CN102539968A - Locking control testing system of intelligent transformer substation - Google Patents

Locking control testing system of intelligent transformer substation Download PDF

Info

Publication number
CN102539968A
CN102539968A CN201110454072XA CN201110454072A CN102539968A CN 102539968 A CN102539968 A CN 102539968A CN 201110454072X A CN201110454072X A CN 201110454072XA CN 201110454072 A CN201110454072 A CN 201110454072A CN 102539968 A CN102539968 A CN 102539968A
Authority
CN
China
Prior art keywords
measure
control device
module
test
measured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110454072XA
Other languages
Chinese (zh)
Other versions
CN102539968B (en
Inventor
侯林
胡志峰
陈健安
孙一民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CYG Sunri Co Ltd
Original Assignee
CYG Sunri Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CYG Sunri Co Ltd filed Critical CYG Sunri Co Ltd
Priority to CN201110454072.XA priority Critical patent/CN102539968B/en
Publication of CN102539968A publication Critical patent/CN102539968A/en
Application granted granted Critical
Publication of CN102539968B publication Critical patent/CN102539968B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a locking control testing system of an intelligent transformer substation; and the technical problem to be solved is to realize the complete and automatic testing of a five-prevention rule for a spacing layer of the intelligent transformer substation. The locking control testing system of the intelligent transformer substation is provided with a rule analyzing module, a routine test generating, configuring and managing module, a testing process control module, a 61850 client side, a Goose interlocking virtual device module, an internal communication module and a signal generating module. Compared with the prior art, the adopted system is composed of the rule analyzing module, the routine test generating, configuring and managing module, the testing process control module, a test report module, a human-computer interface module, the 61850 client side, the internal communication module, the Goose interlocking virtual device module and the signal generating module so that the serial number of primary equipment with the five-prevention rule and the division and combination logic condition of the five-prevention rule are configured in a corresponding manner, and the testing is more convenient and reliable.

Description

Intelligent substation control locking test macro
Technical field
The present invention relates to a kind of test macro of transformer station, particularly a kind of Auto-Test System of intelligent substation control locking.
Background technology
1. five of electric system anti-prevents to be with ground wire to close disconnecting link, prevents that 2. mistake from dividing, mistake is closed disconnecting link, 3. prevents mistakenly entering charged chamber, prevents that 4. on-load from drawing, closing disconnecting link, 5. prevents charged hanging earthing conductor, one of important measures of producing for electric power safety.In five anti-application of present transformer station, five anti-integrated, online five preventing engineerings all adopt the station level five anti-and wall five anti-locking strategies that combine.
Wall five preventing engineerings of prior art; In equipment manufacturing or transformer station field adjustable when checking and accepting; Exist following not enough: 1, need open into amount, of ac, inefficiency for by hand to be measured five anti-devices (contain and treat examining system) and the input of relative interlocking device by the tester.2, because many and complicated by the equipment and the system quantity of the substation equipment of observing and controlling and system and observing and controlling five anti-rules; The tester wants each to be carried out all standing test by every rule of observing and controlling device and system under the situation of various input quantity combinations comprehensively; Need wasteful energy and long time; Cause when debugging or examination substation equipment and system, test is not exclusively abundant, and some five anti-regular leakages are joined, the mispairing situation; Often putting into operation in substation equipment and system just comes to light after going wrong, and power system safety and stability operation and personal security are threatened.
Summary of the invention
The purpose of this invention is to provide a kind of intelligent substation control locking test macro, the technical matters that solve realizes complete, the automatic test of intelligent substation wall five anti-rules.
The present invention adopts following technical scheme: a kind of intelligent substation control locking test macro, be provided with the rule analysis module, and survey routine generation, configuration and administration module; The testing process control module; 61850 clients, the Goose empty apparatus module of interlocking, interior communication module and signal generating module; Said rule analysis module is used for the intelligent substation operating personnel import five anti-rules after; Deciliter logical condition according to primary equipment; After the corresponding configurations of deciliter logical condition of the numbering of primary equipment and five anti-rules; Form the numbering of primary equipment and the corresponding configuration result of deciliter logical condition of five anti-rules, offer and survey routine generation, configuration and administration module; The routine generation of said survey, configuration and administration module with the configuration of intelligent substation measure and control device information configured, form test case with the numbering of primary equipment and the corresponding configuration result of deciliter logical condition of five anti-rules, offer the testing process control module; Said testing process control module is accomplished the test to each test case; The guidance command of said 61850 client acceptance test process control modules is transmitted to measure and control device to be measured, control operation measure and control device to be measured; Said Goose interlock empty apparatus module acceptance test process control module measure and control device to be measured stride the input signal of interlocking at interval, test measure and control device to be measured is set is striden the remote signalling at interval or the signal value of remote measurement, send lock file for measure and control device to be measured; This blank signal of the measure and control device to be measured that communication module acceptance test process control module sends in said; This blank signal of control signal generating module simulation source; Send to measure and control device to be measured; Be used for test and close, divide, the feedback signal that signal generating module is gathered measure and control device to be measured sends to the testing process control module through interior communication module.
The guidance command of testing process control module of the present invention is by the information of observing and controlling device, controls the measure and control device branch, closes information through remote-control channel.
Intelligent substation control locking test macro of the present invention is provided with test report module, is used for the acceptance test process control module with the test result of sending.
Intelligent substation control locking test macro of the present invention is provided with human-computer interface module; Be used to receive the test case that the routine generation of survey, configuration and administration module send; The guidance command to the measure and control device test to be measured of this interval that the testing process control module is sent sends information; After the test report that test report module is sent, with test case, guidance command send information, test report is presented on the display interface.
Human-computer interface module of the present invention also is used to receive the intelligent substation measure and control device information configured of operating personnel's input, and intelligent substation measure and control device information configured is sent to the testing process control module.
Intelligent substation measure and control device information configured of the present invention is the pairing of intelligent substation primary equipment and intelligent substation measure and control device signal.
Remote control, remote signalling, remote measurement related information that intelligent substation measure and control device signal of the present invention is primary equipment and measure and control device, measure and control device parameter information, test run parameter information.
Testing process control module of the present invention is according to test case; Send guidance command to 61850 client modules to the measure and control device test to be measured of this interval; Guidance command is that 61850 clients are sent the network message of test case to the measure and control device to be measured that this test case relates to; After measure and control device was received the message of guidance command, response command was made the action of command specifies; After the measure and control device action; Its outlet terminal is transferred to signal generation apparatus through electric signal or message mode; After signal generation apparatus obtains the outlet result of measure and control device; Send to the testing process control module to test result through interior communication module, the test result content is the corresponding outlet terminal sequence number of measure and control device and close or divide action information.
Testing process control module of the present invention is according to test case; Inwardly communication module is sent the remote signalling of this interval measure and control device to be measured or the configuration information of remote measurement, and configuration information is according to communication protocol message information in measure and control device remote signalling to be measured or telesignalisation and the test case generation, and signal generation apparatus is according to configuration information; The signal value of measure and control device to be measured is set; Simulate this blank signal source, send to measure and control device to be measured, be used for test and close, divide; After the measure and control device action; Its outlet terminal is transferred to signal generation apparatus through electric signal or message mode; After signal generation apparatus obtains the outlet result of measure and control device; Send to the testing process control module to test result through interior communication module, the test result content is the corresponding outlet terminal sequence number of measure and control device and close or divide action information.
Testing process control module of the present invention is according to test case; Send and stride the remote signalling or the remote measurement configuration information of measure and control device to be measured at interval to interlock empty apparatus module of Goose; Configuration information generates according to test case; Configuration information is interlocked through Goose and is sent to measure and control device to be measured after empty device generates message, is used to be provided with test measure and control device to be measured and is striden the remote signalling at interval or the signal value of remote measurement, and the blank signal source is striden in simulation; After the measure and control device action; Its outlet terminal is transferred to signal generation apparatus through electric signal or message mode; After signal generation apparatus obtains the outlet result of measure and control device; Send to the testing process control module to test result through interior communication module, the test result content is the corresponding outlet terminal sequence number of measure and control device and close or divide action information.
The present invention compared with prior art adopts the rule analysis module, surveys routine generation, configuration and administration module; The testing process control module, test report module, human-computer interface module; 61850 clients, interior communication module, the Goose system that empty apparatus module and signal generating module constitute that interlocks; Make the corresponding configurations of deciliter logical condition of numbering and five anti-rules of primary equipment of five anti-rules, feasible test more convenient, more reliable.
Description of drawings
Fig. 1 is the structural drawing of intelligent substation control locking test macro of the present invention.
Fig. 2 is a use process flow diagram of the present invention.
Fig. 3 is a main surface chart of the present invention.
Fig. 4 is configuration interface figure of the present invention.
Fig. 5 is test interface figure of the present invention.
Fig. 6 is test report figure.
Specific embodiments
Below in conjunction with accompanying drawing and embodiment the present invention is done further explain.
As shown in Figure 1, intelligent substation control locking test macro of the present invention is by the rule analysis module; Survey routine generation, configuration and administration module, testing process control module, test report module; Human-computer interface module; The IEC61850 standard client module (61850 client) of substation communication network and system, interior communication module, interlock empty apparatus module and signal generating module of the general purpose event Goose of object-oriented transformer station constitutes.
The rule analysis module is used for the intelligent substation operating personnel import five anti-rules after; Deciliter logical condition according to primary equipment; After the numbering of the primary equipment that relates to the anti-rule of Quan Zhanwu and the five anti-regular corresponding configurations of deciliter logical condition; Form the numbering of primary equipment and the corresponding configuration result of deciliter logical condition of five anti-rules, offer and survey routine generation, configuration and administration module.Configuration is by manual work input configuration, and a master control primary equipment disposes a remote signal, remote signals of non-master control primary equipment configuration.Its form is: " master control primary equipment and logical condition: the combination of primary equipment logical condition ". " in; the master control primary equipment be numbered 1101; H is numbered 1101 the logical condition of master control primary equipment, and L is numbered 1101 master control primary equipment to divide logical condition, and the primary equipment numbering of participating in logical condition control is respectively 11011,11012; it is 0 that primary equipment divides the position, and it is 1 that primary equipment closes the position; The logical condition that is numbered 1101 master control primary equipment is: when 11011 primary equipments simultaneously in a minute position, when 11012 primary equipments are closing, 1101 primary equipments allow to close; Be numbered the branch logical condition of 1101 master control primary equipment: when 11011 primary equipments simultaneously when closing position, 11012 primary equipments in minute position, 1101 master control primary equipments allow to divide.
Operating personnel are input to intelligent substation measure and control device information configured and survey routine generation, configuration and administration module.Intelligent substation measure and control device information configured is the pairing of intelligent substation primary equipment and intelligent substation measure and control device signal; Intelligent substation measure and control device signal is remote control, remote signalling, the remote measurement related information of primary equipment and measure and control device; The measure and control device parameter information, the test run parameter information.The pairing of this primary equipment and measure and control device signal forms the full station arrangement configuration file SCD of transformer station by operating personnel's human configuration.Employing inputs to the mode of surveying routine generation, configuration and administration module with the full station arrangement configuration file SCD of transformer station and realizes.
Survey routine generation, configuration and administration module according to the numbering of primary equipment and the corresponding configuration result of deciliter logical condition, the intelligent substation measure and control device information configured of five anti-rules; The signal of the measure and control device of primary equipment and intelligent substation is configured; Be about to intelligent substation the stand full numbering and the five anti-regular corresponding configuration result of deciliter logical condition of primary equipment; With the measure and control device signal configures, form test case once more, offer the testing process control module.The form of test case is: " the primary equipment logical condition closes effective or invalid ", content is expressed as deciliter status information of primary equipment, and deciliter state of master control primary equipment is effective. ", device numbering is that 1101 master control primary equipment test case is: (1) 11011=0 11012=1 closes effectively; (2) 11011=111012=1 close invalid; (3) 11011=0 11012=0 close invalid.
The testing process control module is used for accomplishing the test to each test case one by one by the order of operating personnel's acquiescence or setting, and every test case is carried out from following three parts simultaneously:
1, the testing process control module is according to test case; Send guidance command to 61850 client modules to the measure and control device test to be measured of this interval; Guidance command is that 61850 clients are sent the network message of test case to the measure and control device to be measured that this test case relates to; After measure and control device to be measured was received the message of guidance command, response command was made the action of command specifies.Test result is judged according to the outlet (output) of measure and control device; After the measure and control device action, its outlet terminal is transferred to signal generation apparatus through electric signal or message mode, after signal generation apparatus obtains the outlet result of measure and control device; Send to the testing process control module to test result through interior communication module; The test result content is the corresponding outlet terminal sequence number of measure and control device and close or divide action information, is combined into 1, is divided into 0.
2, the testing process control module is according to test case; Inwardly communication module is sent the remote signalling of this interval measure and control device to be measured or the configuration information of remote measurement, and configuration information is according to communication protocol message information in measure and control device remote signalling to be measured or telesignalisation and the test case generation, and signal generating module (device) is according to configuration information; The signal value of measure and control device to be measured is set; Simulate this blank signal source, send to measure and control device to be measured, be used for test and close, divide.Test result is judged according to the outlet (output) of measure and control device; After the measure and control device action, its outlet terminal is transferred to signal generation apparatus through electric signal or message mode, after signal generation apparatus obtains the outlet result of measure and control device; Send to the testing process control module to test result through interior communication module; The test result content is the corresponding outlet terminal sequence number of measure and control device and close or divide action information, is combined into 1, is divided into 0.
3, the testing process control module is according to test case; Send and stride the remote signalling or the remote measurement configuration information of measure and control device to be measured at interval to interlock empty apparatus module of Goose; Configuration information generates according to test case; Configuration information is interlocked through Goose and is sent to measure and control device to be measured after empty device generates the Goose message, is used to be provided with test measure and control device to be measured and is striden the remote signalling at interval or the signal value of remote measurement, and the blank signal source is striden in simulation.Test result is judged according to the outlet (output) of measure and control device; After the measure and control device action, its outlet terminal is transferred to signal generation apparatus through electric signal or message mode, after signal generation apparatus obtains the outlet result of measure and control device; Send to the testing process control module to test result through interior communication module; The test result content is the corresponding outlet terminal sequence number of measure and control device and close or divide action information, is combined into 1, is divided into 0.
", above three parts are explained.Numbering 1101 is the master control primary equipment, and numbering 11011,11012 is a primary equipment.If (remote control 1 is certain remote signal of measure and control device 1 the remote control 1 of measure and control device 1; Can from the SCD configuration file, take out) make associated configuration with 1101 primary equipments; (remote signalling 1 is certain remote signals of measure and control device 1 in the remote signalling 1 of measure and control device 1; Can from the SCD configuration file, take out) related with 11011 primary equipments work, the remote signalling 1 and 11012 primary equipments of measure and control device 2 are made associated configuration.When measure and control device 1 was measure and control device to be measured, the remote signalling 1 of measure and control device 1 was this blank signal of measure and control device to be measured, and the remote signalling 1 of measure and control device 2 is the blank signal of striding of measure and control device to be measured.Testing process begins, earlier to test case 1 (11011=0 11012=1) tests, at this moment, 11011=0,11012=1 is expressed as: the remote signalling 1 of measure and control device 1 is 0 (0 expression control signal is not sent), and the remote signalling 1 of measure and control device 2 is 1.Interior communication module sends to signal generation apparatus to the information of " remote signalling 1 of measure and control device 1 is 0 " through message, and it is 0 that signal generation apparatus is provided with device remote signalling 1 value to be measured; Interlock empty apparatus module of Goose sends to measure and control device 1 to the information of " remote signalling 1 of measure and control device 2 is 1 " through organizing the Goose message.Close order through 61850 clients to the remote control that measure and control device 1 sends remote control 1 then.After measure and control device 1 received that order is closed in remote control, the action of making command specifies was closed or is divided, and sends to signal generation apparatus to action message, and action message is: 61850 clients are sent guidance command, and measure and control device 1 is made and closed action.Signal generation apparatus compiles test result, sends to the testing process control module to test result.Test case 2 (11011=1 11012=1), flow process in like manner for test case 3 (11011=0 11012=0).
The testing process control module sends to test report module with test result.
After test report module is received test result; With test case, master control primary equipment, primary equipment information, measure and control device to be measured and related measure and control device signal thereof, corresponding expected results and actual test result; Press the text document form and form test report, export to human-computer interface module.
Human-computer interface module receives surveys the test case that routine generation, configuration and administration module send; The guidance command to the measure and control device test to be measured of this interval that the testing process control module is sent sends information; After the test report that test report module is sent, with test case, guidance command send information, test report is presented on the display interface.Human-computer interface module also is used to receive the intelligent substation measure and control device information configured of operating personnel's input, and intelligent substation measure and control device information configured is sent to the testing process control module.
61850 client modules are used for test process, receive the guidance command that issues from the testing process control module, and this guidance command is by the information of observing and controlling device, controls measure and control device branch to be measured, closes information through remote-control channel.After 61850 clients are accepted guidance command, be transmitted to measure and control device to be measured after being converted into the guidance command mms message that measure and control device can discern, realize through remote-control channel control operation measure and control device to be measured.
The Goose empty apparatus module of interlocking is used for testing process; The measure and control device to be measured that the acceptance test process control module is sent stride the input signal of interlocking at interval; Test measure and control device to be measured is set is striden the signal value of remote signalling at interval or remote measurement; Send Goose lock file message for measure and control device to be measured, these messages be Goose interlock that empty apparatus module simulates that device to be measured needs striding at interval interlocking signal and forming the Goose message.
Interior communication module is used for testing process; The remote signalling of this interval or the telesignalisation of the measure and control device to be measured that the acceptance test process control module sends; Transmit alternately with message; Message format is divided into downlink message and uplink message, and downlink message sends to the control message of signal generation apparatus for the internal communication processing module, and message content is that the notification signal generating means need be simulated what signal of output; Offer measure and control device to be measured be used for the test close, divide; Uplink message refers to remote control outlet information that signal generation apparatus feeds back measure and control device to be measured, and to give internal communication processing module, message content be the corresponding outlet remote-control channel of notice internal communication processing module device to be measured, thereby realize the signal output control (being downlink message information) and signal feedback collection (being uplink message information) to signal generation apparatus.
As shown in Figure 2, intelligent substation control locking test macro of the present invention, testing process may further comprise the steps: create-rule, test configurations and execution test.Rule generates by the full station of the full station wiring diagram generation of the transformer station of operating personnel's input five anti-rules, imports in the intelligent substation control locking test macro as the standard rule of testing.Intelligent substation control locking test macro generates the test case of all standing through the standard rule is analyzed.After intelligent substation control locking test macro imports the full station SCD file of transformer station, can equipment and device signal be configured based on the actual conditions of transformer station.After the configuration successful, insert signal generation apparatus and device to be measured, carry out five anti-regular testings and form test result.
In the test process, intelligent substation control locking test macro is according to configuration information and current test case, with message mode notification signal generating means output signal value.After signal generation apparatus was received message, according to message content, simulating signal was exported to measure and control device to be measured.Measure and control device to be measured is in test process; As receive behind the guidance command that the outlet action is arranged; Outlet information can through with being connected of the Input terminal of signal generation apparatus; Send to signal generation apparatus, after signal generation apparatus is received the outlet action message of device to be measured, report the outlet running-active status of measure and control device to be measured with the mode of SOE message.
Embodiment 1: intelligent substation control locking test macro of the present invention, and adopt the programming of C++ program language to realize, form the Goose of CYG Sunrui Co., Ltd. five anti-intelligence test instrument V2.0.Intelligent substation control locking test macro is installed in the computing machine that operating system is WinXP/Win2003/WinVista; Wall five anti-rules to electric pressure 10KV, 110KV, 220KV digital transformer substation are tested automatically, contain agreement station and totally digitilized transformer station.Start intelligent substation control locking test macro, get into main interface as shown in Figure 3.
The numbering of this intelligent substation wall primary equipment is as shown in Figure 4 with the corresponding configuration interface of deciliter logical condition of five anti-rules.
Testing process begins, and test interface is as shown in Figure 5, starts empty apparatus module of Goose and interior communication module, controls this blank signal and the interlocking signal of device to be measured, and sends guidance command and test:
Figure BDA0000127066160000101
Start the test thread, begin device to be measured is carried out five anti-regular testings:
The test of beginning five anti-rules is as shown in Figure 5, and the remote signal circulation of all configurations of measure and control device to be measured is tested:
Figure BDA0000127066160000132
Figure BDA0000127066160000141
Figure BDA0000127066160000151
Figure BDA0000127066160000161
Figure BDA0000127066160000171
Figure BDA0000127066160000181
Single test case is tested.To test case, the empty device of Goose sends corresponding Goose message and gives device to be measured, and interior communication module is then communicated by letter with signal generation apparatus, controls this blank signal of measure and control device value to be measured, and issues guidance command to device to be measured through 61850 clients.EOT draws test result, and is as shown in Figure 5, and test report has been put down in writing proving installation title, tester, primary equipment, statistical information, and test result is come into plain view.
Figure BDA0000127066160000182
Figure BDA0000127066160000191
Figure BDA0000127066160000201
Figure BDA0000127066160000211
Embodiment 2: intelligent substation control locking test macro of the present invention; Signal generation apparatus adopts the embedded PM02000 of CYG Sunrui Co., Ltd. five anti-integrated test systems; Master control system adopts VxWorks; The employing c programming language is realized, forms the Goose of CYG Sunrui Co., Ltd. five anti-intelligence test instrument V2.0.Intelligent substation control locking test macro is installed in the computing machine that operating system is WinXP/Win2003/WinVista; Wall five anti-rules to electric pressure 10KV, 110KV, 220KV digital transformer substation are tested automatically, contain agreement station and totally digitilized transformer station.
Wall five anti-intelligence tests are carried out the message interaction communication through interior communication module and signal generation apparatus, and signal generation apparatus part analytic message code is following:
Figure BDA0000127066160000212
Figure BDA0000127066160000221
Figure BDA0000127066160000231
Figure BDA0000127066160000251

Claims (10)

1. an intelligent substation is controlled the locking test macro; It is characterized in that: said intelligent substation control locking test macro is provided with the rule analysis module; Survey routine generation, configuration and administration module, testing process control module, 61850 clients; The Goose empty apparatus module of interlocking, interior communication module and signal generating module; Said rule analysis module is used for the intelligent substation operating personnel import five anti-rules after; Deciliter logical condition according to primary equipment; After the corresponding configurations of deciliter logical condition of the numbering of primary equipment and five anti-rules; Form the numbering of primary equipment and the corresponding configuration result of deciliter logical condition of five anti-rules, offer and survey routine generation, configuration and administration module; The routine generation of said survey, configuration and administration module with the configuration of intelligent substation measure and control device information configured, form test case with the numbering of primary equipment and the corresponding configuration result of deciliter logical condition of five anti-rules, offer the testing process control module; Said testing process control module is accomplished the test to each test case; The guidance command of said 61850 client acceptance test process control modules is transmitted to measure and control device to be measured, control operation measure and control device to be measured; Said Goose interlock empty apparatus module acceptance test process control module measure and control device to be measured stride the input signal of interlocking at interval, test measure and control device to be measured is set is striden the remote signalling at interval or the signal value of remote measurement, send lock file for measure and control device to be measured; This blank signal of the measure and control device to be measured that communication module acceptance test process control module sends in said; This blank signal of control signal generating module simulation source; Send to measure and control device to be measured; Be used for test and close, divide, the feedback signal that signal generating module is gathered measure and control device to be measured sends to the testing process control module through interior communication module.
2. intelligent substation control locking test macro according to claim 1, it is characterized in that: the guidance command of said testing process control module is controlled the measure and control device branch, is closed information through remote-control channel for by the information of observing and controlling device.
3. intelligent substation control locking test macro according to claim 1 is characterized in that: said intelligent substation control locking test macro is provided with test report module, is used for the acceptance test process control module with the test result of sending.
4. intelligent substation control locking test macro according to claim 1; It is characterized in that: said intelligent substation control locking test macro is provided with human-computer interface module; Be used to receive the test case that the routine generation of survey, configuration and administration module send; The guidance command to the measure and control device test to be measured of this interval that the testing process control module is sent sends information; After the test report that test report module is sent, with test case, guidance command send information, test report is presented on the display interface.
5. intelligent substation control locking test macro according to claim 1; It is characterized in that: said human-computer interface module also is used to receive the intelligent substation measure and control device information configured of operating personnel's input, and intelligent substation measure and control device information configured is sent to the testing process control module.
6. intelligent substation control locking test macro according to claim 1, it is characterized in that: said intelligent substation measure and control device information configured is the pairing of intelligent substation primary equipment and intelligent substation measure and control device signal.
7. intelligent substation control locking test macro according to claim 6; It is characterized in that: remote control, remote signalling, remote measurement related information that said intelligent substation measure and control device signal is primary equipment and measure and control device; The measure and control device parameter information, the test run parameter information.
8. intelligent substation control locking test macro according to claim 1; It is characterized in that: said testing process control module is according to test case; Send guidance command to 61850 client modules to the measure and control device test to be measured of this interval; Guidance command is that 61850 clients are sent the network message of test case to the measure and control device to be measured that this test case relates to, and after measure and control device was received the message of guidance command, response command was made the action of command specifies; After the measure and control device action; Its outlet terminal is transferred to signal generation apparatus through electric signal or message mode; After signal generation apparatus obtains the outlet result of measure and control device; Send to the testing process control module to test result through interior communication module, the test result content is the corresponding outlet terminal sequence number of measure and control device and close or divide action information.
9. intelligent substation control locking test macro according to claim 1; It is characterized in that: said testing process control module is according to test case; Inwardly communication module is sent the remote signalling of this interval measure and control device to be measured or the configuration information of remote measurement, and configuration information is according to communication protocol message information in measure and control device remote signalling to be measured or telesignalisation and the test case generation, and signal generation apparatus is according to configuration information; The signal value of measure and control device to be measured is set; Simulate this blank signal source, send to measure and control device to be measured, be used for test and close, divide; After the measure and control device action; Its outlet terminal is transferred to signal generation apparatus through electric signal or message mode; After signal generation apparatus obtains the outlet result of measure and control device; Send to the testing process control module to test result through interior communication module, the test result content is the corresponding outlet terminal sequence number of measure and control device and close or divide action information.
10. intelligent substation control locking test macro according to claim 1; It is characterized in that: said testing process control module is according to test case; Send and stride the remote signalling or the remote measurement configuration information of measure and control device to be measured at interval to interlock empty apparatus module of Goose; Configuration information generates according to test case; Configuration information is interlocked through Goose and is sent to measure and control device to be measured after empty device generates message, is used to be provided with test measure and control device to be measured and is striden the remote signalling at interval or the signal value of remote measurement, and the blank signal source is striden in simulation; After the measure and control device action; Its outlet terminal is transferred to signal generation apparatus through electric signal or message mode; After signal generation apparatus obtains the outlet result of measure and control device; Send to the testing process control module to test result through interior communication module, the test result content is the corresponding outlet terminal sequence number of measure and control device and close or divide action information.
CN201110454072.XA 2011-12-30 2011-12-30 Locking control testing system of intelligent transformer substation Active CN102539968B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110454072.XA CN102539968B (en) 2011-12-30 2011-12-30 Locking control testing system of intelligent transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110454072.XA CN102539968B (en) 2011-12-30 2011-12-30 Locking control testing system of intelligent transformer substation

Publications (2)

Publication Number Publication Date
CN102539968A true CN102539968A (en) 2012-07-04
CN102539968B CN102539968B (en) 2014-06-04

Family

ID=46347337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110454072.XA Active CN102539968B (en) 2011-12-30 2011-12-30 Locking control testing system of intelligent transformer substation

Country Status (1)

Country Link
CN (1) CN102539968B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103838675A (en) * 2014-03-21 2014-06-04 上海富欣智能交通控制有限公司 Method for generating test cases for computer interlocking system automatically
CN104142472A (en) * 2013-09-29 2014-11-12 国家电网公司 Intelligent high-voltage switch interlocking logic testing method supporting IEC61850 stipulations
CN105242663A (en) * 2015-10-23 2016-01-13 许继电气股份有限公司 Converter valve return-pulse dynamic performance simulation system
CN105869072A (en) * 2016-04-07 2016-08-17 南京国电南自电网自动化有限公司 Method for automatically creating transformer station five-prevention database
CN106199249A (en) * 2016-06-28 2016-12-07 积成电子股份有限公司 A kind of automatic closed loop test system towards intelligent substation and method of testing
CN109613906A (en) * 2018-11-08 2019-04-12 国网湖南省电力有限公司 Third generation intelligent substation observing and controlling handset test macro and its application method
CN110968071A (en) * 2018-09-30 2020-04-07 株洲中车时代电气股份有限公司 Method and system for generating functional test case of electric screen cabinet of railway vehicle
CN111880029A (en) * 2020-07-09 2020-11-03 广东电网有限责任公司 Five-prevention testing device for spacer layer
CN112556749A (en) * 2020-11-30 2021-03-26 薛峰 Detection method for redundant measurement and control device
CN113552857A (en) * 2021-07-20 2021-10-26 中国电力科学研究院有限公司 Automatic excitation detection method and system in autonomous controllable intelligent substation
CN113641122A (en) * 2021-08-06 2021-11-12 广西电网有限责任公司电力科学研究院 Interlocking logic visualization method and device for intelligent high-voltage switch

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1850142A1 (en) * 2006-04-24 2007-10-31 Abb Research Ltd. System level testing for substation automation systems
EP2088444A1 (en) * 2008-02-11 2009-08-12 ABB Research Ltd. System level testing for substation automation systems
CN101776913A (en) * 2009-12-25 2010-07-14 广东电网公司电力科学研究院 Five-prevention logic testing method and system of transformer substation
CN101887269A (en) * 2010-05-26 2010-11-17 广东电网公司电力科学研究院 Five-prevention logic test method of 61850 transformer substation and system thereof
CN102141950A (en) * 2011-04-18 2011-08-03 国电南瑞科技股份有限公司 Method for checking interlock logics of intelligent substation measuring and controlling device
CN102291277A (en) * 2011-08-09 2011-12-21 上海思源弘瑞自动化有限公司 Automatic test system and method for intelligent substation spacing apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1850142A1 (en) * 2006-04-24 2007-10-31 Abb Research Ltd. System level testing for substation automation systems
EP2088444A1 (en) * 2008-02-11 2009-08-12 ABB Research Ltd. System level testing for substation automation systems
CN101776913A (en) * 2009-12-25 2010-07-14 广东电网公司电力科学研究院 Five-prevention logic testing method and system of transformer substation
CN101887269A (en) * 2010-05-26 2010-11-17 广东电网公司电力科学研究院 Five-prevention logic test method of 61850 transformer substation and system thereof
CN102141950A (en) * 2011-04-18 2011-08-03 国电南瑞科技股份有限公司 Method for checking interlock logics of intelligent substation measuring and controlling device
CN102291277A (en) * 2011-08-09 2011-12-21 上海思源弘瑞自动化有限公司 Automatic test system and method for intelligent substation spacing apparatus

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104142472A (en) * 2013-09-29 2014-11-12 国家电网公司 Intelligent high-voltage switch interlocking logic testing method supporting IEC61850 stipulations
CN103838675A (en) * 2014-03-21 2014-06-04 上海富欣智能交通控制有限公司 Method for generating test cases for computer interlocking system automatically
CN103838675B (en) * 2014-03-21 2016-03-23 上海富欣智能交通控制有限公司 The method of the automatic generating test use case of computer interlock system
CN105242663A (en) * 2015-10-23 2016-01-13 许继电气股份有限公司 Converter valve return-pulse dynamic performance simulation system
CN105869072A (en) * 2016-04-07 2016-08-17 南京国电南自电网自动化有限公司 Method for automatically creating transformer station five-prevention database
CN106199249A (en) * 2016-06-28 2016-12-07 积成电子股份有限公司 A kind of automatic closed loop test system towards intelligent substation and method of testing
CN110968071A (en) * 2018-09-30 2020-04-07 株洲中车时代电气股份有限公司 Method and system for generating functional test case of electric screen cabinet of railway vehicle
CN109613906A (en) * 2018-11-08 2019-04-12 国网湖南省电力有限公司 Third generation intelligent substation observing and controlling handset test macro and its application method
CN111880029A (en) * 2020-07-09 2020-11-03 广东电网有限责任公司 Five-prevention testing device for spacer layer
CN112556749A (en) * 2020-11-30 2021-03-26 薛峰 Detection method for redundant measurement and control device
CN113552857A (en) * 2021-07-20 2021-10-26 中国电力科学研究院有限公司 Automatic excitation detection method and system in autonomous controllable intelligent substation
CN113641122A (en) * 2021-08-06 2021-11-12 广西电网有限责任公司电力科学研究院 Interlocking logic visualization method and device for intelligent high-voltage switch

Also Published As

Publication number Publication date
CN102539968B (en) 2014-06-04

Similar Documents

Publication Publication Date Title
CN102539968A (en) Locking control testing system of intelligent transformer substation
CN104360298B (en) Performance test system and method for merging unit tester
CN103051065B (en) The distributed FA interlock method of testing of a kind of power distribution automation and system
CN107786000B (en) Intelligent generation method for configuration file of digital relay protection tester
CN104090194B (en) Intelligent substation relay protection non-intrusion type test system and method
CN107515344A (en) Test system and method for a kind of whole station information intelligent of digital transformer substation to point
CN101887269B (en) Five-prevention logic test method of 61850 transformer substation and system thereof
CN109873497A (en) A kind of distribution main website and the automatic joint debugging acceptance method of terminal checking and accepting device based on intelligence
CN106444709A (en) Automatic testing method and device of distribution intelligent function of power distribution terminal
CN202159106U (en) Intelligent tester with intelligent power grid self-healing control technology
CN204291050U (en) A kind of dispatching and monitoring information check system
CN102184749A (en) Method for automatically testing DCS (Digital Control System) control cabinet
CN105093017B (en) Intelligent substation GOOSE integrated testabilities device and its method of testing
CN108923953A (en) A kind of virtual main station system of power remote machine debugging
CN106990384A (en) A kind of three-phase electric energy meter false wiring detection means and detection method
CN110989547A (en) Detection method and system for intelligent substation one-key sequence control system
CN106383330B (en) Digitalized electric energy measures test of heuristics platform
CN109697912A (en) A kind of power distribution network O&M experience system
CN107203648A (en) One kind visualization maintenance peace arranges system and method
CN106681313A (en) Function testing method of dynamic stability control system and dynamic stability control system
CN105988100A (en) Method and system for remotely calibrating intelligent substation digital electric energy metering device
CN105242134A (en) Distributed test method suitable for system-grade test of intelligent high-voltage equipment
CN206194227U (en) Low meter analogue means of high confession
CN105680441A (en) Simulated replacement technique-based simulated point-alignment device
CN203606437U (en) Intelligent transformer transformation-ratio simulation test device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant