CN102608490A - 变压器应急备用适用性的判别方法 - Google Patents

变压器应急备用适用性的判别方法 Download PDF

Info

Publication number
CN102608490A
CN102608490A CN2011100256989A CN201110025698A CN102608490A CN 102608490 A CN102608490 A CN 102608490A CN 2011100256989 A CN2011100256989 A CN 2011100256989A CN 201110025698 A CN201110025698 A CN 201110025698A CN 102608490 A CN102608490 A CN 102608490A
Authority
CN
China
Prior art keywords
transformer
applicability
voltage
backup
execute step
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100256989A
Other languages
English (en)
Other versions
CN102608490B (zh
Inventor
赵学强
陆志浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Original Assignee
East China Power Test and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Power Test and Research Institute Co Ltd filed Critical East China Power Test and Research Institute Co Ltd
Priority to CN201110025698.9A priority Critical patent/CN102608490B/zh
Publication of CN102608490A publication Critical patent/CN102608490A/zh
Application granted granted Critical
Publication of CN102608490B publication Critical patent/CN102608490B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

本发明涉及一种变压器应急备用适用性的判别方法,包括以下步骤:主变备用适用性判别开始;根据变压器技术参数计算变压器高压、中压和低压绕组等值电抗XT1、XT2、XT3;计算受损变压器和备品变压器高压-中压等值欧姆值偏差百分数△(XT1+XT2)(%);判断受损变变比是否等于备品变变比;判断△(XT1+XT2)是否小于20;判断△(XT1+XT2)是否小于10;需进一步详细计算论证;主变备用可行;主变备用适用性判别结束。本发明的变压器应急备用适用性的判别方法能够根据提供的变压器原始技术参数来直接进行变压器应急备用适用性的初步判别,而不再需要进行相对较复杂的三相潮流不平衡度具体计算。本发明可以用于变压器应急备用适用性研究的快速判别。

Description

变压器应急备用适用性的判别方法
技术领域
本发明涉及电力系统中三相变压器在三相参数不对称情况下运行的技术领域,具体涉及一种500kV变压器应急备用适用性的判别方法。
背景技术
目前华东电网投运的大型变压器逐渐增多,一旦发生突发事件,将给地区供电造成严重影响。而目前华东电网500kV变压器的备品数量有限。华东电网500kV的降压变压器之间存在包括额定容量、短路阻抗等技术参数不同的差异。现有的备品变压器是否能够作为全网500kV降压变压器的应急备用是一个非常值得研究的课题。
关于500kV变压器应急备用适用性研究一般都是通过具体计算的方法,即应用相关的程序进行全网的三相潮流计算,重点关注由于采用与原变压器规格有差异的备品而带来的三相潮流的不平衡度,从三相电压和三相电流的不平衡度来判别变压器应急备用的可行性。
有鉴于此,寻求一种变压器应急备用适用性的判别方法成为该领域技术人员的追求目标。
发明内容
本发明的任务是提供一种变压器应急备用适用性的判别方法,它克服了上述现有技术的困难,能够根据提供的变压器原始技术参数来直接进行变压器应急备用适用性的初步判别,而不再需要进行相对较复杂的三相潮流不平衡度具体计算,该发明可以用于变压器应急备用适用性研究的快速判别。
本发明的技术解决方案如下:
一种变压器应急备用适用性的判别方法,包括以下步骤:
(1)主变备用适用性判别开始;
(2)根据变压器技术参数计算变压器高压、中压和低压绕组等值电抗XT1、XT2、XT3
(3)计算受损变压器和备品变压器高压-中压等值欧姆值偏差百分数△(XT1+XT2)(%);
(4)判断受损变变比是否等于备品变变比,若是,则执行步骤(5),若否,则执行步骤(6);
(5)判断△(XT1+XT2)是否小于20,若是,则执行步骤(7),若否,则执行步骤(8);
(6)判断△(XT1+XT2)是否小于10,若是,则执行步骤(7),若否,则执行步骤(8);
(7)主变备用可行,执行步骤(9);
(8)需进一步详细计算论证;
(9)主变备用适用性判别结束。
所述变压器为500kV。
本发明由于采用了以上技术方案,使之与现有技术相比,本发明的变压器应急备用适用性的判别方法能够根据提供的变压器原始技术参数来直接进行变压器应急备用适用性的初步判别,而不再需要进行相对较复杂的三相潮流不平衡度具体计算。该发明可以用于变压器应急备用适用性研究的快速判别。
附图说明
图1为本发明的一种变压器应急备用适用性的判别方法的流程图。
具体实施方式
下面结合附图和实施例对本发明作详细说明。
参看图1,本发明的一种变压器应急备用适用性的判别方法,使用在500kV变压器上,包括以下步骤:
(1)主变备用适用性判别开始。
(2)根据变压器技术参数计算变压器高压、中压和低压绕组等值电抗XT1、XT2、XT3,为折算值。
(3)计算受损变压器和备品变压器高压-中压等值欧姆值偏差百分数△(XT1+XT2)(%)。
(4)判断受损变变比是否等于备品变变比,若是,则执行步骤(5),若否,采用最接近变比档位,则执行步骤(6)。
(5)判断△(XT1+XT2)是否小于20,若是,则执行步骤(7),若否,则执行步骤(8)。
(6)判断△(XT1+XT2)是否小于10,若是,则执行步骤(7),若否,则执行步骤(8)。
(7)主变备用可行,执行步骤(9)。
(8)需进一步详细计算论证。
(9)主变备用适用性判别结束。
本发明的实际操作过程如下:
如图1所示,按本发明的变压器应急备用适用性的判别方法,其判别准则为:在受损变变比与备品变变比相等的情况下,如果变压器高压-中压绕组电抗偏差百分数小于20%,则变压器三相电流不平衡度小于8%,即变压器备用可行;在受损变变比与备品变变比不相等并采取最接近变比的情况下,如果变压器高压-中压绕组电抗偏差百分数小于10%,则变压器三相电流不平衡度小于8%,即变压器备用可行。如果不能满足上述前提条件,则需要通过求解变压器三相潮流的详细计算方法来进一步论证变压器备用的可行性。
根据上述变压器备用适用性的判别准则,可以制定变压器备用适用性的判别流程。图1给出了500kV变压器备用适用性初步判别的流程。
本发明提出的500kV备用变压器的适用性的判别准则和判别流程,可以在不经过复杂计算的情况下,快速有效地初步判断500kV变压器备用的可行性,可为选用集中备用的变压器提供指导,具有较强的工程实用性。
本发明是在综合华东电网500kV变压器应急备用研究大量计算结论的基础上而提出的。本发明提出的500kV变压器应急备用适用性的判别方法已经过大量的理论计算和工程实例验证。
综上所述,本发明的变压器应急备用适用性的判别方法能够根据提供的变压器原始技术参数来直接进行变压器应急备用适用性的初步判别,而不再需要进行相对较复杂的三相潮流不平衡度具体计算。该发明可以用于变压器应急备用适用性研究的快速判别。
当然,本技术领域内的一般技术人员应当认识到,上述实施例仅是用来说明本发明,而并非用作对本发明的限定,只要在本发明的实质精神范围内,对上述实施例的变化、变型等都将落在本发明权利要求的范围内。

Claims (2)

1.一种变压器应急备用适用性的判别方法,其特征在于:包括以下步骤:
(1)主变备用适用性判别开始;
(2)根据变压器技术参数计算变压器高压、中压和低压绕组等值电抗XT1、XT2、XT3
(3)计算受损变压器和备品变压器高压-中压等值欧姆值偏差百分数△(XT1+XT2)(%);
(4)判断受损变变比是否等于备品变变比,若是,则执行步骤(5),若否,则执行步骤(6);
(5)判断△(XT1+XT2)是否小于20,若是,则执行步骤(7),若否,则执行步骤(8);
(6)判断△(XT1+XT2)是否小于10,若是,则执行步骤(7),若否,则执行步骤(8);
(7)主变备用可行,执行步骤(9);
(8)需进一步详细计算论证;
(9)主变备用适用性判别结束。
2.如权利要求1所述的变压器应急备用适用性的判别方法,其特征在于:所述变压器为500kV。
CN201110025698.9A 2011-01-25 2011-01-25 变压器应急备用适用性的判别方法 Active CN102608490B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110025698.9A CN102608490B (zh) 2011-01-25 2011-01-25 变压器应急备用适用性的判别方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110025698.9A CN102608490B (zh) 2011-01-25 2011-01-25 变压器应急备用适用性的判别方法

Publications (2)

Publication Number Publication Date
CN102608490A true CN102608490A (zh) 2012-07-25
CN102608490B CN102608490B (zh) 2015-07-08

Family

ID=46526010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110025698.9A Active CN102608490B (zh) 2011-01-25 2011-01-25 变压器应急备用适用性的判别方法

Country Status (1)

Country Link
CN (1) CN102608490B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103984822A (zh) * 2014-05-16 2014-08-13 国家电网公司 一种基于全数字实时仿真装置的三相潮流实现方法
CN116581753A (zh) * 2023-05-29 2023-08-11 国网江苏省电力有限公司电力科学研究院 一种变压器备品配置策略优化方法、装置、介质及设备

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5276402A (en) * 1992-02-28 1994-01-04 Hipotronics, Inc. Three-phase transformer testing method and system
US20080136426A1 (en) * 2004-03-04 2008-06-12 Hubbell Limited Method and Apparatus For Characterising a Three Phase Transformer Using a Single Phase Power supply
CN101425687A (zh) * 2008-07-03 2009-05-06 重庆大学 变压器经济运行自动控制方法及备用自动投切综合装置
CN101752897A (zh) * 2008-12-15 2010-06-23 河南省电力公司南阳供电公司 基于调度自动化平台的综合备用自动投切装置
CN201608538U (zh) * 2009-12-14 2010-10-13 上海市电力公司 一种配电站经济运行方式下备用变压器自动投切装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5276402A (en) * 1992-02-28 1994-01-04 Hipotronics, Inc. Three-phase transformer testing method and system
US20080136426A1 (en) * 2004-03-04 2008-06-12 Hubbell Limited Method and Apparatus For Characterising a Three Phase Transformer Using a Single Phase Power supply
CN101425687A (zh) * 2008-07-03 2009-05-06 重庆大学 变压器经济运行自动控制方法及备用自动投切综合装置
CN101752897A (zh) * 2008-12-15 2010-06-23 河南省电力公司南阳供电公司 基于调度自动化平台的综合备用自动投切装置
CN201608538U (zh) * 2009-12-14 2010-10-13 上海市电力公司 一种配电站经济运行方式下备用变压器自动投切装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张鹏等: "不同换流站Y/Y型换流变压器置换分析与实践", 《南方电网技术》 *
赵学强等: "华东电网500 kV主变备用适用性的初步研究", 《华东电力》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103984822A (zh) * 2014-05-16 2014-08-13 国家电网公司 一种基于全数字实时仿真装置的三相潮流实现方法
CN116581753A (zh) * 2023-05-29 2023-08-11 国网江苏省电力有限公司电力科学研究院 一种变压器备品配置策略优化方法、装置、介质及设备
CN116581753B (zh) * 2023-05-29 2024-01-02 国网江苏省电力有限公司电力科学研究院 一种变压器备品配置策略优化方法、装置、介质及设备

Also Published As

Publication number Publication date
CN102608490B (zh) 2015-07-08

Similar Documents

Publication Publication Date Title
WO2019007348A1 (zh) 非有效接地系统接地故障相主动降压安全处理方法
CN108199349A (zh) 一种串联变压器阀侧绕组匝间零序差动保护方法和装置
CN108110731B (zh) 一种抽能电抗器抽能绕组匝间零序差动保护方法和装置
CN101118265A (zh) 通过辨识电网薄弱环节实时识别电网电压稳定性的方法
CN102593856B (zh) 一种基于短路比的直流孤岛送电系统次同步振荡评估方法
CN103558481B (zh) 同塔并架多回直流线路耦合作用引发换相失败的判别方法
CN102916437A (zh) 一种并网变流器软并网方法
CN103701133B (zh) 高压直流输电系统低功率运行情况下的无功控制方法
CN104882863B (zh) 一种发电厂厂用电系统继电保护配置成套装置
CN109002664A (zh) 一种基于有限元的串联变压器绝缘结构优化方法及系统
CN106033888B (zh) 基于速降直流灵敏度的交流线路故障安控量在线评估方法
CN104281736A (zh) 一种城市轨道交通牵引供配电系统供电电缆的选型方法
CN104113056A (zh) 一种低压限流控制参数的优化方法
CN104333030A (zh) 基于降阶雅克比矩阵的多馈入直流相互作用因子的分析方法
CN103730890B (zh) 一种抑制不换位超/特高压输电线路潜供电流的方法
CN104410091A (zh) 基于变流器控制的风储能量管理系统及其控制方法
CN103427427B (zh) 一种提高电网暂态电压支撑能力的网源稳态调压优化方法
CN102608490B (zh) 变压器应急备用适用性的判别方法
CN104269854A (zh) 一种基于直流逆变站稳定测度指标的电压控制方法
CN106099979A (zh) 一种考虑电网稳定限制的机组进相能力分析方法
CN104410159A (zh) 一种基于实时数字仿真的电网黑启动全过程校核方法
CN108493903B (zh) 一种无需电压的抽能电抗器差动保护方法和装置
CN103713234B (zh) 一种电抗器故障的识别方法和装置
CN106911143B (zh) 一种适用于特高压直流闭锁后的逆变站功率建模方法
CN105005207A (zh) 一种基于atp-emtp的黑启动过电压自动校验方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150929

Address after: 200002 Nanjing East Road, Shanghai, No. 181, No.

Patentee after: State Grid Shanghai Municipal Electric Power Company

Patentee after: East China Electric Power Test & Research Institute Co., Ltd.

Address before: 200437 Handan Road, Shanghai, No. 171, No.