CN102561959A - Two-stage pushing device for tubular columns - Google Patents

Two-stage pushing device for tubular columns Download PDF

Info

Publication number
CN102561959A
CN102561959A CN2012100303429A CN201210030342A CN102561959A CN 102561959 A CN102561959 A CN 102561959A CN 2012100303429 A CN2012100303429 A CN 2012100303429A CN 201210030342 A CN201210030342 A CN 201210030342A CN 102561959 A CN102561959 A CN 102561959A
Authority
CN
China
Prior art keywords
hydraulic cylinder
balladeur train
rocker
drilling rod
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100303429A
Other languages
Chinese (zh)
Inventor
葛乐通
王雄飞
梁宝瑞
史久伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou University
Original Assignee
Changzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou University filed Critical Changzhou University
Priority to CN2012100303429A priority Critical patent/CN102561959A/en
Publication of CN102561959A publication Critical patent/CN102561959A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a two-stage pushing device for tubular columns. A slide rack is slidably connected with a slide way, the tail end of the slide way is fixedly connected with a cylinder body of a first hydraulic cylinder, the top end of a piston shaft of the first hydraulic cylinder is fixedly connected with the lower end of the slide rack, and the tail end of the slide rack is fixedly connected with a cylinder body of a second hydraulic cylinder; the left side and the right side of the slide rack are rotatably connected with two rocking plates which are crossed to form a V-shaped groove, three third hydraulic cylinders are uniformly distributed under each rocking plate, cylinder bodies of the three third hydraulic cylinders are rotatably connected with the slide rack, and piston shafts of the three third hydraulic cylinders are connected with the bottom of the corresponding rocking plate; and a drill stem is located in the V-shaped groove at the head ends of the two rocking plates when conveyed, a piston shaft of the second hydraulic cylinder is exactly aligned to the tail end of the drill stem, the drill stem is secondarily pushed and conveyed out, and a pipe clamp can clamp the drill stem on a drilling platform conveniently. The two-stage pushing device is simple in structure and convenient and fast in operation.

Description

A kind of twin-stage pusher of tubing string
Technical field
The present invention relates to the transport of oil-well rig tubing string, is that tubing string carries the important matching component in the equipment.
Background technology
Drilling well need be carried out tubing string and carry between ground and offshore boring island.At present, the tubing string transport mainly contains two kinds, and the one, adopt the lifting equipment of derrick and ground way to carry tubing string, the mode that mainly cooperates winch to draw, drag with manual operations is carried out; Inconvenient operation, efficient is lower, but also has potential safety hazard.The 2nd, adopt the automatic lifting equipment, this equipment need be taken a fixed ramp slideway, attachment rail on the inclined slip between offshore boring island and ground; Tubing string is placed in the specific elevating stage; The orbital motion of elevating stage front end edge inclined slip, the rear end is pushed and lifting by mechanized equipment, when the track of elevating stage front end edge slideway arrives the offshore boring island work plane; Need push through a hydraulic cylinder in the elevating stage rear end; Make the tubing string front end push out the elevating stage outside, so that carry out the operation of clamping drilling rod, the propelling movement of drilling rod is disposable propelling movement; The complex structure of this automatic lifting equipment, complex operation.
Summary of the invention
The objective of the invention is to provide a kind of twin-stage pusher of tubing string simple in structure, convenient to operation for the deficiency that overcomes above-mentioned prior art.
The technical scheme that the present invention adopts is: the sledge slide slideway that is dynamically connected, and the end of slideway is fixedly connected the cylinder body of first hydraulic cylinder, and the top of the axis of the piston of first hydraulic cylinder is fixedly connected the balladeur train lower end, and the end of balladeur train is fixedly connected the cylinder body of second hydraulic cylinder; The balladeur train left and right sides is rotationally connected and is crossed as two rockers of V-type groove, is uniformly distributed with three the 3rd hydraulic cylinders below the every rocker, and the cylinder body of three the 3rd hydraulic cylinders all is rotationally connected with balladeur train, and the axis of the piston of three the 3rd hydraulic cylinders all connects the bottom surface of rocker; Drilling rod is arranged in the V-type groove at two rocker head end positions when carrying, the axis of the piston of second hydraulic cylinder is over against the end of drilling rod.
The present invention need not to utilize inclined slip, simplifies the structure, and drilling rod pushes carrying device through secondary, is convenient on offshore boring island with pipe clamp clamping drilling rod.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is done further explain;
Vertical view when Fig. 1 is apparatus of the present invention horizontal arrangement;
Enlarged drawing is looked on left side when Fig. 2 is apparatus of the present invention horizontal arrangement;
Fig. 3 is the installation stereogram of the rocker 5 among Fig. 2;
Fig. 4 is the work sketch map that drill string is transferred drilling rod turnover apparatus of the present invention;
Fig. 5 is the work sketch map that apparatus of the present invention twin-stage pushes;
Among the figure: 1. first hydraulic cylinder; 2. second hydraulic cylinder; 3. balladeur train; 4. the 3rd hydraulic cylinder; 5. rocker; 6. slideway; 7. drilling rod; 8. input pipe framed bent; 9. efferent duct framed bent.
The specific embodiment
Shown in Fig. 1-3, the present invention includes six the 3rd hydraulic cylinders 4, first hydraulic cylinder 1 and one second hydraulic cylinder 2, two rockers 5, a balladeur train 3 and a slideway 6.Concrete structure is:
Shown in Fig. 1-2, balladeur train 3 is slidingly connected on the slideway 6, can be along the slide on the slideway 6.The cross section of slideway 6 can be designed to I shape, and there are two tracks its left and right sides, top, and balladeur train 3 is along two slide on the slideway 6.The end of slideway 6 is fixedly connected the hydraulic cylinder of first hydraulic cylinder 1; The top of the hydraulic cylinder piston axle of first hydraulic cylinder 1 is fixedly connected balladeur train 3 lower ends; Be fixedly connected the hydraulic cylinder of second hydraulic cylinder 2 on the end of balladeur train 3, second hydraulic cylinder 2 is slided with balladeur train 3 synchronously.Like this, first hydraulic cylinder 1 and second hydraulic cylinder 2 are installed in series and form a hydraulic cylinder group, and the effect of first hydraulic cylinder 1 is to promote the balladeur train 3 and second hydraulic cylinder 2, and the balladeur train 3 and second hydraulic cylinder 2 are slided on slideway 6 synchronously.
5, two rockers of two rockers, 5 composition V-type grooves as shown in Figure 3, that balladeur train 3 the right and lefts are rotationally connected and intersect; Every rocker 5 rectangular in shape along on the length direction of rocker 5, are uniformly distributed with three the 3rd hydraulic cylinders 4 below every rocker 5; Be that the cylinder body that the right and left has six the 3rd hydraulic cylinder 4, the three hydraulic cylinders 4 all is rotationally connected with balladeur train 3, the hydraulic cylinder piston axle of the 3rd hydraulic cylinder 4 is connected with the bottom surface of rocker 5; Rocker 5 can be around balladeur train 3 swings under the effect of the 3rd hydraulic cylinder 4 like this; Rotate a certain angle separately, simultaneously, rocker 5 and balladeur train 3 do as a whole on slideway 6 moving linearly.
Drilling rod 7 is arranged in the V-type groove at two rockers, 5 head end positions when carrying, the hydraulic cylinder piston axle of second hydraulic cylinder 2 is over against the end of drilling rod 7, during installation; Need have the gap between the end of two rockers 5; Can remove a small rectangular part separately at the end of two rockers 5, make the end of two rockers 5 that certain clearance arranged, the hydraulic cylinder piston axle of being convenient to second hydraulic cylinder 2 promotes the drilling rod 7 on the rocker 5; Make drilling rod 7 can reach two rocker 5 outsides forward, be convenient to the clamping of drilling rod.
The present invention at first need put drilling rod 7 in the present invention before the work of on offshore boring island, carrying drilling rod, shown in a figure of Fig. 4, wherein a rocker 5 is balanced and is horizontal attitude, and drilling rod 7 just is easy to push away from input pipe framed bent 8 and puts to two rockers 5; Then, two rockers 5 under the effect of the 3rd hydraulic cylinder 4, one-tenth V-type groove state as shown in Figure 2; When this device was raised to the suitable height of offshore boring island, shown in a figure of Fig. 5, first hydraulic cylinder 1 at this moment and the hydraulic cylinder piston axle of second hydraulic cylinder 2 were in initial position; Shown in the b figure of Fig. 5; Move forward to the front position of slideway 6 along slideway 6 by first hydraulic cylinder, the 1 promotion balladeur train 3 and second hydraulic cylinder 2; Shown in the c figure of Fig. 5; Hydraulic cylinder piston axle top by second hydraulic cylinder 2 promotes drilling rod 7 through the gap that rocker 5 ends leave, and makes 7 one sections on drilling rod reach rocker 5 outsides through this twice propelling movement, so that the operation of back.So just accomplished the operation of releasing drilling rod 7.
It is the reverse process of up carrying drilling rod 7 that the present invention down carries drilling rod 7 from offshore boring island; In the time of when drilling rod 7 slides into the V-type groove that rocker 5 forms up and down from offshore boring island in, shown in the b figure of Fig. 5, make drilling rod 7 continue to glide concordant with rocker 5 in the hydraulic cylinder piston axle withdrawal hydraulic cylinder of second hydraulic cylinder 2 until the upper end of drilling rod 7 along v type groove; Shown in a of Fig. 5; Make balladeur train 3 slide to the bottom of slideway 6 downwards in the hydraulic cylinder piston axle withdrawal hydraulic cylinder by first hydraulic cylinder 1, at this moment slideway 6 is dropped to ground, shown in the b figure of Fig. 4 by the elevating mechanism effect; The hydraulic cylinder piston axle of three the 3rd hydraulic cylinders 4 on rocker 5 is withdrawn in the hydraulic cylinder; Make a rocker 5 down swing to constant slope, at this moment, drilling rod 7 tumbles on the efferent duct framed bent 9 automatically; So just accomplished the operation of down carrying drilling rod 7.

Claims (4)

1. the twin-stage pusher of a tubing string; Balladeur train (3) slideway (6) that is slidingly connected; It is characterized in that: the end of slideway (6) is fixedly connected the cylinder body of first hydraulic cylinder (1); The top of the axis of the piston of first hydraulic cylinder (1) is fixedly connected balladeur train (3) lower end, and the end of balladeur train (3) is fixedly connected the cylinder body of second hydraulic cylinder (2); Two rockers (5) that balladeur train (3) left and right sides is rotationally connected and is crossed as the V-type groove; Be uniformly distributed with three the 3rd hydraulic cylinders (4) below the every rocker (5); The cylinder body of three the 3rd hydraulic cylinders (4) all is rotationally connected with balladeur train (3), and the axis of the piston of three the 3rd hydraulic cylinders (4) all connects the bottom surface of rocker (5); Drilling rod (7) is arranged in the V-type groove at two rockers (5) head end position when carrying, the axis of the piston of second hydraulic cylinder (2) is over against the end of drilling rod (7).
2. the twin-stage pusher of a kind of tubing string according to claim 1 is characterized in that: have the gap between the end of two rockers (5).
3. the twin-stage pusher of a kind of tubing string according to claim 1, it is characterized in that: the cross section of slideway (6) is an I shape, its left and right sides, top all is tracks.
4. the twin-stage pusher of a kind of tubing string according to claim 1 is characterized in that: the equal rectangular in shape of every rocker (5).
CN2012100303429A 2012-02-13 2012-02-13 Two-stage pushing device for tubular columns Pending CN102561959A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100303429A CN102561959A (en) 2012-02-13 2012-02-13 Two-stage pushing device for tubular columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100303429A CN102561959A (en) 2012-02-13 2012-02-13 Two-stage pushing device for tubular columns

Publications (1)

Publication Number Publication Date
CN102561959A true CN102561959A (en) 2012-07-11

Family

ID=46408408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100303429A Pending CN102561959A (en) 2012-02-13 2012-02-13 Two-stage pushing device for tubular columns

Country Status (1)

Country Link
CN (1) CN102561959A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877802A (en) * 2012-09-29 2013-01-16 济南光先数控机械有限公司 Numerical-control petroleum workover line
CN104420842A (en) * 2013-09-11 2015-03-18 四川宏华石油设备有限公司 Catwalk
CN107100561A (en) * 2017-06-09 2017-08-29 常州大学 A kind of two fulcrum formula drilling rod Fan Song mechanisms
CN109809092A (en) * 2018-12-29 2019-05-28 海宁市英德赛电子有限公司 The pushing meanss of steel cylinder in steel cylinder storage system
CN112943123A (en) * 2021-03-02 2021-06-11 宁夏天地奔牛实业集团有限公司 Drill rod conveying device and raise boring machine

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3865256A (en) * 1973-11-08 1975-02-11 Sr Richard B Freeman Casing and drill pipe handling device
CN201598992U (en) * 2010-01-27 2010-10-06 成都世唯科技有限公司 Conveying mechanism for elevation of drill pipes for oil drilling
CN201614899U (en) * 2009-12-28 2010-10-27 刘承建 Hydraulic catwalk device
CN201627547U (en) * 2010-01-27 2010-11-10 成都世唯科技有限公司 Conveying mechanism for oil drilling
CN201818251U (en) * 2010-10-19 2011-05-04 中国石油化工集团公司 Drilling pipe automatic delivery device directly driven by oil cylinder

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3865256A (en) * 1973-11-08 1975-02-11 Sr Richard B Freeman Casing and drill pipe handling device
CN201614899U (en) * 2009-12-28 2010-10-27 刘承建 Hydraulic catwalk device
CN201598992U (en) * 2010-01-27 2010-10-06 成都世唯科技有限公司 Conveying mechanism for elevation of drill pipes for oil drilling
CN201627547U (en) * 2010-01-27 2010-11-10 成都世唯科技有限公司 Conveying mechanism for oil drilling
CN201818251U (en) * 2010-10-19 2011-05-04 中国石油化工集团公司 Drilling pipe automatic delivery device directly driven by oil cylinder

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877802A (en) * 2012-09-29 2013-01-16 济南光先数控机械有限公司 Numerical-control petroleum workover line
CN102877802B (en) * 2012-09-29 2015-04-29 济南光先数控机械有限公司 Numerical-control petroleum workover line
CN104420842A (en) * 2013-09-11 2015-03-18 四川宏华石油设备有限公司 Catwalk
CN107100561A (en) * 2017-06-09 2017-08-29 常州大学 A kind of two fulcrum formula drilling rod Fan Song mechanisms
CN107100561B (en) * 2017-06-09 2019-03-22 常州大学 A kind of two fulcrum rotary drilling rod Fan Song mechanisms
CN109809092A (en) * 2018-12-29 2019-05-28 海宁市英德赛电子有限公司 The pushing meanss of steel cylinder in steel cylinder storage system
CN112943123A (en) * 2021-03-02 2021-06-11 宁夏天地奔牛实业集团有限公司 Drill rod conveying device and raise boring machine
CN112943123B (en) * 2021-03-02 2022-09-06 宁夏天地奔牛实业集团有限公司 Drill rod conveying device and raise boring machine

Similar Documents

Publication Publication Date Title
CN102561959A (en) Two-stage pushing device for tubular columns
CN103696710B (en) Aboveground working string conveying device
CN203939463U (en) A kind of novel hydraulic dynamic catwalk
CN104594829A (en) Automatic derrick device suitable for double-wellhead pipe arrangement operation and method
CN103790525A (en) Oil cylinder lifting type drilling rig power catwalk
CN102926659A (en) Train-type automatic translational device for drill
CN106285516B (en) Multifunctional cat road
CN206158616U (en) Multi -functional catwalk
CN203767936U (en) Lifting machine capable of turning over
CN202250222U (en) Self-propelled stepping device of scraper blade elevating conveyor
CN106395618A (en) Device for carrying tracks forward and portal crane
CN204024530U (en) Drilling well drilling rod automation conveyer
CN103867142A (en) Catwalk capable of providing power
CN106869827A (en) A kind of self-travel type dynamic catwalk and its traveling method
CN205025386U (en) Ocean well casing utensil conveyor
CN203549112U (en) Pipeline boosting device in pipeline laying
CN203891886U (en) Stone accumulation body or undisturbed soil steel tube jacking device
CN201953323U (en) Novel catwalk for module drilling machine of marine oil drilling platform
CN102536139B (en) Movement mechanism for conveying drill columns for drilling platform
CN203808828U (en) Drilling rig on automatic moving scraper machine
CN202866654U (en) Train type automatic translating device for drilling machine
CN206942673U (en) The device of mining automatic installation jointed rod
CN105672878A (en) Advanced geologic multi-hole synchronous drilling jumbo
CN205477441U (en) Jacking formula power catwalk send brill dolly
CN204266953U (en) A kind of oil drilling pipe guiding device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120711