CN202717509U - Hanger for large-sized cement pipe - Google Patents

Hanger for large-sized cement pipe Download PDF

Info

Publication number
CN202717509U
CN202717509U CN 201220306371 CN201220306371U CN202717509U CN 202717509 U CN202717509 U CN 202717509U CN 201220306371 CN201220306371 CN 201220306371 CN 201220306371 U CN201220306371 U CN 201220306371U CN 202717509 U CN202717509 U CN 202717509U
Authority
CN
China
Prior art keywords
round pin
cement pipe
lifting
hanger
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220306371
Other languages
Chinese (zh)
Inventor
孙焕斌
李波
王文顺
张立新
李明华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Municipal Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Municipal Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Municipal Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN 201220306371 priority Critical patent/CN202717509U/en
Application granted granted Critical
Publication of CN202717509U publication Critical patent/CN202717509U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to the technical field of engineering lifting operation, in particular to a hanger for a large-sized cement pipe and a construction method of the hanger. The hanger comprises a transverse lifting beam, vertical arms, a rotating shaft, round pins, round pin bushes, a ball bed, a safety pin and a wing-shaped baffle plate, and is characterized in that the middle part of the transverse lifting beam is provided with a lifting hook hole, wherein the two ends of the transverse lifting beam are provided with hanging ring holes; two vertical arms are suspended on the hanging ring holes through the rotating shaft respectively; the round pin bushes are embedded into the lower parts of the two vertical arms respectively; and a pair of round pins is inserted into hanging holes buried in the outer wall of the cement pipe through inner holes of the round pin bushes. According to the hanger, the problems and hidden trouble of difficulty in lifting and turning of the large-sized cement pipe, low efficiency and high danger existing in the prior art are solved. Stable lifting can be realized in a construction process, the large-sized cement pipe can be turned over, and the hanger has a wide application range, can be used for lifting, loading, unloading and turning the large-sized cement pipe, can simultaneously guarantee safe construction on the basis of guaranteeing the construction efficiency, and can realize stable, free, safe, reliable, convenient and fast operation in lifting, shifting, plugging and pulling processes.

Description

A kind of suspender for the large-scale cement pipe
[technical field]
The utility model relates to engineering lifting operation technical field, specifically a kind of suspender for the large-scale cement pipe.
[background technology]
In the lifting operation of cement pipe, the large-scale cement pipe is used for lifting at pre-buried two circular holes of pipe outer wall usually, insert the cylindrical hanger of a pair of plug-in type during lifting in hole for hoist, the rope sling at steel rope two ends is hung on the hanger, the centre that suspension hook the hangs over steel rope tube coupling of slinging.The structural principle of this suspender is simple in the prior art, but has the risk of hanger slippage in the hole for hoist, and larger potential safety hazard is arranged.Secondly, cement pipe is being produced, is being deposited, needing frequent upset operation in transportation and the installation process, during the tube coupling upset easily and the steel rope generation interfere with each other, bring certain difficulty to operation.In addition, in operation process, when the tube coupling center of gravity changes, tumble very easily suddenly built on the sand because of suspender, cause the accident, therefore this device and technology are prone to accidents in work progress, and be safe and reliable not.
[utility model content]
The purpose of this utility model is exactly in order to solve upset difficulty in the prior art, low, the dangerous large deficiency of efficient, a kind of novel structure, safe and reliable, broad-spectrum suspender and construction method thereof for the large-scale cement pipe to be provided.
For achieving the above object, a kind of suspender for the large-scale cement pipe is provided, comprise horizontal hanging beam (1), plumbing arm (2), rotating shaft (3), round pin (4), round pin cover (5), ball seat (6), safety plug (7) and wing baffle plate (8), it is characterized in that described horizontal hanging beam (1) middle part is provided with hook on hole, the two ends of horizontal hanging beam (1) are provided with the link hole, the link hole is suspended respectively two plumbing arms (2) in midair by rotating shaft (3), two plumbing arms (2) bottom is inlaid with respectively round pin cover (5), and a pair of round pin (4) inserts in the hole for hoist that is embedded on the cement pipe outer wall by round pin cover (5) endoporus.
Described plumbing arm (2) bottom is provided with ball seat (6), and round pin cover (5) outside face is spherical, is embedded in the ball seat (6), and round pin cover (5) is made universal rotational along ball seat (6).
Described horizontal hanging beam (1) middle part vertical direction is provided with two fixing wing baffle plates (8).
Described round pin cover (5) outside is provided with the pin-and-hole of vertical direction, and safety plug (7) passes pin-and-hole and is inserted in round pin cover (5) and round pin (4) outside.
Also inlay above or below the described round pin cover (5) pin hole and ball seat are installed.
Described construction method is as follows: cement pipe keeps flat, horizontal hanging beam (1) winches to the tube coupling top, two plumbing arms (2) naturally droop in the tube coupling both sides, round pin (4) inserts lifting tube coupling in the tube coupling hole for hoist by round pin cover (5), the upset of wing baffle plate (8) restriction tube coupling, keep tube coupling steady, round pin cover (5) is installed in the ball seat, but universal rotational is convenient to the insertion of round pin and is extracted, before the lifting, insert safety plug (7), prevent that round pin is loosening, withdraw from, tube coupling need to become when keeping flat by keeping flat to become to stand up or stand up, and the tube coupling center of gravity is in the bottom, held stationary under Action of Gravity Field, tube coupling keeps flat, when standing up, utilize the round pin cover (5) of differing heights position on the plumbing arm, all can steadily lift by crane tube coupling.All round pins (4) plugs convenient during lifting is utilized round pin cover (5) the lifting tube coupling of below of plumbing arm (2), is convenient to the tube coupling upset.
The utility model has compared with prior art solved the medium-and-large-sized cement pipe lifting of prior art upset difficulty, efficient low, dangerous large problem and hidden danger.The utility model can be accomplished steady lifting in the construction operation process, turning large-scale cement pipe, of many uses, can be used for lifting, loading and unloading and the upset of large-scale cement pipe, can guarantee to guarantee simultaneously construction safety on the basis of operating efficiency, in lifting, displacement, plug process, all can keep operation steadily freely, safe and reliable, convenient and swift.
[description of drawings]
Fig. 1 is main TV structure and the flat view of hanging of tube coupling that the utility model is used for hoisting large-size cement pipe suspender;
Fig. 2 is side-looking structure and the flat view of hanging of tube coupling that the utility model is used for hoisting large-size cement pipe suspender;
Fig. 3 is the tube coupling rollover states schematic diagram of the utility model when being used for the hoisting large-size cement pipe;
Fig. 4 is the vertical view of hanging of the tube coupling of the utility model when being used for the hoisting large-size cement pipe;
Fig. 5 is that the utility model is used for the universal guide of hoisting large-size cement pipe suspender and the detailed structure schematic diagram of ball seat;
Fig. 6 is the safety plug detailed structure lateral plan that the utility model is used for hoisting large-size cement pipe suspender;
Fig. 7 is the safety plug detailed structure front view that the utility model is used for hoisting large-size cement pipe suspender;
As shown in the figure, among the figure: 1. horizontal hanging beam 2. vertical wall 3. rotating shafts 4. round pins 5. round pins overlap 6. ball seats, 7. safety plugs, 8. wing baffle plates;
Specifying Fig. 1 is Figure of abstract of the present utility model.
[specific embodiment]
The utility model is described in further detail below in conjunction with accompanying drawing, and the structure of this device and principle are very clearly concerning this professional people.
As shown in Figure 1, 2, cement pipe keeps flat, and horizontal hanging beam 1 winches to the tube coupling top, and two plumbing arms 2 naturally droop in the tube coupling both sides, and round pin 4 inserts in the tube coupling hole for hoist by round pin cover 5 and lifts by crane tube coupling, and the 8 restriction tube coupling upsets of wing baffle plate keep tube coupling steady.As shown in Figure 5, round pin cover 5 is installed in the ball seat, but universal rotational is convenient to the insertion of round pin and is extracted.Before the lifting, insert safety plug 7, prevent that round pin from becoming flexible, withdrawing from, and guarantees to lift by crane safety.
As shown in Figure 3, tube coupling need to become when keeping flat by keeping flat to become to stand up or stand up, and the tube coupling center of gravity is in the bottom, held stationary under Action of Gravity Field.
According to the technical solution of the utility model, tube coupling keeps flat, when standing up, utilizes the round pin cover 5 of differing heights position on the plumbing arm, all can steadily lift by crane tube coupling.All round pin 4 plug convenients during lifting.
Utilize the round pin cover 5 lifting tube couplings of below of plumbing arm 2, be convenient to the tube coupling upset, whole lifting upset operation steadily freely, safe and reliable, convenient and swift.

Claims (5)

1. suspender that is used for the large-scale cement pipe, comprise horizontal hanging beam (1), plumbing arm (2), rotating shaft (3), round pin (4), round pin cover (5), ball seat (6), safety plug (7) and wing baffle plate (8), it is characterized in that described horizontal hanging beam (1) middle part is provided with hook on hole, the two ends of horizontal hanging beam (1) are provided with the link hole, the link hole is suspended respectively two plumbing arms (2) in midair by rotating shaft (3), two plumbing arms (2) bottom is inlaid with respectively round pin cover (5), and a pair of round pin (4) inserts in the hole for hoist that is embedded on the cement pipe outer wall by round pin cover (5) endoporus.
2. a kind of suspender for the large-scale cement pipe as claimed in claim 1, it is characterized in that described plumbing arm (2) bottom is provided with ball seat (6), round pin cover (5) outside face is spherical, is embedded in the ball seat (6), and round pin cover (5) is made universal rotational along ball seat (6).
3. a kind of suspender for the large-scale cement pipe as claimed in claim 1 or 2 is characterized in that described horizontal hanging beam (1) middle part vertical direction is provided with two fixing wing baffle plates (8).
4. a kind of suspender for the large-scale cement pipe as claimed in claim 1 or 2 is characterized in that described round pin cover (5) outside is provided with the pin-and-hole of vertical direction, and safety plug (7) passes pin-and-hole and is inserted in round pin cover (5) and round pin (4) outside.
5. a kind of suspender for the large-scale cement pipe as claimed in claim 1 or 2 is characterized in that also inlaying above or below the described round pin cover (5) pin hole and ball seat is installed.
CN 201220306371 2012-06-27 2012-06-27 Hanger for large-sized cement pipe Expired - Fee Related CN202717509U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220306371 CN202717509U (en) 2012-06-27 2012-06-27 Hanger for large-sized cement pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220306371 CN202717509U (en) 2012-06-27 2012-06-27 Hanger for large-sized cement pipe

Publications (1)

Publication Number Publication Date
CN202717509U true CN202717509U (en) 2013-02-06

Family

ID=47619339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220306371 Expired - Fee Related CN202717509U (en) 2012-06-27 2012-06-27 Hanger for large-sized cement pipe

Country Status (1)

Country Link
CN (1) CN202717509U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102718121A (en) * 2012-06-27 2012-10-10 中铁上海工程局有限公司 Lifting device for large cement pipe and construction method thereof
CN105384057A (en) * 2015-11-26 2016-03-09 四川华西绿舍建材有限公司 Lifting sling for prefabricated component
CN105540417A (en) * 2016-02-17 2016-05-04 山东钢铁股份有限公司 Sling
CN106586822A (en) * 2015-10-16 2017-04-26 中国国际海运集装箱(集团)股份有限公司 Lifting tool
CN109422191A (en) * 2017-08-21 2019-03-05 中电普瑞电力工程有限公司 A kind of automatic hanging apparatus
CN112340592A (en) * 2020-11-10 2021-02-09 中建三局安装工程有限公司 Pipe jacking pipe joint hoisting device and construction method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102718121A (en) * 2012-06-27 2012-10-10 中铁上海工程局有限公司 Lifting device for large cement pipe and construction method thereof
CN102718121B (en) * 2012-06-27 2014-04-23 中铁上海工程局有限公司 Construction method of lifting device for large cement pipe
CN106586822A (en) * 2015-10-16 2017-04-26 中国国际海运集装箱(集团)股份有限公司 Lifting tool
CN106586822B (en) * 2015-10-16 2018-06-12 中国国际海运集装箱(集团)股份有限公司 Hoisting fixture
CN105384057A (en) * 2015-11-26 2016-03-09 四川华西绿舍建材有限公司 Lifting sling for prefabricated component
CN105540417A (en) * 2016-02-17 2016-05-04 山东钢铁股份有限公司 Sling
CN109422191A (en) * 2017-08-21 2019-03-05 中电普瑞电力工程有限公司 A kind of automatic hanging apparatus
CN112340592A (en) * 2020-11-10 2021-02-09 中建三局安装工程有限公司 Pipe jacking pipe joint hoisting device and construction method thereof

Similar Documents

Publication Publication Date Title
CN102718121B (en) Construction method of lifting device for large cement pipe
CN202717509U (en) Hanger for large-sized cement pipe
CN202967866U (en) Three-chain adjustable sling
CN202296842U (en) Hanger special for universal shaft of vertical rolling mill
CN103241645B (en) Self-locking composite conducting wire hoisting hook
CN203295036U (en) Self-locking compound-wire lifting hook
CN204281061U (en) A kind of can the combined sling of automatic releasing hook
CN205472275U (en) Prevent wheel die overhead hoist that turns on one's side
CN201580891U (en) Lifting appliance for assisting overturn of centrifugal mold
CN105621231A (en) Combined lifting appliance special for large-diameter reinforced concrete drainage pipe
CN205034957U (en) I -steel is hoist for handling
CN204752012U (en) Wall -hanging miniature hoist
CN203976209U (en) A kind of hoisting large-size is without the lid that hangs of hanger equipment
CN204162282U (en) A kind of large-diameter steel reinforced concrete drainage pipe special combination suspender
CN202785255U (en) Turnover hoisting tool for reinforced concrete pipe joint
CN202465029U (en) Cable hoisting tool
CN202944976U (en) Hoisting device of light hollow partition board
CN202156870U (en) Inner expansion type lifting appliance for steel tubes
CN205772790U (en) Circular spherical tank integral hoisting specific purpose tool
CN202116194U (en) Intra-pipe lifting appliance with main hook and auxiliary hooks
CN201089694Y (en) Vehicle wheel sling
CN205170175U (en) Large castings's two point type hoists
CN207645607U (en) A kind of anchor winch experiment loading unit
CN204355947U (en) Large-scale without eye plate lifting beam device
CN204897153U (en) Slings for lifting loads

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130206

Termination date: 20160627

CF01 Termination of patent right due to non-payment of annual fee