CN102556849A - Integral hoisting method of distributor of bulb tubular hydraulic generator unit - Google Patents
Integral hoisting method of distributor of bulb tubular hydraulic generator unit Download PDFInfo
- Publication number
- CN102556849A CN102556849A CN2012100105362A CN201210010536A CN102556849A CN 102556849 A CN102556849 A CN 102556849A CN 2012100105362 A CN2012100105362 A CN 2012100105362A CN 201210010536 A CN201210010536 A CN 201210010536A CN 102556849 A CN102556849 A CN 102556849A
- Authority
- CN
- China
- Prior art keywords
- water distributor
- hydraulic generator
- tubular hydraulic
- bulb tubular
- distributor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The invention discloses an integral hoisting method of a distributor of a bulb tubular hydraulic generator unit. Four hoisting points are arranged on the distributor of the bulb tubular hydraulic generator unit. After the upper-end hoisting points and the lower-end hoisting points on the same side are connected in series through steel wire ropes, the steel wire ropes are hung on a hook of a hoisting device, the hoisting device is started, and the distributor is hoisted and installed. By hanging the steel wire ropes at both ends of the hook after the hoisting points on the same side are connected in series respectively through the steel wire ropes, during a hoisting process, along with the changes of the hoisting height of the distributor of the bulb tubular hydraulic generator unit, the steel wire ropes slide on the hook for regulation to enable the distributor of the bulb tubular hydraulic generator unit to be always in a relatively stable state so as to prevent the distributor of the bulb tubular hydraulic generator unit from turning to the side. The integral hoisting method of the distributor of the bulb tubular hydraulic generator unit is suitable for hoisting of the distributor of the bulb tubular hydraulic generator unit.
Description
Technical field
The present invention relates to a kind of scaled bulb tubular hydraulic generator group water distributor integral hoisting method.
Background technology
12 meters of the water distributor diameters of super large type light bulb through-flow type hydro-turbo generator set, high 2.8 meters, 195 tons of hoisting weights, water distributor generally comprise inner pivot ring and outer lead ring.The installation of water distributor need be stood up it, and it is vertically hung in the foundation ditch installs.Water distributor stands up general employing two main suspension centre body turning methods.This two main suspension centre body turning method refers to, and two free bearings is arranged in the attachment face in the outer lead ring of water distributor, and on the sidewall surfaces on a twisted seat opposite, is provided with two suspension centres; Two suspension centres are near the upper surface of water distributor, connect suspension centre with an end of steel rope after, the other end is connected with suspender; With suspender with water distributor sling come after; Because two main suspension centres on the water distributor receive connecting lever stroke limitation and deviation of gravity center bigger, eccentric weight moment will cause water distributor tumble and impulsive force bigger, should not below water distributor, support overcome impulsive force temporarily; And after water distributor stood up, the flange face squareness can not be adjusted.When water distributor stood up, the suffered impulsive force of steel rope was not easy to calculate, and can't guarantee safety.
Summary of the invention
The technical matters that the present invention will solve provides a kind of scaled bulb tubular hydraulic generator group water distributor integral hoisting method.
The technical solution adopted for the present invention to solve the technical problems is: a kind of scaled bulb tubular hydraulic generator group water distributor integral hoisting method comprises the steps:
1) at water distributor one side-lower two twisted seats are set, and water distributor is hinged with a twisted seat;
2) prop up twisted seat the left and right sides of right water distributor sidewall be provided with upper end suspension centre and lower end suspension centre, after with steel rope the upper end suspension centre of homonymy and lower end suspension centre being connected respectively, steel rope hangs over the hook two ends of hanging device;
3) water distributor is sling and overturn 90 ° with hanging device, remove a twisted seat;
4) installation O RunddichtringO on the inner pivot ring of water distributor and outer lead ring;
5) after vertically lifting up into water distributor in the foundation ditch, inner pivot ring is connected with the cast seat;
6) leak tightness and the right alignment between inspection inner pivot ring and cast seat.
Further as the improvement of technical scheme of the present invention, in step 1), said twisted seat is symmetrically distributed in the water distributor below.
Further as the improvement of technical scheme of the present invention, in step 2) in, the upper end suspension centre is symmetrically distributed, and the lower end suspension centre is symmetrically distributed.
Further as the improvement of technical scheme of the present invention, in step 2) or step 3) in, said hanging device is transfer crane or crane in bridge type.
Further, in step 5), hauling rope is set in the water distributor both sides as the improvement of technical scheme of the present invention.
Beneficial effect of the present invention: among the present invention through after respectively the suspension centre of homonymy being together in series with steel rope; Steel rope hangs over the two ends of suspension hook; In the lifting process, along with the variation of scaled bulb tubular hydraulic generator group water distributor height of lift, steel rope is slide control on suspension hook; Make scaled bulb tubular hydraulic generator group water distributor be in relative pulsation-free state always, prevent that the rollover phenomenon from appearring in scaled bulb tubular hydraulic generator group water distributor.
The present invention is applicable in the lifting of scaled bulb tubular hydraulic generator group water distributor.
Description of drawings
Lateral plan when Fig. 1 is a scaled bulb tubular hydraulic generator group water distributor quiescence of the present invention;
Front elevation when Fig. 2 is a scaled bulb tubular hydraulic generator group water distributor quiescence of the present invention;
Fig. 3 is the scheme drawing of scaled bulb tubular hydraulic generator group water distributor of the present invention when slinging state.
The specific embodiment
Referring to figs. 1 through Fig. 3, a kind of scaled bulb tubular hydraulic generator group water distributor integral hoisting method comprises the steps:
1) at water distributor 1 one side-lowers two twisted seats 4 are set, and water distributor 1 is hinged with a twisted seat 4;
2) prop up twisted seat 4 the left and right sides of right water distributor 1 sidewall be provided with upper end suspension centre 5 and lower end suspension centre 7, after with steel rope 8 the upper end suspension centre 5 of homonymy being connected with lower end suspension centre 7 respectively, steel rope 8 hangs over the hook two ends of hanging device 6;
3) with hanging device 6 90 ° are sling and overturn to water distributor 1, remove a twisted seat 4;
4) installation O RunddichtringO on the inner pivot ring of water distributor 3 and outer lead ring 2;
5) after vertically lifting up into water distributor 1 in the foundation ditch, inner pivot ring 3 is connected with the cast seat;
6) leak tightness and the right alignment between inspection inner pivot ring 3 and cast seat.
As the preferred embodiment of the present invention, in step 1), said twisted seat 4 is symmetrically distributed in the water distributor below.
As the preferred embodiment of the present invention, in step 2) in, upper end suspension centre 5 is symmetrically distributed, and lower end suspension centre 7 is symmetrically distributed.
As the preferred embodiment of the present invention, in step 2) or step 3) in, said hanging device is transfer crane or crane in bridge type.
As the preferred embodiment of the present invention, in step 5), hauling rope is set in water distributor 1 both sides.
In conjunction with Fig. 1 to Fig. 3, specify the application of the present invention in the integral hoisting of scaled bulb tubular hydraulic generator group water distributor.
Hinged two twisted seats 4 outside the outer lead ring attachment face of water distributor 1, after will being arranged on homonymy upper end suspension centre 5 and two lower end suspension centres 7 on the water distributor 1 and connecting with steel rope 8 respectively, steel rope hangs on the suspension hook; And with transfer crane hook or crane in bridge type water distributor 1 is sling after 90 °, will prop up twisted seat 4 dismountings, adjust the squareness of water distributors 1 with 30 tons of chain blocks; Installation O RunddichtringO on inner pivot ring 3 and outer lead ring 2 respectively, and respectively worry a solid and reliable hauling rope in water distributor 1 both sides, prevent water distributor 1 is vertically being hung in the foundation ditch process; Water distributor 1 rotates; After hanging in foundation ditch, in the cast seat, hang the squareness between 10 tons of chain block adjustment inner pivot rings 3 and cast seat, adjust suitable back and connect with the cast seat; After the connection, leak tightness and right alignment between inspection inner pivot ring 3 and cast seat.
Certainly; The invention is not limited to above-mentioned embodiment; Those of ordinary skill in the art also can make equivalent variations or replacement under the prerequisite of spirit of the present invention, modification that these are equal to or replacement all are included in the application's claim institute restricted portion.
Claims (5)
1. a scaled bulb tubular hydraulic generator group water distributor integral hoisting method is characterized in that: comprise the steps:
1) at water distributor (1) one side-lower two twisted seats (4) are set, and water distributor (1) is hinged with a twisted seat (4);
2) prop up twisted seat (4) the left and right sides of right water distributor (1) sidewall be provided with upper end suspension centre (5) and lower end suspension centre (7); After using the upper end suspension centre (5) and lower end suspension centre (7) series connection of steel rope (8) with homonymy respectively, steel rope (8) hangs over the hook two ends of hanging device (6);
3) with hanging device (6) 90 ° are sling and overturn to water distributor (1), remove a twisted seat (4);
4) go up installation O RunddichtringO at the inner pivot ring (3) of water distributor and outer lead ring (2);
5) after vertically lifting up into water distributor (1) in the foundation ditch, inner pivot ring (3) is connected with the cast seat;
6) leak tightness and the right alignment between inspection inner pivot ring (3) and cast seat.
2. scaled bulb tubular hydraulic generator group water distributor integral hoisting method according to claim 1 is characterized in that: in step 1), said twisted seat (4) is symmetrically distributed in the water distributor below.
3. scaled bulb tubular hydraulic generator group water distributor integral hoisting method according to claim 1 is characterized in that: in step 2) in, upper end suspension centre (5) is symmetrically distributed, and lower end suspension centre (7) is symmetrically distributed.
4. scaled bulb tubular hydraulic generator group water distributor integral hoisting method according to claim 1 is characterized in that: in step 2) or step 3) in, said hanging device (6) is transfer crane or crane in bridge type.
5. scaled bulb tubular hydraulic generator group water distributor integral hoisting method according to claim 1 is characterized in that: in step 5), in water distributor (1) both sides hauling rope is set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100105362A CN102556849A (en) | 2012-01-14 | 2012-01-14 | Integral hoisting method of distributor of bulb tubular hydraulic generator unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100105362A CN102556849A (en) | 2012-01-14 | 2012-01-14 | Integral hoisting method of distributor of bulb tubular hydraulic generator unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102556849A true CN102556849A (en) | 2012-07-11 |
Family
ID=46403707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100105362A Pending CN102556849A (en) | 2012-01-14 | 2012-01-14 | Integral hoisting method of distributor of bulb tubular hydraulic generator unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102556849A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113757021A (en) * | 2021-09-24 | 2021-12-07 | 广西桂冠电力股份有限公司大化水力发电总厂 | Method for measuring center of large shaft of water turbine |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101357736A (en) * | 2008-09-03 | 2009-02-04 | 沪东中华造船(集团)有限公司 | Method for hoisting and turning over large articles using frame crane |
CN101670979A (en) * | 2009-10-10 | 2010-03-17 | 南通润邦重机有限公司 | Technique for overturning cabinet workpiece |
CN102152840A (en) * | 2011-04-01 | 2011-08-17 | 天津新河船舶重工有限责任公司 | Method for lifting and carrying overweight hull section by utilizing combination tool of hinge and heeling-preventing support |
-
2012
- 2012-01-14 CN CN2012100105362A patent/CN102556849A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101357736A (en) * | 2008-09-03 | 2009-02-04 | 沪东中华造船(集团)有限公司 | Method for hoisting and turning over large articles using frame crane |
CN101670979A (en) * | 2009-10-10 | 2010-03-17 | 南通润邦重机有限公司 | Technique for overturning cabinet workpiece |
CN102152840A (en) * | 2011-04-01 | 2011-08-17 | 天津新河船舶重工有限责任公司 | Method for lifting and carrying overweight hull section by utilizing combination tool of hinge and heeling-preventing support |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113757021A (en) * | 2021-09-24 | 2021-12-07 | 广西桂冠电力股份有限公司大化水力发电总厂 | Method for measuring center of large shaft of water turbine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201217608Y (en) | Integral component suspending beam for hoisting | |
CN102718121B (en) | Construction method of lifting device for large cement pipe | |
CN202967866U (en) | Three-chain adjustable sling | |
CN202296842U (en) | Hanger special for universal shaft of vertical rolling mill | |
CN106758860B (en) | Across the cable walking cord clip handling mounting device of one kind and method | |
CN108313864B (en) | High-rise building shaft pipeline flip-chip lifting device | |
CN202717509U (en) | Hanger for large-sized cement pipe | |
CN201010421Y (en) | Special hanger for altering oil cylinder | |
CN103663101A (en) | Method for lifting voltage stabilizer of nuclear power station | |
CN204456109U (en) | A kind of steel pipe pile lifting piling construction tackling system | |
CN103072899A (en) | Hoisting technology for ultra-large type cylinder block | |
CN208532009U (en) | The hanging apparatus of heavy thin-wall long and thin class equipment | |
CN202214131U (en) | Three-point lifting beam | |
CN206088728U (en) | Novel large -scale gallows of taking a trial run | |
CN102556849A (en) | Integral hoisting method of distributor of bulb tubular hydraulic generator unit | |
CN205275004U (en) | Automatic balanced type hanging beam | |
CN202558444U (en) | Steel penstock hoisting balance beam device | |
CN205442379U (en) | Balanced sling | |
CN201686393U (en) | Derrick mast hoisting tool | |
CN201089694Y (en) | Vehicle wheel sling | |
CN207645607U (en) | A kind of anchor winch experiment loading unit | |
CN202657829U (en) | Hoisting in place device for fixing branch hinge of arc gate | |
CN208054723U (en) | A kind of Pipe installing application c-type suspension hook | |
CN102515017B (en) | Combined neck suspender | |
CN201406267Y (en) | Lever scale type balancing spreader for overhauling metal mixing car |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120711 |