CN204101017U - Dew well coal mining slope displacement monitoring device - Google Patents

Dew well coal mining slope displacement monitoring device Download PDF

Info

Publication number
CN204101017U
CN204101017U CN201420437084.0U CN201420437084U CN204101017U CN 204101017 U CN204101017 U CN 204101017U CN 201420437084 U CN201420437084 U CN 201420437084U CN 204101017 U CN204101017 U CN 204101017U
Authority
CN
China
Prior art keywords
displacement
slope
monitor
gps
electrically connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420437084.0U
Other languages
Chinese (zh)
Inventor
王振伟
吕祥锋
刘如成
刘锋
赵雪
许昌
贺昌斌
程名远
李营作
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCTEG China Coal Technology and Engineering Group Corp
Original Assignee
CCTEG China Coal Technology and Engineering Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCTEG China Coal Technology and Engineering Group Corp filed Critical CCTEG China Coal Technology and Engineering Group Corp
Priority to CN201420437084.0U priority Critical patent/CN204101017U/en
Application granted granted Critical
Publication of CN204101017U publication Critical patent/CN204101017U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

本实用新型涉及一种露井煤矿开采边坡位移监测装置,包括采集记录装置电连接工控机,特点在于:采集记录装置还分别电连接GPS探测仪、无缆位移监测仪,GPS探测仪无线连接多个GPS探点,无缆位移监测仪电连接多个位移探头。用无缆位移监测仪监测边坡深部岩层位移,用GPS探测仪同步监测边坡表面位移,将边坡深部岩层位移和边坡表面位移信号通过采集记录装置传送至工控机,通过工控机内编程分析煤矿深部岩层与边坡位移场动态变化过程,预测煤矿安全程度,确定或调整露井协调开采方案,确保煤矿安全生产,操作简单、安全、可重复性好,适宜现场作业。

The utility model relates to a mining side slope displacement monitoring device in an open shaft coal mine, which includes a collection and recording device electrically connected to an industrial computer, and is characterized in that the collection and recording device is also electrically connected to a GPS detector, a cable-free displacement monitor, and the GPS detector is connected wirelessly. With multiple GPS probe points, the cableless displacement monitor is electrically connected to multiple displacement probes. Use the cable-free displacement monitor to monitor the displacement of the deep rock layer of the slope, and use the GPS detector to monitor the displacement of the slope surface synchronously. Analyze the dynamic change process of the deep rock formation and slope displacement field of the coal mine, predict the safety degree of the coal mine, determine or adjust the coordinated mining plan of the open pit, and ensure the safe production of the coal mine. The operation is simple, safe, and repeatable, and is suitable for on-site operations.

Description

Dew well coal mining slope displacement monitoring device
Technical field
The utility model relates to dew well colliery unitized production slope displacement monitoring equipment, particularly reveals well coal mining slope displacement monitoring device.
Background technology
Open coal mine safety in production is extremely important to guarantee coal engineering output, and especially increasing coal production is outdoor with well work harmonic extraction mode, brings safely have a strong impact on to Opencut coal mine mining.At present, outdoor with well work unitized production process, exploitation safe coefficient is weighed by monitor well industrial and mineral mining pressure and roadway deformation amount, slope stability monitoring is main by surveying side slope square position external crack width and quantity and depression degree, the means of few employing slope displacement monitoring, weigh stability of slope degree.But well industrial and mineral rock pressure [in mine and roadway deformation amount and slope stability Monitoring Data are relatively independent, each other without contrast.Urgent need can accurate detection deep rock deformation collapse state and slope displacement field variation characteristic, and rock stratum, deep and side slope surface displacement data can be obtained by synchronism detection, deep and side slope surface displacement data combines more Accurate Prediction mine safety degree, is conducive to revealing the determination that reasonable plan is adopted by well association.Thus, the monitoring device of the dew well coal mining slope displacement realizing dew well harmonic extraction is needed.
Summary of the invention
In order to overcome the deficiencies in the prior art, provide a kind of dew well coal mining slope displacement monitoring device.
The utility model solves the technical scheme that its technical matters adopts: a kind of dew well coal mining slope displacement monitoring device, comprise acquisition and recording device electrical connection industrial computer, feature is: acquisition and recording device is also electrically connected GPS detection instrument, respectively without cable displacement monitor, the multiple GPS of GPS detection instrument wireless connections visits point, is electrically connected multiple displacement probe without cable displacement monitor.
Wherein: displacement probe wire rope jacking gear is connected to boring top.
Wherein: multiple GPS visits point and is placed on side slope step or original ground respectively, and multiple displacement probe is placed on bore inner respectively.
In order to better understand dew well coal mining slope displacement monitoring device, simply introduce the using method of this device below.Some boring 3 is played on top, side slope section 11 coal seam 2, displacement probe 4 is sent into the precalculated position of boring 3 with wire rope jacking gear 10, boring 3 aperture is placed on without cable displacement monitor 5, GPS is visited on a 6 side slope step being placed on side slope section 11 or original ground, in the open when exploitation and well work unitized production, the strata displacement of side slope deep is monitored with without cable displacement monitor 5, with GPS detection instrument 7 Simultaneous Monitoring side slope surface displacement, the strata displacement of side slope deep and side slope surface displacement signal are sent to industrial computer 9 by acquisition and recording device 8, by Analysis of programming prediction colliery safe coefficient in industrial computer 9, determine or adjust dew well harmonic extraction scheme, guarantee Safety of Coal Mine Production.
The beneficial effects of the utility model are: monitor the strata displacement of side slope deep with without cable displacement monitor 5, with GPS detection instrument 7 Simultaneous Monitoring side slope surface displacement, the strata displacement of side slope deep and side slope surface displacement signal are sent to industrial computer 9 by acquisition and recording device 8, by rock stratum, deep, Analysis of programming colliery in industrial computer 9 and slope displacement field dynamic changing process, prediction colliery safe coefficient, determine or adjust dew well harmonic extraction scheme, guarantee Safety of Coal Mine Production, simple to operate, safety, favorable repeatability, suitable site work.
Accompanying drawing explanation
Fig. 1 structure principle chart of the present utility model;
Fig. 2 application structure principle schematic of the present utility model.
Embodiment
Accompanying drawing number
2. coal seams in figure, 3. hole, 4. displacement probe, 5. without cable displacement monitor, 6.GPS visits point, 7.GPS detection instrument, 8. acquisition and recording device, 9. industrial computer, 10. wire rope jacking gear, 11. side slope sections.
Embodiment one
See Fig. 1, a kind of dew well coal mining slope displacement monitoring device, comprise acquisition and recording device 8 and be electrically connected industrial computer 9, feature is: acquisition and recording device 8 is also electrically connected GPS detection instrument 7, respectively without cable displacement monitor 5, the multiple GPS of GPS detection instrument 7 wireless connections visits point 6, is electrically connected multiple displacement probe 4 without cable displacement monitor 5.
Embodiment two
See Fig. 1, Fig. 2, a kind of dew well coal mining slope displacement monitoring device, comprise acquisition and recording device 8 and be electrically connected industrial computer 9, feature is: acquisition and recording device 8 is also electrically connected GPS detection instrument 7, respectively without cable displacement monitor 5, the multiple GPS of GPS detection instrument 7 wireless connections visits point 6, is electrically connected multiple displacement probe 4 without cable displacement monitor 5.
Wherein: displacement probe 4 wire rope jacking gear is connected to boring 3 top.
Embodiment three
See Fig. 1, Fig. 2, a kind of dew well coal mining slope displacement monitoring device, comprise acquisition and recording device 8 and be electrically connected industrial computer 9, feature is: acquisition and recording device 8 is also electrically connected GPS detection instrument 7, respectively without cable displacement monitor 5, the multiple GPS of GPS detection instrument 7 wireless connections visits point 6, is electrically connected multiple displacement probe 4 without cable displacement monitor 5.
Wherein: displacement probe 4 wire rope jacking gear is connected to boring 3 top.
Wherein: multiple GPS visits point 6 and is placed on side slope step or original ground respectively, and it is inner that multiple displacement probe 4 is placed on boring 3 respectively.
In order to better understand dew well coal mining slope displacement monitoring device, simply introduce the using method of this device below.Some boring 3 is played on top, side slope section 11 coal seam 2, displacement probe 4 is sent into the precalculated position of boring 3 with wire rope jacking gear 10, boring 3 aperture is placed on without cable displacement monitor 5, GPS is visited on a 6 side slope step being placed on side slope section 11 or original ground, in the open when exploitation and well work unitized production, the strata displacement of side slope deep is monitored with without cable displacement monitor 5, with GPS detection instrument 7 Simultaneous Monitoring side slope surface displacement, the strata displacement of side slope deep and side slope surface displacement signal are sent to industrial computer 9 by acquisition and recording device 8, by Analysis of programming prediction colliery safe coefficient in industrial computer 9, determine or adjust dew well harmonic extraction scheme, guarantee Safety of Coal Mine Production.

Claims (4)

1.一种露井煤矿开采边坡位移监测装置,包括采集记录装置电连接工控机,特征在于:采集记录装置还分别电连接GPS探测仪、无缆位移监测仪,GPS探测仪无线连接多个GPS探点,无缆位移监测仪电连接多个位移探头。1. A mining side slope displacement monitoring device in an open pit coal mine, comprising a collection and recording device electrically connected to an industrial computer, characterized in that the collection and recording device is also electrically connected to a GPS detector and a cable-free displacement monitor respectively, and the GPS detector is wirelessly connected to multiple GPS probe point, the cableless displacement monitor is electrically connected to multiple displacement probes. 2.根据权利要求1所述的一种露井煤矿开采边坡位移监测装置,特征在于:位移探头用钢丝绳升降装置连接至钻孔顶部。2. A device for monitoring the displacement of a mining slope in an open pit coal mine according to claim 1, characterized in that the displacement probe is connected to the top of the borehole by a wire rope lifting device. 3.根据权利要求1所述的一种露井煤矿开采边坡位移监测装置,特征在于:多个GPS探点分别放置在边坡台阶或原始地面上,多个位移探头分别放置在钻孔内部。3. The device for monitoring slope displacement in open pit coal mining according to claim 1, characterized in that: a plurality of GPS probe points are respectively placed on the slope steps or the original ground, and a plurality of displacement probes are respectively placed inside the borehole . 4.根据权利要求2所述的一种露井煤矿开采边坡位移监测装置,特征在于:多个GPS探点分别放置在边坡台阶或原始地面上,多个位移探头分别放置在钻孔内部。4. A side slope displacement monitoring device for open pit coal mine mining according to claim 2, characterized in that: a plurality of GPS probe points are respectively placed on the slope steps or the original ground, and a plurality of displacement probes are respectively placed inside the borehole .
CN201420437084.0U 2014-07-31 2014-07-31 Dew well coal mining slope displacement monitoring device Expired - Fee Related CN204101017U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420437084.0U CN204101017U (en) 2014-07-31 2014-07-31 Dew well coal mining slope displacement monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420437084.0U CN204101017U (en) 2014-07-31 2014-07-31 Dew well coal mining slope displacement monitoring device

Publications (1)

Publication Number Publication Date
CN204101017U true CN204101017U (en) 2015-01-14

Family

ID=52269436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420437084.0U Expired - Fee Related CN204101017U (en) 2014-07-31 2014-07-31 Dew well coal mining slope displacement monitoring device

Country Status (1)

Country Link
CN (1) CN204101017U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105526908A (en) * 2015-09-16 2016-04-27 鞍钢集团矿业公司 Three dimensional laser scanning-GPS-combined side slope monitoring method
CN113742748A (en) * 2021-09-06 2021-12-03 山西能源学院 Coal mine yield calculation method based on block chain
CN114894242A (en) * 2022-04-08 2022-08-12 中国电建集团贵阳勘测设计研究院有限公司 Displacement amplification equipment for slope protection early warning

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105526908A (en) * 2015-09-16 2016-04-27 鞍钢集团矿业公司 Three dimensional laser scanning-GPS-combined side slope monitoring method
CN105526908B (en) * 2015-09-16 2017-10-13 鞍钢集团矿业有限公司 The slope monitoring method that a kind of 3 D laser scanning and GPS are combined
CN113742748A (en) * 2021-09-06 2021-12-03 山西能源学院 Coal mine yield calculation method based on block chain
CN114894242A (en) * 2022-04-08 2022-08-12 中国电建集团贵阳勘测设计研究院有限公司 Displacement amplification equipment for slope protection early warning
CN114894242B (en) * 2022-04-08 2024-03-12 中国电建集团贵阳勘测设计研究院有限公司 A displacement amplification device for slope protection and early warning

Similar Documents

Publication Publication Date Title
CN104132761B (en) Device and method for real-time monitoring of multi-point coal and rock mass stress
CN101581234B (en) Comprehensive underground test method for deformation and damage of terranes of mining top plate and mining bottom plate of coal bed
CN106546366B (en) An umbrella-shaped deep hole three-dimensional stress and displacement comprehensive testing device
CN204002753U (en) Underground engineering parameter measuring system
CN103591922B (en) Short range seam mining upper Seam Floor Failure degree of depth radon gas detection method
CN103529488B (en) Mine roof and floor gushing water monitoring and forecasting system and method
CN105318824B (en) A kind of method that wall rock loosening ring is measured based on distributed resistance foil gauge
CN205605197U (en) Downhole near-bit multi-parameter measuring device
CN101761062A (en) Wireless rotating penetrometer
CN104237025A (en) Mining fracturing simulating test method for sealing drilling
CN104237486B (en) A kind of closing boring Mining failure simulation test device
CN104989389A (en) Coal mass strength distribution characteristic continuous detecting method and device
CN103790582A (en) Geostress measuring device and method
CN116988786A (en) A three-dimensional geostress measurement method in underground mines
CN114837160A (en) Comprehensive detection device for surrounding soil deformation applied to underground pipe gallery
CN101482621A (en) A monitoring method for sliding attitude acceleration of landslide mass
CN104089595B (en) Stope base object model ruptures determination of distance method in advance
CN108984807A (en) A kind of coal mine down-hole tunnel deformation monitoring method
CN103673982B (en) A kind of shallow coal scam overlying strata movement on-Line Monitor Device and method
CN101832127B (en) Permanent pressure gauge testing method for coal bed gas observation well
CN102162357B (en) An in-situ test method for the existing stress on shaft wall
CN203145925U (en) Device for quickly measuring coal seam gas pressure by upward remote drilling
CN202485845U (en) Device for monitoring lateral bearing pressure of stoping tunnel
CN206290248U (en) The device of Oil/gas Well change under a kind of practical simulation mining influence
CN205785167U (en) A kind of measurement apparatus of protected seam dilatancy amount

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150114

CF01 Termination of patent right due to non-payment of annual fee