CN102608490A - 变压器应急备用适用性的判别方法 - Google Patents
变压器应急备用适用性的判别方法 Download PDFInfo
- Publication number
- CN102608490A CN102608490A CN2011100256989A CN201110025698A CN102608490A CN 102608490 A CN102608490 A CN 102608490A CN 2011100256989 A CN2011100256989 A CN 2011100256989A CN 201110025698 A CN201110025698 A CN 201110025698A CN 102608490 A CN102608490 A CN 102608490A
- Authority
- CN
- China
- Prior art keywords
- transformer
- applicability
- execution
- standby
- voltage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
本发明涉及一种变压器应急备用适用性的判别方法,包括以下步骤:主变备用适用性判别开始;根据变压器技术参数计算变压器高压、中压和低压绕组等值电抗XT1、XT2、XT3;计算受损变压器和备品变压器高压-中压等值欧姆值偏差百分数△(XT1+XT2)(%);判断受损变变比是否等于备品变变比;判断△(XT1+XT2)是否小于20;判断△(XT1+XT2)是否小于10;需进一步详细计算论证;主变备用可行;主变备用适用性判别结束。本发明的变压器应急备用适用性的判别方法能够根据提供的变压器原始技术参数来直接进行变压器应急备用适用性的初步判别,而不再需要进行相对较复杂的三相潮流不平衡度具体计算。本发明可以用于变压器应急备用适用性研究的快速判别。
Description
技术领域
本发明涉及电力系统中三相变压器在三相参数不对称情况下运行的技术领域,具体涉及一种500kV变压器应急备用适用性的判别方法。
背景技术
目前华东电网投运的大型变压器逐渐增多,一旦发生突发事件,将给地区供电造成严重影响。而目前华东电网500kV变压器的备品数量有限。华东电网500kV的降压变压器之间存在包括额定容量、短路阻抗等技术参数不同的差异。现有的备品变压器是否能够作为全网500kV降压变压器的应急备用是一个非常值得研究的课题。
关于500kV变压器应急备用适用性研究一般都是通过具体计算的方法,即应用相关的程序进行全网的三相潮流计算,重点关注由于采用与原变压器规格有差异的备品而带来的三相潮流的不平衡度,从三相电压和三相电流的不平衡度来判别变压器应急备用的可行性。
有鉴于此,寻求一种变压器应急备用适用性的判别方法成为该领域技术人员的追求目标。
发明内容
本发明的任务是提供一种变压器应急备用适用性的判别方法,它克服了上述现有技术的困难,能够根据提供的变压器原始技术参数来直接进行变压器应急备用适用性的初步判别,而不再需要进行相对较复杂的三相潮流不平衡度具体计算,该发明可以用于变压器应急备用适用性研究的快速判别。
本发明的技术解决方案如下:
一种变压器应急备用适用性的判别方法,包括以下步骤:
(1)主变备用适用性判别开始;
(2)根据变压器技术参数计算变压器高压、中压和低压绕组等值电抗XT1、XT2、XT3;
(3)计算受损变压器和备品变压器高压-中压等值欧姆值偏差百分数△(XT1+XT2)(%);
(4)判断受损变变比是否等于备品变变比,若是,则执行步骤(5),若否,则执行步骤(6);
(5)判断△(XT1+XT2)是否小于20,若是,则执行步骤(7),若否,则执行步骤(8);
(6)判断△(XT1+XT2)是否小于10,若是,则执行步骤(7),若否,则执行步骤(8);
(7)主变备用可行,执行步骤(9);
(8)需进一步详细计算论证;
(9)主变备用适用性判别结束。
所述变压器为500kV。
本发明由于采用了以上技术方案,使之与现有技术相比,本发明的变压器应急备用适用性的判别方法能够根据提供的变压器原始技术参数来直接进行变压器应急备用适用性的初步判别,而不再需要进行相对较复杂的三相潮流不平衡度具体计算。该发明可以用于变压器应急备用适用性研究的快速判别。
附图说明
图1为本发明的一种变压器应急备用适用性的判别方法的流程图。
具体实施方式
下面结合附图和实施例对本发明作详细说明。
参看图1,本发明的一种变压器应急备用适用性的判别方法,使用在500kV变压器上,包括以下步骤:
(1)主变备用适用性判别开始。
(2)根据变压器技术参数计算变压器高压、中压和低压绕组等值电抗XT1、XT2、XT3,为折算值。
(3)计算受损变压器和备品变压器高压-中压等值欧姆值偏差百分数△(XT1+XT2)(%)。
(4)判断受损变变比是否等于备品变变比,若是,则执行步骤(5),若否,采用最接近变比档位,则执行步骤(6)。
(5)判断△(XT1+XT2)是否小于20,若是,则执行步骤(7),若否,则执行步骤(8)。
(6)判断△(XT1+XT2)是否小于10,若是,则执行步骤(7),若否,则执行步骤(8)。
(7)主变备用可行,执行步骤(9)。
(8)需进一步详细计算论证。
(9)主变备用适用性判别结束。
本发明的实际操作过程如下:
如图1所示,按本发明的变压器应急备用适用性的判别方法,其判别准则为:在受损变变比与备品变变比相等的情况下,如果变压器高压-中压绕组电抗偏差百分数小于20%,则变压器三相电流不平衡度小于8%,即变压器备用可行;在受损变变比与备品变变比不相等并采取最接近变比的情况下,如果变压器高压-中压绕组电抗偏差百分数小于10%,则变压器三相电流不平衡度小于8%,即变压器备用可行。如果不能满足上述前提条件,则需要通过求解变压器三相潮流的详细计算方法来进一步论证变压器备用的可行性。
根据上述变压器备用适用性的判别准则,可以制定变压器备用适用性的判别流程。图1给出了500kV变压器备用适用性初步判别的流程。
本发明提出的500kV备用变压器的适用性的判别准则和判别流程,可以在不经过复杂计算的情况下,快速有效地初步判断500kV变压器备用的可行性,可为选用集中备用的变压器提供指导,具有较强的工程实用性。
本发明是在综合华东电网500kV变压器应急备用研究大量计算结论的基础上而提出的。本发明提出的500kV变压器应急备用适用性的判别方法已经过大量的理论计算和工程实例验证。
综上所述,本发明的变压器应急备用适用性的判别方法能够根据提供的变压器原始技术参数来直接进行变压器应急备用适用性的初步判别,而不再需要进行相对较复杂的三相潮流不平衡度具体计算。该发明可以用于变压器应急备用适用性研究的快速判别。
当然,本技术领域内的一般技术人员应当认识到,上述实施例仅是用来说明本发明,而并非用作对本发明的限定,只要在本发明的实质精神范围内,对上述实施例的变化、变型等都将落在本发明权利要求的范围内。
Claims (2)
1.一种变压器应急备用适用性的判别方法,其特征在于:包括以下步骤:
(1)主变备用适用性判别开始;
(2)根据变压器技术参数计算变压器高压、中压和低压绕组等值电抗XT1、XT2、XT3;
(3)计算受损变压器和备品变压器高压-中压等值欧姆值偏差百分数△(XT1+XT2)(%);
(4)判断受损变变比是否等于备品变变比,若是,则执行步骤(5),若否,则执行步骤(6);
(5)判断△(XT1+XT2)是否小于20,若是,则执行步骤(7),若否,则执行步骤(8);
(6)判断△(XT1+XT2)是否小于10,若是,则执行步骤(7),若否,则执行步骤(8);
(7)主变备用可行,执行步骤(9);
(8)需进一步详细计算论证;
(9)主变备用适用性判别结束。
2.如权利要求1所述的变压器应急备用适用性的判别方法,其特征在于:所述变压器为500kV。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110025698.9A CN102608490B (zh) | 2011-01-25 | 2011-01-25 | 变压器应急备用适用性的判别方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110025698.9A CN102608490B (zh) | 2011-01-25 | 2011-01-25 | 变压器应急备用适用性的判别方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102608490A true CN102608490A (zh) | 2012-07-25 |
CN102608490B CN102608490B (zh) | 2015-07-08 |
Family
ID=46526010
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110025698.9A Active CN102608490B (zh) | 2011-01-25 | 2011-01-25 | 变压器应急备用适用性的判别方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102608490B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103984822A (zh) * | 2014-05-16 | 2014-08-13 | 国家电网公司 | 一种基于全数字实时仿真装置的三相潮流实现方法 |
CN116581753A (zh) * | 2023-05-29 | 2023-08-11 | 国网江苏省电力有限公司电力科学研究院 | 一种变压器备品配置策略优化方法、装置、介质及设备 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5276402A (en) * | 1992-02-28 | 1994-01-04 | Hipotronics, Inc. | Three-phase transformer testing method and system |
US20080136426A1 (en) * | 2004-03-04 | 2008-06-12 | Hubbell Limited | Method and Apparatus For Characterising a Three Phase Transformer Using a Single Phase Power supply |
CN101425687A (zh) * | 2008-07-03 | 2009-05-06 | 重庆大学 | 变压器经济运行自动控制方法及备用自动投切综合装置 |
CN101752897A (zh) * | 2008-12-15 | 2010-06-23 | 河南省电力公司南阳供电公司 | 基于调度自动化平台的综合备用自动投切装置 |
CN201608538U (zh) * | 2009-12-14 | 2010-10-13 | 上海市电力公司 | 一种配电站经济运行方式下备用变压器自动投切装置 |
-
2011
- 2011-01-25 CN CN201110025698.9A patent/CN102608490B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5276402A (en) * | 1992-02-28 | 1994-01-04 | Hipotronics, Inc. | Three-phase transformer testing method and system |
US20080136426A1 (en) * | 2004-03-04 | 2008-06-12 | Hubbell Limited | Method and Apparatus For Characterising a Three Phase Transformer Using a Single Phase Power supply |
CN101425687A (zh) * | 2008-07-03 | 2009-05-06 | 重庆大学 | 变压器经济运行自动控制方法及备用自动投切综合装置 |
CN101752897A (zh) * | 2008-12-15 | 2010-06-23 | 河南省电力公司南阳供电公司 | 基于调度自动化平台的综合备用自动投切装置 |
CN201608538U (zh) * | 2009-12-14 | 2010-10-13 | 上海市电力公司 | 一种配电站经济运行方式下备用变压器自动投切装置 |
Non-Patent Citations (2)
Title |
---|
张鹏等: "不同换流站Y/Y型换流变压器置换分析与实践", 《南方电网技术》 * |
赵学强等: "华东电网500 kV主变备用适用性的初步研究", 《华东电力》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103984822A (zh) * | 2014-05-16 | 2014-08-13 | 国家电网公司 | 一种基于全数字实时仿真装置的三相潮流实现方法 |
CN116581753A (zh) * | 2023-05-29 | 2023-08-11 | 国网江苏省电力有限公司电力科学研究院 | 一种变压器备品配置策略优化方法、装置、介质及设备 |
CN116581753B (zh) * | 2023-05-29 | 2024-01-02 | 国网江苏省电力有限公司电力科学研究院 | 一种变压器备品配置策略优化方法、装置、介质及设备 |
Also Published As
Publication number | Publication date |
---|---|
CN102608490B (zh) | 2015-07-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101345464B (zh) | 一种采用交直交变流器调速的双馈电动机及其启动控制方法 | |
KR101904815B1 (ko) | Ess용 pcs 및 pcs 운전 방법 | |
CN102820771A (zh) | 一种变流器设备软启动装置及软启动方法 | |
CN104882863B (zh) | 一种发电厂厂用电系统继电保护配置成套装置 | |
Arana et al. | Energization of wind turbine transformers with an auxiliary generator in a large offshore wind farm during islanded operation | |
CN104038124B (zh) | 基于双励磁绕组的励磁控制系统 | |
CN110994590A (zh) | 一种基于光储系统的电压暂降治理系统及其控制方法 | |
CN103972883A (zh) | 配电网合环点选择方法和系统 | |
CN205791877U (zh) | 电机定子绕组切换装置 | |
KR101904821B1 (ko) | 마이크로그리드 시스템 및 고장 처리 방법 | |
CN203632348U (zh) | 一种高压端供能系统 | |
CN102608490B (zh) | 变压器应急备用适用性的判别方法 | |
CN103116088B (zh) | 一种大型变压器三相参数不一致运行分析方法 | |
JPWO2013035801A1 (ja) | 蓄電システム、充放電回路、及び系統連系装置 | |
CN104811025A (zh) | 具有多重保护的辅助变流器 | |
CN103730947A (zh) | 一种混合式高压端供能系统 | |
CN105870894B (zh) | 基于合闸电压幅值控制的变压器励磁涌流抑制系统及方法 | |
CN102902892B (zh) | 电力供电系统中变压器数学模型的简化方法 | |
CN202749184U (zh) | 大功率风电整机试验台变压器预充磁装置 | |
JP2011200032A (ja) | 単独運転検出装置、分散電源装置、同期検出方法、及び系統連系制御方法 | |
Choi et al. | A stable operation strategy in micro-grid systems without diesel generators | |
CN104638631B (zh) | 一种直流孤岛送电系统的直流电流限幅方法 | |
CN102945735A (zh) | 一种带调压器的预充磁变压器及其制作方法 | |
CN102944809B (zh) | 一种快速识别电网故障的方法 | |
CN105914710B (zh) | 基于合闸电压频率控制的变压器励磁涌流抑制系统及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20150929 Address after: 200002 Nanjing East Road, Shanghai, No. 181, No. Patentee after: State Grid Shanghai Municipal Electric Power Company Patentee after: East China Electric Power Test & Research Institute Co., Ltd. Address before: 200437 Handan Road, Shanghai, No. 171, No. Patentee before: East China Electric Power Test & Research Institute Co., Ltd. |