CN102587378B - 海上潮间带单管桩液压冲击沉桩垂直度超差纠偏工艺 - Google Patents

海上潮间带单管桩液压冲击沉桩垂直度超差纠偏工艺 Download PDF

Info

Publication number
CN102587378B
CN102587378B CN201210081474.4A CN201210081474A CN102587378B CN 102587378 B CN102587378 B CN 102587378B CN 201210081474 A CN201210081474 A CN 201210081474A CN 102587378 B CN102587378 B CN 102587378B
Authority
CN
China
Prior art keywords
pile
gripper
telescopic arm
inclination direction
pile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210081474.4A
Other languages
English (en)
Other versions
CN102587378A (zh
Inventor
李泽
张海生
张乐平
王徽华
曹春潼
谢闽
嵇红霖
高建忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD
Original Assignee
JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD filed Critical JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD
Priority to CN201210081474.4A priority Critical patent/CN102587378B/zh
Publication of CN102587378A publication Critical patent/CN102587378A/zh
Application granted granted Critical
Publication of CN102587378B publication Critical patent/CN102587378B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

本发明公开了一种海上潮间带单管桩液压冲击沉桩垂直度超差纠偏工艺,包括以下步骤:当入土深度米时,当摩阻力+桩体自重若+工装自重<吊机起重能力,通过全回转起重机将单管桩拔出,重新进行自沉、压锤等沉桩。当入土深度
Figure 547743DEST_PATH_IMAGE004
米时,计算出桩体最大倾斜方向,将打桩船移至桩体最大倾斜方向,将上抱桩器上液压伸缩臂前伸顶住桩体开动液压冲击锤进行沉桩。当入土深度

Description

海上潮间带单管桩液压冲击沉桩垂直度超差纠偏工艺
技术领域
本发明涉及海上潮间带风电行业的基础沉桩施工工程,特别是一种海上潮间带单管桩液压冲击沉桩垂直度超差纠偏工艺。
背景技术
目前,海上潮间带风电场大直径、大吨位单管桩基础采用液压冲击沉桩,目前尚处于初级探索阶段,由于其垂直度设计上的高标准(≤2.75‰)、海洋地质条件的复杂性、水文条件的不确定性以及施工技术、经验的不成熟,在施工过程中容易出现单管桩基础垂直度超差,施工风险大,反复施工的情况。
发明内容
本发明的目的是为了克服以上的不足,提供一种能够保证单管桩液压冲击沉桩垂直度满足设计标准要求,施工风险小的海上潮间带单管桩液压冲击沉桩垂直度超差纠偏工艺。
本发明的目的通过以下技术方案来实现:一种海上潮间带单管桩液压冲击沉桩垂直度超差纠偏工艺,包括以下步骤:1)当入土深度h≤4米时,首先计算摩阻力、桩体自重、工装自重,当摩阻力+桩体自重+工装自重<吊机起重能力,通过全回转起重机将单管桩拔出,重新进行自沉、压锤沉桩。
2)当入土深度4<h≤8米时,根据桩顶法兰360度均布12个测点的倾斜度测量数据,法兰倾斜度等于桩体垂直度,计算出桩体最大倾斜方向,即方位角度;在高潮移船时即水深大于2.5米时将打桩船移至桩体最大倾斜方向,上抱桩器对着最大倾斜方向,且桩体距上抱桩器的距离在抱桩器伸缩臂行程范围内;将上抱桩器上液压伸缩臂前伸顶住桩体,开动液压冲击锤进行沉桩,使用单击或短时间间断连续冲击,在此过程中时刻监控垂直度变化,并实时推动上抱桩器液压伸缩臂,直至将垂直度偏差调整至标准范围内。
3)当入土深度h>8米时,在潮间带露滩时通过挖掘机将单管桩四周上层沙土挖去2~5米,将打桩船移至桩体最大倾斜方向,上抱桩器对着最大倾斜方向,且桩体距上抱桩器的距离在抱桩器伸缩臂行程范围内;将上抱桩器上液压伸缩臂前伸顶住桩体,开动液压冲击锤进行沉桩,使用单击或短时间间断连续冲击,在此过程中时刻监控垂直度变化,并实时推动上抱桩器液压伸缩臂,直至将垂直度偏差调整至标准范围内,即≤2.75‰。
本发明与现有技术相比具有以下优点:
此方法针对无过渡段单管桩基础采取液压冲击沉桩,在桩体不同入土深度实际情况下,若桩体垂直度超差时保证单管桩液压冲击沉桩垂直度,大大降低了施工风险,确保了施工质量和工期。
具体实施方式:
    为了加深对本发明的理解,下面将结合实施例对本发明作进一步详述,该实施例仅用于解释本发明,并不构成对本发明保护范围的限定。
本发明海上潮间带单管桩液压冲击沉桩垂直度超差纠偏工艺的一种具体实施方式,包括以下步骤:
1)当入土深度h≤4米时,首先计算摩阻力、桩体自重(300T~400T)、工装自重(10T),当摩阻力+桩体自重+工装自重<吊机起重能力(800T),通过800T全回转起重机将单管桩拔出,重新进行自沉、压锤沉桩。
2)当入土深度4<h≤8米时,根据桩顶法兰360度均布12个测点的倾斜度测量数据,法兰倾斜度等于桩体垂直度,计算出桩体最大倾斜方向,即方位角度;在高潮具体移船的条件下(即水深大于2.5米情况下)将打桩船移至桩体最大倾斜方向,上抱桩器对着最大倾斜方向,且桩体距上抱桩器的距离在抱桩器伸缩臂行程范围内;将上抱桩器上液压伸缩臂前伸顶住桩体(推力不大于100T),开动液压冲击锤进行沉桩,使用单击或短时间间断连续冲击,在此过程中时刻监控垂直度变化,并实时推动(桩向哪边斜就向相反方向推)上抱桩器液压伸缩臂,直至将垂直度偏差调整至标准范围内。
3)当入土深度h>8米时,在潮间带露滩时通过挖掘机将单管桩四周上层沙土挖去2~5米,将打桩船移至桩体最大倾斜方向,上抱桩器对着最大倾斜方向,且桩体距上抱桩器的距离在抱桩器伸缩臂行程范围内;将上抱桩器上液压伸缩臂前伸顶住桩体(推力不大于100T),开动液压冲击锤进行沉桩,使用单击或短时间间断连续冲击,在此过程中时刻监控垂直度变化,并实时推动(桩向哪边斜就向相反方向推)上抱桩器液压伸缩臂,直至将垂直度偏差调整至标准范围内,即≤2.75‰。
本发明针对无过渡段单管桩基础采取液压冲击沉桩,在桩体不同入土深度实际情况下,若桩体垂直度超差时保证单管桩液压冲击沉桩垂直度,为海上风电业引入单管桩施工技术提供了有力支持,大大降低了施工风险,确保了施工质量和工期。

Claims (1)

1. 一种海上潮间带单管桩液压冲击沉桩垂直度超差纠偏工艺,其特征在于:包括以下步骤:
1)当入土深度h≤4米时,
首先计算摩阻力、桩体自重、工装自重,当摩阻力+桩体自重+工装自重<吊机起重能力,通过全回转起重机将单管桩拔出,重新进行自沉、压锤沉桩;
2)当入土深度4<h≤8米时,
A)根据桩顶法兰360度均布12个测点的倾斜度测量数据,法兰倾斜度等于桩体垂直度,计算出桩体最大倾斜方向,即方位角度;
B)在高潮移船时即水深大于2.5米时将打桩船移至桩体最大倾斜方向,上抱桩器对着最大倾斜方向,且桩体距上抱桩器的距离在抱桩器伸缩臂行程范围内;
C)将上抱桩器上液压伸缩臂前伸顶住桩体,开动液压冲击锤进行沉桩,使用单击或短时间间断连续冲击,在此过程中时刻监控垂直度变化,并实时推动上抱桩器液压伸缩臂,直至将垂直度偏差调整至标准范围内。
3)当入土深度h>8米时,
在潮间带露滩时通过挖掘机将单管桩四周上层沙土挖去2~5米;
B)将打桩船移至桩体最大倾斜方向,上抱桩器对着最大倾斜方向,且桩体距上抱桩器的距离在抱桩器伸缩臂行程范围内;
C)将上抱桩器上液压伸缩臂前伸顶住桩体,开动液压冲击锤进行沉桩,使用单击或短时间间断连续冲击,在此过程中时刻监控垂直度变化,并实时推动上抱桩器液压伸缩臂,直至将垂直度偏差调整至标准范围内,即≤2.75‰。
CN201210081474.4A 2012-03-26 2012-03-26 海上潮间带单管桩液压冲击沉桩垂直度超差纠偏工艺 Active CN102587378B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210081474.4A CN102587378B (zh) 2012-03-26 2012-03-26 海上潮间带单管桩液压冲击沉桩垂直度超差纠偏工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210081474.4A CN102587378B (zh) 2012-03-26 2012-03-26 海上潮间带单管桩液压冲击沉桩垂直度超差纠偏工艺

Publications (2)

Publication Number Publication Date
CN102587378A CN102587378A (zh) 2012-07-18
CN102587378B true CN102587378B (zh) 2014-04-16

Family

ID=46476571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210081474.4A Active CN102587378B (zh) 2012-03-26 2012-03-26 海上潮间带单管桩液压冲击沉桩垂直度超差纠偏工艺

Country Status (1)

Country Link
CN (1) CN102587378B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147441A (zh) * 2012-12-03 2013-06-12 龙源电力集团股份有限公司 一种大型单桩施工垂直度控制方法
CN116163304B (zh) * 2023-03-28 2023-10-20 广东省源天工程有限公司 一种基于液压振动锤的智能打桩系统

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1321995A (en) * 1970-05-29 1973-07-04 Int Research & Dev Co Ltd Hydraulically-operated driving mechanisms for underwater use
GB2109041A (en) * 1981-11-05 1983-05-25 Petro Drive Inc Pile driving rig having angulating knuckle lead therefor
JPH1181309A (ja) * 1997-09-08 1999-03-26 Morinagagumi:Kk 斜杭の打設工法と打設装置
CN1391010A (zh) * 2002-07-25 2003-01-15 上海隧道工程股份有限公司 插入法立柱桩施工工艺
JP2003082664A (ja) * 2001-09-12 2003-03-19 Nippon Steel Corp 鋼管杭の貫入装置および貫入方法
CN1536173A (zh) * 2003-04-04 2004-10-13 中港第一航务工程局第一工程公司 大直径钢圆筒振动下沉工艺方法
CN102182205A (zh) * 2011-05-18 2011-09-14 江苏海上龙源风力发电有限公司 一种潮间带单桩风机基础施工工艺
CN102312436A (zh) * 2010-07-02 2012-01-11 南通市海洋水建工程有限公司 钢管桩沉桩施工工艺

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01181309A (ja) * 1988-01-14 1989-07-19 Asahi Kasei Micro Syst Kk 伸張回路

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1321995A (en) * 1970-05-29 1973-07-04 Int Research & Dev Co Ltd Hydraulically-operated driving mechanisms for underwater use
GB2109041A (en) * 1981-11-05 1983-05-25 Petro Drive Inc Pile driving rig having angulating knuckle lead therefor
JPH1181309A (ja) * 1997-09-08 1999-03-26 Morinagagumi:Kk 斜杭の打設工法と打設装置
JP2003082664A (ja) * 2001-09-12 2003-03-19 Nippon Steel Corp 鋼管杭の貫入装置および貫入方法
CN1391010A (zh) * 2002-07-25 2003-01-15 上海隧道工程股份有限公司 插入法立柱桩施工工艺
CN1536173A (zh) * 2003-04-04 2004-10-13 中港第一航务工程局第一工程公司 大直径钢圆筒振动下沉工艺方法
CN102312436A (zh) * 2010-07-02 2012-01-11 南通市海洋水建工程有限公司 钢管桩沉桩施工工艺
CN102182205A (zh) * 2011-05-18 2011-09-14 江苏海上龙源风力发电有限公司 一种潮间带单桩风机基础施工工艺

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王建华.钢管桩的振冲法施工与纠偏.《浙江水利科技》.2005,(第5期),第61-62、68页.
钢管桩的振冲法施工与纠偏;王建华;《浙江水利科技》;20050925(第5期);第61-62、68页 *

Also Published As

Publication number Publication date
CN102587378A (zh) 2012-07-18

Similar Documents

Publication Publication Date Title
CN109797749B (zh) 一种水下基坑施工装置及施工方法
CN102312442A (zh) 栈桥钢管桩基础的施工方法
CN106522211B (zh) 一种桥墩管桩桩基施工装置及其施工方法
CN107675743B (zh) 一种锚艇辅助顶推单边横移施工系统及其施工方法
CN109241631A (zh) 盾构隧道管片上浮量计算方法
CN104563119A (zh) 旋转式水上打桩导架
CN207176723U (zh) 一种海上风电嵌岩单桩及其施工系统
Hinzmann et al. Decommissioning of offshore monopiles, occuring problems and alternative solutions
CN102587378B (zh) 海上潮间带单管桩液压冲击沉桩垂直度超差纠偏工艺
CN109252521A (zh) 钢梁下有限空间水中钢管桩拔出设备及其施工方法
CN114197439B (zh) 高涌流深水水下碎石桩施工方法以及施工设备
EP2591175A1 (en) Surface-breaking re-usable submergeable template for installing one or more submerged columns/piles
CN202176267U (zh) 一种新的吸力桩式海底钻井基盘
CN104695433A (zh) 一种砂性地基中沥青涂层桩的施工方法
CN104947664A (zh) 一种厚密石块填海层预应力高强混凝土方桩施工方法
CN103556972A (zh) 一种自安装式海底钻井基盘及其安装方法
CN102953709A (zh) 一种新的吸力桩式海底钻井基盘
CN109385997B (zh) 狭窄场地条件下phc管桩的施工方法
CN104120699B (zh) 钢板桩桶基人工岛护壁结构
JP2012067513A (ja) 水中掘削装置および水中掘削方法
CN104153366B (zh) 一种海中强风浪高强度裸岩钢管桩基的方法
CN207295707U (zh) 新型海上打桩船
Sarkar et al. Installation of monopiles for offshore wind turbines—by using end-caps and a subsea holding structure
CN102758434B (zh) 中掘预应力离心管桩沉桩装置及其沉桩法
CN204199288U (zh) 一种管桩纠偏校正装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant