CN102577889A - Overground spatial protection method for ancient trees - Google Patents

Overground spatial protection method for ancient trees Download PDF

Info

Publication number
CN102577889A
CN102577889A CN2011100026120A CN201110002612A CN102577889A CN 102577889 A CN102577889 A CN 102577889A CN 2011100026120 A CN2011100026120 A CN 2011100026120A CN 201110002612 A CN201110002612 A CN 201110002612A CN 102577889 A CN102577889 A CN 102577889A
Authority
CN
China
Prior art keywords
ancient tree
steel sheet
sheet pile
around
ancient
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100026120A
Other languages
Chinese (zh)
Other versions
CN102577889B (en
Inventor
闵卫国
杨敏
施臻
赵琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No2 Building Co Ltd
Original Assignee
Shanghai No2 Building Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No2 Building Co Ltd filed Critical Shanghai No2 Building Co Ltd
Priority to CN201110002612.0A priority Critical patent/CN102577889B/en
Publication of CN102577889A publication Critical patent/CN102577889A/en
Application granted granted Critical
Publication of CN102577889B publication Critical patent/CN102577889B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an overground spatial protection method for ancient trees, which includes: driving in at least one circle of steel sheet piles around the roots of an ancient tree; and setting a circle of steel sheets around the upper portion of the ancient tree. By the overground spatial protection method, the Lassen steel sheet piles are used to effectively prevent cement slurry to invade the land around the ancient tree, maintenance observation wells are used to facilitate detection of water level around the ancient tree and water level for constructors, and surrounding pollution is effectively managed for the ancient tree.

Description

The guard method of aboveground space ancient tree
Technical field
The present invention relates to a kind of environmental protection node, relate in particular to the protection node of a kind of aboveground space top ancient tree.
Background technology
Now, Along with people's is to the attention of environmental protection, has increasing ground surface works team when operation, near the underground ancient tree the engineering to be protected.The node processing of the common ancient tree virescence maintenance that often has at first adopts the color steel enclosure wall to go along with sb. to guard him around ancient tree; Next sends the special messenger to carry out ancient tree maintenance greening; And this kind handled and can be produced following problem: (1) on every side underground engineering be used for reinforcing the ground wall the muddy water of cement mixing pile owing to too near ancient tree, infiltrate the root system scope of ancient tree easily.(2) damage of alkaline water to ancient tree can not be effectively isolated in common maintenance.(3) the basement structure construction stage is prone to the subterranean water level reduction, influences the existence of ancient tree.
Summary of the invention
The purpose of aboveground space ancient tree of the present invention guard method is to overcome the deficiency of prior art, and a kind of protection node to the harm of ancient tree root system that can prevent cement, alkaline water and subterranean water level etc. is provided, and effectively ancient tree is protected.
To achieve these goals, the technical scheme taked of the present invention is:
The guard method of a kind of aboveground space ancient tree wherein, is squeezed at least one circle steel sheet pile around the root of ancient tree; Enclose around the top of said ancient tree and to put a circle steel plate.
In the first embodiment of the present invention, select two-layer Larsen steel sheet pile as said steel sheet pile.
In the second embodiment of the present invention, said steel sheet pile is provided with around said ancient tree radius 10m place, and the degree of depth is 12m.
In the third embodiment of the present invention, select color steel as said steel plate.
In the fourth embodiment of the present invention, said steel plate is provided with around said ancient tree radius 5m place, and highly is 2.2m.
In the fifth embodiment of the present invention, below said ancient tree, be provided with a bite maintenance at least and observe well.
In the sixth embodiment of the present invention, the diameter that well is observed in said maintenance is 600mm, and the degree of depth is 2000mm.
In the seventh embodiment of the present invention, squeezing into a circle degree of depth at the peripheral 1m place of said steel sheet pile is the cement steel sheet pile of 20m.
In the eighth embodiment of the present invention, on said ancient tree, cover one deck crape net.
In the nineth embodiment of the present invention, below said ancient tree, enclose the shading canopy around being provided with one.
The present invention is owing to adopted above-mentioned technology, and the good effect that makes it to have is:
(1) use through the Larsen steel sheet pile prevents the peripheral soil of cement mortar intrusion ancient tree effectively.
(2) being convenient to the constructor through maintenance observation well detects water level around the ancient tree and water level.
Description of drawings
Fig. 1 is the sketch map of aboveground space ancient tree of the present invention guard method;
Fig. 2 is the cutaway view of aboveground space ancient tree of the present invention guard method.
Embodiment
Provide the embodiment of aboveground space ancient tree of the present invention guard method below in conjunction with accompanying drawing.
Fig. 1 is the sketch map of aboveground space ancient tree of the present invention guard method; Fig. 2 is the cutaway view of aboveground space ancient tree of the present invention guard method, see also illustrated in figures 1 and 2, the guard method of a kind of aboveground space ancient tree; At the root of ancient tree 1 to be protected around squeezing at least one circle steel sheet pile 2; The periphery that vertically is arranged in ancient tree 1 root of steel sheet pile 2 concave-convex surfaces to the lower part increase safeguard measure of ancient tree 1, is enclosed steel plate 4 on the top of ancient tree 1 around being provided with one; Steel plate 4 vertically is arranged in the ancient tree 1 and encloses, to the top increase safeguard measure of ancient tree 1.
In the practice process of the present invention, through the use of steel sheet pile, can be effectively the soil of ancient tree root periphery be left with being separated by by the construction soil, cement mortar immerses in the soil of ancient tree root periphery when preventing to construct; Through the use of steel plate, can ancient tree around around one the circle baffle plate, with ancient tree with kept apart by the job site, block the infiltration of sewage effectively.
In the first embodiment of the present invention, steel sheet pile 2 can adopt the Larsen steel sheet pile as material, and the Larsen steel sheet pile is chosen two-layer.Ground floor steel sheet pile 2 around squeeze into ancient tree 1 around; Second layer steel sheet pile 2 is close to ground floor steel sheet pile 2 and is provided with; Because the Larsen steel sheet pile has good sealing property; And the setting through two-layered steel plates stake 2, can avoid cement mortar to see through 2 pairs of ancient tree roots of steel sheet pile soil effectively and attack.
In the second embodiment of the present invention, steel sheet pile 2 is around ancient tree 1 radius 10m place facility, and its degree of depth is 12m.Certainly; This size is only squeezed into setting according to the size of above-mentioned ancient tree 1 to be protected; It is a preferred size, if the ancient tree to be protected of other different scales is arranged, promptly comes the setting of arranging of steel sheet pile 2 on every side according to its size; Only need to satisfy and to avoid cement mortar to see through 2 pairs of ancient tree roots of steel sheet pile soil effectively attacking and get final product, do not do at this and give unnecessary details.
In the third embodiment of the present invention, steel plate 4 can adopt color steel as material.Installation period is short, sealing performance good because color steel has, and can block extraneous sewage through steel plate 4 effectively and infiltrate to the inside of ancient tree 1.
In the fourth embodiment of the present invention, steel plate 4 is provided with around ancient tree 1 radius 5m place, and it highly is 2.2m.Certainly; The size of this steel plate 4 is only installed according to the size of above-mentioned ancient tree 1 to be protected; It is a preferred size, if the ancient tree to be protected of other different scales is arranged, promptly comes the setting of arranging of steel plate 4 on every side according to its size; Only need to satisfy and can be effectively block extraneous sewage and infiltrate to the inside of ancient tree 1 and get final product, do not do at this and give unnecessary details through steel plate 4.
In the fifth embodiment of the present invention, below ancient tree 1, be provided with a bite maintenance at least and observe well 5.Observing well 5 through maintenance is convenient to construction period water level and water quality around the ancient tree 1 is observed.
In the sixth embodiment of the present invention, the diameter that well 5 is observed in maintenance is 600mm, and its degree of depth is 2000mm.
In the seventh embodiment of the present invention; Also squeeze into a circle cement steel sheet pile 3 at the peripheral 1m place of steel sheet pile 2; The degree of depth of cement steel sheet pile 3 is 20m, and the cement of generation infiltrates in the soil of ancient tree root periphery when preventing that through cement steel sheet pile 3 construction period, peripheral cement was built.Certainly; The size of this cement steel sheet pile 3 is only squeezed into setting according to the size of above-mentioned ancient tree 1 to be protected; It is a preferred size, if the ancient tree to be protected of other different scales is arranged, promptly comes the setting of arranging of cement steel sheet pile 3 on every side according to its size; The cement that only need satisfy generation in the time of can preventing that effectively peripheral cement from building through cement steel sheet pile 3 infiltrates in the peripheral soil of ancient tree root and gets final product, and does not do at this and gives unnecessary details.
In the eighth embodiment of the present invention; In the actual installation process; Can on ancient tree 1, cover one deck crape net; Can the crape net be covered to ground from the top of ancient tree 1, also can the crape net directly be wrapped in the bark part of ancient tree 1, can prevent effectively that through the crape net construction period on-the-spot airborne dust from producing ancient tree 1 and pollute.
In the nineth embodiment of the present invention, in the actual installation process, also can be around a circle shading canopy is set, to avoid the influence of illuminating light radiation of construction period below ancient tree 1 to ancient tree 1.
Aboveground space ancient tree of the present invention guard method; Construction period is when protecting ancient tree; At first around the root of ancient tree, enclose the Larsen steel sheet pile around squeezing into one; Squeeze into a circle cement steel sheet pile again in the periphery of Larsen steel sheet pile, cement mortar immersed in the ancient tree soil on every side when the use through Larsen steel sheet pile and cement steel sheet pile can prevent to construct effectively.Color steel is enclosed around being provided with one in top ancient tree; At least one maintenance is set below ancient tree observes a well and a circle shading canopy; On ancient tree, also can cover one deck crape net; Can be convenient to construction period to on-the-spot dust pollution through these measures, the light radiation of construction illumination and water pollute and carry out effective control and management, finally with the protection ancient tree.
In sum; Use aboveground space ancient tree of the present invention guard method; Prevent the soil of cement mortar intrusion ancient tree periphery effectively through the use of Larsen steel sheet pile; Be convenient to the constructor through maintenance observation well water level around the ancient tree and water level are detected, effectively the pollution around the ancient tree is managed.
The above is merely preferred embodiment of the present invention, not in order to restriction the present invention, all any modifications of within spirit of the present invention and principle, being done, is equal to and replaces and improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. aboveground space ancient tree guard method is characterized in that, squeezes at least one circle steel sheet pile around the root of ancient tree; Enclose around the top of said ancient tree and to put a circle steel plate.
2. aboveground space ancient tree according to claim 1 guard method is characterized in that, selects two-layer Larsen steel sheet pile as said steel sheet pile.
3. aboveground space ancient tree according to claim 2 guard method is characterized in that, said steel sheet pile is provided with around said ancient tree radius 10m place, and the degree of depth is 12m.
4. aboveground space ancient tree according to claim 1 guard method is characterized in that, selects color steel as said steel plate.
5. aboveground space ancient tree according to claim 4 guard method is characterized in that, said steel plate is provided with around said ancient tree radius 5m place, and highly is 2.2m.
6. aboveground space ancient tree according to claim 1 guard method is characterized in that, below said ancient tree, is provided with a bite maintenance at least and observes well.
7. aboveground space ancient tree according to claim 6 guard method is characterized in that, the diameter that well is observed in said maintenance is 600mm, and the degree of depth is 2000mm.
8. aboveground space ancient tree according to claim 1 guard method is characterized in that, squeezing into a circle degree of depth at the peripheral 1m place of said steel sheet pile is the cement steel sheet pile of 20m.
9. according to the guard method of the arbitrary described aboveground space ancient tree of claim 1 ~ 8, it is characterized in that, on said ancient tree, cover one deck crape net.
10. according to the guard method of the arbitrary described aboveground space ancient tree of claim 1 ~ 8, it is characterized in that, below said ancient tree, enclose the shading canopy around being provided with one.
CN201110002612.0A 2011-01-07 2011-01-07 Overground spatial protection method for ancient trees Active CN102577889B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110002612.0A CN102577889B (en) 2011-01-07 2011-01-07 Overground spatial protection method for ancient trees

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110002612.0A CN102577889B (en) 2011-01-07 2011-01-07 Overground spatial protection method for ancient trees

Publications (2)

Publication Number Publication Date
CN102577889A true CN102577889A (en) 2012-07-18
CN102577889B CN102577889B (en) 2015-08-05

Family

ID=46467579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110002612.0A Active CN102577889B (en) 2011-01-07 2011-01-07 Overground spatial protection method for ancient trees

Country Status (1)

Country Link
CN (1) CN102577889B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107182642A (en) * 2017-06-21 2017-09-22 中国航天建设集团有限公司 Old trees' conservancy method and old trees' conservancy system
CN108934654A (en) * 2018-07-09 2018-12-07 杭州三江园林绿化工程有限公司 A kind of ancient tree original place guard method in dredging waterway
CN115299275A (en) * 2022-07-11 2022-11-08 北京市政路桥股份有限公司 Funnel type ancient tree protection structure construction method for upper part of slope terrain tunnel
CN115316169A (en) * 2022-07-11 2022-11-11 北京市政路桥股份有限公司 Basin-type ancient tree protection structure constructed synchronously by utilizing tunnel anchor rods and construction method
CN115299275B (en) * 2022-07-11 2024-05-10 北京市政路桥股份有限公司 Construction method of funnel type ancient tree protection structure for upper part of slope terrain tunnel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU8166691A (en) * 1990-08-24 1992-02-27 Isao Yamada Method of planting trees in drying region
DE4206648A1 (en) * 1992-03-03 1993-09-09 Otto Scharnweber Garten Und La Method of moving tree and root system laterally - uses horizontal sheet piles driven under root ball and on top of slipway with cross members between them
CN2607745Y (en) * 2003-02-20 2004-03-31 刘世明 Seedling growth pit for desert tree-planting
CN101406150A (en) * 2008-11-27 2009-04-15 中国科学院武汉植物园 Operation method for transplanting wild big tree
CN201398349Y (en) * 2009-04-09 2010-02-10 吴伟明 Semicircle big tree transplanting box
CN201398344Y (en) * 2009-04-09 2010-02-10 吴伟明 Square big tree transplanting box

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU8166691A (en) * 1990-08-24 1992-02-27 Isao Yamada Method of planting trees in drying region
DE4206648A1 (en) * 1992-03-03 1993-09-09 Otto Scharnweber Garten Und La Method of moving tree and root system laterally - uses horizontal sheet piles driven under root ball and on top of slipway with cross members between them
CN2607745Y (en) * 2003-02-20 2004-03-31 刘世明 Seedling growth pit for desert tree-planting
CN101406150A (en) * 2008-11-27 2009-04-15 中国科学院武汉植物园 Operation method for transplanting wild big tree
CN201398349Y (en) * 2009-04-09 2010-02-10 吴伟明 Semicircle big tree transplanting box
CN201398344Y (en) * 2009-04-09 2010-02-10 吴伟明 Square big tree transplanting box

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
牟松: "穿越名木古树群浅埋隧道施工技术", 《隧道建设》, vol. 24, no. 02, 30 April 2004 (2004-04-30) *
肖斌: "韶山高速公路绿化工程大树栽植技术要点", 《湖南交通科技》, vol. 34, no. 04, 31 December 2008 (2008-12-31), pages 187 - 189 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107182642A (en) * 2017-06-21 2017-09-22 中国航天建设集团有限公司 Old trees' conservancy method and old trees' conservancy system
CN108934654A (en) * 2018-07-09 2018-12-07 杭州三江园林绿化工程有限公司 A kind of ancient tree original place guard method in dredging waterway
CN115299275A (en) * 2022-07-11 2022-11-08 北京市政路桥股份有限公司 Funnel type ancient tree protection structure construction method for upper part of slope terrain tunnel
CN115316169A (en) * 2022-07-11 2022-11-11 北京市政路桥股份有限公司 Basin-type ancient tree protection structure constructed synchronously by utilizing tunnel anchor rods and construction method
CN115316169B (en) * 2022-07-11 2024-01-09 北京市政路桥股份有限公司 Basin-type ancient tree protection structure synchronously constructed by tunnel anchor rods and construction method
CN115299275B (en) * 2022-07-11 2024-05-10 北京市政路桥股份有限公司 Construction method of funnel type ancient tree protection structure for upper part of slope terrain tunnel

Also Published As

Publication number Publication date
CN102577889B (en) 2015-08-05

Similar Documents

Publication Publication Date Title
US20160273181A1 (en) Flood Prevention System and Method
CN203808215U (en) Side slope drainage and protection structure
CN102577889B (en) Overground spatial protection method for ancient trees
CN104847364A (en) Construction method of shield and continuous cutting pile foundation for penetrating through residential building group
CN102002952B (en) Spiral flow tank pit protection construction method for soil and rock combined region
CN210816669U (en) Dangerous waste rigid landfill pool
CN101761069B (en) Construction method of three-in-one underground diaphragm wall
CN110586606A (en) Dangerous waste rigid landfill pool
CN102373675B (en) Fabricated culvert member and construction method thereof
CN212772481U (en) Anti earthquake liquefaction system of sand foundation building
CN104805873A (en) Multi-defense line type anti-floating system capable of monitoring release of water pressure of basement
JP5352023B1 (en) Simple bottom plate structure of final disposal site
CN204608811U (en) Ultra-deep-water position drop and drainage structure
CN210341959U (en) Foundation pit drainage system
JP2014223561A (en) Simple vertical wall structure of final disposal site
CN203145003U (en) Manual holing pouring pile with high security
CN102635044A (en) Treating method of dynamic compacter for excavation roadbed
KR101622337B1 (en) Layered debris barrier with eco-corridors and monitoring system
CN203927685U (en) A kind of integral solar garden lamp
CN106351173A (en) Water-permeable breakwater structure
CN202247924U (en) Assembled steel structure open caisson in pipe jacking construction
Wrzesiński Hazards resulting from improper building drainage system by the use of BIM
Peng et al. Design and construction of the new library at China Agricultural University
Ugolini et al. Managing water risks in archaeological sites: the flooding of the complex of Santa Croce in Ravenna.
CN217711040U (en) Leachate collecting system of waste incineration plant

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 200120 D, building 5, 33 Fushan Road, Shanghai, Pudong New Area

Applicant after: Shanghai Construction No.2 (Group) Co., Ltd.

Address before: 200120 Shanghai city Pudong New Area Fushan Road No. 33

Applicant before: Shanghai No.2 Building Co., Ltd.

CB03 Change of inventor or designer information

Inventor after: Wang Siman

Inventor after: Min Weiguo

Inventor after: Yang Min

Inventor after: Shi Zhen

Inventor after: Zhao Qi

Inventor before: Min Weiguo

Inventor before: Yang Min

Inventor before: Shi Zhen

Inventor before: Zhao Qi

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: MIN WEIGUO YANG MIN SHI ZHEN ZHAO QI TO: WANG SIMAN MIN WEIGUO YANG MIN SHI ZHEN ZHAO QI

Free format text: CORRECT: APPLICANT; FROM: SECOND BUILDING CO., LTD., SHANGHAI TO: SHANGHAI CONSTRUCTION NO.2 (GROUP) CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant