CN102561529A - 钢筋混凝土框架梁索筋配置结构 - Google Patents
钢筋混凝土框架梁索筋配置结构 Download PDFInfo
- Publication number
- CN102561529A CN102561529A CN2012100703794A CN201210070379A CN102561529A CN 102561529 A CN102561529 A CN 102561529A CN 2012100703794 A CN2012100703794 A CN 2012100703794A CN 201210070379 A CN201210070379 A CN 201210070379A CN 102561529 A CN102561529 A CN 102561529A
- Authority
- CN
- China
- Prior art keywords
- framework
- rib
- vierendeel girder
- reinforced concrete
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
本发明涉及钢筋混凝土结构,具体是一种用于框架梁柱节点处理的钢筋混凝土框架梁索筋配置结构。包括框架梁受拉筋、框架梁受压筋、框架柱纵筋,所述钢筋混凝土框架梁柱节点处,在框架梁受拉筋和框架梁受压筋之间配置有索筋。本发明通过在钢筋混凝土框架结构梁柱节点处设置索筋,当梁受拉钢筋屈服后可以在节点处形成索效应,可有效避免钢筋混凝土框架结构发生连续倒塌,并能提高框架节点的抗震性能,具有良好的结构应用性。本发明具有施工简单、安全可靠、经久耐用等特点,应用前景广阔。
Description
技术领域:
本发明涉及钢筋混凝土结构,具体是一种用于框架梁柱节点处理的钢筋混凝土框架梁索筋配置结构。
背景技术:
现有钢筋混凝土框架结构中,框架柱与框架梁在节点处的钢筋结构,仅是框架柱纵筋与框架梁受拉筋和框架梁受压筋之间的绑扎结构。与剪力墙结构相比,这种框架结构更容易发生竖向连续倒塌。尤其在钢筋混凝土结构遭遇爆炸、撞击或地震等偶然事件时,若局部某一竖向承重构件(如承重柱)发生破坏,从而其上部承重梁失去原有支承、跨度成倍增加,内力可能大大超过设计值,从而可能使框架结构发生连续倒塌。由于钢筋混凝土结构达到防止连续倒塌的发生,需要结构出现很大的变形和内力重分布,在弯曲破坏前不应出现脆性的剪切破坏,这就要求构件具有足够的抗剪能力。
发明内容:
本发明旨在解决现有钢筋混凝土框架结构存在的上述问题,而提供一种当框架梁受拉筋屈服后可以在节点处形成索效应,从而避免钢筋混凝土框架结构发生连续倒塌的钢筋混凝土框架梁索筋配置结构。
本发明解决所述问题采用的技术方案是:
一种钢筋混凝土框架梁索筋配置结构,包括框架梁受拉筋、框架梁受压筋、框架柱纵筋,所述钢筋混凝土框架梁柱节点处,在框架梁受拉筋和框架梁受压筋之间配置有索筋。
更进一步:
所述框架梁受拉筋和框架梁受压筋之间配置有两层索筋,两层索筋通过上下索筋箍筋绑扎固定。
所述每层索筋为2-4根,索筋的直径及锚固长度和框架梁受拉筋相同。
所述索筋伸出柱外的长度为框架梁有效高度的1/2与钢筋锚固长度之和。
依照本发明,通过在钢筋混凝土框架结构梁柱节点处设置索筋,当梁受拉钢筋屈服后可以在节点处形成索效应,有效提高框架节点的抗震性能,避免钢筋混凝土框架结构发生连续倒塌,具有良好的结构应用性。本发明具有施工简单、安全可靠、经久耐用等特点,应用前景广阔。
附图说明:
图1为本发明实施例边柱节点索筋配置结构示意图。
图2为本发明实施例中柱节点索筋配置结构示意图。
图3为图1、图2中A-A剖视图。
图中:1-框架梁受拉筋,2-混凝土,3-索筋,4-框架梁箍筋,5-框架梁受压筋,6-框架柱纵筋,7-框架柱箍筋,8-索筋箍筋。
具体实施方式:
以下结合实施例详述本发明。
参见附图,本实施例所述的钢筋混凝土框架梁索筋配置结构,是在钢筋混凝土框架梁柱节点处框架梁受拉筋1和框架梁受压筋5之间增设两层索筋3,每层索筋3的根数可以根据实际需要配置,一般为2-4根,附图显示每层两根。索筋3的直径及锚固长度和框架梁受拉筋1相同,索筋3与其索筋箍筋8之间的固定采用绑扎方式,索筋3伸出柱外的长度为框架梁有效高度的1/2与钢筋锚固长度之和。
上述钢筋混凝土框架梁柱节点涉及中柱节点(如图1)和边柱节点(如图2)。施工时,先绑扎框架梁柱钢筋和索筋,然后支模浇筑混凝土2,达到养护要求后拆模养护。
Claims (4)
1.一种钢筋混凝土框架梁索筋配置结构,包括框架梁受拉筋、框架梁受压筋、框架柱纵筋,其特征在于,所述钢筋混凝土框架梁柱节点处,在框架梁受拉筋和框架梁受压筋之间配置有索筋。
2.如权利要求1所述的钢筋混凝土框架梁索筋配置结构,其特征在于,所述框架梁受拉筋和框架梁受压筋之间配置有两层索筋,两层索筋通过上下索筋箍筋绑扎固定。
3.如权利要求1或2所述的钢筋混凝土框架梁索筋配置结构,其特征在于,所述每层索筋为2-4根,索筋的直径及锚固长度和框架梁受拉筋相同。
4.如权利要求1所述的钢筋混凝土框架梁索筋配置结构,其特征在于,所述索筋伸出柱外的长度为框架梁有效高度的1/2与钢筋锚固长度之和。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100703794A CN102561529A (zh) | 2012-03-17 | 2012-03-17 | 钢筋混凝土框架梁索筋配置结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100703794A CN102561529A (zh) | 2012-03-17 | 2012-03-17 | 钢筋混凝土框架梁索筋配置结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102561529A true CN102561529A (zh) | 2012-07-11 |
Family
ID=46408004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100703794A Pending CN102561529A (zh) | 2012-03-17 | 2012-03-17 | 钢筋混凝土框架梁索筋配置结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102561529A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195169A (zh) * | 2013-03-14 | 2013-07-10 | 北京工业大学 | 一种配垂直拉筋的钢筋混凝土框架节点 |
CN103924663A (zh) * | 2014-03-21 | 2014-07-16 | 北京工业大学 | 一种提高rc框架结构抗连续倒塌能力的设计方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2027785A (en) * | 1978-08-14 | 1980-02-27 | Camazet Ag | A Connection Between a Beam or Beams and a Pillar, all of Prefabricated Concrete |
CN2591119Y (zh) * | 2002-11-22 | 2003-12-10 | 钟肇鸿 | 建筑框架的梁柱节点结构 |
KR20040103833A (ko) * | 2004-11-02 | 2004-12-09 | 주식회사 동성중공업 | 복합구조 시스템 |
KR100769154B1 (ko) * | 2007-03-06 | 2007-10-22 | (주)연우엔지니어링건축사사무소 | 패널존의 좌굴방지 및 하부근과의 시공 향상을 위한프리캐스트 콘크리트 기둥 및 그 제조방법 |
CN201351308Y (zh) * | 2009-01-16 | 2009-11-25 | 西安建筑科技大学 | 配实腹钢板的混凝土异形柱——型钢混凝土梁框架节点 |
CN201362891Y (zh) * | 2009-03-03 | 2009-12-16 | 华丰建设股份有限公司 | 不同混凝土品种的梁柱节点核心区结构 |
CN202466839U (zh) * | 2012-03-17 | 2012-10-03 | 河北联合大学 | 钢筋混凝土框架梁索筋配置结构 |
-
2012
- 2012-03-17 CN CN2012100703794A patent/CN102561529A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2027785A (en) * | 1978-08-14 | 1980-02-27 | Camazet Ag | A Connection Between a Beam or Beams and a Pillar, all of Prefabricated Concrete |
CN2591119Y (zh) * | 2002-11-22 | 2003-12-10 | 钟肇鸿 | 建筑框架的梁柱节点结构 |
KR20040103833A (ko) * | 2004-11-02 | 2004-12-09 | 주식회사 동성중공업 | 복합구조 시스템 |
KR100769154B1 (ko) * | 2007-03-06 | 2007-10-22 | (주)연우엔지니어링건축사사무소 | 패널존의 좌굴방지 및 하부근과의 시공 향상을 위한프리캐스트 콘크리트 기둥 및 그 제조방법 |
CN201351308Y (zh) * | 2009-01-16 | 2009-11-25 | 西安建筑科技大学 | 配实腹钢板的混凝土异形柱——型钢混凝土梁框架节点 |
CN201362891Y (zh) * | 2009-03-03 | 2009-12-16 | 华丰建设股份有限公司 | 不同混凝土品种的梁柱节点核心区结构 |
CN202466839U (zh) * | 2012-03-17 | 2012-10-03 | 河北联合大学 | 钢筋混凝土框架梁索筋配置结构 |
Non-Patent Citations (1)
Title |
---|
中华人民共和国住房和城乡建设部: "《高层建筑混凝土结构技术规程 JGJ3-2010》", 《高层建筑混凝土结构技术规程 JGJ3-2010》, 1 October 2011 (2011-10-01) * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195169A (zh) * | 2013-03-14 | 2013-07-10 | 北京工业大学 | 一种配垂直拉筋的钢筋混凝土框架节点 |
CN103195169B (zh) * | 2013-03-14 | 2015-10-07 | 北京工业大学 | 一种配垂直拉筋的钢筋混凝土框架节点 |
CN103924663A (zh) * | 2014-03-21 | 2014-07-16 | 北京工业大学 | 一种提高rc框架结构抗连续倒塌能力的设计方法 |
CN103924663B (zh) * | 2014-03-21 | 2016-04-13 | 北京工业大学 | 一种提高rc框架结构抗连续倒塌能力的设计方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104727441B (zh) | 一种预应力装配式混凝土梁柱节点构造及其施工方法 | |
WO2019149270A1 (zh) | 一种普通钢筋与精轧螺纹钢筋混合配筋的拼装墩 | |
CN103669224A (zh) | 斜置拱塔双索面预应力混凝土斜拉桥中拱塔施工方法及钢管支架 | |
KR101184654B1 (ko) | 강관 매립형 콘크리트 블록 일체식 지점부 시공방법 | |
CN112900618A (zh) | 一种预制装配式框架、梁柱节点及施工方法 | |
CN103898834B (zh) | 一种钢管混凝土组合梁与桁架式索塔斜拉桥及其施工方法 | |
CN103046645A (zh) | 一种大跨度预制整浇结构及施工方法 | |
KR20160109629A (ko) | 외부보강된 내부구속 중공 철근콘크리트 기둥-기초 접합부의 시공방법 | |
CN103711329A (zh) | 外贴钢骨混凝土框架法加固结构的方法 | |
CN103643634A (zh) | 钢管混凝土拱桥拱脚锚固结构 | |
CN202466839U (zh) | 钢筋混凝土框架梁索筋配置结构 | |
KR101335382B1 (ko) | 내부힌지를 활용한 복합트러스 거더교의 시공법 | |
CN110700082A (zh) | 一种sma-ecc自复位圆钢管约束钢筋混凝土桥墩的柱脚节点 | |
CN204385883U (zh) | 一种装配式阳台 | |
CN204081070U (zh) | 一种大跨度钢骨梁悬挑结构 | |
CN103924676B (zh) | 预应力连接混凝土梁圆钢管混凝土柱节点 | |
CN205669259U (zh) | 后张预应力预制框架 | |
CN102561529A (zh) | 钢筋混凝土框架梁索筋配置结构 | |
CN102852280A (zh) | 一种带搁置头的预应力预制梁 | |
CN102518229A (zh) | 一种双向摇摆筒体抗震结构 | |
CN202831219U (zh) | 一种大跨度预制整浇结构 | |
CN107142830A (zh) | 钢管腹板预应力钢混组合主梁结构及施工方法 | |
CN104264782A (zh) | 装配整体式预应力框架结构及其施工方法 | |
CN205152800U (zh) | 复杂受力条件下悬空模板加固体系 | |
CN209779955U (zh) | 一种现浇钢筋混凝土剪力墙 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120711 |