162064A Pending CN102609810A (en) 2012-01-19 2012-01-19 Hydraulic power plant intelligent management system based on geographic information system

Country Status (1)

Country Link
CN (1) CN102609810A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104460635A (en) * 2014-12-24 2015-03-25 四川谊田集群科技有限公司 Integrated information platform system based on intelligent hydraulic power plant
CN107222457A (en) * 2017-04-14 2017-09-29 弘成科技发展有限公司 A kind of interface access system and method for interaction between system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1428711A (en) * 2001-12-28 2003-07-09 鸿富锦精密工业(深圳)有限公司 Pinguan newtwork system and method
CN101539858A (en) * 2008-12-16 2009-09-23 厦门亿力吉奥信息科技有限公司 Electric power GIS secondary development platform
CN101944204A (en) * 2010-09-10 2011-01-12 北京恒华伟业科技股份有限公司 Geographic information system applied to power system and method for improving display efficiency thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1428711A (en) * 2001-12-28 2003-07-09 鸿富锦精密工业(深圳)有限公司 Pinguan newtwork system and method
CN101539858A (en) * 2008-12-16 2009-09-23 厦门亿力吉奥信息科技有限公司 Electric power GIS secondary development platform
CN101944204A (en) * 2010-09-10 2011-01-12 北京恒华伟业科技股份有限公司 Geographic information system applied to power system and method for improving display efficiency thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐礼强 等: "基于GIS的并行和分布式处理技术在水信息领域中的应用", 《水利水电技术》, vol. 36, no. 10, 17 November 2005 (2005-11-17) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104460635A (en) * 2014-12-24 2015-03-25 四川谊田集群科技有限公司 Integrated information platform system based on intelligent hydraulic power plant
CN104460635B (en) * 2014-12-24 2018-01-02 四川谊田集群科技有限公司 A kind of integrated information platform system based on intelligent hydroelectric power plant
CN107222457A (en) * 2017-04-14 2017-09-29 弘成科技发展有限公司 A kind of interface access system and method for interaction between system

Similar Documents

Publication Publication Date Title
CN102957205B (en) A kind of method and system setting up electricity distribution network model
CN101436790B (en) On-line splicing and coalition method for electric network model containing complex T connection line
CN101329564B (en) Computer room management system
Ramamurthy et al. The internet of things in the power sector opportunities in Asia and the Pacific
CN103093024B (en) A kind of planning power grid visualization methods of exhibiting based on WEBGIS
CN102929911B (en) Substation and scheduling station method of integrated modeling
CN104135069B (en) Method for configuring operating parameters of secondary equipment of intelligent substation
CN103093392A (en) Electrical power system three-dimensional digitalization operation platform
CN104616101B (en) A kind of integrated power system resource model and foundation and maintaining method
CN101719690B (en) Dispatching method of electric network
CN104537573A (en) Power grid operation information panoramic visualized display system
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN101483342A (en) Geographical information system used for electric system
CN104050529A (en) Power grid dispatching intelligent maintenance order and operation order system
CN110288176A (en) Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS
CN104158286A (en) Integrated main station system for regulation and control
CN104050541A (en) Maintenance cycle management system for grid equipment
CN104966245A (en) Visualized power supply scheme auxiliary compilation method based on power grid GIS (Gas Insulated Switchgear)
CN108510405A (en) A kind of one-stop management platform of photovoltaic power station
CN110276516A (en) Distribution monitoring analysis and repairing command methods based on power grid GIS
CN104778551A (en) Designing and analyzing method of visualization grid
CN104504770A (en) Intelligent patrol system for communication device
CN103888286A (en) Information communication machine room device and line resource management system
CN102064602A (en) Operating method of B/S framework networked electronic simulation drawing board system
CN102609810A (en) Hydraulic power plant intelligent management system based on geographic information system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120725