CN102587289A - Automatic control pre-assembly device and method for steel box girders - Google Patents

Automatic control pre-assembly device and method for steel box girders Download PDF

Info

Publication number
CN102587289A
CN102587289A CN201210101981XA CN201210101981A CN102587289A CN 102587289 A CN102587289 A CN 102587289A CN 201210101981X A CN201210101981X A CN 201210101981XA CN 201210101981 A CN201210101981 A CN 201210101981A CN 102587289 A CN102587289 A CN 102587289A
Authority
CN
China
Prior art keywords
steel box
steel case
case beam
box girders
hydraulic jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210101981XA
Other languages
Chinese (zh)
Inventor
刘志刚
王岁利
章建
成宇海
李硕
宋浩宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Baoji Bridge Yangzhou Co Ltd
Original Assignee
China Railway Baoji Bridge Yangzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Baoji Bridge Yangzhou Co Ltd filed Critical China Railway Baoji Bridge Yangzhou Co Ltd
Priority to CN201210101981XA priority Critical patent/CN102587289A/en
Publication of CN102587289A publication Critical patent/CN102587289A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an automatic control pre-assembly device for steel box girders. The automatic control pre-assembly device for the steel box girders comprises a plurality of vertically arranged hydraulic jacks which are connected with a hydraulic control console. According to the automatic control pre-assembly device for the steel box girders, springing parameters of the steel box girders can be controlled precisely, the assembly efficiency is high, and an effect of spatial three-dimensional curve springing of the steel box girders can be achieved. The invention also discloses a method for assembling the steel box girders by adopting the automatic control pre-assembly device for the steel box girders. The method comprises the following steps of: calculating rational pivot positions of the steel box girders through stress analysis software; arranging a plurality of hydraulic jacks below each steel box girder according to the rational pivot; controlling the hydraulic jacks by using the hydraulic control console to adjust the heights as well as the longitudinal and transverse directions of the steel box girders to achieve a steel box girder bridging linear effect; and arranging bridge matching pieces. The method is convenient to implement, suitable for industrial production and high in control precision.

Description

A kind of steel case beam is preparatory assembly unit device of control and assembling method automatically
Technical field
The present invention relates to a kind of assembly unit device of steel case beam, relate in particular to a kind of steel case beam preparatory assembly unit device of control automatically; The invention still further relates to the said steel case beam method of the preparatory assembly unit device jointing steel box beam of control automatically of utilizing.
Background technology
The preparatory assembly unit of domestic and international existing steel case beam is divided into and utilizes moulding bed arch camber technology to realize steel case beam arch camber and utilize steel case beam length and the arch camber of matching parts thickness realization steel case beam.The moulding bed arch camber comparatively bothers, and efficiency of construction is low, and cost is big.Utilize steel case beam length and matching parts arch camber, precision is low, and it is linear to react the bridge location steel box beam erection more really.Daxie, the Zhejiang second bridge steel case beam is divided into straightway, the section of broadening and relaxes three kinds of forms of curved section; Bridge axis shape is the space three-dimensional curve that vertical curve and horizontal curve constitute; Adopt preparatory assembly unit moulding bed to make steel case beam, when assembly unit different segment in advance, need each transformation of the way moulding bed, and can not design moulding bed accurately; Cause steel case beam making error big, the size Control inaccuracy.
Summary of the invention
Goal of the invention: the objective of the invention is to the deficiency to prior art, provide a kind of and can accurately control steel case beam arch camber parameter, assembly unit efficient is high, can realize that the steel case beam of steel case beam space three-dimensional curve arch camber is controlled preparatory assembly unit device automatically.Another object of the present invention is to provide a kind of said steel case beam method of the preparatory assembly unit device jointing steel box beam of control automatically of utilizing.
Technical scheme: in order to realize the foregoing invention purpose, the technical scheme that the present invention adopted is:
A kind of steel case beam is the preparatory assembly unit device of control automatically, comprises the hydraulic jack that plurality of vertical is arranged, described hydraulic jack is connected with hydraulic control panel.
The hydraulic jack of described vertical layout per four as one group, each group is connected with hydraulic control panel respectively.
A kind of big shaped steel case beam is controlled pre-assembly method automatically; Adopt the reasonable position of the fulcrum of force analysis computed in software tapping case beam; Under each steel case beam, arrange several hydraulic jack according to reasonable fulcrum; Utilize hydraulic control panel control hydraulic jack to carry out steel case deck-molding journey and vertical and horizontal adjustment, it is linear to reach steel box beam erection, and the bridge location matching parts is installed then.
Calculate four reasonable fulcrums of each steel case beam, arrange four hydraulic jack according to reasonable fulcrum below each steel case beam.
Adopt the reasonable position of the fulcrum of force analysis computed in software tapping case beam; Under each steel case beam, arrange four hydraulic jack; Utilize hydraulic control panel to carry out steel case deck-molding journey and vertical and horizontal adjustment; It is linear to reach steel box beam erection, and the bridge location matching parts is installed then, when bridge location sets up, utilizes the bridge location matching parts to reset and sets up.
Beneficial effect: the present invention compared with prior art, its beneficial effect is:
Hydraulic jack is arranged on the reasonable position of the fulcrum of steel case beam, through the rise drawdown parameter of hydraulic control panel control hydraulic jack, accurately controls each strong point height, has promptly guaranteed the arch camber parameter of steel case beam; The hydraulic jack scalable data is controlled, is convenient to regulate the position of each strong point of steel case beam; Adopt hydraulic system can support heavy weight steel case beam, be fit to the preparatory assembly unit of big shaped steel case beam; Hydraulic control panel is easy to operate, and assembly unit efficient is high, has removed complicated internal model making from, has reduced cost of production; The method of the big shaped steel case of assembly unit of the present invention beam is convenient to implement, and be fit to suitability for industrialized production, and control accuracy is high.
Description of drawings
Fig. 1 is a structural representation of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing, through a most preferred embodiment, technical scheme of the present invention is elaborated, but protection scope of the present invention is not limited to said embodiment.
As shown in Figure 1; A kind of steel case beam is the preparatory assembly unit device of control automatically; Comprise the hydraulic jack 1 that plurality of vertical is arranged, confirm to be provided with the quantity of hydraulic jack according to quantity, quality and the size of steel case beam, described hydraulic jack 1 is connected with hydraulic control panel 2; The hydraulic jack of described vertical layout per four as one group, each group is connected with hydraulic control panel respectively.Adopt the reasonable position of the fulcrum of ansys force analysis computed in software tapping case beam 3; Under each steel case beam, arrange four hydraulic jack according to reasonable fulcrum; With flat car for transport of sills steel case beam is placed on the hydraulic jack position piecemeal, utilizes hydraulic control panel to carry out steel case deck-molding journey and vertical and horizontal adjustment, it is linear to reach steel box beam erection; Detect linear qualified back bridge location matching parts 4 is installed, when bridge location sets up, utilize bridge location matching parts 4 to reset and set up.

Claims (4)

1. a steel case beam is controlled preparatory assembly unit device automatically, and it is characterized in that: comprise the hydraulic jack that plurality of vertical is arranged, described hydraulic jack is connected with hydraulic control panel.
2. steel case beam according to claim 1 is the preparatory assembly unit device of control automatically, it is characterized in that: the hydraulic jack of described vertical layout per four as one group, each group is connected with hydraulic control panel respectively.
3. a steel case beam is controlled pre-assembly method automatically; It is characterized in that: the reasonable position of the fulcrum that adopts force analysis computed in software tapping case beam; Under each steel case beam, arrange several hydraulic jack according to reasonable fulcrum; Utilize hydraulic control panel control hydraulic jack to carry out steel case deck-molding journey and vertical and horizontal adjustment, it is linear to reach steel box beam erection, and the bridge location matching parts is installed then.
4. steel case beam according to claim 3 is controlled pre-assembly method automatically, it is characterized in that: calculate four reasonable fulcrums of each steel case beam, arrange four hydraulic jack according to reasonable fulcrum below each steel case beam.
CN201210101981XA 2012-03-31 2012-03-31 Automatic control pre-assembly device and method for steel box girders Pending CN102587289A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210101981XA CN102587289A (en) 2012-03-31 2012-03-31 Automatic control pre-assembly device and method for steel box girders

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210101981XA CN102587289A (en) 2012-03-31 2012-03-31 Automatic control pre-assembly device and method for steel box girders

Publications (1)

Publication Number Publication Date
CN102587289A true CN102587289A (en) 2012-07-18

Family

ID=46476483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210101981XA Pending CN102587289A (en) 2012-03-31 2012-03-31 Automatic control pre-assembly device and method for steel box girders

Country Status (1)

Country Link
CN (1) CN102587289A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741602A (en) * 2013-12-19 2014-04-23 中铁宝桥集团有限公司 Steel box girder computer simulation flat arch camber preassembling method
CN104607815A (en) * 2014-12-18 2015-05-13 大连船舶重工集团装备制造有限公司 Method for manufacturing and controlling camber of crane main girder
CN105499927A (en) * 2015-12-24 2016-04-20 中铁宝桥集团有限公司 Manufacturing method of space curve profile steel component
CN111501559A (en) * 2020-04-07 2020-08-07 中铁大桥科学研究院有限公司 System for assembling steel box girder of swivel cable-stayed bridge and adjusting method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1077609A (en) * 1996-09-02 1998-03-24 Kawada Kogyo Kk Steel member manufacturing method
CN1415040A (en) * 1999-12-31 2003-04-30 奥特玛尔·法里昂 Unit for production of track elements
CN1978305A (en) * 2005-12-07 2007-06-13 因温特奥股份公司 Transportation system cradle, intermediate product, assembly plant, and method for manufacturing assembly
CN101623820A (en) * 2009-08-05 2010-01-13 中铁宝桥集团有限公司 Horizontal preassembling method of large-sized bridge steel tower
CN201534280U (en) * 2009-08-05 2010-07-28 中铁宝桥集团有限公司 Horizontal pre-assembly system for steel tower of large-scale bridge
CN202519584U (en) * 2012-03-31 2012-11-07 中铁宝桥(扬州)有限公司 Automatic control pre-framing device for steel box girder

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1077609A (en) * 1996-09-02 1998-03-24 Kawada Kogyo Kk Steel member manufacturing method
CN1415040A (en) * 1999-12-31 2003-04-30 奥特玛尔·法里昂 Unit for production of track elements
CN1978305A (en) * 2005-12-07 2007-06-13 因温特奥股份公司 Transportation system cradle, intermediate product, assembly plant, and method for manufacturing assembly
CN101623820A (en) * 2009-08-05 2010-01-13 中铁宝桥集团有限公司 Horizontal preassembling method of large-sized bridge steel tower
CN201534280U (en) * 2009-08-05 2010-07-28 中铁宝桥集团有限公司 Horizontal pre-assembly system for steel tower of large-scale bridge
CN202519584U (en) * 2012-03-31 2012-11-07 中铁宝桥(扬州)有限公司 Automatic control pre-framing device for steel box girder

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741602A (en) * 2013-12-19 2014-04-23 中铁宝桥集团有限公司 Steel box girder computer simulation flat arch camber preassembling method
CN104607815A (en) * 2014-12-18 2015-05-13 大连船舶重工集团装备制造有限公司 Method for manufacturing and controlling camber of crane main girder
CN105499927A (en) * 2015-12-24 2016-04-20 中铁宝桥集团有限公司 Manufacturing method of space curve profile steel component
CN105499927B (en) * 2015-12-24 2017-12-12 中铁宝桥集团有限公司 A kind of manufacture method of space curve Steel section member
CN111501559A (en) * 2020-04-07 2020-08-07 中铁大桥科学研究院有限公司 System for assembling steel box girder of swivel cable-stayed bridge and adjusting method

Similar Documents

Publication Publication Date Title
CN102322071B (en) Universal base structure of main transformer of 220kV substation
CN102500979A (en) Method for forming and assembling four faces of bridge crane box type girder
CN102587289A (en) Automatic control pre-assembly device and method for steel box girders
CN203793390U (en) Mobile car for mounting guide rail rack
CN203783165U (en) Multi-directional accurate adjusting device for embedded part
CN103643667A (en) Ship lift nut column installation auxiliary adjustment method
CN105013899B (en) Bending component forming method based on BIM technology
CN202519584U (en) Automatic control pre-framing device for steel box girder
CN201738597U (en) Sectional steel and steel pipe combined type support system of beam with high and large cross section
CN203772858U (en) Loadable mobile side wall for roadbed slope three-dimensional mould test platform
CN102501198A (en) Method for adjusting flexibility of assembly fixture of car body
CN202164623U (en) Universal foundation structure of 220 kV transformer substation main transformer
CN204295412U (en) Longmen machine tool crossbeam relief arrangement
CN102505863B (en) Wireless laser synchronous control device for multi-rail slide construction
CN204531180U (en) Control the stiff skeleton of large-scale component reinforcing bar binding precision
CN202540273U (en) Support for inclined stay bar
CN203156332U (en) Off-line assembling platform for flattener
CN203513176U (en) Four-column car lifting machine
CN203108983U (en) Gate embedded part correcting device
CN201437587U (en) Steel-casing assembling platform suitable for marine construction
CN201433074Y (en) Height positioning mechanism of lifting machine
CN203383515U (en) Displacer
CN202763337U (en) Flange connecting pipe height marking tool
CN102879074B (en) Method for trail weighing of anchor machine sensor
CN201778495U (en) Jig frame for overhead assembly of large-span truss

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120718