CN102589763B - Performance online monitoring system for filler - Google Patents

Performance online monitoring system for filler Download PDF

Info

Publication number
CN102589763B
CN102589763B CN 201210020613 CN201210020613A CN102589763B CN 102589763 B CN102589763 B CN 102589763B CN 201210020613 CN201210020613 CN 201210020613 CN 201210020613 A CN201210020613 A CN 201210020613A CN 102589763 B CN102589763 B CN 102589763B
Authority
CN
China
Prior art keywords
monitoring
monitor
sleeve
connects
main website
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201210020613
Other languages
Chinese (zh)
Other versions
CN102589763A (en
Inventor
张新国
王华玲
卿熙宏
韩汝军
王胜清
刘音
江宁
江兴元
陈绍杰
尹立明
刘进晓
常西坤
孙文斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN 201210020613 priority Critical patent/CN102589763B/en
Publication of CN102589763A publication Critical patent/CN102589763A/en
Application granted granted Critical
Publication of CN102589763B publication Critical patent/CN102589763B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The invention relates to a performance online monitoring system for a filler, which comprises downhole monitoring substations and a plurality of monitoring units. Each monitoring unit comprises a monitor, a supporting rod, a sleeve and a chassis which are sequentially connected with one another, wherein the monitor comprises a measuring rod, one end of the measuring rod is in contact with a filling top plate, the other end of the measuring rod is arranged in the sleeve, and a strain piece is arranged at the middle part of the measuring rod; lifting devices are arranged in the sleeves, and the supporting rods can be drive to rise or fall through the lifting devices; the sleeves are fixedly connected with the chassis, and the chassis is substantially circular and is fixedly arranged on filing bottom plates through ground anchors; and the downhole monitoring substations are connected with the strain pieces and receive strain data acquired by the strain pieces.

Description

A kind of obturation performance on-line monitoring system
Technical field
The present invention relates to the monitoring equipment that use in a kind of colliery, relate in particular to the on-line monitoring system stressed to goaf paste body filling body, that deformation monitoring is monitored.
Background technology
As solving under the buildings, under the railway, under the water body and press coal mining technology---paste body filling on the piestic water, the fine or not how to evaluate of filling effect, a direct mode is the stressed and distortion of monitoring obturation.Because obturation is under the environment of this high temperature of coal mine gob, high pressure and water, and belongs to confined space, the people can't enter to measure, and can only carry out remote detection by equipment.At present traditional detection monitoring equipment volume is bigger, can't adapt to the environment of high temperature, high pressure and water, can't monitor accurately, and because monitoring equipment relies on personnel's operation, it also can't be monitored in real time.
Summary of the invention
Task of the present invention be to provide a kind of obturation stressed, the distortion on-line monitoring system.
Its technical solution is: a kind of obturation performance on-line monitoring system, comprise underground monitoring substation and a plurality of monitoring means, each monitoring means comprises monitor, support bar, sleeve and the chassis that connects in turn, described monitor comprises sounding rod, one end in contact filling top board of described sounding rod, the other end is arranged in the sleeve, is provided with foil gauge at the middle part of described sounding rod; Be provided with jacking gear in the described sleeve, can drive described support bar by described jacking gear and rise or descend; The fixedly connected described chassis of described sleeve, described chassis are circular substantially, its by earth anchorage on the filling base plate; Described underground monitoring substation connects described foil gauge, and receives the strain data that described foil gauge is gathered.
Described underground monitoring substation comprises one or more in Programmable Logic Controller, single-chip microcomputer, the computing machine.
The quantity of described underground monitoring substation is identical with the quantity of monitoring means, and each underground monitoring substation only connects the foil gauge of a monitoring means and receives the strain data of its collection.
Also comprise the monitoring main website that is installed in the big lane, down-hole, described monitoring main website connects each Monitor Sub-Station of Less.
Described main website comprises one or more in Programmable Logic Controller, single-chip microcomputer, the computing machine.
Comprise also being installed in aboveground monitor server that described monitor server connects described monitoring main website.
Described monitor server connects described monitoring main website by wireless mode.
The present invention can have following useful technique effect:
1, adopts special foil gauge, realized the monitoring of goaf filling body;
2, the present invention adopts multistage bus distributed structure, the essential safe type design;
3, among the present invention, aboveground monitor server and communication interface can be installed in to carry in the pumping plant controller room and reach in the control room, monitor server with can realize unattended operation and operated from a distance after device control cell is connected;
Description of drawings
Accompanying drawing 1 is the johning knot composition of monitoring means of the present invention and described underground monitoring substation.
Reference numeral is as follows:
1-filling top board; 2-filling base plate; The 3-monitor; The 4-support bar; The 5-sleeve; The 6-chassis; The 7-foil gauge; The 8-earth anchor; 9-underground monitoring substation.
Embodiment
Referring to accompanying drawing 1, a kind of obturation performance on-line monitoring system, comprise underground monitoring substation and a plurality of monitoring means, each monitoring means comprises monitor, support bar, sleeve and the chassis that connects in turn, and monitor is shaft-like substantially, comprise sounding rod, one end of sounding rod closely contacts the filling top board, preferably contacts filling top board place and projection is set to increase the firmness of combination, and the other end is arranged in the sleeve, middle part at sounding rod is provided with foil gauge, is used for measuring the strain of obturation; Sleeve is a hollow cylinder, and inside is provided with jacking gear, as lifting jack etc., can drive support bar by jacking gear and rise or descend, with transportation convenient for assembly and adapt to different pack heights; Sleeve is fixedly connected on the circular base plate, and the chassis is fixed on the filling base plate, preferably by earth anchorage on the filling base plate; The underground monitoring substation is arranged near the filling area, and near the tunnel the goaf, it connects foil gauge, and receives the obturation strain data that foil gauge is gathered.The quantity of preferred underground monitoring substation is identical with the quantity of monitoring means, and Monitor Sub-Station of Less is corresponding one by one with monitoring means, and each underground monitoring substation only connects the foil gauge of a monitoring means and receives the strain data of its collection.Each Monitor Sub-Station of Less is connected in parallel in the monitoring main website that is arranged in the big lane, down-hole, and strain data gathers and can carry out preliminary processing in the monitoring main website, as conversion of strain and deflection etc.Monitoring main website and Monitor Sub-Station of Less can be selected in Programmable Logic Controller, single-chip microcomputer, the computing machine one or more to handle as processor and transmit strain data.Also monitor server can be set aboveground, monitor server connects the monitoring main website by wireless mode and receives the strain data in the monitoring main website and carry out work such as figure demonstration, printing, record.
The above; only be the preferable embodiment of patent of the present invention; but the protection domain of patent of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that patent of the present invention discloses; the variation that can expect easily or replacement all should be encompassed within the protection domain of patent of the present invention.

Claims (5)

1. an obturation performance on-line monitoring system comprises underground monitoring substation and a plurality of monitoring means, it is characterized in that:
Each monitoring means comprises monitor, support bar, sleeve and the chassis that connects in turn, described monitor comprises sounding rod, one end in contact filling top board of described sounding rod, the other end is arranged in the sleeve, described sounding rod contact filling top board place arranges projection, is provided with foil gauge at the middle part of described sounding rod; Be provided with jacking gear in the described sleeve, can drive described support bar by described jacking gear and rise or descend; The fixedly connected described chassis of described sleeve, described chassis are circular substantially, its by earth anchorage on the filling base plate;
Described underground monitoring substation connects described foil gauge, and receives the strain data that described foil gauge is gathered;
Described underground monitoring substation comprises one or more in Programmable Logic Controller, single-chip microcomputer, the computing machine;
The quantity of described underground monitoring substation is identical with the quantity of monitoring means, and each underground monitoring substation only connects the foil gauge of a monitoring means and receives the strain data of its collection.
2. on-line monitoring system as claimed in claim 1 is characterized in that: also comprise the monitoring main website that is installed in the big lane, down-hole, described monitoring main website connects each Monitor Sub-Station of Less.
3. on-line monitoring system as claimed in claim 2, it is characterized in that: described main website comprises one or more in Programmable Logic Controller, single-chip microcomputer, the computing machine.
4. as claim 2 or 3 described on-line monitoring systems, it is characterized in that: comprise also being installed in aboveground monitor server that described monitor server connects described monitoring main website.
5. on-line monitoring system as claimed in claim 4 is characterized in that: described monitor server connects described monitoring main website by wireless mode.
CN 201210020613 2012-01-30 2012-01-30 Performance online monitoring system for filler Expired - Fee Related CN102589763B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201210020613 CN102589763B (en) 2012-01-30 2012-01-30 Performance online monitoring system for filler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201210020613 CN102589763B (en) 2012-01-30 2012-01-30 Performance online monitoring system for filler

Publications (2)

Publication Number Publication Date
CN102589763A CN102589763A (en) 2012-07-18
CN102589763B true CN102589763B (en) 2013-08-21

Family

ID=46478722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201210020613 Expired - Fee Related CN102589763B (en) 2012-01-30 2012-01-30 Performance online monitoring system for filler

Country Status (1)

Country Link
CN (1) CN102589763B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110155117B (en) * 2019-06-21 2020-07-07 中国神华能源股份有限公司 Detection device
CN111044007B (en) * 2019-12-31 2021-02-05 山东科技大学 On-line monitoring system and monitoring method for transverse deformation of filling body
CN111044006B (en) * 2019-12-31 2021-02-05 山东科技大学 On-line monitoring system and monitoring method for deformation of filling body

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2058917U (en) * 1989-02-10 1990-07-04 徐荫和 Miniture dc hydraulic lift
CN2439421Y (en) * 2000-06-30 2001-07-18 杨贵修 Underground type garbage transferring station
CN101077756A (en) * 2007-06-23 2007-11-28 深圳市中信康特种设备技术有限公司 Erecting equipment remote actual time safety monitoring system and its control method
CN201476909U (en) * 2009-03-27 2010-05-19 清华大学 Bolt stress detection device
CN201637523U (en) * 2010-04-09 2010-11-17 西安中星测控有限公司 Wireless pressure measuring system
CN201826829U (en) * 2010-09-28 2011-05-11 中国石油集团川庆钻探工程有限公司 Testing tubular column stress tester
CN202073323U (en) * 2011-05-25 2011-12-14 中冶建工集团有限公司 Supporting frame for regulating installing horizontality of embedded part
CN202467929U (en) * 2012-01-30 2012-10-03 山东科技大学 On-line monitoring system for performance of filling body

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2058917U (en) * 1989-02-10 1990-07-04 徐荫和 Miniture dc hydraulic lift
CN2439421Y (en) * 2000-06-30 2001-07-18 杨贵修 Underground type garbage transferring station
CN101077756A (en) * 2007-06-23 2007-11-28 深圳市中信康特种设备技术有限公司 Erecting equipment remote actual time safety monitoring system and its control method
CN201476909U (en) * 2009-03-27 2010-05-19 清华大学 Bolt stress detection device
CN201637523U (en) * 2010-04-09 2010-11-17 西安中星测控有限公司 Wireless pressure measuring system
CN201826829U (en) * 2010-09-28 2011-05-11 中国石油集团川庆钻探工程有限公司 Testing tubular column stress tester
CN202073323U (en) * 2011-05-25 2011-12-14 中冶建工集团有限公司 Supporting frame for regulating installing horizontality of embedded part
CN202467929U (en) * 2012-01-30 2012-10-03 山东科技大学 On-line monitoring system for performance of filling body

Also Published As

Publication number Publication date
CN102589763A (en) 2012-07-18

Similar Documents

Publication Publication Date Title
CN201696091U (en) Mine ground pressure displacement monitoring system
CN202467929U (en) On-line monitoring system for performance of filling body
CN102174898B (en) Mine ground pressure monitoring system
CN102589763B (en) Performance online monitoring system for filler
CN203572600U (en) Surrounding rock stress monitoring early warning system based on step type full length slip-casting monitoring anchor poles
CN103344495B (en) Rigid bearing plate center pit method servocontrol deep rock-mass deformation test unit and method thereof
CN203795485U (en) Horizontal bearing characteristics test model of prestressed concrete pipe pile
CN202883017U (en) Online monitoring and pre-warning system for coal mine anchor cable stress
CN111441825A (en) Fully-mechanized mining face hydraulic support working state monitoring system
CN104849413A (en) Device for monitoring thermo-hydro-mechanical-chemical multi-field properties of stope paste filling material
CN204594814U (en) A kind of bar-mat reinforcement dynamic mechanical proving installation
CN212563333U (en) Fully-mechanized mining face hydraulic support working state monitoring system
CN201680827U (en) Digging height online monitoring system for coal mine underground fully-mechanized coal face
CN202370562U (en) Solid waste filling coal mining hydraulic support frame
CN204066342U (en) A kind of landslide monitoring apparatus
CN204101017U (en) Dew well coal mining slope displacement monitoring device
CN205977278U (en) Judge device of tunnel stability
CN202012372U (en) Mine pressure monitoring system
CN206638159U (en) A kind of intelligent and safe anchor pole
CN106596279B (en) Mine roof pressure simulation test device
CN202304738U (en) Displacement warning device
CN203669927U (en) Gob-side entry retaining mine ground pressure monitoring system
CN204902821U (en) Dangerous early warning system of power line shaft tower based on stress detects
CN206648761U (en) Colliery depth shaft wall safety monitoring assembly
CN203116954U (en) Comprehensive experiment device for hydraulic loading of crane beams

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821

Termination date: 20170130