CN102609356A - Terminal product driver loading stability testing method - Google Patents

Terminal product driver loading stability testing method Download PDF

Info

Publication number
CN102609356A
CN102609356A CN2012100185121A CN201210018512A CN102609356A CN 102609356 A CN102609356 A CN 102609356A CN 2012100185121 A CN2012100185121 A CN 2012100185121A CN 201210018512 A CN201210018512 A CN 201210018512A CN 102609356 A CN102609356 A CN 102609356A
Authority
CN
China
Prior art keywords
terminal
measured
remote wake
server
countdown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100185121A
Other languages
Chinese (zh)
Other versions
CN102609356B (en
Inventor
张辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Centerm Information Co Ltd
Original Assignee
Fujian Centerm Information Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Centerm Information Co Ltd filed Critical Fujian Centerm Information Co Ltd
Priority to CN201210018512.1A priority Critical patent/CN102609356B/en
Publication of CN102609356A publication Critical patent/CN102609356A/en
Application granted granted Critical
Publication of CN102609356B publication Critical patent/CN102609356B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Computer And Data Communications (AREA)

Abstract

The invention provides a terminal product driver loading stability testing method, which includes the steps: firstly, starting remote wakeup support in a BIOS (basic input/output system) of a terminal to be tested, writing a countdown automatic shutdown script and placing the script in a startup folder; and secondly, setting a remote wakeup program in a server, establishing a remote wakeup batch processing file and a vbs (visual basic script) file for realizing automatic looping execution of the remote wakeup batch processing file, automatically operating the remote wakeup batch processing file after operating the vbs file, realizing automatic looping boot of the terminal to be tested, reading driver information from the BIOS, automatically operating the countdown automatic shutdown script prior to shutting down the terminal to be tested after completely loading a driver, and clearing the loaded driver information. By the aid of the method, automatic repeated driver loading for the terminal to be tested is realized, terminal driver loading stability is reflected more really and accurately, manual operation and watching are omitted in the whole testing process, and testing cost is reduced.

Description

End product drives the stability test method that loads
[technical field]
The present invention relates to the electronic product field tests, particularly a kind of end product drives the stability test method that loads.
[background technology]
Existing end product adopts the windows system mostly, and the hardware of such end product could be worked after mostly need loading its driver, for example, and video card driving, sound card driving, network interface card driving etc.In use, make mistakes, all possibly cause the terminal to be broken down, can't use as long as a certain driving on the terminal loads.Therefore, such end product must carry out the strictness test to the loading stability of various drivers on the terminal before putting on market.Existing method of testing, mostly through restarting the terminal repeating test of starting shooting, observe start after; Whether the terminal can operate as normal, if can operate as normal, representes that then all drivers all load; If whether cisco unity malfunction is then analyzed to drive to load and is made mistakes.But activation bit can't intactly be read again in the terminal from BIOS in restarting process, and this just means the terminal in restarting, and driving is not intactly to reload.Have only terminal closedown, start again then, all drivings on the terminal just can be carried out once comprehensively, intactly load.Drive when loading stability when adopting constantly to restart to test, can't real simulated all drive the complete procedure of loading.Therefore, judge that by this method there is drawback in the stability that drive to load, can not be truly, exposed terminal drives the problem that loading procedure possibly exist all sidedly.
[summary of the invention]
The technical matters that the present invention will solve; Be to provide a kind of end product to drive and load the stability test method; Need not manual operation; Realize that robotization repeatability drives loading, and loading all is that the complete of driver on the terminal reloaded each time, reflects the stability that final drive loads more truly, exactly.
The present invention is achieved in that
End product drives the stability test method that loads; Said method of testing provides at least one the terminal to be measured that windows operating system is housed; One is equipped with the server of windows operating system, a switch, and said terminal to be measured, server all link to each other with said switch; Said method of testing comprises the steps:
Step 1, unlatching Remote Wake Up support in the BIOS at terminal to be measured;
Step 2, write the countdown script that shuts down automatically, the time of said countdown defines as required;
Step 3, be placed on the said countdown script that shuts down automatically under the startup file clip directory at said terminal to be measured; Behind the starting up of terminal to be measured like this; If final drive to be measured loads normal; Then can move the said countdown script that shuts down automatically automatically, with said terminal closedown to be measured, the driving that has loaded on all terminals to be measured is eliminated;
Step 4, with a Remote Wake Up program be placed on said server WINDOWS under the catalogue, said Remote Wake Up program can realize terminal to be measured Auto Power On;
Step 5, create a Remote Wake Up autoexec at said server; The content of said Remote Wake Up autoexec is a plurality of order lines, and said order line comprises: Remote Wake Up routine call instruction, the MAC Address at terminal to be measured, the IP address at terminal to be measured and the subnet mask at terminal to be measured; The all corresponding terminal to be measured of the subnet mask at the MAC Address at the terminal to be measured in every said order line, the IP address at terminal to be measured and terminal to be measured;
Step 6, on said server, create a vbs script file, carry out in order to the Automatic Cycle that realizes the Remote Wake Up autoexec, reach Automatic Cycle start at terminal to be measured with this; In the said vbs script file value of name is pointed to the path of said Remote Wake Up autoexec, and the dormancy time of said vbs script file is set, said dormancy time is the interval time of said vbs script file operation;
Step 7, on said server, double-click the said vbs script file of back operation;
Step 8, according to the value of name in the said vbs script file, server moves name value Remote Wake Up autoexec pointed automatically, after the operation of said Remote Wake Up autoexec; Call said Remote Wake Up program, send an Ethernet packets of information with broadcast mode, the data field of said Ethernet packets of information comprises the MAC Address at least one terminal to be measured; Data field in the said Ethernet packets of information is to extract from said Remote Wake Up autoexec; This Ethernet packets of information arrives on all terminals to be measured in the network through the forwarding of said switch, and the network interface card on each terminal to be measured receives said Ethernet packets of information; Compare to this Ethernet packets of information in each terminal to be measured; Concrete comparison mode is: after said Ethernet packets of information is received at a certain terminal to be measured, compare the MAC Address whether data field in the said Ethernet packets of information comprises this terminal to be tested network interface card, if; Just activate this terminal to be measured power supply; Auto Power On, in the process of start, this complete again load driver in terminal to be measured; If not, then abandoning this Ethernet packets of information, any response is not done at this terminal to be measured;
Terminal to be measured after step 9, the completion start; Load inerrancy if the driving at terminal to be measured by complete loading, drives, terminal then to be measured is the script that shuts down automatically of the countdown under the said startup file clip directory of operation automatically; Treat that the self-defining countdown time exhausts terminal closedown to be measured; If the driving loading procedure at terminal to be measured is made mistakes, then the blue screen phenomenon can appear, and terminal to be measured then stops at the blue screen picture, can't move the said countdown script that shuts down automatically, keeps the on-the-spot tester of the confession debugging that makes mistakes and checks;
After the operation of step 10, said vbs script file, behind the dormancy time that is provided with, be activated automatically, move said vbs script file once more, get into step 8 then, repetitive cycling like this, thus realized the robotization complete loading final drive that circulates;
Above-mentioned steps 1 to step 5 concerns in no particular order.
Further, after said step 10, also comprise:
Step 11, in the process of server, finish the process of said vbs script file, said vbs script file is promptly out of service, and test promptly stops;
Step 12, tester check the system journal at terminal to be measured, confirm terminal to be measured in whole unattended test process, and whether its state is all normal.
Further, said terminal to be measured, server link to each other with said switch through netting twine.
The present invention has following advantage:
The present invention is through being provided with automatic shutdown script, at server the Remote Wake Up program being set, creating the Remote Wake Up autoexec and creating one in order to realize the vbs script file of Remote Wake Up autoexec Automatic Cycle execution at terminal to be tested; Terminal to be measured Automatic Cycle start and complete load driver have been realized; More truly, reflect the stability that final drive loads exactly; And whole test process need not manually-operated, and it is on duty to need not manual work, reduces testing cost.
[description of drawings]
Combine embodiment that the present invention is further described with reference to the accompanying drawings.
Fig. 1 is a schematic flow sheet of the present invention.
[embodiment]
A kind of end product drives the stability test method that loads; Said method of testing provides at least one the terminal to be measured that windows operating system is housed; One is equipped with the server of windows operating system, a switch, and said terminal to be measured, server all link to each other with said switch; See also Fig. 1, said method of testing comprises the steps:
Step 1, unlatching Remote Wake Up support in the BIOS at terminal to be measured;
Step 2, write the countdown script that shuts down automatically, the time of said countdown defines as required; To write the 30s countdown script that shuts down automatically is example, the said countdown script called after close.bat that shuts down automatically, and its content is: shutdown-s-t30;
Step 3, be placed on the said countdown script that shuts down automatically under the startup file clip directory at said terminal to be measured; Behind the starting up of terminal to be measured like this; If final drive to be measured loads normal; Then can move the said countdown script that shuts down automatically automatically, with said terminal closedown to be measured, the driving that has loaded on all terminals to be measured is eliminated;
Step 4, with a Remote Wake Up program be placed on said server WINDOWS under the catalogue, said Remote Wake Up program can realize terminal to be measured Auto Power On through the operation at said server; Remote Wake Up program of the prior art, like WolCmd.exe, existing is that example specifies implementation process with WolCmd.exe;
Step 5, create a Remote Wake Up autoexec at said server; The content of said Remote Wake Up autoexec is a plurality of order lines, and said order line comprises: Remote Wake Up routine call instruction, the MAC Address at terminal to be measured, the IP address at terminal to be measured and the subnet mask at terminal to be measured; The all corresponding terminal to be measured of the subnet mask at the MAC Address at the terminal to be measured in every said order line, the IP address at terminal to be measured and terminal to be measured; The concrete establishment mode of said Remote Wake Up autoexec is: at the document that the newly-built suffix of said server is txt, composed changes the document suffix into bat after preserving, and generates said Remote Wake Up autoexec; Said suffix is that the content of edit of txt document is the content of said Remote Wake Up autoexec.In the present embodiment, create the Remote Wake Up autoexec of file wol.bat by name, the path of its establishment is that said content of edit is specially: wolcmd [mac address 1] [ip address 1] [subnet mask] under the root directory of c dish;
Step 6, on said server, create a vbs script file, carry out in order to the Automatic Cycle that realizes the Remote Wake Up autoexec, reach Automatic Cycle start at terminal to be measured with this; In the said vbs script file value of name is pointed to the path of said Remote Wake Up autoexec, and the dormancy time of said vbs script file is set, said dormancy time is the interval time of said vbs script file operation; Said vbs script is specific as follows, and the dormancy time of its setting is 120s:
name=″c:\wol.bat″
set?ws=CreateObject(″wscript.shell″)
set?fso=CreateObject(″Scripting.FileSystemObject″)
while?1
set?f=fso.getfile(name)
ws.run?f.shortpath,0
wscript.sleep?1000*120
wend
Step 7, on said server, double-click the said vbs script file of back operation;
Step 8, according to the value of name in the said vbs script file, server moves name value Remote Wake Up autoexec pointed wol.bat automatically, after the said Remote Wake Up autoexec wol.bat operation; Call said Remote Wake Up program, send an Ethernet packets of information with broadcast mode, the data field of said Ethernet packets of information comprises the MAC Address at least one terminal to be measured; When adopting WolCmd.exe Remote Wake Up program; The MAC Address at each terminal to be tested in the said Ethernet packets of information will be repeated 16 times continuously, and the data field in the said Ethernet packets of information is to extract from said Remote Wake Up autoexec wol.bat, and this Ethernet packets of information is through the forwarding of said switch; Arrive on all terminals to be measured in the network; Network interface card on each terminal to be measured receives said Ethernet packets of information, compares to this Ethernet packets of information in each terminal to be measured, and specifically comparison mode is: after said Ethernet packets of information is received at a certain terminal to be measured; Compare the MAC Address whether data field in the said Ethernet packets of information comprises this terminal to be tested network interface card; If just activate this terminal to be measured power supply, Auto Power On; In the process of start, this complete again load driver in terminal to be measured; If not, then abandoning this Ethernet packets of information, any response is not done at this terminal to be measured;
Terminal to be measured after step 9, the completion start; Load inerrancy if the driving at terminal to be measured by complete loading, drives, terminal then to be measured is the script that shuts down automatically of the countdown under the said startup file clip directory of operation automatically; Treat that the self-defining countdown time exhausts terminal closedown to be measured; If the driving loading procedure at terminal to be measured is made mistakes, then the blue screen phenomenon can appear, and terminal to be measured then stops at the blue screen picture, can't move the said countdown script that shuts down automatically, keeps the on-the-spot tester of the confession debugging that makes mistakes and checks;
After the operation of step 10, said vbs script file, behind the dormancy time that is provided with, be activated automatically, move said vbs script file once more, get into step 8 then, repetitive cycling like this, thus realized the robotization complete loading final drive that circulates.
Step 1 to step 5 concerns in no particular order among the present invention.
When needs stopped test, execution in step 11: in the process of server, finish the process of said vbs script file, said vbs script file was promptly out of service, and test promptly stops.After finishing the process of said vbs script file, just can not call said Remote Wake Up program again, terminal to be measured just can not waken up again.
For further confirming the test mode of terminal to be measured in whole test process, execution in step 12: the tester checks the system journal at terminal to be measured, confirms terminal to be measured in whole unattended test process, and whether its state is all normal.In the present embodiment, said terminal to be measured, server link to each other with said switch through netting twine.
Need to prove that here the present invention to the hardware requirement at terminal to be measured is: power supply must be to meet the above ATX power supply of ATX 2.01 standards, and+5V Standby electric current at least should be more than 600mA; Secondly, mainboard is supported PCI 2.2 and above version, perhaps when mainboard during at PCI2.1 and following version, extra 3 special core sockets is provided, and guarantees under stopped status, to supply power to network interface card; At last, network interface card will be supported the WOL standard.
The present invention is through being provided with automatic shutdown script, at server the Remote Wake Up program being set, creating the Remote Wake Up autoexec and creating one in order to realize the vbs script file of Remote Wake Up autoexec Automatic Cycle execution at terminal to be tested; Terminal to be measured Automatic Cycle start and complete load driver have been realized; More truly, reflect the stability that final drive loads exactly; And whole test process need not manually-operated, and it is on duty to need not manual work, reduces testing cost.
Though more than described embodiment of the present invention; But the technician who is familiar with the present technique field is to be understood that; We described concrete embodiment is illustrative; Rather than being used for qualification to scope of the present invention, those of ordinary skill in the art are in the modification and the variation of the equivalence of doing according to spirit of the present invention, all should be encompassed in the scope that claim of the present invention protects.

Claims (3)

1. end product drives the stability test method that loads; It is characterized in that: said method of testing provides at least one the terminal to be measured that windows operating system is housed; One is equipped with the server of windows operating system, a switch, and said terminal to be measured, server all link to each other with said switch; Said method of testing comprises the steps:
Step 1, unlatching Remote Wake Up support in the BIOS at terminal to be measured;
Step 2, write the countdown script that shuts down automatically, the time of said countdown defines as required;
Step 3, be placed on the said countdown script that shuts down automatically under the startup file clip directory at said terminal to be measured; Behind the starting up of terminal to be measured like this; If final drive to be measured loads normal; Then can move the said countdown script that shuts down automatically automatically, with said terminal closedown to be measured, the driving that has loaded on all terminals to be measured is eliminated;
Step 4, with a Remote Wake Up program be placed on said server WINDOWS under the catalogue, said Remote Wake Up program can realize terminal to be measured Auto Power On;
Step 5, create a Remote Wake Up autoexec at said server; The content of said Remote Wake Up autoexec is a plurality of order lines, and said order line comprises: Remote Wake Up routine call instruction, the MAC Address at terminal to be measured, the IP address at terminal to be measured and the subnet mask at terminal to be measured; The all corresponding terminal to be measured of the subnet mask at the MAC Address at the terminal to be measured in every said order line, the IP address at terminal to be measured and terminal to be measured;
Step 6, on said server, create a vbs script file, carry out in order to the Automatic Cycle that realizes the Remote Wake Up autoexec, reach Automatic Cycle start at terminal to be measured with this; In the said vbs script file value of name is pointed to the path of said Remote Wake Up autoexec, and the dormancy time of said vbs script file is set, said dormancy time is the interval time of said vbs script file operation;
Step 7, on said server, double-click the said vbs script file of back operation;
Step 8, according to the value of name in the said vbs script file, server moves name value Remote Wake Up autoexec pointed automatically, after the operation of said Remote Wake Up autoexec; Call said Remote Wake Up program, send an Ethernet packets of information with broadcast mode, the data field of said Ethernet packets of information comprises the MAC Address at least one terminal to be measured; Data field in the said Ethernet packets of information is to extract from said Remote Wake Up autoexec; This Ethernet packets of information arrives on all terminals to be measured in the network through the forwarding of said switch, and the network interface card on each terminal to be measured receives said Ethernet packets of information; Compare to this Ethernet packets of information in each terminal to be measured; Concrete comparison mode is: after said Ethernet packets of information is received at a certain terminal to be measured, compare the MAC Address whether data field in the said Ethernet packets of information comprises this terminal to be tested network interface card, if; Just activate this terminal to be measured power supply; Auto Power On, in the process of start, this complete again load driver in terminal to be measured; If not, then abandoning this Ethernet packets of information, any response is not done at this terminal to be measured;
Terminal to be measured after step 9, the completion start; Load inerrancy if the driving at terminal to be measured by complete loading, drives, terminal then to be measured is the script that shuts down automatically of the countdown under the said startup file clip directory of operation automatically; Treat that the self-defining countdown time exhausts terminal closedown to be measured; If the driving loading procedure at terminal to be measured is made mistakes, then the blue screen phenomenon can appear, and terminal to be measured then stops at the blue screen picture, can't move the said countdown script that shuts down automatically, keeps the on-the-spot tester of the confession debugging that makes mistakes and checks;
After the operation of step 10, said vbs script file, behind the dormancy time that is provided with, be activated automatically, move said vbs script file once more, get into step 8 then, repetitive cycling like this, thus realized the robotization complete loading final drive that circulates;
Above-mentioned steps 1 to step 5 concerns in no particular order.
2. end product according to claim 1 drives and loads the stability test method, it is characterized in that: after said step 10, also comprise:
Step 11, in the process of server, finish the process of said vbs script file, said vbs script file is promptly out of service, and test promptly stops;
Step 12, tester check the system journal at terminal to be measured, confirm terminal to be measured in whole unattended test process, and whether its state is all normal.
3. end product according to claim 1 drives and loads the stability test method, it is characterized in that: said terminal to be measured, server link to each other with said switch through netting twine.
CN201210018512.1A 2012-01-19 2012-01-19 Terminal product driver loading stability testing method Active CN102609356B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210018512.1A CN102609356B (en) 2012-01-19 2012-01-19 Terminal product driver loading stability testing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210018512.1A CN102609356B (en) 2012-01-19 2012-01-19 Terminal product driver loading stability testing method

Publications (2)

Publication Number Publication Date
CN102609356A true CN102609356A (en) 2012-07-25
CN102609356B CN102609356B (en) 2014-12-10

Family

ID=46526746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210018512.1A Active CN102609356B (en) 2012-01-19 2012-01-19 Terminal product driver loading stability testing method

Country Status (1)

Country Link
CN (1) CN102609356B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102880457A (en) * 2012-08-13 2013-01-16 中兴通讯股份有限公司 Method and equipment for processing data
CN103257922A (en) * 2013-04-16 2013-08-21 合肥联宝信息技术有限公司 Method for quickly testing reliability of BIOS (basic input output system) and OS (operating system) interface codes
CN104092794A (en) * 2014-07-25 2014-10-08 中国工商银行股份有限公司 Batch course processing method and system
CN106933578A (en) * 2017-02-28 2017-07-07 惠州华阳通用电子有限公司 A kind of USB drive load methods of QNX systems
CN108205480A (en) * 2017-12-28 2018-06-26 问众智能信息科技(北京)有限公司 Abnormality eliminating method, device, intelligent back vision mirror and storage medium
CN109117330A (en) * 2018-07-27 2019-01-01 郑州云海信息技术有限公司 A kind of test method, test macro and the relevant apparatus of SSD power-on and power-off
CN110633184A (en) * 2019-08-02 2019-12-31 苏州浪潮智能科技有限公司 Automatic heat dissipation testing method and system for server
CN112817427A (en) * 2021-02-24 2021-05-18 携程旅游信息技术(上海)有限公司 Control method and system for power utilization of terminal equipment, electronic equipment and medium
CN113326191A (en) * 2021-05-27 2021-08-31 合肥移瑞通信技术有限公司 Current consumption testing method and device and storage medium
CN113391936A (en) * 2021-06-15 2021-09-14 西安联乘智能科技有限公司 Reliability test method and system for vehicle-mounted intelligent antenna equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1673970A (en) * 2004-03-27 2005-09-28 鸿富锦精密工业(深圳)有限公司 Monitoring system and method for graphic interface when a Long-distance computer is opened
CN1841340A (en) * 2005-03-28 2006-10-04 华为技术有限公司 Method and system for testing drive software
CN101609426A (en) * 2009-07-14 2009-12-23 浪潮电子信息产业股份有限公司 A kind of method that realizes human-machine interactive test automatically performed by computer
CN101751263A (en) * 2008-11-28 2010-06-23 英业达集团(天津)电子技术有限公司 Method for testing dynamic custom starting core

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1673970A (en) * 2004-03-27 2005-09-28 鸿富锦精密工业(深圳)有限公司 Monitoring system and method for graphic interface when a Long-distance computer is opened
CN1841340A (en) * 2005-03-28 2006-10-04 华为技术有限公司 Method and system for testing drive software
CN101751263A (en) * 2008-11-28 2010-06-23 英业达集团(天津)电子技术有限公司 Method for testing dynamic custom starting core
CN101609426A (en) * 2009-07-14 2009-12-23 浪潮电子信息产业股份有限公司 A kind of method that realizes human-machine interactive test automatically performed by computer

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013178115A1 (en) * 2012-08-13 2013-12-05 中兴通讯股份有限公司 Data processing method and device
CN102880457A (en) * 2012-08-13 2013-01-16 中兴通讯股份有限公司 Method and equipment for processing data
CN102880457B (en) * 2012-08-13 2018-08-10 南京中兴新软件有限责任公司 A kind of method and apparatus that data are handled
CN103257922A (en) * 2013-04-16 2013-08-21 合肥联宝信息技术有限公司 Method for quickly testing reliability of BIOS (basic input output system) and OS (operating system) interface codes
CN104092794A (en) * 2014-07-25 2014-10-08 中国工商银行股份有限公司 Batch course processing method and system
CN104092794B (en) * 2014-07-25 2017-08-11 中国工商银行股份有限公司 Batch process handling method and system
CN106933578B (en) * 2017-02-28 2020-05-22 惠州华阳通用电子有限公司 USB drive loading method of QNX system
CN106933578A (en) * 2017-02-28 2017-07-07 惠州华阳通用电子有限公司 A kind of USB drive load methods of QNX systems
CN108205480A (en) * 2017-12-28 2018-06-26 问众智能信息科技(北京)有限公司 Abnormality eliminating method, device, intelligent back vision mirror and storage medium
CN108205480B (en) * 2017-12-28 2021-10-26 大众问问(北京)信息科技有限公司 Abnormity processing method and device, intelligent rearview mirror and storage medium
CN109117330A (en) * 2018-07-27 2019-01-01 郑州云海信息技术有限公司 A kind of test method, test macro and the relevant apparatus of SSD power-on and power-off
CN110633184A (en) * 2019-08-02 2019-12-31 苏州浪潮智能科技有限公司 Automatic heat dissipation testing method and system for server
CN112817427A (en) * 2021-02-24 2021-05-18 携程旅游信息技术(上海)有限公司 Control method and system for power utilization of terminal equipment, electronic equipment and medium
CN113326191A (en) * 2021-05-27 2021-08-31 合肥移瑞通信技术有限公司 Current consumption testing method and device and storage medium
CN113391936A (en) * 2021-06-15 2021-09-14 西安联乘智能科技有限公司 Reliability test method and system for vehicle-mounted intelligent antenna equipment

Also Published As

Publication number Publication date
CN102609356B (en) 2014-12-10

Similar Documents

Publication Publication Date Title
CN102609356B (en) Terminal product driver loading stability testing method
WO2017000843A1 (en) Automatic test method and device for board card
CN108170494B (en) Application program starting method and starting system for intelligent terminal
US8924769B2 (en) Software burning system and burning control method
US20090234942A1 (en) Apparatus, system, and method for testing embedded device
CN106201799A (en) Test method for DC restart of server based on ipmi service
WO2017028574A1 (en) Router testing method and testing device
WO2018006702A1 (en) Abnormality processing method, apparatus and system in automation test
CN112073263B (en) Method, system, equipment and medium for testing and monitoring reliability of white box switch
CN114780316A (en) Memory test method, device and system
US20140053032A1 (en) Memory test method, memory test device, and adapter thereof
CN113590401B (en) CPE equipment multifunctional test method, CPE equipment multifunctional test device, computer equipment and storage medium
CN104268041A (en) Automatic closed loop test method for frequent startup and shutdown of vehicle-mounted display
CN109660386B (en) Software upgrading method for semiconductor memory aging test system
CN108490289B (en) Electronic equipment testing method and device and electronic equipment
CN102819474B (en) Test method and device for system operation
CN104239172A (en) Automatic testing device for powering on and off test
CN115913913B (en) Network card pre-starting execution environment function fault positioning method and device
CN107835108B (en) OpenWrt-based MAC (media Access control) layer protocol stack verification platform
CN108776601B (en) Android H5 page loading method, device, equipment and storage medium
CN114253781B (en) Test method, device, equipment and storage medium
CN114138312A (en) Upgrade test method, device, electronic equipment and computer readable storage medium
CN112631678B (en) Dynamic loading method based on zynq
CN108347521A (en) A kind of data back up method and device
CN105515918A (en) Network awakening test method under SUSE Linux system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant