CN113172736B - Preparation method of concrete moon door and special mold - Google Patents

Preparation method of concrete moon door and special mold Download PDF

Info

Publication number
CN113172736B
CN113172736B CN202110583937.6A CN202110583937A CN113172736B CN 113172736 B CN113172736 B CN 113172736B CN 202110583937 A CN202110583937 A CN 202110583937A CN 113172736 B CN113172736 B CN 113172736B
Authority
CN
China
Prior art keywords
die
special
door
components
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110583937.6A
Other languages
Chinese (zh)
Other versions
CN113172736A (en
Inventor
刘永娟
王文超
刘芳芳
张栋
荣兵声
宋文
王青涛
杨宏义
吴彬
赵仁亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weihai Construction Group Co ltd
Weihai Lidong Construction Technology Co ltd
Weihai Vocational College
Original Assignee
Weihai Construction Group Co ltd
Weihai Lidong Construction Technology Co ltd
Weihai Vocational College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weihai Construction Group Co ltd, Weihai Lidong Construction Technology Co ltd, Weihai Vocational College filed Critical Weihai Construction Group Co ltd
Priority to CN202110583937.6A priority Critical patent/CN113172736B/en
Publication of CN113172736A publication Critical patent/CN113172736A/en
Application granted granted Critical
Publication of CN113172736B publication Critical patent/CN113172736B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/022Means for inserting reinforcing members into the mould or for supporting them in the mould
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/04Frames for doors, windows, or the like to be fixed in openings
    • E06B1/24Frames of natural stone, concrete, or other stone-like material

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The invention relates to a preparation method and a special mold for a concrete moon door, which solve the technical problems of low finished product strength, long construction period, poor quality and environmental pollution existing in the conventional construction method. The invention also provides a preparation method of the concrete moon door. The invention can be used in the field of construction.

Description

Preparation method of concrete moon door and special mold
Technical Field
The invention relates to a preparation method of a building and a special mould, in particular to a preparation method of a concrete moon door and a special mould.
Background
The moon door is also called a moon hole door or a moon door, is an arc-shaped hole door arranged on a yard wall in Chinese classical gardens, vietnam gardens and large-scale residences, and is seen indoors in the fresher traditional buildings. The round shape is named as moon, which not only serves as an access channel between the houses, but also can lead in the landscape on the other side through the door opening, and has practicability and decoration. The lower part is flat without a threshold, and the utility model can be used for the separation and transition between courtyards and indoor spaces.
The traditional moon door construction process of building an inner circle by two meters is as follows: the bottom of a building worker for building the moon door is connected with wall bodies on two sides through sintered bricks and cement mortar, the moon door is used as a foundation for building the moon door, a batten with the length of one meter is vertically erected at the arching center position of the moon door on the foundation, and a bamboo rod with the length of one meter is nailed at the top of the batten. Masonry is carried out by masonry workers along with the turning radius of the bamboo poles, and the positions where the bamboo pole heads are located are the edges of the inner holes of the moon doors.
The traditional construction method mainly has the following problems: because the masonry structure has poor integral anti-overturning property, the masonry structure has low strength compared with reinforced concrete, excessive material consumption and over-high dead weight, and poor tensile, shear, bending and shock resistance; environmental pollution of construction site; the construction molding period is long; poor apparent flatness; the inner circle of the moon door built manually has large error.
Disclosure of Invention
The invention aims to solve the technical problems of low finished product strength, long construction period, poor quality and environmental pollution of the existing construction method, and provides a preparation method and a special mould of a concrete moon door, wherein the finished product strength is high, the construction period is short, the product quality is high, and the environment pollution is avoided.
The invention provides a preparation method of a concrete moon door and a special die, which are provided with side dies and finished component cavities, wherein the side dies comprise an upper side die, two side dies, a bottom side die and a door opening reserved special-shaped side die.
Preferably, the periphery of the special die is provided with local reverse and step settlement.
Preferably, the steel plate is also provided with a profiled side form supporting steel beam.
Preferably, the device is also provided with a sleeve for hoisting.
Preferably, it is further provided with a connection hole.
Preferably, a base is further arranged to connect the reserved corrugated pipe.
The invention also provides a preparation method of the concrete moon door, which comprises the following steps: (1) Preparing a special die, wherein the die is provided with a side die and a finished component cavity, and the side die comprises an upper side die, two side dies, a bottom side die and a door opening reserved special-shaped side die; (2) The concrete moon door member is integrally divided into two parts by a side central axis, and concrete is poured by adopting a reverse hitting process to respectively prepare two members; (3) Demolding the two members prepared in the step (2) and splicing and fixing the two members; (4) And (4) mounting and fixing the whole component prepared in the step (3).
Preferably, in the step (2), pre-embedded threaded steel sleeves are reserved at the front face and the upper side forms of the member; reserving holes in the peripheral side forms and the inner sides of the arc-shaped side forms of the door openings; the bottom of the component is embedded with a reserved corrugated pipe.
Preferably, in the step (3), when the members are spliced, the two members are spliced in an aligned mode and inserted with reinforcing steel bars, plugging is carried out after grouting, and the tops of the members are spliced in a staggered mode through a horse tooth groove. Preferably, in the step (4), the whole member is installed and fixed, is pre-embedded and reserved by a corrugated pipe, and is connected in a grouting manner by connecting the pre-embedded steel bar bolts of the ground bottom plate;
the invention has the following beneficial effects:
(1) The mechanical property of the finished product is excellent: the finished member can be cast by using C30-C60 concrete, the member is maintained by heating and humidifying by adopting a steam maintenance method, and the demolding strength of the member can reach over 75 percent after 600min of heating and humidifying; the high-strength grouting material can reach the strength of more than 30-50 MPa in one day and about 100MPa in 28 days, and the inclined support can be detached after grouting for 1-2 days.
(2) The production rate is fast, and the construction cycle is short, can carry out mass production: the whole finished product can be produced by one set of mould in one day, and the whole process of construction comprises a series of work of hoisting, splicing, grouting and the like because the mould is a prefabricated product, and the whole set of finished product can be installed only in half a day.
(3) The mould can be recycled and has high utilization rate, low cost and high recycling times compared with the traditional wood mould.
(4) The finished product has good appearance and high flatness.
(5) The finished product is provided with a cavity, so that the material consumption can be greatly saved.
Drawings
FIG. 1 is a schematic perspective view of a special mold according to the present invention;
FIG. 2 is a schematic sectional view of a special mold according to the present invention;
FIG. 3 is a schematic view of the top splice of the special mold of the present invention;
fig. 4 is a flow chart of a method for manufacturing the concrete moon door according to the present invention.
The symbols in the drawings illustrate that:
1. an upper side form; 2. hoisting a threaded steel sleeve; 3. reinforcing bar penetrating and grouting connecting holes; 4. a finished component cavity; 5. side forms on two sides; 6. reserving a special-shaped side mold in the door opening; 7. horizontally demoulding the hoisting point; 8. supporting the steel beam by the special-shaped side forms; 9. the base is connected with the reserved corrugated pipe; 10. and (4) a bottom side die.
Detailed Description
The present invention will be further described with reference to the following examples.
As shown in fig. 1 and 2, the invention provides a special mold for preparing a concrete moon door, which is provided with a finished component cavity 4, wherein the periphery of the finished component cavity 4 is respectively provided with an upper side mold 1, two side molds 5, a bottom side mold 10 and a door opening reserved special-shaped side mold 6; the finished component cavity 4 is a reserved cavity of a semi-finished product after the side die is assembled and produced for a single time; the special mould is also provided with a threaded steel sleeve 2 for hoisting, a bar penetrating grouting connecting hole 3, a special-shaped side formwork supporting steel beam 8 and a base connecting reserved corrugated pipe 9.
As shown in figure 1, the periphery of the die is provided with local upper-reverse and stepped settlement, the deformation of the die in the production procedure can be reduced by splicing the die, the demoulding of the finished product can be facilitated, and the integrity of the finished product after demoulding is ensured when the finished product does not reach 100%.
The used mould of production adopts bolted connection seamless concatenation, and door opening reservation abnormal shape side forms 6 and abnormal shape side forms support adding of girder steel 8 establish in order to prevent that door opening reservation abnormal shape side forms from receiving external stress such as concrete and taking place to warp when producing, and the stability that can strengthen the special-shaped mould is established in adding of abnormal shape side forms support girder steel. The door opening is reserved with a special-shaped side mold 6 and peripheral side molds, and the shape and the size can be customized according to the specific requirements of customers on the moon door.
Compared with a wooden template, the steel mold has the characteristics of high precision, repeated utilization and the like, can meet the requirement of producing various shapes, is not limited to single sizes of inner circle and outer square and the like, can be produced in batch, can be specially customized for a special project, and can be used for designing the sizes, the appearance shapes and the like according to the special requirements of the project. The precision of the special-shaped corners of the die can be guaranteed by adopting a 5mm steel plate for laser blanking, and the mechanical welding seamless treatment is adopted, so that the precision of the processed die is guaranteed, and the problem of material leakage caused by seam leakage caused by welding leakage can be solved.
As shown in figure 4, the production method of the concrete moon gate provided by the invention is characterized in that production is carried out according to a novel assembly type concrete member process, the whole member is divided into two parts by a side central axis and adopts a reverse beating process, M20 80 threaded steel sleeves are pre-embedded at three positions on the front surface of the member (the stress level and the uniformity during lifting are ensured), two M20 200 threaded steel sleeves are pre-embedded at two positions on an upper side die of the member (for vertical lifting installation and use), the whole member is spliced by two members produced in a split mode (a splicing mode is that holes are reserved at 50 mm-100 mm positions on the inner sides of a peripheral side die and a doorway arc side die, the two members are aligned and spliced to insert reinforcing steel bars during splicing, a rubber plug is used after high-strength grouting is used, and a horse tooth groove type staggered splicing grouting is carried out at the top of the member, so that the horizontal distortion can be effectively solved.)
Except the dowel bar connecting hole, other joint surfaces of the whole joint surfaces of the two members are in a hollow state, and most joint surfaces of the two members are in the hollow state, so that the concrete is saved, and meanwhile, space is reserved for local deformation caused by self load of the members. The component is supported and fixed by pre-buried reservation of a corrugated pipe, and is grouted and connected by connecting pre-buried steel bolts of a ground bottom plate (when high-strength grouting material is used and the grouting material does not reach the specified strength, a front three-point pre-buried M20X 80 threaded steel sleeve is connected with an inclined support for temporary fixation.)
However, the above description is only exemplary of the present invention, and the scope of the present invention should not be limited thereby, and the replacement of the equivalent components or the equivalent changes and modifications made according to the protection scope of the present invention should be covered by the claims of the present invention.

Claims (1)

1. A preparation method of a concrete moon door is characterized by comprising the following steps:
(1) Preparing a special die, wherein the special die is provided with a side die and a finished component cavity, and the side die comprises an upper side die, two side dies, a bottom side die and a door opening reserved special-shaped side die; local upper reverse and step settlement are arranged on the periphery of the special die; the special-shaped side formwork supporting steel beam, the hoisting sleeve, the connecting hole and the base are connected with the reserved corrugated pipe;
(2) The concrete moon door member is integrally divided into two parts by a side central axis, and concrete is poured by adopting a reverse hitting process to respectively prepare two members; the joint surfaces of the two components are hollow except for the dowel bar connecting hole; pre-buried threaded steel sleeves are reserved on the front face of the component and the side forms at the upper part of the component; reserving holes in the peripheral side forms and the inner sides of the arc-shaped side forms of the door openings; pre-burying a reserved corrugated pipe at the bottom of the component;
(3) Demoulding the two components prepared in the step (2) and splicing and fixing the two components, wherein the two components are aligned, spliced and inserted into a steel bar when the components are spliced, plugging is carried out after grouting, and the tops of the components are spliced in a staggered manner through a horse tooth groove;
(4) And (4) integrally installing and fixing the member prepared in the step (3), pre-burying and reserving the corrugated pipe, and grouting and connecting the member by connecting the pre-buried steel bar bolts of the ground bottom plate.
CN202110583937.6A 2021-05-27 2021-05-27 Preparation method of concrete moon door and special mold Active CN113172736B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110583937.6A CN113172736B (en) 2021-05-27 2021-05-27 Preparation method of concrete moon door and special mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110583937.6A CN113172736B (en) 2021-05-27 2021-05-27 Preparation method of concrete moon door and special mold

Publications (2)

Publication Number Publication Date
CN113172736A CN113172736A (en) 2021-07-27
CN113172736B true CN113172736B (en) 2023-03-24

Family

ID=76927103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110583937.6A Active CN113172736B (en) 2021-05-27 2021-05-27 Preparation method of concrete moon door and special mold

Country Status (1)

Country Link
CN (1) CN113172736B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116226993A (en) * 2023-03-14 2023-06-06 太原市第一建筑工程集团有限公司 A kind of construction method of moon gate

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2005240674B2 (en) * 2004-05-11 2010-10-21 The Australian Steel Company (Operations) Pty Ltd Cavity former
CN102691458B (en) * 2012-06-15 2014-05-07 北京港源建筑装饰工程有限公司 Large-scale archaistic metal combined moon gate and construction method thereof
CN204510587U (en) * 2015-02-06 2015-07-29 黄继舟 A kind of plaster cavity die box
CN108240112B (en) * 2018-01-30 2020-03-31 中冶建工集团有限公司 Circular arch door steel combined die carrier
CN112140293A (en) * 2019-06-26 2020-12-29 湖南五新模板有限公司 A kind of concrete prefabricated member mould and its demoulding method
CN112814022A (en) * 2021-03-22 2021-05-18 湖南建工集团有限公司 Precast concrete equipment foundation side forms

Also Published As

Publication number Publication date
CN113172736A (en) 2021-07-27

Similar Documents

Publication Publication Date Title
US11466445B2 (en) Integrated steel concrete building and construction method thereof
CN102605858B (en) Building structure and construction method
CN208502433U (en) A kind of prefabricated assembled Assembled surrounding wall with vertical curtain wall penel component
CN113338451A (en) Assembly type structure adaptive to deformed steel pipe column and construction method thereof
CN206329145U (en) A kind of quick assembled type enclosure wall
CN113172736B (en) Preparation method of concrete moon door and special mold
CN204081478U (en) A kind of Novel steel structure cast-in-situ floor formwork erecting structure
CN114482575B (en) Installation and use method of prefabricated shear wall positioning device
CN218970358U (en) Assembled building double-skin outer wall structure
CN213417871U (en) Assembly type disassembly-free foundation template and cast-in-place foundation building structure
CN102587665B (en) Pouring method of coupled shear wall structure
CN212295078U (en) Steel assembled synthetic concrete building
CN113323189A (en) Assembled heat-preservation energy-saving shear wall based on channel steel connecting piece and implementation method
CN210659513U (en) Prefabricated enclosure of assembled
CN112814022A (en) Precast concrete equipment foundation side forms
CN217680017U (en) Grouted assembled concrete column member
CN217079684U (en) Split type form removal-free concrete hollow structure
CN216893447U (en) Hidden back edge non-dismantling formwork for forming reinforced concrete member
CN206815366U (en) A kind of prefabricated assembled basis
CN118600995A (en) An integrated prefabricated elevator foundation pit and construction method thereof
CN210858229U (en) Assembled precast concrete enclosure
CN107856177A (en) A kind of assembly concrete post mold
CN110238962B (en) Method for manufacturing novel precast concrete inner wall
CN210140846U (en) Independent foundation of precast concrete dry type combination
CN107775781A (en) A kind of assembly concrete beam mould

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant