CN102585525A - SBS (styrene-butadiene-styrene) modified asphalt with stable thermal storage and preparation process thereof - Google Patents
SBS (styrene-butadiene-styrene) modified asphalt with stable thermal storage and preparation process thereof Download PDFInfo
- Publication number
- CN102585525A CN102585525A CN2012100088899A CN201210008889A CN102585525A CN 102585525 A CN102585525 A CN 102585525A CN 2012100088899 A CN2012100088899 A CN 2012100088899A CN 201210008889 A CN201210008889 A CN 201210008889A CN 102585525 A CN102585525 A CN 102585525A
- Authority
- CN
- China
- Prior art keywords
- weight
- styrene
- sbs
- butadiene
- matrix pitch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses an SBS (styrene-butadiene-styrene) modified asphalt with stable thermal storage, which has significantly improved thermal storage stability and has good high-temperature and low-temperature road performance. The SBS modified asphalt is prepared by the step of adding a styrene-butadiene-styrene block copolymer, a stabilizer, a solubilizer and polyphosphate into base asphalt, wherein the weight of the styrene-butadiene-styrene block copolymer is 2-6% of the weight of the base asphalt, the weight of the stabilizer is 0.1-0.2% of the weight of the base asphalt, the weight of the solubilizer is 1-5% of the weight of the base asphalt, and the weight of polyphosphate is 0.1-1% of the weight of the base asphalt. The preparation process of the SBS modified asphalt comprises the following steps: (1) collecting base asphalt, and heating to 175-185 DEG C; (2) adding aromatic oil, and stirring for 40-80 seconds; (3) adding styrene-butadiene-styrene block copolymer, and shearing for 8-12 minutes; (4) adding sulfur powder, and shearing for 8-12 minutes; and (5) adding polyphosphate, and developing under stirring for 100-140 minutes to obtain the SBS modified asphalt with stable thermal storage.
Description
Technical field
The present invention relates to a kind of SBS modifying asphalt and preparation technology thereof of steady heat storage.
Background technology
The SBS modifying asphalt is owing to have good high temperature performance, and can improve bituminous ageing resistance and fatigue resistance, become the principal item of China's modifying asphalt at present.But; There are bigger difference in SBS properties-correcting agent and pitch aspect physics such as molecular weight, density and chemical property, cause both consistencies relatively poor, and the SBS modifying asphalt is in the thermmal storage process; The segregation demixing phenomenon occurs through regular meeting, influence the modifying asphalt quality and use with normal.
The adding stablizer can improve the stability in storage of SBS modifying asphalt, like sulphur and compound thereof, mainly plays the effect of linking agent, and it is crosslinked that SBS is taken place, and forms the space reticulated structure.Though but many times the adding of stablizer can be played a role, but still can not make SBS compatible with matrix pitch, the stable storing type of modifying asphalt is still defective.
Because SBS absorbs oil and melts bloated in pitch; Volume can enlarge several times; Help SBS in pitch dispersion and form the space reticulated structure, the isolating speed that slows down, thus the component of its stability in storage and matrix pitch particularly aromatic hydrocarbons divide content relevant; Add solubilizing agent, can improve the stability in storage of SBS modifying asphalt like aromatic hydrocarbon oil.But the adding of aromatic hydrocarbon oil reduces bituminous viscosity degradation, softening temperature, and penetration degree raises, and has satisfied not " asphalt highway construction technique normalizing " technical requirements (JTGF40-2004) probably.Simultaneously, the high-temperature behavior of modifying asphalt significantly reduces, and makes bituminous pavement face the threat that high-temperature stability aspect diseases such as rut occur.
In sum, be badly in need of a kind of good hot storage stability that both had, can keep simultaneously the modifying asphalt of good high low temperature pavement performance again.
Summary of the invention
To above-mentioned prior art, the invention provides a kind of SBS modifying asphalt of steady heat storage, modifying asphalt of the present invention has improved the bituminous hot storage stability, has good high low temperature pavement performance simultaneously.
The present invention realizes through following technical scheme:
A kind of SBS modifying asphalt of steady heat storage; Be to be prepared from through in matrix pitch, adding styrene-butadiene-styrene block copolymer (SBS), stablizer, solubilizing agent and polyphosphoric acid; Said styrene-butadiene-styrene block copolymer weight is 2~6% of matrix pitch weight; Stablizer weight is 0.1~0.2% of matrix pitch weight, and solubilizing agent weight is 1~5% of matrix pitch weight, and polyphosphoric acid weight is 0.1~1% of matrix pitch weight.
Preferably, said stablizer is the sulphur powder, or other has the compound of the sulphur of crosslinked action.
Preferably, said solubilizing agent is that aromatic hydrocarbon rubber oil is or/and naphthenic hydrocarbon rubber is oily.
The preparation technology of the SBS modifying asphalt of said steady heat storage, step is:
(1) gets matrix pitch, be heated to 175~185 ℃;
(2) add aromatic hydrocarbon oil, stirred 40~80 seconds;
(3) add styrene-butadiene-styrene block copolymer, sheared 8~12 minutes;
(4) add the sulphur powder, sheared 8~12 minutes;
(5) add polyphosphoric acid, stir and grew 100~140 minutes, promptly get the SBS modifying asphalt of steady heat storage.
In said step (2), (5), stirring velocity is 60~80 revolutions per seconds.
In said step (3), (4), velocity of shear is 6000~7000 revolutions per seconds.
The SBS modifying asphalt of steady heat storage of the present invention has obviously improved the bituminous hot storage stability, has good high low temperature pavement performance simultaneously, has following advantage:
1, polyphosphoric acid can carry out the basic group in the pitch and SBS crosslinkedly, plays inhibition thereby can separate with bituminous SBS.
2, polyphosphoric acid carries out the basic group in the pitch and SBS crosslinked, has improved the performance of modifying asphalt, can improve softening temperature, reduces penetration degree.Reaching under the situation of identical index request, can reduce the SBS addition content.Because the polyphosphoric acid price is lower than SBS, this can reduce cost.And, make the steady heat storage property improvement of SBS modifying asphalt because the minimizing of SBS volume can make SBS absorb the oil content in the more pitch.
3, add aromatic hydrocarbons wet goods solubilizing agent bituminous viscosity degradation, softening temperature are reduced, penetration degree raises, and ductility improves; And add polyphosphoric acid the bituminous softening temperature is improved; Penetration degree reduces, and ductility reduces, so adjust the addition of the two; Can improve bituminous three big indexs comprehensively, keep good high low temperature pavement performance.
Embodiment
Below in conjunction with embodiment the present invention is further described.
The SBS modifying asphalt of embodiment 1 preparation steady heat storage
Step is following:
1, gets No. 70 matrix pitches in 1000g Shandong, be heated to 180 ℃;
2, add aromatic hydrocarbon oil 30g, stirred 1 minute;
3, add the SBS35g of 4303 models, sheared 10 minutes;
4, add sulphur powder 1.2g, sheared 10 minutes;
5, add polyphosphoric acid 5g, stir and grew 2 hours, promptly get.
Comparative Examples 1
Step is following:
1, gets No. 70 matrix pitches in 1000g Shandong, be heated to 180 ℃;
2, add the SBS40g of 4303 models, sheared 10 minutes;
3, add sulphur powder 1.2g, sheared 10 minutes;
4, stir growth 2 hours, promptly get.
Comparative Examples 2
1, gets No. 70 matrix pitches in 1000g Shandong, be heated to 180 ℃;
2, add aromatic hydrocarbon oil 30g, stirred 1 minute;
3, add the SBS40g of 4303 models, sheared 10 minutes;
4, add sulphur powder 1.2g, sheared 10 minutes;
5, stir growth 2 hours, promptly get.
Comparative Examples 3
1, gets No. 70 matrix pitches in 1000g Shandong, be heated to 180 ℃;
2, add the SBS35g of 4303 models, sheared 10 minutes;
3, add sulphur powder 1.2g, sheared 10 minutes;
4, add polyphosphoric acid 5g, stir and grew 2 hours, promptly get.
Above-mentioned stirring velocity is 80 revolutions per seconds, and velocity of shear is 6000 revolutions per seconds.
The prescription of embodiment 1 and Comparative Examples 1,2,3 thereof is relatively seen table 1:
Table 1 modifying asphalt prescription comparison sheet, the g of unit
Comparative Examples 1 | Comparative Examples 2 | Comparative Examples 3 | Embodiment 1 | |
No. 70 matrix pitches | 1000 | 1000 | 1000 | 1000 |
Aromatic hydrocarbon oil | 30 | 30 | ||
4303SBS | 40 | 40 | 35 | 35 |
The sulphur powder | 1.2 | 1.2 | 1.2 | 1.2 |
Polyphosphoric acid | 5 | 5 |
The experimental test index comparing result of the modifying asphalt of embodiment 1 and Comparative Examples 1,2,3 preparations thereof is seen table 2:
Table 2 modifying asphalt experimental test index contrast table
Can find out that from table 2 Comparative Examples 1 is for only having used the prescription of stablizer, segregation is serious; Comparative Examples 2 has been added solubilizing agent, though segregation improves, penetration degree exceeds code requirement; Polyphosphoric acid is added in contrast 3, and reduces the SBS volume, and segregation makes moderate progress, but the not enough code requirement of ductility; Embodiment 1 segregation is very little, satisfies code requirement, and each item index is relatively more balanced, all satisfies code requirement.
Embodiment 2
Step is following:
1, gets No. 70 matrix pitches of 1000g shoreization, be heated to 180 ℃;
2, add aromatic hydrocarbon oil 40g, stirred 1 minute;
3, add the SBS45g of 1301 models, sheared 8 minutes;
4, add sulphur powder 1.5g, sheared 8 minutes;
5, add polyphosphoric acid 3g, stir and grew 140 minutes, promptly get.
Above-mentioned stirring velocity is 60 revolutions per seconds, and velocity of shear is 7000 revolutions per seconds.
The experimental test index result of the modifying asphalt of embodiment 2 preparations sees table 3:
Table 3 modifying asphalt experimental test index table
Index | Unit | Test-results | Technical requirements I-D |
Penetration degree (25 ℃, 100g, 5s) | 0.1mm | 51 | 40~60 |
Ductility (5 ℃, 5cm/min) | cm | 29 | ≮20 |
Softening temperature (R&B) | ℃ | 75 | ≮60 |
Segregation (the 48h softening temperature is poor) | ℃ | 2 | ≯2.5 |
Embodiment 2 uses be penetration degree less, with No. 70 relatively poor matrix pitches of SBS properties-correcting agent consistency, SBS properties-correcting agent uses and bitumen compatibility line style 1301 type SBS preferably, uses the indexs such as SBS modifying asphalt segregation of embodiment 2 to satisfy code requirement.
Embodiment 3
Step is following:
1, gets 1000g Korea S SK70 matrix pitch, be heated to 180 ℃;
2, add aromatic hydrocarbon oil 20g, stirred 1 minute;
3, add the SBS30g of 4303 models, sheared 12 minutes;
4, add sulphur powder 1.1g, sheared 12 minutes;
5, add polyphosphoric acid 7g, stir and grew 2 hours, promptly get.
Above-mentioned stirring velocity is 70 revolutions per seconds, and velocity of shear is 6500 revolutions per seconds.
The experimental test index result of the modifying asphalt of embodiment 3 preparations sees table 4:
Table 4 modifying asphalt experimental test index table
Index | Unit | Test-results | Technical requirements I-D |
Penetration degree (25 ℃, 100g, 5s) | 0.1mm | 57 | 40~60 |
Ductility (5 ℃, 5cm/min) | cm | 32 | ≮20 |
Softening temperature (R&B) | ℃ | 67 | ≮60 |
Segregation (the 48h softening temperature is poor) | ℃ | 1 | ≯2.5 |
Embodiment 3 uses be penetration degree big, with SBS properties-correcting agent consistency No. 70 matrix pitches preferably, use the indexs such as SBS modifying asphalt segregation of embodiment 3 to satisfy code requirement.
Embodiment 4
Step is following:
1, gets 1000g Korea S SK90 matrix pitch, be heated to 175 ℃;
2, add aromatic hydrocarbon oil 30g, stirred 1 minute;
3, add the SBS40g of 4303 models, sheared 12 minutes;
4, add sulphur powder 1.2g, sheared 8 minutes;
5, add polyphosphoric acid 4g, stir and grew 2 hours, promptly get.
Above-mentioned stirring velocity is 80 revolutions per seconds, and velocity of shear is 7000 revolutions per seconds.
The experimental test index result of the modifying asphalt of embodiment 4 preparations sees table 5:
Table 5 modifying asphalt experimental test index table
Index | Unit | Test-results | Technical requirements I-C |
Penetration degree (25 ℃, 100g, 5s) | 0.1mm | 72 | 60~80 |
Ductility (5 ℃, 5cm/min) | cm | 44 | ≮30 |
Softening temperature (R&B) | ℃ | 73 | ≮55 |
Segregation (the 48h softening temperature is poor) | ℃ | 1.5 | ≯2.5 |
What embodiment 4 used is No. 90 matrix pitches, uses the indexs such as SBS modifying asphalt segregation of embodiment 4 to satisfy code requirement.
Claims (7)
1. the SBS modifying asphalt of a steady heat storage; It is characterized in that: be to be prepared from through in matrix pitch, adding styrene-butadiene-styrene block copolymer, stablizer, solubilizing agent and polyphosphoric acid; Said styrene-butadiene-styrene block copolymer weight is 2~6% of matrix pitch weight; Stablizer weight is 0.1~0.2% of matrix pitch weight, and solubilizing agent weight is 1~5% of matrix pitch weight, and polyphosphoric acid weight is 0.1~1% of matrix pitch weight.
2. the SBS modifying asphalt of a kind of steady heat storage according to claim 1, it is characterized in that: said stablizer is that sulphur is or/and the compound of sulphur.
3. the SBS modifying asphalt of a kind of steady heat storage according to claim 1, it is characterized in that: said solubilizing agent is that aromatic hydrocarbon rubber oil is or/and naphthenic hydrocarbon rubber is oily.
4. the SBS modifying asphalt of a kind of steady heat storage according to claim 1; It is characterized in that: said styrene-butadiene-styrene block copolymer weight is 3.5% of matrix pitch weight; Stablizer weight is 0.12% of matrix pitch weight; Solubilizing agent weight is 3% of matrix pitch weight, and polyphosphoric acid weight is 0.5% of matrix pitch weight; Said matrix pitch is No. 70 matrix pitches, and said styrene-butadiene-styrene block copolymer is the SBS of 4303 models, and said stablizer is the sulphur powder, said solubilizing agent aromatic hydrocarbon oil.
5. the preparation technology of the SBS modifying asphalt of each described a kind of steady heat storage in the claim 1~4, it is characterized in that: step is:
(1) gets matrix pitch, be heated to 175~185 ℃;
(2) add aromatic hydrocarbon oil, stirred 40~80 seconds;
(3) add styrene-butadiene-styrene block copolymer, sheared 8~12 minutes;
(4) add the sulphur powder, sheared 8~12 minutes;
(5) add polyphosphoric acid, stir and grew 100~140 minutes, promptly get the SBS modifying asphalt of steady heat storage.
6. preparation technology according to claim 5 is characterized in that: in said step (2), (5), stirring velocity is 60~80 revolutions per seconds.
7. preparation technology according to claim 5 is characterized in that: in said step (3), (4), velocity of shear is 6000~7000 revolutions per seconds.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100088899A CN102585525A (en) | 2012-01-12 | 2012-01-12 | SBS (styrene-butadiene-styrene) modified asphalt with stable thermal storage and preparation process thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100088899A CN102585525A (en) | 2012-01-12 | 2012-01-12 | SBS (styrene-butadiene-styrene) modified asphalt with stable thermal storage and preparation process thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102585525A true CN102585525A (en) | 2012-07-18 |
Family
ID=46474791
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100088899A Pending CN102585525A (en) | 2012-01-12 | 2012-01-12 | SBS (styrene-butadiene-styrene) modified asphalt with stable thermal storage and preparation process thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102585525A (en) |
Cited By (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103232713A (en) * | 2013-05-03 | 2013-08-07 | 中海油(青岛)重质油加工工程技术研究中心有限公司 | Large-aperture permeable asphalt and preparation method thereof |
CN103305014A (en) * | 2013-05-06 | 2013-09-18 | 中海油(青岛)重质油加工工程技术研究中心有限公司 | SBS (stimulated brillouin scattering) modified asphalt and preparation method thereof |
CN103396670A (en) * | 2013-07-11 | 2013-11-20 | 河海大学 | Waterproof modified asphalt for dam asphalt well and preparation method thereof |
CN103773008A (en) * | 2012-10-25 | 2014-05-07 | 中国石油化工股份有限公司 | High-viscosity modified asphalt and preparation method thereof |
CN103788668A (en) * | 2013-12-30 | 2014-05-14 | 长沙理工大学 | Composite modified asphalt and preparation method thereof |
CN103865280A (en) * | 2014-03-12 | 2014-06-18 | 长安大学 | Compound modified asphalt and preparation method thereof |
CN104059369A (en) * | 2014-07-01 | 2014-09-24 | 无锡市鑫路道路材料有限公司 | Composite polymer modified asphalt and preparing method of composite polymer modified asphalt |
CN105585863A (en) * | 2014-10-22 | 2016-05-18 | 中国石油化工股份有限公司 | High softening point asphalt modifier and asphalt composition and preparation method |
CN105838093A (en) * | 2016-04-22 | 2016-08-10 | 河南普天交通科技有限公司 | SBS (styrene-butadiene-styrene) modified asphalt and preparation method thereof |
CN106810883A (en) * | 2015-12-02 | 2017-06-09 | 中国石油化工股份有限公司 | A kind of bituminous composition and preparation method thereof |
CN107163599A (en) * | 2017-07-05 | 2017-09-15 | 河南师范大学 | A kind of preparation method of road and bridge coiled material modified pitch |
CN107189464A (en) * | 2017-07-05 | 2017-09-22 | 河南省高远公路养护技术有限公司 | It is a kind of for emulsified bitumen modifying agent of road in alpine region engineering and its preparation method and application |
CN107189462A (en) * | 2017-07-05 | 2017-09-22 | 河南师范大学 | A kind of preparation method of composite modified asphalt |
CN107216664A (en) * | 2017-07-05 | 2017-09-29 | 河南省高远公路养护技术有限公司 | A kind of emulsified bitumen modifying agent, preparation method and its application in modified emulsifying asphalt is prepared |
CN107245246A (en) * | 2017-05-14 | 2017-10-13 | 中铁二院工程集团有限责任公司 | A kind of modified pitch for improving high-speed railway tunneling boring bituminous concrete reinforcing surface layer of subgrade bed cryogenic property and preparation method thereof |
CN109593374A (en) * | 2018-12-04 | 2019-04-09 | 黄河三角洲京博化工研究院有限公司 | A kind of hydraulic asphalt and preparation method thereof |
CN109971195A (en) * | 2019-04-26 | 2019-07-05 | 西安公路研究院 | A kind of modified pitch and preparation method thereof |
CN110218463A (en) * | 2019-07-16 | 2019-09-10 | 黄河三角洲京博化工研究院有限公司 | A kind of modified pitch and preparation method thereof |
CN110437632A (en) * | 2018-05-04 | 2019-11-12 | 中国石油化工股份有限公司 | A kind of modifying agent mother liquor and road asphalt and its preparation method |
CN110484010A (en) * | 2019-09-12 | 2019-11-22 | 吉林省交通规划设计院 | A kind of road bio-rubber modified pitch and preparation method thereof |
CN111393863A (en) * | 2020-04-14 | 2020-07-10 | 四川路友交通物资发展有限公司 | Rubber powder modified asphalt and preparation method thereof |
CN112724697A (en) * | 2020-12-30 | 2021-04-30 | 北新禹王防水科技(安徽)有限公司 | High polymer modified asphalt and processing system |
CN112745627A (en) * | 2019-10-30 | 2021-05-04 | 中国石油化工股份有限公司 | High-viscosity asphalt additive and preparation method thereof |
WO2022052202A1 (en) * | 2020-09-08 | 2022-03-17 | 福州大学 | High-toughness sbs/sbr polyphosphoric acid composite modified asphalt and preparation method therefor |
CN114479791A (en) * | 2020-10-27 | 2022-05-13 | 中国石油化工股份有限公司 | Plugging agent for oil-based drilling fluid and application |
CN114479790A (en) * | 2020-10-27 | 2022-05-13 | 中国石油化工股份有限公司 | Plugging agent for oil-based drilling fluid and preparation method and application thereof |
CN115572412A (en) * | 2022-11-09 | 2023-01-06 | 中交第二航务工程局有限公司 | Stabilizer for improving storage stability of polymer modified asphalt |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1339557A (en) * | 2000-08-18 | 2002-03-13 | 中国石油化工股份有限公司 | Process for preparing modified asphalt with improved storage stability |
-
2012
- 2012-01-12 CN CN2012100088899A patent/CN102585525A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1339557A (en) * | 2000-08-18 | 2002-03-13 | 中国石油化工股份有限公司 | Process for preparing modified asphalt with improved storage stability |
Non-Patent Citations (1)
Title |
---|
毛三鹏等: "多聚磷酸在SBS改性沥青中的应用研究", 《石油沥青》 * |
Cited By (44)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103773008A (en) * | 2012-10-25 | 2014-05-07 | 中国石油化工股份有限公司 | High-viscosity modified asphalt and preparation method thereof |
CN103773008B (en) * | 2012-10-25 | 2016-03-30 | 中国石油化工股份有限公司 | A kind of high-viscosity modified asphalt and preparation method thereof |
CN103232713A (en) * | 2013-05-03 | 2013-08-07 | 中海油(青岛)重质油加工工程技术研究中心有限公司 | Large-aperture permeable asphalt and preparation method thereof |
CN103232713B (en) * | 2013-05-03 | 2015-08-12 | 中国海洋石油总公司 | A kind of Large-aperture permeable asphalt and preparation method thereof |
CN103305014A (en) * | 2013-05-06 | 2013-09-18 | 中海油(青岛)重质油加工工程技术研究中心有限公司 | SBS (stimulated brillouin scattering) modified asphalt and preparation method thereof |
CN103305014B (en) * | 2013-05-06 | 2015-08-26 | 中国海洋石油总公司 | A kind of SBS modifying asphalt and preparation method thereof |
CN103396670A (en) * | 2013-07-11 | 2013-11-20 | 河海大学 | Waterproof modified asphalt for dam asphalt well and preparation method thereof |
CN103396670B (en) * | 2013-07-11 | 2016-03-23 | 河海大学 | A kind of water-repellent modified pitch for dam asphalt well and preparation method thereof |
CN103788668A (en) * | 2013-12-30 | 2014-05-14 | 长沙理工大学 | Composite modified asphalt and preparation method thereof |
CN103788668B (en) * | 2013-12-30 | 2016-01-06 | 长沙理工大学 | A kind of composite modified asphalt and preparation method thereof |
CN103865280B (en) * | 2014-03-12 | 2016-04-06 | 长安大学 | A kind of composite modified asphalt and preparation method thereof |
CN103865280A (en) * | 2014-03-12 | 2014-06-18 | 长安大学 | Compound modified asphalt and preparation method thereof |
CN104059369A (en) * | 2014-07-01 | 2014-09-24 | 无锡市鑫路道路材料有限公司 | Composite polymer modified asphalt and preparing method of composite polymer modified asphalt |
CN105585863A (en) * | 2014-10-22 | 2016-05-18 | 中国石油化工股份有限公司 | High softening point asphalt modifier and asphalt composition and preparation method |
CN105585863B (en) * | 2014-10-22 | 2018-07-20 | 中国石油化工股份有限公司 | A kind of high softening point bitumen modifying agent and its bituminous composition and preparation method |
CN106810883A (en) * | 2015-12-02 | 2017-06-09 | 中国石油化工股份有限公司 | A kind of bituminous composition and preparation method thereof |
CN106810883B (en) * | 2015-12-02 | 2020-02-07 | 中国石油化工股份有限公司 | Asphalt composition and preparation method thereof |
CN105838093A (en) * | 2016-04-22 | 2016-08-10 | 河南普天交通科技有限公司 | SBS (styrene-butadiene-styrene) modified asphalt and preparation method thereof |
CN107245246A (en) * | 2017-05-14 | 2017-10-13 | 中铁二院工程集团有限责任公司 | A kind of modified pitch for improving high-speed railway tunneling boring bituminous concrete reinforcing surface layer of subgrade bed cryogenic property and preparation method thereof |
CN107163599A (en) * | 2017-07-05 | 2017-09-15 | 河南师范大学 | A kind of preparation method of road and bridge coiled material modified pitch |
CN107189464A (en) * | 2017-07-05 | 2017-09-22 | 河南省高远公路养护技术有限公司 | It is a kind of for emulsified bitumen modifying agent of road in alpine region engineering and its preparation method and application |
CN107189462A (en) * | 2017-07-05 | 2017-09-22 | 河南师范大学 | A kind of preparation method of composite modified asphalt |
CN107216664A (en) * | 2017-07-05 | 2017-09-29 | 河南省高远公路养护技术有限公司 | A kind of emulsified bitumen modifying agent, preparation method and its application in modified emulsifying asphalt is prepared |
CN107163599B (en) * | 2017-07-05 | 2019-07-23 | 河南师范大学 | A kind of preparation method of road and bridge coiled material modified pitch |
CN110437632B (en) * | 2018-05-04 | 2021-05-04 | 中国石油化工股份有限公司 | Modifier mother liquor and road asphalt and preparation method thereof |
CN110437632A (en) * | 2018-05-04 | 2019-11-12 | 中国石油化工股份有限公司 | A kind of modifying agent mother liquor and road asphalt and its preparation method |
CN109593374A (en) * | 2018-12-04 | 2019-04-09 | 黄河三角洲京博化工研究院有限公司 | A kind of hydraulic asphalt and preparation method thereof |
CN109971195A (en) * | 2019-04-26 | 2019-07-05 | 西安公路研究院 | A kind of modified pitch and preparation method thereof |
CN109971195B (en) * | 2019-04-26 | 2021-04-30 | 西安公路研究院 | Modified asphalt and preparation method thereof |
CN110218463B (en) * | 2019-07-16 | 2021-09-21 | 黄河三角洲京博化工研究院有限公司 | Modified asphalt and preparation method thereof |
CN110218463A (en) * | 2019-07-16 | 2019-09-10 | 黄河三角洲京博化工研究院有限公司 | A kind of modified pitch and preparation method thereof |
CN110484010A (en) * | 2019-09-12 | 2019-11-22 | 吉林省交通规划设计院 | A kind of road bio-rubber modified pitch and preparation method thereof |
CN112745627B (en) * | 2019-10-30 | 2022-07-08 | 中国石油化工股份有限公司 | High-viscosity asphalt additive and preparation method thereof |
CN112745627A (en) * | 2019-10-30 | 2021-05-04 | 中国石油化工股份有限公司 | High-viscosity asphalt additive and preparation method thereof |
CN111393863A (en) * | 2020-04-14 | 2020-07-10 | 四川路友交通物资发展有限公司 | Rubber powder modified asphalt and preparation method thereof |
CN111393863B (en) * | 2020-04-14 | 2022-02-18 | 四川路友交通物资发展有限公司 | Rubber powder modified asphalt and preparation method thereof |
WO2022052202A1 (en) * | 2020-09-08 | 2022-03-17 | 福州大学 | High-toughness sbs/sbr polyphosphoric acid composite modified asphalt and preparation method therefor |
CN114479791A (en) * | 2020-10-27 | 2022-05-13 | 中国石油化工股份有限公司 | Plugging agent for oil-based drilling fluid and application |
CN114479790A (en) * | 2020-10-27 | 2022-05-13 | 中国石油化工股份有限公司 | Plugging agent for oil-based drilling fluid and preparation method and application thereof |
CN114479791B (en) * | 2020-10-27 | 2023-07-28 | 中国石油化工股份有限公司 | Plugging agent for oil-based drilling fluid and application |
CN114479790B (en) * | 2020-10-27 | 2023-08-01 | 中国石油化工股份有限公司 | Plugging agent for oil-based drilling fluid and preparation method and application thereof |
CN112724697A (en) * | 2020-12-30 | 2021-04-30 | 北新禹王防水科技(安徽)有限公司 | High polymer modified asphalt and processing system |
CN115572412A (en) * | 2022-11-09 | 2023-01-06 | 中交第二航务工程局有限公司 | Stabilizer for improving storage stability of polymer modified asphalt |
CN115572412B (en) * | 2022-11-09 | 2024-03-22 | 中交第二航务工程局有限公司 | Stabilizer for improving storage stability of polymer modified asphalt |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102585525A (en) | SBS (styrene-butadiene-styrene) modified asphalt with stable thermal storage and preparation process thereof | |
CN106433168B (en) | A kind of non-volatile normal temperature modified bituminous cement and non-volatile normal-temperature regeneration asphalt mixture | |
CN105331127A (en) | Improved SBS (Styrene Butadiene Styrene) modified asphalt and manufacturing method thereof | |
CN103059593B (en) | Diatomite compound SBS (Styrene Butadiene Styrene) modified asphalt and preparation method thereof | |
WO2019129148A1 (en) | Modified asphalt and preparation method therefor | |
CN102766338B (en) | Wide temperature range modified asphalt for roads and preparation method thereof | |
CN103305015B (en) | Warm mix high-elastic plasticity bridge expanssion joint seam sealer and preparation method | |
CN103773011B (en) | A kind of bitumen regenerant and preparation method thereof | |
CN103613940A (en) | Rock asphalt composite modifier as well as preparation method and application thereof | |
CN103194072A (en) | Complex modified asphalt composition and preparation method thereof | |
CN101265363A (en) | Waste and old rubber powder modifying asphalt and preparation method thereof | |
CN105907020A (en) | Wheel sticking prevention modified emulsified asphalt and preparation method thereof | |
CN103289321B (en) | Pavement thermoregulation paving material based on phase-change heat accumulation microcapsules | |
CN107915878B (en) | Asphalt composite modifier suitable for modified hard asphalt and preparation method thereof | |
CN103113044B (en) | High-modulus bituminous mixture admixed with waste material, preparation method and method for preparing mixture specimen | |
CN103497481A (en) | Colored asphalt cementing material and preparation method thereof | |
CN103773009B (en) | A kind of preparation method of high-viscosity modified asphalt | |
CN106810883B (en) | Asphalt composition and preparation method thereof | |
CN108165036A (en) | A kind of modified asphalt composite of low temperature performance excellent and preparation method thereof | |
CN102924936A (en) | Bituminous cold reclaiming agent and application of bituminous cold reclaiming agent in cold reclaiming of bituminous concrete | |
CN104761918A (en) | On-site cooled regeneration special emulsified asphalt mixture | |
CN103773008A (en) | High-viscosity modified asphalt and preparation method thereof | |
CN103834184A (en) | High-modulus asphalt and preparation method thereof | |
CN112500711A (en) | High-viscoelasticity modified asphalt and preparation method thereof | |
CN105837099A (en) | Compound regenerative asphalt concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120718 |