CN102587665A - Pouring method of coupled shear wall structure - Google Patents

Pouring method of coupled shear wall structure Download PDF

Info

Publication number
CN102587665A
CN102587665A CN2012100763969A CN201210076396A CN102587665A CN 102587665 A CN102587665 A CN 102587665A CN 2012100763969 A CN2012100763969 A CN 2012100763969A CN 201210076396 A CN201210076396 A CN 201210076396A CN 102587665 A CN102587665 A CN 102587665A
Authority
CN
China
Prior art keywords
template
side template
channel
steel
support arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100763969A
Other languages
Chinese (zh)
Other versions
CN102587665B (en
Inventor
曹阳
李秋建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou No5 Building Group Co ltd
Original Assignee
Suzhou No5 Building Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou No5 Building Group Co ltd filed Critical Suzhou No5 Building Group Co ltd
Priority to CN201210076396.9A priority Critical patent/CN102587665B/en
Publication of CN102587665A publication Critical patent/CN102587665A/en
Application granted granted Critical
Publication of CN102587665B publication Critical patent/CN102587665B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a pouring method of a coupled shear wall structure. The pouring method comprises the following steps of: (1) splicing a left-side template, locating and then installing the left-side template; (2) installing a template supporting member on the left-side template; (3) regulating the left-side template and installing a split bolt; (4) splicing a right-side template, after completing, installing the right-side template, and enabling the left-side template and the right-side template to be arranged oppositely; (5) regulating the right-side template so that the channel steel of the left-side template is clamped in an opening of the angle steel of the right-side template; installing the template supporting member and the split bolt so that the left-side template and the right-side template are fastened through the split bolt and are supported through the template supporting member; (6) installing a common building template; (7) placing concrete grout between the left-side template and the common building template as well as between the right-side template and the common building template; (8) maintaining concrete; (9) dismantling the template supporting member and disassembling the left-side template, the right-side template and the common building template; and (10) completing construction. With the adoption of the pouring method, the preparation of an expansion joint coupled shear wall is realized, and the pouring method of the coupled shear wall structure has positive practical significance.

Description

A kind of pouring procedure of coupled shear wall structure
Technical field
The present invention relates to a kind of pouring procedure of coupled shear wall structure, belong to building engineering field.
Background technology
Shear wall structure (shearwall structure) replaces the beam column in the frame construction with reinforced concrete wall panel; Can bear the internal force that all kinds of loads cause; And the effective horizontal force of control structure, this structure of bearing vertical and horizontal force with reinforced concrete wall panel is called shear wall structure.It is the bearing system that a kind of reinforced concrete wall constitutes.The anti-side rigidity of shear wall structure is bigger, and the distortion of generation is the flexure type distortion basically.This kind distortion is caused that by normal stress one side is drawn a side pressurized (the anti-side rigidity of frame construction is less, and stratified deformation rises with floor height and reduces, and the distortion of generation is the shearing-type distortion basically, is caused by shear stress) during distortion.At present, shear wall structure is widely used in building engineering.Along with improving constantly of social production force level, the popularization and application of commercial concrete and pumping of concrete technology, concrete poring rate has had large increase, has also promoted the fast development of shear wall structure.
The pouring procedure of existing coupled shear wall structure generally is a cast-in-situ steel reinforced concrete; Promptly at the construction field (site) reinforcing bar both sides are assembled row's common templates respectively; Placing of concrete is starched between two row's common templates again; After waiting to solidify, remove the common templates of both sides, get final product so that concrete grout is floating in surface of wall again.Yet there is following problem in above-mentioned pouring procedure: the engineering time of (1) said method is longer, must increase cost, and receives weather conditions and to influence the chance of construction period higher; (2) traditional template generally is wooden form or steel form, and wooden form has expended a large amount of forest reserves in producing use, and recovery utilization rate is low, has expended a large amount of material resources manpowers, and the environment to China has caused serious harm simultaneously; And traditional steel form exist from great, repeat usage is low, dismounting is difficult, operator's labour intensity is big, and problem such as construction quality is not high.
Therefore, develop a kind of pouring procedure of new coupled shear wall structure,, have active operation significance to improve efficiency of construction and construction quality.
Summary of the invention
Goal of the invention of the present invention provides a kind of pouring procedure of coupled shear wall structure.
For reaching the foregoing invention purpose, the technical scheme that the present invention adopts is: a kind of pouring procedure of coupled shear wall structure comprises the steps:
(1) assembly unit left side template, the left side template is installed in the back, location;
(2) mounting template support member on the left side template of step (1);
(3) adjustment left side template, installation split bolt;
(4) assembly unit right side template is installed the right side template then after the completion; Left side template and right side template are oppositely arranged;
The right side template of the left side template of said step (1) and step (4) is assembled through bolt or latch by at least 2 template elementary cells; Said template elementary cell comprises panel, 2 channel-section steels and at least 2 angle steel; The parallel two ends of being located at panel of said 2 channel-section steels, and its base plate and said panel offset; Be installed with said angle steel between 2 channel-section steels; Said channel-section steel and angle steel all are fixedly arranged on a side of panel, and the side plate in the outside of channel-section steel is concordant with the side of panel; Be equipped with the connecting hole of at least 2 correspondences on the side plate in the outside of said 2 channel-section steels; In said 2 channel-section steels, the base plate of a channel-section steel is provided with at least 2 through holes, and through hole runs through said panel; Be provided with at least 2 draw-in groove structures in another channel-section steel; The two ends of the side plate vertical with panel of said angle steel are provided with opening;
The through hole that said split bolt runs through on the said channel-section steel base plate is realized connecting; Said template support is located in the said draw-in groove structure;
(5) adjustment right side template; The channel-section steel of left side template is stuck in the opening of angle steel of right side template; Said template support and split bolt are installed, left side template and right side template are fastenedly connected through split bolt, and support through template support between left side template and the right side template;
(6) the common building template is installed;
(7) at placing of concrete slurry between left side template and the common building template, between right side template and the common building template;
(8) curing concrete;
(9) dismantle said template support, dismounting left side template, right side template and common building template;
(10) construction is accomplished, and can obtain the coupled shear wall structure.
In the preceding text, said left side template and right side template are akin, can certainly be: first assembly unit right side template, assembly unit left side template then.
In the said template elementary cell, channel-section steel is a main joist, and angle steel is a secondary joist, and panel can adopt the thick Q235 steel plate of 3mm.Said angle steel can be a plurality of, is evenly arranged between two angle steel.Connecting hole on the said channel-section steel side plate is for the template elementary cell is formed template through bolt or latch assembly unit.Through hole on the said channel-section steel base plate is for split bolt is installed; The quantity of above-mentioned connecting hole and through hole can in the light of actual conditions be adjusted.Said draw-in groove structure is for mounting template support member between two templates (like jack etc.).
In the technique scheme, be installed with one group of round steel in the side plate of said channel-section steel, be installed with the L shaped round steel that falls of another group correspondence on its base plate, constitute said draw-in groove structure.
Preferably, one group of round steel of said channel-section steel side plate is 4 linear pattern round steel that are parallel to the channel-section steel base plate, and another on the said base plate organized down L shaped round steel and also be 4, and corresponding one by one with said linear pattern round steel, constitutes the draw-in groove structure.
In the technique scheme, the common building template in the said step (6) is a wooden form.
In the technique scheme; The structure of said template support is: comprise at least 2 rhombus jack, be provided with a connecting rod between two adjacent rhombus jack, an end of said connecting rod is provided with a link slot; The shape of said link slot and said rhombus jack upper screw rod nose shape adapt; The wall of said link slot is provided with dowel hole, and the other end of said connecting rod is provided with a branch sleeve, and said branch sleeve is provided with the screw rod fixed pin holes; The rhombus jack upper screw rod head adjacent with said link slot inserts in the said link slot; Said screw mandrel head is connected through alignment pin with said link slot, and said alignment pin is positioned at said dowel hole, and the rhombus jack upper screw rod afterbody adjacent with said branch sleeve inserts in the said branch sleeve; Said rhombus jack upper screw rod afterbody is connected through dowel fixes with said branch sleeve, and said pin is inserted in the said screw rod fixed pin holes;
Said rhombus jack comprises top end, down top, two are gone up left support arm, two left support arm, two are gone up right support arm and two right support arm down down; Said two last left support arms are connected with top end with two upper ends of going up right support arm; Said two last left support arms and two upper ends of going up right support arm form intermeshing detent projection; Said two down left support arms with two down the lower end of right support arm be connected with said the top down; The lower end of said two following left support arms and two following right support arms forms intermeshing detent projection; The upper end of said two last left support arm lower ends and said two following left support arms is hinged through a left jointed shaft; Said two go up right support arm lower end with said two the upper end of right support arm is hinged through a right jointed shaft down, said left jointed shaft, right jointed shaft are through screw mandrel connection.
Above-mentioned template support can be referring to the rhombus jack and the cascaded structure thereof of Chinese utility model patent CN201762057U record.
Because the technique scheme utilization, the present invention compared with prior art has advantage:
1. the present invention is directed to the pouring procedure that designs a kind of new coupled shear wall structure by the assembled new template of template elementary cell; The cascaded structure that cooperates a plurality of rhombus jack to form; Realize the preparation of shrinkage joint double shear wall, had active operation significance.
2. pouring procedure of the present invention is simple, the template easy accessibility, and efficiency of construction is high, not only practiced thrift manpower and construction cost greatly, and construction quality is higher, has obtained significant effect.
3. the template that is exclusively used in the coupled shear wall structure of the present invention's employing can adopt existing steel manufacturing, has avoided adopting the wasting of resources problem of plank in the past, has the advantage of energy-conserving and environment-protective.
4. the present invention has adopted the combined steel pallet, has improved the number of turnover of steel template, has not only practiced thrift timber but also improved the applicable performance of steel form; Compare with conventional construction method, expanded the construction operation face, improved efficiency of construction.
5. the present invention is applicable to multilayer and highrise building, and especially malformation seam width surpasses the preparation of the coupled shear wall of 100mm.
Description of drawings
Fig. 1 is the vertical view of template elementary cell in the embodiment of the invention one;
Fig. 2 is the front view of template elementary cell in the embodiment of the invention one;
Fig. 3 is the A portion enlarged drawing of Fig. 1;
Fig. 4 is the structural representation of left side template in the embodiment of the invention one;
Fig. 5 is the C-C sectional view of Fig. 4;
Fig. 6 is the B-B sectional view of Fig. 4;
Fig. 7 is the assembling sketch map of left side template and right side template in the embodiment of the invention one;
Fig. 8 is the D portion enlarged drawing of Fig. 7.
Wherein: 1, panel; 2, channel-section steel; 3, angle steel; 4, connecting hole; 5, through hole; 6, round steel; 7, fall L shaped round steel; 8, opening.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is further described:
Embodiment one
Shown in Fig. 1 ~ 8, a kind of pouring procedure of coupled shear wall structure, concrete technological process is following:
Positioner → installation door opening the template of the preparatory assembly unit of left side template → location unwrapping wire → installation left side template → installation left side template → installation rhombus template support → adjustment left side template, installation split bolt → installation right side template → adjustment right side template, fastening split bolt → examination → layering symmetry concreting → curing concrete → form removal → cleaning.
Said left side template and right side template are assembled through bolt or latch by a plurality of template elementary cells, and said template elementary cell comprises 1,2 channel-section steels 2 of panel and 7 angle steel 3;
The parallel two ends of being located at panel of said 2 channel-section steels, and its base plate and said panel offset; Be installed with said angle steel between 2 channel-section steels; Said channel-section steel and angle steel all are fixedly arranged on a side of panel, and the side plate in the outside of channel-section steel is concordant with the side of panel;
Be equipped with the connecting hole 4 of at least 2 correspondences on the side plate in the outside of said 2 channel-section steels; In said 2 channel-section steels, the base plate of a channel-section steel is provided with 9 through holes 5, and through hole runs through said panel; Be provided with 5 draw-in groove structures in another channel-section steel.Said angle steel is evenly arranged between 2 channel-section steels;
Be installed with one group of round steel 6 in the side plate of said channel-section steel, be installed with the L shaped round steel 7 that falls of another group correspondence on its base plate, constitute said draw-in groove structure.One group of round steel of said channel-section steel side plate is 4 linear pattern round steel that are parallel to the channel-section steel base plate, and another on the said base plate organized down L shaped round steel and also be 4, and corresponding one by one with said linear pattern round steel, constitutes the draw-in groove structure.
The two ends of the side plate vertical with panel of said angle steel are provided with opening 8.
Said channel-section steel be long limit be the 12# channel-section steel as main joist, secondary joist is that 40 * 4 angle steel, spacing are 600mm, panel is the thick Q235 steel plate of 3mm.Several template elementary cells connect with Ф 10 plain bolts, are combined into the width that needs, and the elementary cell template in its edge can be adjusted, make according to the drawing real size.In the main joist channel-section steel of steel form elementary cell, a side is for installing split bolt, and opposite side is for installing tandem rhombus support member.
Said template support can be referring to the rhombus jack and the cascaded structure thereof of Chinese utility model patent CN201762057U record; Its structure is: comprise at least 2 rhombus jack, be provided with a connecting rod between two adjacent rhombus jack, an end of said connecting rod is provided with a link slot; The shape of said link slot and said rhombus jack upper screw rod nose shape adapt; The wall of said link slot is provided with dowel hole, and the other end of said connecting rod is provided with a branch sleeve, and said branch sleeve is provided with the screw rod fixed pin holes; The rhombus jack upper screw rod head adjacent with said link slot inserts in the said link slot; Said screw mandrel head is connected through alignment pin with said link slot, and said alignment pin is positioned at said dowel hole, and the rhombus jack upper screw rod afterbody adjacent with said branch sleeve inserts in the said branch sleeve; Said rhombus jack upper screw rod afterbody is connected through dowel fixes with said branch sleeve, and said pin is inserted in the said screw rod fixed pin holes;
Said rhombus jack comprises top end, down top, two are gone up left support arm, two left support arm, two are gone up right support arm and two right support arm down down; Said two last left support arms are connected with top end with two upper ends of going up right support arm; Said two last left support arms and two upper ends of going up right support arm form intermeshing detent projection; Said two down left support arms with two down the lower end of right support arm be connected with said the top down; The lower end of said two following left support arms and two following right support arms forms intermeshing detent projection; The upper end of said two last left support arm lower ends and said two following left support arms is hinged through a left jointed shaft; Said two go up right support arm lower end with said two the upper end of right support arm is hinged through a right jointed shaft down, said left jointed shaft, right jointed shaft are through screw mandrel connection.
Key points for operation of the present invention are following:
One, left and right side template preparatory work before installation
(1) template should be confided a technological secret before installing;
(2) after template is marched into the arena, should require to check quantity, check model, the cleaning surface according to stencil design;
(3) assembly shuttering is numbered template with display face in factory or on-the-spot assembly unit in advance, sits in the right seat during installation;
(4) must emit template inside cord and control line before template is installed as reference for installation;
(5) must internal cleaning is clean before the matched moulds, keep somewhere clean out in the template bottom in case of necessity;
(6) must be before the matched moulds through subsurface work acceptance;
(7) template should the brushing interleaving agent before in place, and the template of having brushed interleaving agent should be mended brush after meeting and drenching with rain; The interleaving agent that uses must not influence the Structural Engineering quality.
Two, the installation of left and right side template should meet following regulation:
(1) template is installed and should be met the stencil design requirement;
Follow first deformation joint inboard, posterolateral principle installation in position by the template numbering when (2) template is installed;
Fixation will be arranged at root and top when (3) template was installed, and root should have seal approach, guaranteed not spillage, mould does not rise;
(4) formwork bracing system must be firmly, stable, the strong point should be located at firm reliable place, must not with the scaffold drawknot;
(5) should on template, make before the concreting and build the number of altitude:
Key problem in technology of the present invention requires as follows:
(1) necessary drafting matching board plan view and turnover flowing water are allocated figure before template construct, the installation;
(2) appearance and size of template and bore hole size should adhere to specification.
Quality critical of the present invention requires as follows:
(1) crudy of strict control template (left side template and right side template) makes appearance and size, planeness, eyelet position and size etc. meet the allowable variation requirement;
(2) should carry out the location setting-out work before template is installed, sit in the right seat during installation and the back is installed guarantees whole stability, indeformable in guaranteeing to construct, do not misplace, mould does not rise;
(3) must not pour into cement paste in the split bolt PVC sleeve pipe, guarantee that split bolt pulls out smoothly;
(4) template should conscientiously be cleared up template, the brushing interleaving agent before in place;
(5) must not prize or hammer into shape during the template stripper plate and pound, with the protection finished product;
When (6) template is parked, should erect placement, must not horizontal positioned, avoid torsional deformation.

Claims (5)

1. the pouring procedure of a coupled shear wall structure is characterized in that, comprises the steps:
(1) assembly unit left side template, the left side template is installed in the back, location;
(2) mounting template support member on the left side template of step (1);
(3) adjustment left side template, installation split bolt;
(4) assembly unit right side template is installed the right side template then after the completion; Left side template and right side template are oppositely arranged;
The right side template of the left side template of said step (1) and step (4) is assembled through bolt or latch by at least 2 template elementary cells; Said template elementary cell comprises panel (1), 2 channel-section steels (2) and at least 2 angle steel (3); The parallel two ends of being located at panel of said 2 channel-section steels, and its base plate and said panel offset; Be installed with said angle steel between 2 channel-section steels; Said channel-section steel and angle steel all are fixedly arranged on a side of panel, and the side plate in the outside of channel-section steel is concordant with the side of panel; Be equipped with the connecting hole (4) of at least 2 correspondences on the side plate in the outside of said 2 channel-section steels; In said 2 channel-section steels, the base plate of a channel-section steel is provided with at least 2 through holes (5), and through hole runs through said panel; Be provided with at least 2 draw-in groove structures in another channel-section steel; The two ends of the side plate vertical with panel of said angle steel are provided with opening (8);
The through hole (5) that said split bolt runs through on the said channel-section steel base plate is realized connecting; Said template support is located in the said draw-in groove structure;
(5) adjustment right side template; The channel-section steel of left side template is stuck in the opening of angle steel of right side template; Said template support and split bolt are installed, left side template and right side template are fastenedly connected through split bolt, and support through template support between left side template and the right side template;
(6) the common building template is installed;
(7) at placing of concrete slurry between left side template and the common building template, between right side template and the common building template;
(8) curing concrete;
(9) dismantle said template support, dismounting left side template, right side template and common building template;
(10) construction is accomplished, and can obtain the coupled shear wall structure.
2. the pouring procedure of coupled shear wall structure according to claim 1 is characterized in that: be installed with one group of round steel (6) in the side plate of said channel-section steel, be installed with on its base plate another group corresponding fall L shaped round steel (7), constitute said draw-in groove structure.
3. the pouring procedure of coupled shear wall structure according to claim 2; It is characterized in that: one group of round steel of said channel-section steel side plate is 4 linear pattern round steel that are parallel to the channel-section steel base plate; On the said base plate another organized down L shaped round steel and also is 4; And corresponding one by one with said linear pattern round steel, constitute the draw-in groove structure.
4. the pouring procedure of coupled shear wall structure according to claim 1 is characterized in that: the common building template in the said step (6) is a wooden form.
5. the pouring procedure of coupled shear wall structure according to claim 1 is characterized in that, the structure of said template support is: comprise at least 2 rhombus jack; Be provided with a connecting rod between two adjacent rhombus jack; One end of said connecting rod is provided with a link slot, and the shape of said link slot and said rhombus jack upper screw rod nose shape adapt, and the wall of said link slot is provided with dowel hole; The other end of said connecting rod is provided with a branch sleeve; Said branch sleeve is provided with the screw rod fixed pin holes, and the rhombus jack upper screw rod head adjacent with said link slot inserts in the said link slot, and said screw mandrel head is connected through alignment pin with said link slot; Said alignment pin is positioned at said dowel hole; The rhombus jack upper screw rod afterbody adjacent with said branch sleeve inserts in the said branch sleeve, and said rhombus jack upper screw rod afterbody is connected through dowel fixes with said branch sleeve, and said pin is inserted in the said screw rod fixed pin holes;
Said rhombus jack comprises top end, down top, two are gone up left support arm, two left support arm, two are gone up right support arm and two right support arm down down; Said two last left support arms are connected with top end with two upper ends of going up right support arm; Said two last left support arms and two upper ends of going up right support arm form intermeshing detent projection; Said two down left support arms with two down the lower end of right support arm be connected with said the top down; The lower end of said two following left support arms and two following right support arms forms intermeshing detent projection; The upper end of said two last left support arm lower ends and said two following left support arms is hinged through a left jointed shaft; Said two go up right support arm lower end with said two the upper end of right support arm is hinged through a right jointed shaft down, said left jointed shaft, right jointed shaft are through screw mandrel connection.
CN201210076396.9A 2012-03-21 2012-03-21 Pouring method of coupled shear wall structure Expired - Fee Related CN102587665B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210076396.9A CN102587665B (en) 2012-03-21 2012-03-21 Pouring method of coupled shear wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210076396.9A CN102587665B (en) 2012-03-21 2012-03-21 Pouring method of coupled shear wall structure

Publications (2)

Publication Number Publication Date
CN102587665A true CN102587665A (en) 2012-07-18
CN102587665B CN102587665B (en) 2014-08-20

Family

ID=46476849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210076396.9A Expired - Fee Related CN102587665B (en) 2012-03-21 2012-03-21 Pouring method of coupled shear wall structure

Country Status (1)

Country Link
CN (1) CN102587665B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114717A (en) * 2013-03-14 2013-05-22 青岛博海建设集团有限公司 Formwork system of shear walls at two sides of extensible seam
CN108915800A (en) * 2018-07-05 2018-11-30 济南市琦泉热电有限责任公司 The method for solving Steam Turbine Vibration using the bored cylinder of steam turbine
CN109594709A (en) * 2018-11-07 2019-04-09 西安理工大学 Partial precast assembled steel and regeneration concrete compoboard and production, assembly method
CN112144874A (en) * 2020-10-10 2020-12-29 陈立勇 Layered formwork pouring process for house

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1421956A (en) * 1920-12-22 1922-07-04 Herman J Kestler Collapsible mold for concrete structures
US2304851A (en) * 1939-08-26 1942-12-15 Schlatter Moses Adjustable form
EP0029486A1 (en) * 1979-11-23 1981-06-03 Samuel Barbey Shuttering, wall obtained by means of that shuttering and hopper for realizing this wall
CN201762057U (en) * 2010-02-05 2011-03-16 苏州第五建筑集团有限公司 Rhombic lifting jack and serial structure thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1421956A (en) * 1920-12-22 1922-07-04 Herman J Kestler Collapsible mold for concrete structures
US2304851A (en) * 1939-08-26 1942-12-15 Schlatter Moses Adjustable form
EP0029486A1 (en) * 1979-11-23 1981-06-03 Samuel Barbey Shuttering, wall obtained by means of that shuttering and hopper for realizing this wall
CN201762057U (en) * 2010-02-05 2011-03-16 苏州第五建筑集团有限公司 Rhombic lifting jack and serial structure thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114717A (en) * 2013-03-14 2013-05-22 青岛博海建设集团有限公司 Formwork system of shear walls at two sides of extensible seam
CN103114717B (en) * 2013-03-14 2015-12-02 青岛博海建设集团有限公司 A kind of both sides, shrinkage joint shear wall formwork system
CN108915800A (en) * 2018-07-05 2018-11-30 济南市琦泉热电有限责任公司 The method for solving Steam Turbine Vibration using the bored cylinder of steam turbine
CN109594709A (en) * 2018-11-07 2019-04-09 西安理工大学 Partial precast assembled steel and regeneration concrete compoboard and production, assembly method
CN109594709B (en) * 2018-11-07 2021-05-25 西安理工大学 Partially prefabricated assembled steel and recycled concrete composite board and manufacturing and assembling method thereof
CN112144874A (en) * 2020-10-10 2020-12-29 陈立勇 Layered formwork pouring process for house

Also Published As

Publication number Publication date
CN102587665B (en) 2014-08-20

Similar Documents

Publication Publication Date Title
CN102704672B (en) Installation construction method for large all-steel formwork at internal corner of shear wall
CN201635388U (en) Unilateral supporting formwork system for cast-in-place concrete arc outer wall
CN104895318A (en) Aluminum alloy template system and construction method of same
CN101839061A (en) Unilateral formwork erecting system of cast-in-site concrete arc outer wall body and construction method thereof
CN109184189A (en) A kind of diameter Silo conical shell silo roof construction method
CN102587665B (en) Pouring method of coupled shear wall structure
CN111335181A (en) Mounting support frame and mounting method for cast-in-place concrete structure template of steel-concrete composite beam flange plate
CN109778911B (en) Underground pipe gallery composite plastic formwork assembling and disassembling construction method
CN114046041B (en) Template reinforcing structure of bare concrete wall post-pouring strip and construction method thereof
CN101298796A (en) Self-bearing type preprocessing component, self-bearing type preprocessing concrete structure and construction method thereof
CN203640278U (en) Stair construction die shelf
CN212154120U (en) Aluminum alloy template set for prefabricated building
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN109235871B (en) Construction method of variable cross-section structure aluminum alloy template
CN105625708B (en) A kind of aluminum wood composite shuttering system for building
CN212642113U (en) Formwork support system and construction structure
CN210105302U (en) Supporting-free adjustable combined die for sealing die of post-cast joint of prefabricated primary and secondary beams
CN104110132B (en) A kind of adjustable composite stairway steel formwork for highrise building and assemble method thereof
CN103216087B (en) A kind of two-way self-bearing type construction formwork system
CN209504442U (en) A kind of self-bearing type combined steel formwork
CN204728474U (en) Precast wall panel connecting box
CN216195529U (en) Wallboard of assembled steel-concrete structure
CN113172736B (en) Preparation method of concrete moon door and special mold
CN220285307U (en) Disassembly-free template supporting system based on assembled mortise-tenon connection combined structure
CN114892969B (en) Unsupported template system and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820