CN102561352A - Method and device for sawing foundation pile - Google Patents

Method and device for sawing foundation pile Download PDF

Info

Publication number
CN102561352A
CN102561352A CN2012100192962A CN201210019296A CN102561352A CN 102561352 A CN102561352 A CN 102561352A CN 2012100192962 A CN2012100192962 A CN 2012100192962A CN 201210019296 A CN201210019296 A CN 201210019296A CN 102561352 A CN102561352 A CN 102561352A
Authority
CN
China
Prior art keywords
foundation pile
immersed tube
rope saw
rope
sawed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100192962A
Other languages
Chinese (zh)
Other versions
CN102561352B (en
Inventor
丁明明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ERSHU MACHINERY EQUIPMENT CO Ltd
Original Assignee
SHANGHAI ERSHU MACHINERY EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ERSHU MACHINERY EQUIPMENT CO Ltd filed Critical SHANGHAI ERSHU MACHINERY EQUIPMENT CO Ltd
Priority to CN201210019296.2A priority Critical patent/CN102561352B/en
Publication of CN102561352A publication Critical patent/CN102561352A/en
Application granted granted Critical
Publication of CN102561352B publication Critical patent/CN102561352B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention relates removal of pile foundations or foundation piles of a building structure, in particular to a method and a device for sawing a foundation pile, which are mainly used for removing underground obstacles in metro construction. The device for sawing the foundation pile comprises a crane, a high-frequency vibrating hammer, a high-pressure water pipe, a rope saw, a guide rail and a ground drill, wherein a rope sawing portion of the rope saw deeps to a required cutoff depth of a stump through a pulley of the ground drill, and the high-frequency vibrating hammer drives the ground drill underground. The method and the device for sawing the foundation pile have the advantages that using the rope saw guarantees high sawing efficiency, low cost and low noise, and the method and the device are applicable to various types of foundation piles and also applicable to engineering sites such has bridge piles and the like.

Description

Sawed-off method of a kind of foundation pile and device thereof
Technical field
The present invention relates to the pile foundation of building structure or the removing of foundation pile, especially relate to the sawed-off method and the device thereof of foundation pile.
Background technology
Foundation pile is the basis of building, and building is high more usually, and its foundation pile is dark more.Along with the development of society, traffic is more and more flourishing, and subway is all being built in many cities as the instrument of Modern Traffic.Yet, in the building course of subway, need to remove many buildings, remove in the process of building, just comprise the dismounting of its foundation pile.
Foundation pile has two kinds, and 1) the steel concrete foundation pile; 2) steel pipe pile.In the prior art, the pile foundation method for dismounting has three kinds: 1) driving, and promptly use jump bit to impact broken stub, grab out the broken residual body of useless stake with grab bucket then; 2) pulling out method adopts the large-tonnage crane gear directly to extract pile body; 3) off-centre twists off method.Noise was bigger when the shortcoming that driving exists was to construct, and can't guarantee the degree that the pile foundation body is broken, was applicable to and buried more shallow pile foundation, and for the pile foundation that all-metal constitutes, punch method is also inapplicable.The problem of dial-out method is crane gear is required height, and required expense is big, has the big problem of noise equally, and dark stub is inapplicable for burying.It is brute force to be carried out in the stake of giving up step by step twist off that off-centre twists off method, up to certain degree of depth.For burying very dark useless stake, it is huge thoroughly to remove cost.In the engineering practice, often need remove the above stub of certain depth, the requirement of iron formation gets final product contentedly.
Summary of the invention
One of the object of the invention provides a kind of new sawed-off method of foundation pile.
Two of the object of the invention provides the sawed-off device of a kind of foundation pile.
One of the object of the invention is achieved in that the sawed-off method of a kind of foundation pile, and its sawed-off step is:
1) the at first definite foundation pile that will handle;
2) excavate the stub surrounding soil, expose the foundation pile head;
3) the sawed-off device of foundation pile is installed, and immersed tube is nested with on foundation pile;
4) high-pressure water pipe of the sawed-off device of foundation pile and high-pressure air pipe eject water under high pressure and high pressure gas, the earth around the foundation pile is carried out water under high pressure dash and air-brush, make its scour out mud, and overflow automatically; Simultaneously, high-frequency vibratory hammer work is impacted immersed tube, through continuous operation, makes immersed tube drop to the degree of depth of blocking of design;
5) start sawed-off device, block foundation pile;
6) immersed tube of slinging cleans and also removes the rope saw;
7) hang out by sawed-off useless stake;
8) fill and lead up the hole body;
Two of the object of the invention is achieved in that a kind of device that is used to remove foundation pile, is made up of crane, high-frequency vibratory hammer, rope saw, immersed tube, auxiliary pipe laying, leading block group, location assembly pulley, high pressure water jets injection device and high pressure gas injection apparatus; It is characterized in that: the cross sectional dimensions of said immersed tube makes immersed tube can be inserted in foundation pile greater than foundation pile; The outer wall both sides of said immersed tube are provided with an auxiliary pipe laying at least, be provided with in this auxiliary pipe laying high pressure water jets injection device and high pressure gas spray, go up the leading block group, down the leading block group and and the location assembly pulley; Leading block group and following leading block group are respectively installed in the top of said auxiliary pipe laying and bottom, and the bottom of said immersed tube has the teeth of carbide alloy.
Said auxiliary pipe laying has two, is respectively applied for the first auxiliary pipe laying that installation dress high pressure gas injection apparatus pipeline and high-pressure water jet install pipes; Be used to install the second auxiliary pipe laying of rope saw.
The bottom of said immersed tube inwall also is provided with the rope saw retainer ring that the rope saw is installed in immersed tube inwall bottom; Said rope saw retainer ring is made up of two parts, is respectively snap ring and retaining ring, and said snap ring is provided with an annular groove; The lateral wall angle of slope of annular groove is degree, and effect is to be convenient to install the rope saw, and when the rope saw is started working; The rope saw can come off automatically, carries out sawed-off to foundation pile.Come off when preventing the immersed tube dither, adopt retaining ring protection rope saw.In case of necessity can be on the wall of immersed tube, in the position of snap ring, two sidetrackings up and down of rope saw bundle the hole, will restrict with galvanized wire and saw binding, play reinforcement effect.Said binding hole evenly distributes on the wall of immersed tube, and quantity can be pacified to be needed to confirm, right at least, right usually, confirms according to the diameter of immersed tube, too much there is no need, and the rope saw can not come off when dither, and sinks with immersed tube, arrives the position that foundation pile is sawed-off.The outer wall of said immersed tube also is provided with two subsidiary conduits,
Said rope saw is by rope saw, guide rail and rope saw drive unit.Said rope saw drive unit is installed on the guide rail, and the rope saw forms from the guiding of passing last leading block group, location assembly pulley and the following leading block group on immersed tube top after the rope saw is drawn and overlaps strand, in the annular groove of embedding snap ring.
The lateral wall angle of slope of said annular groove is degree.
The said leading block group that goes up is made up of mount pad and two pulleys, and two pulleys are fixedly mounted on the mount pad, and said assembly pulley is fixed on the top of the second auxiliary pipe laying through mount pad.
Said down leading block group is constituted the truckle group and is tiltedly covered with sealing by mount pad, two leading blocks, four; Said mount pad is fixedly mounted in the second auxiliary pipe laying; Its position is sawed retainer ring 41 with the rope in the immersed tube 4 and is cooperated, and is provided with through hole between the immersed tube 4 and the second auxiliary pipe laying 52, and the rope saw is installed in rope through this hole and saws on the retainer ring 41; The outside in this hole is provided with four truckles 623, is used for protection rope saw 31.
Said location assembly pulley 7 is made up of location and installation seat 71 and four truckles 72, and said four truckles 71 are installed in and are installed in abreast on the mount pad 71.
The invention has the advantages that: owing to adopted the rope saw, sawed-off efficient is high, cost is low, noise is lower.Be applicable to polytype foundation pile, also be applicable to Other Engineering occasions such as bridge pier.
 
Description of drawings
Fig. 1 is a flow chart of the present invention.
Fig. 2 is a structural representation of the present invention.
Fig. 3 is a rope saw retainer ring structural scheme of mechanism of the present invention.
Fig. 4 is leading block group of the present invention and location assembly pulley sectional view.
Fig. 5 is a leading block group schematic perspective view of the present invention.
 
Specific embodiment
Combine accompanying drawing and embodiment that content of the present invention is elaborated as follows at present:
The sawed-off method of a kind of foundation pile of the present invention:
1) the definite earlier foundation pile that will handle, the mark reference position, such as: with the pending stub region of strikingly color mark, convenient construction personnel operation location.
2) excavate the foundation pile surrounding soil, expose the foundation pile head.
3) saw of will restricting is installed in the immersed tube, and connects water under high pressure and high-pressure air pipe, immersed tube is escaped to put on foundation pile, for the sawed-off device work of foundation pile ready.
4) high-pressure water pipe and tracheae ejection water, the gas of opening the sawed-off device of foundation pile are handled the stub surrounding soil, make it be fit to bore the ground device and embed; Simultaneously, use high-frequency vibratory hammer that immersed tube is hung down and hit, make immersed tube reduce to the predetermined sawed-off degree of depth.
5) start sawed-off device, block foundation pile.In this step, rope saw running drives rope saw back and forth movement, making the rope saw do sawed-off action to foundation pile, up to stub by sawed-off.
6) immersed tube of slinging cleans equipment such as immersed tube, removes the equipment of rope saw.
7) take out in the body from the hole with the crane stake of will giving up.
8) fill and lead up the hole body.
A kind of device that is used to remove foundation pile of the present invention, its most preferred embodiment is referring to shown in the accompanying drawing.Present embodiment is made up of crane 1, high-frequency vibratory hammer 2, rope saw 3, immersed tube 4, auxiliary pipe laying 5, leading block group 6, location assembly pulley 7, high-pressure water pipe 8 and high-pressure air pipe 9.The cross sectional dimensions of said immersed tube 4 makes immersed tube 4 can be inserted in foundation pile greater than foundation pile.Each auxiliary pipe laying of the outer wall both sides of said immersed tube 4, wherein a side is for being used for fixing high-pressure water pipe and high-pressure air pipe 8; Opposite side is used for installing and locating assembly pulley 7, and leading block group 61 and following leading block group 62 are respectively installed in the top of this auxiliary pipe laying and bottom, and the bottom of said immersed tube 4 has the teeth of carbide alloy, bores the usefulness on ground when being convenient to dither.
In the present embodiment, said auxiliary pipe laying has two, is respectively the first auxiliary pipe laying that is used to install high-pressure air pipe 9 and high-pressure water pipe 8; Be used to install the second auxiliary pipe laying 52 of rope saw.
The bottom of said immersed tube 4 inwalls also is provided with rope saw retainer ring 41, is used for the rope saw is installed in the bottom of immersed tube inwall.Said rope saw retainer ring 41 is made up of two parts; Be respectively snap ring 411 and retaining ring 412, said snap ring 411 is provided with an annular groove 413, and lateral wall 414 angle of slope of annular groove are 45 degree; Effect is to be convenient to install the rope saw; And when the rope saw was started working, the rope saw can come off automatically, carries out sawed-off to foundation pile.Come off when preventing the immersed tube dither, adopt retaining ring protection rope saw.In case of necessity can be on the wall of immersed tube, in the position of snap ring, two sidetrackings up and down of rope saw bundle hole 415, will restrict with galvanized wire and saw binding, play reinforcement effect.Said binding hole evenly distributes on the wall of immersed tube, and quantity can be pacified to be needed to confirm, right at least; Usually 2-16 is right, confirms according to the diameter of immersed tube 4, too much there is no need; The rope saw can not come off when dither, and sinks with immersed tube 4, arrives the position that foundation pile is sawed-off.The outer wall of said immersed tube 4 also is provided with two subsidiary conduits,
Said rope saw 3 is by rope saw 31, guide rail 32 and rope saw drive unit 33.Said rope saw drive unit 33 is installed on the guide rail 32; The leading block group 6 of rope saw 31 from passing immersed tube 4 tops after rope saw 3 is drawn is through the guiding of location assembly pulley 7, after through bottom leading block 6; Form the cover strand, embed in the annular groove 411 of snap ring 41.After saw started, because lateral wall 412 angle of slope of annular groove 411 are 45 degree, rope saw 31 can skid off annular groove 411 at rope, entangle pending foundation pile and tighten up, when rope saw 3 moves reciprocatingly, up to foundation pile by sawed-off.
The said leading block group 61 that goes up is made up of mount pad 611 and two pulleys 612, and said assembly pulley 612 is fixed on the top of the second auxiliary pipe laying 52 through mount pad 611.
Said down leading block group 62 by mount pad 621, two leading blocks 622, four constitute tiltedly 624 one-tenth on lid of truckle group 623 and sealing; Said mount pad 621 is fixedly mounted in the second auxiliary pipe laying 52; Its position is sawed retainer ring 41 with the rope in the immersed tube 4 and is cooperated, and is provided with through hole 42 between the immersed tube 4 and the second auxiliary pipe laying 52, and rope saw 31 is installed on the saw retainer ring 41 of restricting through this through hole 42; The outside of this through hole 42 is provided with four truckles 623, is used for protection rope saw 31.Tiltedly lid 624 of sealing is also established in the bottom of said mount pad 621, when being used for immersed tube decline, prevents that earth from getting into, and damages rope saw 31.
Said location assembly pulley 7 is made up of location and installation seat 71 and four truckles 72, and said four truckles 71 are installed in and are installed in abreast on the mount pad 71, is used for protection rope saw 31.
Said crane 1 is through the hoist cable high-frequency vibratory hammer 2 of slinging, and high-frequency vibratory hammer 2 grips with immersed tube 4, high-frequency vibratory hammer 2 of the present invention and all belong to prior art with the fixing of immersed tube 4, and this paper repeats no more.In the present embodiment, high-frequency vibratory hammer 2 is selected the vibrating hammer between 100 tons-150 tons for use.Said high-pressure water pipe and high-pressure air pipe 8 are fixed on the lower end of boring ground device 9, and constantly water, gas impact the soil body around the stub in implementation process, make it soft, are convenient to immersed tube and embed.

Claims (9)

1. sawed-off method of foundation pile: it is characterized in that, comprise following steps:
1) the at first definite foundation pile that will handle;
2) excavate the stub surrounding soil, expose the foundation pile head;
3) the sawed-off device of foundation pile is installed, and immersed tube is nested with on foundation pile;
4) high-pressure water pipe of the sawed-off device of foundation pile and high-pressure air pipe eject water under high pressure and high pressure gas, the earth around the foundation pile is carried out water under high pressure dash and air-brush, make its scour out mud, and overflow automatically; Simultaneously, high-frequency vibratory hammer work is impacted immersed tube, through continuous operation, makes immersed tube drop to the degree of depth of blocking of design;
5) start sawed-off device, block foundation pile;
6) immersed tube of slinging cleans and also removes the rope saw;
7) hang out by sawed-off useless stake;
8) fill and lead up the hole body.
2. a device that is used to remove foundation pile is made up of crane 1, high-frequency vibratory hammer 2, rope saw 3, immersed tube 4, auxiliary pipe laying 5, leading block group 6, location assembly pulley 7, high pressure water jets injection device 8 and high pressure gas injection apparatus 9; It is characterized in that: the cross sectional dimensions of said immersed tube 4 makes immersed tube 4 can be inserted in foundation pile greater than foundation pile; The outer wall both sides of said immersed tube 4 are provided with an auxiliary pipe laying 5 at least, be provided with in this auxiliary pipe laying 5 high pressure water jets injection device 9 spray 8 with high pressure gas, go up leading block group 61, down leading block group 62 and and location assembly pulley 7; Leading block group 61 and following leading block group 62 are respectively installed in the top of said auxiliary pipe laying and bottom, and the bottom of said immersed tube 4 has the teeth of carbide alloy.
3. a kind of device that is used to remove foundation pile according to claim 2; It is characterized in that: said auxiliary pipe laying 5 has two, is respectively applied for the first auxiliary pipe laying 51 that dress high pressure gas injection apparatus 9 pipelines and high pressure water jets injection device 8 pipelines are installed; Be used to install the second auxiliary pipe laying 52 of rope saw 31.
4. a kind of device that is used to remove foundation pile according to claim 2 is characterized in that: the bottom of said immersed tube 4 inwalls also is provided with the rope saw retainer ring 41 that rope saw 31 is installed in immersed tube 4 inwalls bottom; Said rope saw retainer ring 41 is made up of two parts, is respectively snap ring 41 and retaining ring 42, and said snap ring 41 is provided with an annular groove 411, and lateral wall 412 angle of slope of annular groove 411 are 45 to spend; Effect is to be convenient to install the rope saw, and when the rope saw was started working, the rope saw can come off automatically, carries out sawed-off to foundation pile; Come off when preventing immersed tube 4 dithers, adopt retaining ring 42 protection rope saws, in case of necessity can be on the wall of immersed tube 4, in the position of snap ring 41; Two sidetrackings up and down of rope saw bundle hole 43, will restrict with galvanized wire and saw binding, play reinforcement effect, and said binding hole 43 evenly distributes on the wall of immersed tube 4; Quantity can be pacified to be needed to confirm, at least 2 pairs, 2-16 is right usually; Diameter according to immersed tube 4 is confirmed, too much there is no need, and the rope saw can not come off when dither; And sink with immersed tube 4, arrive the position that foundation pile is sawed-off, the outer wall of said immersed tube 4 also is provided with two subsidiary conduits.
5. a kind of device that is used to remove foundation pile according to claim 2; It is characterized in that: said rope saw 3 is by rope saw 31, guide rail 32 and rope saw drive unit 33; Said rope saw drive unit 33 is installed on the guide rail 32; Rope saw 31 forms from the guiding of passing last leading block group 61, location assembly pulley 7 and the following leading block group 62 on immersed tube 4 tops after rope saw 3 is drawn and overlaps strand, in the annular groove 411 of embedding snap ring 41.
6. a kind of device that is used to remove foundation pile according to claim 5 is characterized in that: lateral wall 412 angle of slope of said annular groove 411 are 45 degree.
7. a kind of device that is used to remove foundation pile according to claim 2; It is characterized in that: the said leading block group 61 that goes up is made up of mount pad 611 and two pulleys 612; Two pulleys are fixedly mounted on the mount pad 611, and said assembly pulley 612 is fixed on the top of the second auxiliary pipe laying 52 through mount pad 611.
8. a kind of device that is used to remove foundation pile according to claim 2; It is characterized in that: said down leading block group 62 by mount pad 621, two leading blocks 622, four constitute tiltedly 624 one-tenth on lid of truckle group 623 and sealing; Said mount pad 621 is fixedly mounted in the second auxiliary pipe laying 52; Its position is sawed retainer ring 41 with the rope in the immersed tube 4 and is cooperated, and is provided with through hole between the immersed tube 4 and the second auxiliary pipe laying 52, and the rope saw is installed in rope through this hole and saws on the retainer ring 41; The outside in this hole is provided with four truckles 623, is used for protection rope saw 31.
9. a kind of device that is used to remove foundation pile according to claim 2 is characterized in that: said location assembly pulley 7 is made up of location and installation seat 71 and four truckles 72, and said four truckles 71 are installed in and are installed in abreast on the mount pad 71.
CN201210019296.2A 2012-01-21 2012-01-21 A kind of sawing foundation pile method and device thereof Active CN102561352B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210019296.2A CN102561352B (en) 2012-01-21 2012-01-21 A kind of sawing foundation pile method and device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210019296.2A CN102561352B (en) 2012-01-21 2012-01-21 A kind of sawing foundation pile method and device thereof

Publications (2)

Publication Number Publication Date
CN102561352A true CN102561352A (en) 2012-07-11
CN102561352B CN102561352B (en) 2015-12-16

Family

ID=46407833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210019296.2A Active CN102561352B (en) 2012-01-21 2012-01-21 A kind of sawing foundation pile method and device thereof

Country Status (1)

Country Link
CN (1) CN102561352B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107254876A (en) * 2017-06-27 2017-10-17 广东工业大学 The pile pulling device and method of a kind of armored concrete pile for prestressed pipe

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001262570A (en) * 2000-03-16 2001-09-26 Dymosha Co Ltd Cutting and removing construction method and device for existing foundation pile
JP2006097275A (en) * 2004-09-28 2006-04-13 Yoshio Matsumoto Existing pile cutting/removing device and existing pile cutting/removing method
CN2806566Y (en) * 2005-06-21 2006-08-16 上海建仕建筑工程有限公司 Pile extracting device using steel sleeve water-gas injection method
CN201169773Y (en) * 2008-02-26 2008-12-24 上海古华实业有限公司 Construction apparatus for clearing away underground original stakes
CN101368386A (en) * 2007-08-16 2009-02-18 江苏华东建设基础工程总公司 Pile extractor and construction method for pile extraction
WO2011107818A1 (en) * 2010-03-01 2011-09-09 Bouygues Travaux Publics Method of cutting foundation elements in the ground

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001262570A (en) * 2000-03-16 2001-09-26 Dymosha Co Ltd Cutting and removing construction method and device for existing foundation pile
JP2006097275A (en) * 2004-09-28 2006-04-13 Yoshio Matsumoto Existing pile cutting/removing device and existing pile cutting/removing method
CN2806566Y (en) * 2005-06-21 2006-08-16 上海建仕建筑工程有限公司 Pile extracting device using steel sleeve water-gas injection method
CN101368386A (en) * 2007-08-16 2009-02-18 江苏华东建设基础工程总公司 Pile extractor and construction method for pile extraction
CN201169773Y (en) * 2008-02-26 2008-12-24 上海古华实业有限公司 Construction apparatus for clearing away underground original stakes
WO2011107818A1 (en) * 2010-03-01 2011-09-09 Bouygues Travaux Publics Method of cutting foundation elements in the ground

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107254876A (en) * 2017-06-27 2017-10-17 广东工业大学 The pile pulling device and method of a kind of armored concrete pile for prestressed pipe

Also Published As

Publication number Publication date
CN102561352B (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN100535261C (en) Pile extractor and construction method thereof
CN1077942C (en) Pile head treating tool for cast-in-place pile, pile head treating method, and cast-in-place piling method
CN110158582A (en) A method of trestle steel pipe pile is set on intectate riverbed
CN102587380A (en) Construction method for wholly removing drilling pile head
CN104775433B (en) A kind of method of pile pulling construction
CN101368386A (en) Pile extractor and construction method for pile extraction
CN1963044A (en) Construction method for withdrawal of waste pile
CN108978661B (en) Construction method for removing cast-in-situ bored pile
CN106400804A (en) Obstructing pulling method pile digging construction device and method
CN203270578U (en) Underground pile foundation pulling device with steel wire rope sleeve clamp
CN109594563A (en) A kind of full-sleeve obstacle cleaning machine and its construction method
CN105862862A (en) Salvage method for large-diameter pile buried hammer
CN202492847U (en) High-pressure water jet casing pipe pile pulling tool
KR20110107968A (en) Concrete file drawing public law and the drawing which are laid in
CN102561352A (en) Method and device for sawing foundation pile
CN201087421Y (en) Pile extractor
CN102733391B (en) Construction method of pile body underwater cutting
CN102926654B (en) Pile Hole Ring Cutting System and Pile Hole Ring Cutting Method
CN202090349U (en) Device for removing square pile
CN115075249B (en) Pile foundation cleaning device and pile foundation cleaning process
JP2863487B2 (en) Pile pull-out method and device
CN102747725A (en) Bored pile construction method with tiny disturbance
CN1723335A (en) Method to install underground pipe casing
JP4366597B2 (en) Cutting and removing existing piles
CN200949230Y (en) Sleeve method construction equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant